HDEC03-11-R-0001 SCIPIII Amend 6.pdf

PDF 22 KB Posted

Attached to
SCIP III Federal contract opportunity
Solicitation number
HDEC03-11-R-0001
Issued by
Defense Commissary Agency

About this file

HDEC03-11-R-0001 SCIPIII Amend 6

View the file

Other files for this federal contract opportunity

Other files attached to SCIP III, newest first.
File Type Posted
HDEC03-11-R-0001 SCIP III Amend 9.pdf PDF
HDEC03-11-R-0001 SCIP Amend8.pdf PDF
HDEC03-11-R-0001 SCIPIII Amend 7.pdf PDF
SCIPIII ATCH 30 DRW A21-A23.pdf PDF
SCIPIIIATCH26Questions 6.pdf PDF
SCIPIII ATCH29 DRAW A18-A20.pdf PDF
SCIPIII ATCH 31 DRW A25-A29.pdf PDF
SCIPIII ATCH28 DRAW A16-A17.pdf PDF
SCIPIII ATCH27 DRW A1-A15.pdf PDF
SCIPIII ATCH 32 DRW A30-A32.pdf PDF
SCIPIIIATCH24Sketch 1.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 5.pdf PDF
SCIPIIIATCH25Sketch 2.pdf PDF
SCIPIIIATCH23PASSREQ.pdf PDF
SCIPIIIATCH22Questions 5.pdf PDF
SCIPIIIATCH19INFRARPT.pdf PDF
SCIPIIIATCH21WDREV2.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 4.pdf PDF
SCIPIIIATCH3SCHBRev1.pdf PDF
SCIPIIIATCH18ROOFRFP.pdf PDF
SCIPIIIATCH20Questions4.pdf PDF
SCIPIIIATCH1SOW Rev 1.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 3.pdf PDF
SCIPIIIATCH14ENVSRV.pdf PDF
SCIPIIATCH17Sketch 1 new AHU-1 location.pdf PDF
SCIPIIIATCH9ScheduleRev1.pdf PDF
SCIPIIIATCH16Sketch 2 —
SCIPIIIATCH15QUESTIONS3.pdf PDF
SCIPIIIATCH13WDREV.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 2.pdf PDF
SCIPIIIATCH12QUESTIONS.pdf PDF
SCIPIIIATNDATCH11.pdf PDF
SCIPIIICONFSLDSATCH10.pdf PDF
SCIPIIIATCH7Map.pdf PDF
SCIPIIIATCH8Questions.pdf PDF
SCIPIIIATCH9Schedule.xls XLS spreadsheet
SCIPIIIATCH6EAL.pdf PDF
HDEC03-11-R-0001-0001 SCIPIII AMEND 1.doc DOC document
SCIPIIIATCH5WD.pdf PDF
SCIPIIIATCH3SCHB.pdf PDF
SCIPIIIATCH4MCGUIREDOCS.pdf PDF
HDEC03-11-R-0001 SCIPIII SOLICITATION.doc DOC document
SCIPIIIATCH2PastPerformance.pdf PDF
SCIPIIIATCH1SOW.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

A. Incorporate Questions and Answ ers (Attachment 26). The Question and Answ er period for this solictation ended on 8 Aug 2011.

B. Draw ings A-1 thru A-3 and A-10 thru A-32 that w ere incorporated in Amendment 5 are being added to this Amendment as Attachments 26, 28, and 29.

C. All offerors are reminded that your proposal shall include acknow ledgement of all amendments.

D. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HDEC03-11-R-0001

X 9B. DATED (SEE ITEM 11)

30-Jun-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt ofOffer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning 1 copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy of the offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2011

CODE

DEFENSE COMMISSARY AGENCY

CONSTRUCTION - DESIGN BRANCH

2250 FOULOIS STREET, SUITE 3

LACKLAND AFB TX 78236

HDEC03 7. ADMINISTERED BY (Ifother than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HDEC03-11-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

ATTACHMENTS

# of

ATCH DOCUMENT PAGE(S) DATE

1 SCIP III Statement of Work (Rev 1) 16 28 Jul 2011

2 Past Performance Questionnare 7 30 Jun 2011

3 McGuire AFB Seed Project Schedule B 1 5 Aug 2011 Schedule B (Rev 1)

4 McGuire AFB Project Specific Docs 1 30 Jun 2011

5 DOL General Decision NJ20100032 13 10 June 2011 Building - McGuire AFB, NJ

6 Entry Authority List (EAL) Letter 1 6 July 2011

7 Pre-proposal Conf Location Map 1 6 July 2011

8 Questions and Answers 2 6 July 2011

9 Project Schedule Spreadsheet (Rev 1) 7 29 July 2011

10 Pre-proposal Conference Slides 19 22 July 2011

11 Pre-proposal Conference Attendance 15 14 July 2011

12 Questions and Answers – 2 9 22 July 2011

13 DOL General Decision NJ100032 15 15 July 2011 Building – McGuire AFB, NJ

14 Asbestos Survey Report 50 25 Sep 2010 McGuire AFB

HDEC03-11-R-0001

15 Questions and Answers – 3 13 29 Jul 2011

16 Sketch #2 Equipment Phasing 1 29 Jul 2011

17 Sketch #1 New AHU1 Location 1 29 Jul 2011

18 Request for Proposal 1 31 Jul 2011 Architectural and Refrigeration

19 Infrared Moisture Survey 1 1 Aug 2011

20 Questions and Answers – 4 19 5 Aug 2011

21 DOL General Decision NJ100032 17 5 Aug 2011 Building – McGuire AFB, NJ

22 Questions and Answers – 5 10 16 Aug 2011

23 Request for Visitors Pass 1 16 Aug 2011

24 Sketch #1 New AHU-1 Drawing 1 16 Aug 2011

25 Sketch #2 Roof Equipment Phasing 1 16 Aug 2011

26 Questions and Answers – 6 1 18 Aug 2011

27 Drawings A-1 thru A-3 and A10 – A15 9 17 Aug 2011

28 Drawings A-16 thru A-26 10 17 Aug 2011

29 Drawings A-27 thru A-32 6 17 Aug 2011

(End of Summary of Changes)

File details come from the government source that posted it. Updated .