HDEC03-11-R-0001 SCIPIII SOLICITATION.doc

DOC document 423 KB Posted

Attached to
SCIP III Federal contract opportunity
Solicitation number
HDEC03-11-R-0001
Issued by
Defense Commissary Agency

About this file

HDEC03-11-R-0001 SCIPIII SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to SCIP III, newest first.
File Type Posted
HDEC03-11-R-0001 SCIP III Amend 9.pdf PDF
HDEC03-11-R-0001 SCIP Amend8.pdf PDF
HDEC03-11-R-0001 SCIPIII Amend 7.pdf PDF
SCIPIII ATCH28 DRAW A16-A17.pdf PDF
SCIPIII ATCH 31 DRW A25-A29.pdf PDF
HDEC03-11-R-0001 SCIPIII Amend 6.pdf PDF
SCIPIII ATCH 30 DRW A21-A23.pdf PDF
SCIPIIIATCH26Questions 6.pdf PDF
SCIPIII ATCH29 DRAW A18-A20.pdf PDF
SCIPIII ATCH27 DRW A1-A15.pdf PDF
SCIPIII ATCH 32 DRW A30-A32.pdf PDF
SCIPIIIATCH25Sketch 2.pdf PDF
SCIPIIIATCH23PASSREQ.pdf PDF
SCIPIIIATCH24Sketch 1.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 5.pdf PDF
SCIPIIIATCH22Questions 5.pdf PDF
SCIPIIIATCH3SCHBRev1.pdf PDF
SCIPIIIATCH19INFRARPT.pdf PDF
SCIPIIIATCH21WDREV2.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 4.pdf PDF
SCIPIIIATCH18ROOFRFP.pdf PDF
SCIPIIIATCH20Questions4.pdf PDF
SCIPIIATCH17Sketch 1 new AHU-1 location.pdf PDF
SCIPIIIATCH9ScheduleRev1.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 3.pdf PDF
SCIPIIIATCH14ENVSRV.pdf PDF
SCIPIIIATCH1SOW Rev 1.pdf PDF
SCIPIIIATCH16Sketch 2 —
SCIPIIIATCH15QUESTIONS3.pdf PDF
HDEC03-11-R-0001 SCIP III Amend 2.pdf PDF
SCIPIIIATCH12QUESTIONS.pdf PDF
SCIPIIIATCH13WDREV.pdf PDF
SCIPIIIATNDATCH11.pdf PDF
SCIPIIICONFSLDSATCH10.pdf PDF
SCIPIIIATCH8Questions.pdf PDF
SCIPIIIATCH7Map.pdf PDF
SCIPIIIATCH9Schedule.xls XLS spreadsheet
SCIPIIIATCH6EAL.pdf PDF
HDEC03-11-R-0001-0001 SCIPIII AMEND 1.doc DOC document
SCIPIIIATCH2PastPerformance.pdf PDF
SCIPIIIATCH5WD.pdf PDF
SCIPIIIATCH3SCHB.pdf PDF
SCIPIIIATCH4MCGUIREDOCS.pdf PDF
SCIPIIIATCH1SOW.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

SCIP III MULTIPLE AWARD BASIC CONTRACT

FFP

SCIP III is a multiple award, competitive, design-build, indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general statement of work further defined with each individual task order. Award of the seed project constitutes the minimum for the first contract awarded. A minimum of $5,000 is guaranteed over the life of the contract. The total aggregate maximum amount of this program including all contracts shall not exceed $498,000,000.00.

FOB: Destination

NSN: Z199-CO-NST-RUCT

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$5,000.00

$498,000,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN
MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$5,000.00

$498,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN
MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$100,000.00

$25,000,000.00

Section C - Descriptions and Specifications

STATEMENT OF WORK

The Statement of Work that will govern every order under this IDIQ contract is dated 21 June 2011 and is listed as Attachment 1 in Section J of this solicitation.

The seed project specific document (specifications, drawings, and photographs) for the Commissary project at McGuire AFB, project is located at ftp://65.106.202.164 Username: SCIP Password: Tr05!p@7 Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
1825 dys. ADC
1
DEFENSE COMMISSARY AGENCY

CONSTRUCTION - DESIGN BRANCH

2250 FOULOIS STREET, SUITE 3

LACKLAND AFB TX 78236

FOB: Destination

HDEC03

Section G - Contract Administration Data

TO BE FUNDED BY EACH INDIVIDUAL TASK ORDER

CLAUSES INCORPORATED BY FULL TEXT

WIDE AREA WORKFLOW (WAWF) INVOICING INFORMATION:

All invoices shall be submitted electronically to DFAS Columbus via https://wawf.eb.mil/ in accordance with DFARS Clause 252.232-7003, Electronic Submission of Payment Requests AND Receiving Reports (MAR 2008). The full text of this clause can be found at:http://farsite.hill.af.mil/.

