This is a technical electrical load analysis report generated by Fluke for Building 562 (Serial Number 70503603) covering the evaluation period from April 1, 2026 to April 8, 2026. The report analyzes electrical capacity and demand using NEC 220.87 standards and provides critical data on the facility's power distribution system.

The building's electrical panel has a 600-ampere circuit breaker rating with an 80% continuous load capacity threshold of 480 amperes. Current connected load analysis shows a maximum average demand of 73 amperes, a maximum 3-hour continuous load of 71 amperes, and a base load of 46 amperes, resulting in 409 amperes of available continuous load capacity. The facility currently has 509 amperes of combined continuous and non-continuous load capacity available. Projected load analysis indicates a planned additional load of 100 amperes, bringing the projected total load to 191 amperes with a projected continuous load of 149 amperes. This leaves 331 amperes of projected remaining continuous load capacity, meaning the planned additional load represents 78.0% of the available continuous load. The graph depicts current and maximum continuous load measurements across three phases (A, B, and C) over the evaluation period, with Phase C showing the maximum values.

View the file

Other files

File Type Posted
BLD 562 300A (SN 70503603)_260401_0925.pdf PDF
Amendment 05.pdf PDF
BLD 562 200A (SN 70503603)_260401_0925.pdf PDF
562 Metering Graph.jpg JPG image
562 Metering Max Avg.jpg JPG image
Amendment 04.pdf PDF
C_IMG_20260310_111023551_HDR.jpg JPG image
A_IMG_20260310_110709257_HDR.jpg JPG image
D_IMG_20260310_111225555.jpg JPG image
B_IMG_20260310_110835951_HDR.jpg JPG image
D_IMG_20260310_111211863_HDR.jpg JPG image
A_IMG_20260310_110720143_HDR.jpg JPG image
MDP_IMG_20260310_110451510_HDR.jpg JPG image
MDP_IMG_20260310_110517249_HDR.jpg JPG image
B_IMG_20260310_110847216_HDR.jpg JPG image
MDP_IMG_20260310_110533776.jpg JPG image
C_IMG_20260310_111032976.jpg JPG image
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amendment 01.pdf PDF
MACC RFP.pdf PDF
(A) 1874684 B562 Replace MAU1Final DB RFPsigned.pdf PDF
(F) Map to B135.pdf PDF
(J) General Requirements.pdf PDF
(B) NEPA.pdf PDF
(D) 2016-R-0149.pdf PDF
(H) RFI Form.pdf PDF
(I) Bid Form.docx DOCX document
(G) Base Map.pdf PDF
(E) CERT-141.pdf PDF
(C) WD CT20260024 01232026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/10/2026 8:48:07 AM

From:

To:

Period:

Evaluation Period

4/1/2026 9:30:00 AM

4/8/2026 9:15:00 AM

6d 23h 45m 0s

NEC220.87 Report

BLD 562 (SN 70503603)_260401_0925.fca2 page 1 of 2

4/10/2026 8:48:07 AM

Settings

Panel Circuit Breaker Rating 600A

80% of Panel Circuit Breaker Rating 480A

Seasonal Adjustments 0A

Known Non Operating Load 0A

Planned Additional Load 100A

Maximum values detected on Phase C

Continuous Load Capacity calculations based on: 80% CBR

Connected Load Study

Maximum Average Demand (MAD) 73A

Maximum 3-hour Continuous Load (MCL) 71A

Total Connected Load (NEC 220.87 Exception method) 91A

Base Load (Minimum Average Demand) 46A

Available Capacity Continuous Load 409A

Available Capacity Cont. & Non-Cont. 509A

Plan/Projected Load Analysis

Projected Load 191A

Projected Remaining Load Capacity 409A

Planned Additional Continuous Load % 78.0%

Projected Continuous Load 149A

Projected Remaining Continuous Load Capacity 331A

BLD 562 (SN 70503603)_260401_0925.fca2 page 2 of 2