This is an NEC220.87 electrical load analysis report generated by Fluke for Building 562 (Serial Number 70503603) covering an evaluation period from April 1, 2026 to April 8, 2026. The report assesses the electrical capacity and load requirements for a panel with a 600-ampere (A) circuit breaker rating, using the 80% continuous load capacity calculation method standard in the National Electrical Code (NEC).

The connected load study identifies a maximum average demand of 73A and maximum 3-hour continuous load of 71A, with a total connected load of 91A using the NEC 220.87 Exception method. The panel currently has an available continuous load capacity of 409A and combined continuous and non-continuous capacity of 509A, with a base load of 46A. The plan/projected load analysis incorporates a planned additional load of 300A, resulting in a projected total load of 391A and projected continuous load of 305A, which represents 78.0% of the planned additional continuous load. This leaves a projected remaining continuous load capacity of 175A and total remaining capacity of 209A, indicating sufficient capacity for the planned electrical additions to Building 562.

View the file

Other files

File Type Posted
Amendment 05.pdf PDF
BLD 562 200A (SN 70503603)_260401_0925.pdf PDF
562 Metering Graph.jpg JPG image
BLD 562 100A (SN 70503603)_260401_0925.pdf PDF
562 Metering Max Avg.jpg JPG image
Amendment 04.pdf PDF
C_IMG_20260310_111023551_HDR.jpg JPG image
A_IMG_20260310_110709257_HDR.jpg JPG image
D_IMG_20260310_111225555.jpg JPG image
B_IMG_20260310_110835951_HDR.jpg JPG image
D_IMG_20260310_111211863_HDR.jpg JPG image
A_IMG_20260310_110720143_HDR.jpg JPG image
MDP_IMG_20260310_110451510_HDR.jpg JPG image
MDP_IMG_20260310_110517249_HDR.jpg JPG image
B_IMG_20260310_110847216_HDR.jpg JPG image
MDP_IMG_20260310_110533776.jpg JPG image
C_IMG_20260310_111032976.jpg JPG image
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amendment 01.pdf PDF
MACC RFP.pdf PDF
(A) 1874684 B562 Replace MAU1Final DB RFPsigned.pdf PDF
(F) Map to B135.pdf PDF
(J) General Requirements.pdf PDF
(B) NEPA.pdf PDF
(D) 2016-R-0149.pdf PDF
(H) RFI Form.pdf PDF
(I) Bid Form.docx DOCX document
(G) Base Map.pdf PDF
(E) CERT-141.pdf PDF
(C) WD CT20260024 01232026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/10/2026 8:49:13 AM

From:

To:

Period:

Evaluation Period

4/1/2026 9:30:00 AM

4/8/2026 9:15:00 AM

6d 23h 45m 0s

NEC220.87 Report

BLD 562 (SN 70503603)_260401_0925.fca2 page 1 of 2

4/10/2026 8:49:13 AM

Settings

Panel Circuit Breaker Rating 600A

80% of Panel Circuit Breaker Rating 480A

Seasonal Adjustments 0A

Known Non Operating Load 0A

Planned Additional Load 300A

Maximum values detected on Phase C

Continuous Load Capacity calculations based on: 80% CBR

Connected Load Study

Maximum Average Demand (MAD) 73A

Maximum 3-hour Continuous Load (MCL) 71A

Total Connected Load (NEC 220.87 Exception method) 91A

Base Load (Minimum Average Demand) 46A

Available Capacity Continuous Load 409A

Available Capacity Cont. & Non-Cont. 509A

Plan/Projected Load Analysis

Projected Load 391A

Projected Remaining Load Capacity 209A

Planned Additional Continuous Load % 78.0%

Projected Continuous Load 305A

Projected Remaining Continuous Load Capacity 175A