HS0016943v2 HSP Training.pdf

PDF 1 MB Posted

Attached to
Water Improvements at El Paso Psychiatric Center
Solicitation number
HHS0016943v2
Issued by
El Paso County, Texas

About this file

This is a training document related to a Request for Competitive Sealed Proposals issued by the Texas Health and Human Services Commission (HHSC) for Water Improvements at El Paso Psychiatric Center (Project No. 24-001-EPC). The project seeks a general contractor to design and construct an additional domestic water service line to bring the facility into compliance with International Plumbing Code standards. The scope includes installation of new domestic water service from an existing 8-inch water main along Boll Place through a new meter vault and pressure reducing valve to final connections inside the building at 4615 Alameda Avenue in El Paso, Texas. Key dates include a pre-proposal webinar on May 12, 2026, at 10:00 a.m. Central Time, a mandatory facility site visit on May 19, 2026, at 10:00 a.m. Central Time, a question deadline of May 26, 2026, by 5:00 p.m. Central Time, and proposals due by June 16, 2026, at 10:30 a.m. Central Time with public opening on June 17, 2026, at 2:00 p.m. Central Time. The anticipated Notice of Award is September 16, 2026, with a contract start date of October 16, 2026, and project completion no later than August 31 of the following year, with HHSC retaining the discretionary right to extend the contract for up to six additional months beyond final substantial completion.

The project is valued at approximately $300,000 with evaluation criteria weighted as follows: Relevant Construction Services Ability and Experience (30%), Quality and Safety Programs (5%), Proposed Methodology (25%), and Pricing (40%), with award on a best-value basis to the lowest-priced qualified respondent. Respondents must demonstrate a minimum of five years of business experience in similar construction projects and submit three references from comparable projects. A Historically Underutilized Business (HUB) Subcontracting Plan is mandatory with a utilization goal of 32.9%, applicable to all respondents regardless of HUB certification status. Bid security equal to at least 5% of the Total Base Proposal Cost is required, with performance and payment bonds required in the amount of 100% of the contract price within ten calendar days of contract award. The contractor must budget a $45,000 contingency fund for external utility coordination with El Paso Water and must achieve Substantial Completion within 120 calendar days of Notice to Proceed, with liquidated damages assessed at $150.00 per calendar day for delays. The contractor must maintain Pollution Liability Insurance with minimum coverage of $1,000,000 per claim and $1,000,000 aggregate for a ten-year period following project completion.

View the file

Other files

File Type Posted
HHS0016943v2 Attach H-3_Addendum 1 to Project Drawings and Project Specifications.pdf PDF
HHS0016943v2 Addendum 2 PCS 121.pdf PDF
HHS0016943v2 Responses to Questions.pdf PDF
HHS0016943v2 Addendum 1 PCS 121.pdf PDF
HHS0016943v2 PPW Attendance Roster.pdf PDF
ESBD_510337_1780518856960_RFP HHS0016943v2_Addendum 2.pdf PDF
HHS0016943v2 Site Visit Sign in Sheet.pdf PDF
HHS0016943v2_Attach H-1_Project Drawings.pdf PDF
HHS0016943v2_Exhibit B_HUB Requirements.pdf PDF
HHS0016943v2_Attach H-2_Project Specifications.pdf PDF
HHS0016943v2_Attach G_HSP.pdf PDF
HHS0016943v2_Exhibit F_Respondent's Pricing Proposal Form.pdf PDF
HHS0016943v2_Exhibit G_Evaluation Tool.pdf PDF
HHS0016943v2_Exhibit A_Affs_and_Solicitation_Acceptance.pdf PDF
HHS0016943v2_Attach C_Project Special Conditions.pdf PDF
HHS0016943v2_Exhibit E_Respondent's Information, Disclosures, and Financial Form.pdf PDF
HHS0016943v2_Attach A_Contract_Affs.pdf PDF
HHS0016943v2_Exhibit C_Draft General Construction Services Contract.pdf PDF
HHS0016943v2_Attach E_Prevailing Wage Rates.pdf PDF
HHS0016943v2_Attach I_Negotiated Modifications to the Proposal.pdf PDF
HHS0016943v2_Attach F_Signed Pricing Proposal.pdf PDF
HHS0016943v2_Attach D_Facility Specific Policies and Procedures.pdf PDF
HHS0016943v2_Attach B_Texas UGCs (Version 2.2).pdf PDF
ESBD_510337_1777054076977_RFP HHS0016943v2.pdf PDF
HHS0016943v2_Exhibit D_Exceptions Form.pdf PDF
HHS0016943v2_Attach J_HHS UTCs - Vendor v 3.4 Nov 2023.pdf PDF
HHS0016943v2_Exhibit H_Site Visit Location.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historically Underutilized Business (HUB)

HUB Subcontracting Plan (HSP)

