HHS0016943v2_Attach I_Negotiated Modifications to the Proposal.pdf

PDF 146 KB Posted

Attached to
Water Improvements at El Paso Psychiatric Center
Solicitation number
HHS0016943v2
Issued by
El Paso County, Texas

About this file

This document is Attachment I to a Texas state or local contract, specifically a template for negotiated modifications to a proposal following contract negotiations among the involved parties. The attachment outlines the process for revising and modifying key contract documents, including the Respondent's/Contractor's Signed Pricing and Delivery Proposal (Attachment F), Project Drawings (Attachment H-1), and Project Specifications (Attachment H-2). The template was updated in September 2025 and provides a standardized format for documenting changes agreed upon during the negotiation phase of the contracting process.

The document includes three illustrative examples demonstrating typical modifications that may result from negotiations: scope reductions (such as limiting work from multiple buildings to a single building), contract sum adjustments (such as reducing the total contract value by specified amounts), and delivery schedule modifications (such as accelerating timelines based on facility availability or project conditions). This template serves as the official record of negotiated changes and allows both the government entity and contractor to document any alterations to the original proposal terms, pricing, drawings, or specifications that were agreed upon before final contract execution.

View the file

Other files

File Type Posted
HHS0016943v2 PPW Attendance Roster.pdf PDF
HHS0016943v2 Addendum 2 PCS 121.pdf PDF
HHS0016943v2 Responses to Questions.pdf PDF
HHS0016943v2 Addendum 1 PCS 121.pdf PDF
HS0016943v2 HSP Training.pdf PDF
ESBD_510337_1780518856960_RFP HHS0016943v2_Addendum 2.pdf PDF
HHS0016943v2 Site Visit Sign in Sheet.pdf PDF
HHS0016943v2 Attach H-3_Addendum 1 to Project Drawings and Project Specifications.pdf PDF
HHS0016943v2_Attach F_Signed Pricing Proposal.pdf PDF
HHS0016943v2_Attach D_Facility Specific Policies and Procedures.pdf PDF
HHS0016943v2_Attach B_Texas UGCs (Version 2.2).pdf PDF
HHS0016943v2_Exhibit E_Respondent's Information, Disclosures, and Financial Form.pdf PDF
HHS0016943v2_Attach A_Contract_Affs.pdf PDF
HHS0016943v2_Exhibit C_Draft General Construction Services Contract.pdf PDF
HHS0016943v2_Attach E_Prevailing Wage Rates.pdf PDF
ESBD_510337_1777054076977_RFP HHS0016943v2.pdf PDF
HHS0016943v2_Exhibit D_Exceptions Form.pdf PDF
HHS0016943v2_Attach J_HHS UTCs - Vendor v 3.4 Nov 2023.pdf PDF
HHS0016943v2_Exhibit H_Site Visit Location.pdf PDF
HHS0016943v2_Attach H-1_Project Drawings.pdf PDF
HHS0016943v2_Exhibit B_HUB Requirements.pdf PDF
HHS0016943v2_Attach H-2_Project Specifications.pdf PDF
HHS0016943v2_Attach G_HSP.pdf PDF
HHS0016943v2_Exhibit F_Respondent's Pricing Proposal Form.pdf PDF
HHS0016943v2_Exhibit G_Evaluation Tool.pdf PDF
HHS0016943v2_Exhibit A_Affs_and_Solicitation_Acceptance.pdf PDF
HHS0016943v2_Attach C_Project Special Conditions.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template Updated: September 2025

Attachment I

Negotiated Modifications to the Proposal

Attachment I

After negotiations among the Parties to the Contract, the following attachments (and any addenda thereto) to the Contract are revised and modified as set forth below: The Respondent’s/Contractor’s Signed Pricing and Delivery Proposal (Attachment F), and to the extent applicable, the Project Drawings(Attachment H-1), and the Project Specifications (Attachment H-2).

<Insert specific details of negotiated items here in list or paragraph form (or both)>

Example:

<Section 2, Pricing, of the Contract is amended to delete and replace the base proposal amount from $1 to $100.>

Example:

Scope to be reduced from Building 510 & 550 to include only Building 510

Example:

Reduced Contract Sum by $50,000.00

Example:

Delivery time schedule to change from 250 days to 150 days due to Bldg 310 being available to start earlier

(Remainder of Page Intentionally Left Blank)

File details come from the government source that posted it. Updated .