This is a Request for Information (RFI) form template used for the DLA Site Development contract (RFP 5997283). The form serves as a standardized mechanism for contractors to request clarification or additional information regarding contract requirements, specifications, drawings, and technical details without authorizing work to proceed.

The RFI form captures essential contract and project identification information including contract number, title, prime contractor, and subcontractor/supplier details. It requires specification of the information being requested, identification of relevant drawings, details, specifications, and CPM activity numbers, and indicates whether the request has cost effects (increase, decrease, or none). The form includes three distinct signature sections: from the contractor requesting information with a required response date, a recommendation section from the field office, and a reply section from the field office to the prime contractor. Critically, the form explicitly states that RFI responses do not constitute authorization to proceed with work, do not form a basis for contract changes in amount or time, and that contractors proceeding based on an RFI response do so at their own risk. If contractors view an RFI response as a changed condition, they must notify the Contracting Officer in writing within 20 calendar days. Distribution requirements include sending the original to file via REICC along with copies to the Supervising Civil Engineer, Construction Representative, and DLA Site Development.

View the file

Other files

File Type Posted
562 Metering Graph.jpg JPG image
562 Metering Max Avg.jpg JPG image
BLD 562 100A (SN 70503603)_260401_0925.pdf PDF
Amendment 05.pdf PDF
BLD 562 200A (SN 70503603)_260401_0925.pdf PDF
BLD 562 300A (SN 70503603)_260401_0925.pdf PDF
Amendment 04.pdf PDF
B_IMG_20260310_110847216_HDR.jpg JPG image
MDP_IMG_20260310_110451510_HDR.jpg JPG image
A_IMG_20260310_110720143_HDR.jpg JPG image
C_IMG_20260310_111023551_HDR.jpg JPG image
D_IMG_20260310_111211863_HDR.jpg JPG image
MDP_IMG_20260310_110517249_HDR.jpg JPG image
MDP_IMG_20260310_110533776.jpg JPG image
Amendment 03.pdf PDF
C_IMG_20260310_111032976.jpg JPG image
A_IMG_20260310_110709257_HDR.jpg JPG image
B_IMG_20260310_110835951_HDR.jpg JPG image
D_IMG_20260310_111225555.jpg JPG image
Amendment 02.pdf PDF
Amendment 01.pdf PDF
(A) 1874684 B562 Replace MAU1Final DB RFPsigned.pdf PDF
(E) CERT-141.pdf PDF
(I) Bid Form.docx DOCX document
(D) 2016-R-0149.pdf PDF
(F) Map to B135.pdf PDF
MACC RFP.pdf PDF
(B) NEPA.pdf PDF
(C) WD CT20260024 01232026.pdf PDF
(J) General Requirements.pdf PDF
(G) Base Map.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

RFP 5997283

REQUEST FOR INFORMATION RFI NUMBER:

CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:

COST EFFECT: INCREASE: DECREASE: NONE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By: Date: Signature:

From:

To: Field Office Code

RECOMMENDATION:

Date: Signature:

From: Field Office To: Prime Contractor

REPLY:

Date: Signature:

This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.

Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT

CONSTITUTE AUTHORIZATION TO PROCEED.

copy to: File 2L

Supv Civil Engineer Construction Representative

DLA Site Development

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.

DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER

File details come from the government source that posted it. Updated .