Training

Agenda

1. HSP Method Options

2. Required HSP Pages

3. Method V: Section 3

4. GFE Attachment A

5. GFE Attachment B

6. Additional Information

7. Special Reminders

8. HUB Contact Information

01/2026 HUB HSP Training 2

Texas Government Code and Texas

Administrative Code

Responses that do not include a completed HSP shall be

Rejected pursuant to:

TGC §2161.252(b) and

34 TAC 20.285

01/2026 HUB HSP Training 3 https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://texas-sos.appianportalsgov.com/rules-and-meetings?$locale=en_US&interface=VIEW_TAC_SUMMARY&queryAsDate=04%2F09%2F2025&recordId=214411 https://texas-sos.appianportalsgov.com/rules-and-meetings?$locale=en_US&interface=VIEW_TAC_SUMMARY&queryAsDate=04%2F09%2F2025&recordId=214411

HSP Method Options Subcontracting Method

Options Subcontracting Method Definition

I: All HUB(s) Utilizing only Texas certified HUB(s).

See GFE Attachment A.

II: Mentor-Protégé Relationship Utilizing an approved M/P agreement.

See GFE Attachment B.

III: Meeting/Exceeding HUB Goal Subcontracting goal met by HUB(s).

See GFE Attachment A.

IV: Solicitation Method Subcontracting utilization goal not met.

See GFE Attachment B:

Contact 3+ HUBs & 2 minority/trade organizations in writing.

V: Self Performing Contractor performs all work with own resources. No GFE Attachment.

01/2026 HUB HSP Training 4

HSP Required Pages Continued

All subcontracting method options require:

✓Page 1, Section 1: Respondent & Bid Information

✓Page 2, Section 2: Respondent's Subcontracting

Intentions oYes – fill out part b., c., & d (if applicable) oNo – see next slide/Section 3

✓Page 3, Section 4: Affirmation signature

01/2026 HUB HSP Training 6

Method V: Section 3

01/2026 HUB HSP Training 7

The Prime contractor performs ALL work-related activities

Agency may request additional information.

➢ Equipment ➢Materials

➢ Supplies

➢ Transportation

➢ Delivery ➢W-2 Employees

GFE Attachment A

Method I or III:

1. Contractor Name / Solicitation

2. Subcontracting Opportunity

3. Subcontractor Selection

a. Company Name

b. TX HUB: Y/N

c. TX VID or Federal EIN #

d. % & $:

*“TBD” is NOT acceptable

01/2026 HUB HSP Training 8

GFE Attachment B

Method II or IV:

01/2026 HUB HSP Training 9

Written Notices:

• Minimum 7 working days

• Supporting documents

(email, fax, etc.)

• 3+ “Active” HUBs

• 2 Trade Org./Business

Development Centers

GFE Attachments B

Method II or IV:

01/2026 HUB HSP Training 10

1. Contractor name/ Solicitation #

2. Subcontracting Opportunity

3. Subcontractor Selection

*Please provide justification for all Non- HUB subcontractors

Additional Information

01/2026 HUB HSP Training 11

Subcontracting method options I-IV require:

• HUB Vendor Profiles on CMBL/HUB Directory

i. HUB’s VID#

ii. Contact information

iii. “A” = Active status

iv. Expiration date

• Written GFE notification (Method IV Only) Sent emails

2. Certified Letters

3. Fax logs *7 business days to respond

Special Reminders

01/2026 HUB HSP Training 12

❑ Review HSP Checklist for guidance.

❑ Check the Solicitation HUB Subcontracting Goal %.

❑ Choose an HSP method & provide documentation.

❑ The Commodity Book is the only resource for NIGP or class/item codes.

❑ The CMBL/HUB Directory is a resource to seek out certified active Texas

HUBs.

❑ HSP Courtesy Reviews are available upon written request.

❑ No HSP changes are allowed until after contract award.

https://commbook.app.cpa.state.tx.us/ https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do

HUB Office Contact Information

Bob.McCurdy@hhs.texas.gov

(512) 406-2534

HHSCHUB@hhs.texas.gov

*Active solicitation HSP questions contact designated HUB Coordinator.

01/2026 HUB HSP Training 13 mailto:bob.mccurdy@hhs.texas.gov mailto:HHSCHUB@hhs.texas.gov

Thank You

01/2026 HUB HSP Training 14

Introduction
Slide 1: Historically Underutilized Business (HUB)
Agenda
Slide 2: Agenda
Slide 3: Texas Government Code and Texas Administrative Code
HSP Participation Methods
Slide 4: HSP Method Options
HSP Requirements
Slide 5
Slide 6: HSP Required Pages Continued
Method 5: Justification Section
Slide 7: Method V: Section 3
GFE Attachment A
Slide 8: GFE Attachment A
GFE Attachment B
Slide 9: GFE Attachment B 1 of 2
Slide 10: GFE Attachments B 2 of 2
Additional Information
Slide 11: Additional Information
Special Reminders
Slide 12: Special Reminders
HUB Office Contact Information
Slide 13: HUB Office Contact Information
Conclusion
Slide 14: Thank You

File details come from the government source that posted it. Updated .