CONTRACTOR: This contract requires the type of invoice to be used as “Invoice and Receiving Report (Combo)”. Pay DoDAAC: Block 18a of the contract. Admin DoDAAC: Block 9 of the contract. Ship to DoDAAC: Located in 15 of the contract, or for delivery to multiple locations and freight forwarders, locate the ship to DoDAAC in the item number information. A separate Invoice shall be submitted for each store location.

STORE: After you sign the receiving report in WAWF, add the email address of the contracting POC above to generate a copy of the receiving report to the POC.

UID REQUIREMENTS: UID information must be completed on the invoice for any property requiring UID identification and/or valuation by the contract.

Payment Status can be obtained by checking the Misc Info Tab on your invoice in WAWF and on the MyInvoice link or at https://myinvoice.csd.disa.mil/index.html.

Payment Inquires: Payment questions can be addressed by calling Customer Service, DFAS-Columbus, OH at 800-756-4571, Opt 2, Opt 2.

Technical Assistance with WAWF: Ogden Help Desk, 1-866-618-5988, Opt 2, Opt 3

Section H - Special Contract Requirements

ORDERING PROCEDURES

TASK ORDER ISSUANCE PROCEDURES

1. GENERAL

1.1 Work under this contract will be ordered by written Task Orders (TO) issued on DD Form 1155 Order for Supplies and Services to the contractor by the Procuring Contracting Officer/Ordering Officer.

1.2 Each award as a result of this solicitation will cite an individual contract number. Individual Task Orders will be placed in a sequential numbering system, which relate back to the basic contract and their assigned Proposed Task Order (PTO) Number.

1.3 The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, delivery, or otherwise incur costs except as authorized by duly executed Task Orders.

2. TASK ORDERS

Orders will be awarded at a firm-fixed price. The government may also request the contractors to submit rough estimates on price and schedule, and responses to other considerations, as appropriate, for preliminary evaluation and then select contractors most likely to submit highest value solutions for submittal of final proposals for Task Order award. The government may use various delivery approaches such as design/bid/build, design/build, or some combination of these arrangements, or other project delivery approaches approved by HQ Defense Commissary Agency. Each Task Order will contain applicable clauses and provisions specifying the competitive considerations, specific submittal requirements and evaluation factors.

3. COMPETITION FOR TASK ORDERS

3.1 Competition for issuance of Task Orders is limited to those awardees under this contract. All awardees will be given a fair opportunity and will be able to submit proposals on any of the projects that are within their bonding capacity, subject to the following exceptions: 1) Projects valued under $3.5 Million will be set aside, at the Contracting Officers discretion, for competition or sole source acquisition among the SCIP III 8(a) contractors, 2) Projects valued under $12.5 Million will be evaluated and a determination will be made whether there are two or more small business contractors able to do the work and provide a fair price, 3) All projects in excess of $12.5 Million and any project not deemed acceptable under one of the other two set aside programs will be issued for full and open competition.

3.2 Unless the Contracting Officer applies one of the exceptions noted above, each Task Order will be awarded as a result of competition to the contractor who offers the best value to the Government considering the criteria specified. The Contracting Officer’s decision as to the selection for award of a Task Order is not protestable unless the protest is on the grounds that the order increases the scope, period of performance, or maximum value of the contract.

3.3 The contracting officer may also use a multi-phased approach to encourage contractor response and exchange of information as part of the order solicitation process. When requirements are resource intensive, complex, or need additional development, the contracting officer may request that contractors submit rough estimates on price and schedule, and responses to other considerations, as appropriate (such as comments on the government’s preliminary plans and proposed conceptual approach, opportunities for economy and efficiency, past performance, schedule considerations, architect-engineer team capabilities, and other factors as may be defined) for preliminary evaluation by the government. Following this preliminary evaluation, contractors considered the most likely to submit highest value solutions may then be selected for submittal of final proposals for Task Order Award. After the preliminary evaluation, the selected contactors may be required to participate in one-on-one sessions with the government to increase their understanding of the requirements, provide suggestions for refining requirements, discuss risk reduction measures, address anticipated material, resource and equipment availability and comment on constructability means and methods, among other considerations, prior to submittal of final proposals for Task Order Award.

4. REQUIREMENTS FOR TASK ORDER PROPOSALS

4.1 The Government is not obligated to hold discussions prior to award of a Task Order. If the Government determines that proposals are necessary, proposals may be submitted in writing or oral form at the discretion of the Contracting Officer. Should all proposals contain deficiencies that would preclude awarding the Task Order, discussions will commence to resolve the deficiencies and contractors will be provided an opportunity to submit a final proposal revision.

