HHS0016943v2 PPW Attendance Roster.pdf

PDF 74 KB Posted

Attached to
Water Improvements at El Paso Psychiatric Center
Solicitation number
HHS0016943v2
Issued by
El Paso County, Texas

About this file

This is a Pre-Proposal Webinar Attendance Roster for Request for Competitive Sealed Proposals HHS0016943v2 issued by the Texas Health and Human Services Commission (HHSC) for Water Improvements at El Paso Psychiatric Center. The project involves design and construction of an additional domestic water service line to bring the facility into compliance with International Plumbing Code standards, including installation of a new service from an existing 8-inch water main through a new meter vault and pressure reducing valve with final building connections. The webinar was held on May 12, 2026, at 10:00 a.m. Central Time. A mandatory facility site visit is scheduled for May 19, 2026, at 10:00 a.m. Central Time at 4615 Alameda Avenue in El Paso, Texas. The deadline for submitting questions is May 26, 2026, by 5:00 p.m. Central Time, with proposals due by June 16, 2026, at 10:30 a.m. Central Time and public opening on June 17, 2026, at 2:00 p.m. Central Time. The anticipated Notice of Award is September 16, 2026, with a contract start date of October 16, 2026, and project completion no later than August 31 of the following year, with HHSC retaining the discretionary right to extend the contract for up to six additional months.

The pre-proposal webinar was attended by eight individuals representing HHSC staff, one consultant firm (Walter P Moore), and two prime contractors (AAA General Contractors and El Paso Jag INC). Respondents must meet a minimum of five years of business experience in similar construction projects and provide three references from comparable projects. The project is valued at approximately $300,000 with evaluation criteria weighted as follows: Relevant Construction Services Ability and Experience (30%), Quality and Safety Programs (5%), Proposed Methodology (25%), and Pricing (40%), with award on a best-value basis to the lowest-priced qualified respondent. A mandatory Historically Underutilized Business (HUB) Subcontracting Plan is required with a 32.9% utilization goal, with failure to submit a compliant plan resulting in automatic disqualification. Bid security of at least 5% of the Total Base Proposal Cost is required, along with performance and payment bonds in the amount of 100% of the contract price within ten calendar days of award. Liquidated damages are assessed at $150.00 per calendar day for failure to meet the Substantial Completion deadline, and the contractor must maintain Pollution Liability Insurance with minimum coverage of $1,000,000 per claim and $1,000,000 aggregate for a ten-year period following project completion.

View the file

Other files

File Type Posted
HHS0016943v2 Addendum 2 PCS 121.pdf PDF
HHS0016943v2 Responses to Questions.pdf PDF
HHS0016943v2 Addendum 1 PCS 121.pdf PDF
HHS0016943v2 Attach H-3_Addendum 1 to Project Drawings and Project Specifications.pdf PDF
HS0016943v2 HSP Training.pdf PDF
ESBD_510337_1780518856960_RFP HHS0016943v2_Addendum 2.pdf PDF
HHS0016943v2 Site Visit Sign in Sheet.pdf PDF
HHS0016943v2_Attach F_Signed Pricing Proposal.pdf PDF
HHS0016943v2_Attach D_Facility Specific Policies and Procedures.pdf PDF
HHS0016943v2_Attach B_Texas UGCs (Version 2.2).pdf PDF
HHS0016943v2_Exhibit E_Respondent's Information, Disclosures, and Financial Form.pdf PDF
HHS0016943v2_Attach A_Contract_Affs.pdf PDF
HHS0016943v2_Exhibit C_Draft General Construction Services Contract.pdf PDF
HHS0016943v2_Attach E_Prevailing Wage Rates.pdf PDF
HHS0016943v2_Attach I_Negotiated Modifications to the Proposal.pdf PDF
HHS0016943v2_Attach H-1_Project Drawings.pdf PDF
HHS0016943v2_Exhibit B_HUB Requirements.pdf PDF
HHS0016943v2_Attach H-2_Project Specifications.pdf PDF
HHS0016943v2_Attach G_HSP.pdf PDF
HHS0016943v2_Exhibit F_Respondent's Pricing Proposal Form.pdf PDF
HHS0016943v2_Exhibit G_Evaluation Tool.pdf PDF
HHS0016943v2_Exhibit A_Affs_and_Solicitation_Acceptance.pdf PDF
HHS0016943v2_Attach C_Project Special Conditions.pdf PDF
ESBD_510337_1777054076977_RFP HHS0016943v2.pdf PDF
HHS0016943v2_Exhibit D_Exceptions Form.pdf PDF
HHS0016943v2_Attach J_HHS UTCs - Vendor v 3.4 Nov 2023.pdf PDF
HHS0016943v2_Exhibit H_Site Visit Location.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name Firm City State E-Mail Prime/Sub/Other

David Moran HHSC Austin TX david.moran@hhs.texas.gov Other Bob McCurdy HHSC Austin TX bob.mccurdy@hhs.texas.gov Other Gabriela Ramos Walter P Moore El Paso TX GRamos@walterpmoore.com Other Sonny Adhikari HHSC Austin TX Sonny.Adhikari@hhs.texas.gov Other Astrid Santos HHSC Austin TX astrid.santos@hhs.texas.gov Other Andres Rayas AAA General Contractors El Paso TX arayas@799contractors.com Prime Israel Vaquera El Paso Jag INC El Paso TX construction@elpasojag.com Prime

Pre-Proposal Webinar Attendance Roster, RFP HHS0016943v2 Water Improvements at El Paso Psychiatric Center

May 12, 2026, at 10:00 am Central Time

File details come from the government source that posted it. Updated .