4.2 Technical Proposals, if required, may address one or more factors, including the following:

4.2.1 Proposed design solutions

4.2.2 Design and construction capabilities

4.2.3 The contractor’s technical understanding of the work

4.2.4 The most efficient and effective plan to accomplish the work

4.2.5 Proposed materials, type, and quantities and rationale for selection

4.2.6 Project scheduling information

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JUL 2004
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
APR 1984
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
OCT 2010
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-13
Contractor Code of Business Ethics and Conduct
APR 2010
52.203-14
Display of Hotline Poster(s)
DEC 2007
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7
Central Contractor Registration
APR 2008
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2010
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
MAY 2011
52.211-13
Time Extensions
SEP 2000
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-10
Price Reduction for Defective Certified Cost or Pricing Data
OCT 2010
52.215-11
Price Reduction for Defective Certified Cost or Pricing Data--Modifications
OCT 2010
52.215-12
Subcontractor Certified Cost or Pricing Data
OCT 2010
52.215-13
Subcontractor Certified Cost or Pricing Data--Modifications
OCT 2010
52.215-15
Pension Adjustments and Asset Reversions
OCT 2010
52.215-16
Facilities Capital Cost of Money
JUN 2003
52.215-18
Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions
JUL 2005
52.215-19
Notification of Ownership Changes
OCT 1997
52.215-21
Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data--Modifications
OCT 2010
52.215-22
Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.215-23
Limitations on Pass-Through Charges
OCT 2009
52.217-5
Evaluation Of Options
JUL 1990
52.217-7
Option For Increased Quantity-Separately Priced Line Item
MAR 1989
52.219-8
Utilization of Small Business Concerns
DEC 2010
52.219-9
Small Business Subcontracting Plan
OCT 2010
52.219-9 Alt II
Small Business Subcontracting Plan (JAN 2011) Alternate II
OCT 2010
52.219-11
Special 8(A) Contract Conditions
FEB 1990
52.219-14
Limitations On Subcontracting
DEC 1996
52.219-16
Liquidated Damages-Subcontracting Plan
JAN 1999
52.222-3
Convict Labor
JUN 2003
52.222-4
Contract Work Hours and Safety Standards Act - Overtime Compensation
JUL 2005
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
JUN 2010
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-23
Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-33
Notice of Requirement for Project labor Agreement
MAY 2010
52.222-34
Project Labor Agreement
MAY 2010
52.222-35
Equal Opportunity for Veterans
SEP 2010
52.222-36
Affirmative Action For Workers With Disabilities
OCT 2010
52.222-37
Employment Reports on Veterans
SEP 2010
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
FEB 2009
52.222-54
Employment Eligibility Verification
JAN 2009
52.222-99 (Dev)
Notification of Employee Rights under the National Labor Relations Act (DEVIATION 2010-O0013)
JUN 2010
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5
Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-6
Drug-Free Workplace
MAY 2001
52.223-12
Refrigeration Equipment and Air Conditioners
MAY 1995
52.223-14
Toxic Chemical Release Reporting
AUG 2003
52.223-15
Energy Efficiency in Energy-Consuming Products
DEC 2007
52.223-17
Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18
Contractor Policy to Ban Text Messaging While Driving
SEP 2010
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.227-4
Patent Indemnity-Construction Contracts
DEC 2007
52.227-4 Alt I
Patent Indemnity-Construction Contracts (Dec 2007) - Alternate I
DEC 2007
52.228-2
Additional Bond Security
OCT 1997
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.228-11
Pledges Of Assets
SEP 2009
52.228-12
Prospective Subcontractor Requests for Bonds
OCT 1995
52.228-14
Irrevocable Letter of Credit
DEC 1999
52.228-15
Performance and Payment Bonds--Construction
OCT 2010
52.229-2
North Carolina State and Local Sales and Use Tax
APR 1984
52.229-3
Federal, State And Local Taxes
APR 2003
52.230-1
Cost Accounting Standards Notices And Certification
OCT 2008
52.230-2
Cost Accounting Standards
OCT 2010
52.230-6
Administration of Cost Accounting Standards
JUN 2010
52.230-7
Proposal Disclosure--Cost Accounting Practice Change
APR 2005
52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-17
Interest
OCT 2010
52.232-18
Availability Of Funds
APR 1984
52.232-23
Assignment Of Claims
JAN 1986
52.232-25
Prompt Payment
OCT 2008
52.232-27
Prompt Payment for Construction Contracts
OCT 2008
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
APR 1984
52.236-4
Physical Data
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991
52.236-13 Alt I
Accident Prevention (Nov 1991) - Alternate I
NOV 1991
52.236-14
Availability and Use of Utility Services
APR 1984
52.236-15
Schedules for Construction Contracts
APR 1984
52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-21 Alt I
Specifications and Drawings for Construction (Feb 1997) - Alternate I
APR 1984
52.236-26
Preconstruction Conference
FEB 1995
52.236-28
Preparation of Proposals--Construction
OCT 1997
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.243-4
Changes
JUN 2007
52.243-6
Change Order Accounting
APR 1984
52.244-6
Subcontracts for Commercial Items
DEC 2010
52.246-12
Inspection of Construction
AUG 1996
52.246-21
Warranty of Construction
MAR 1994
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-Price) (May 2004) - Alternate I
SEP 1996
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.250-1
Indemnification Under Public Law 85-804
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
JAN 2009
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
JAN 2009
252.203-7003
Agency Office of the Inspector General
SEP 2010
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
Central Contractor Registration (52.204-7) Alternate A
SEP 2007
252.204-7007 Alt A
Annual Representations and Certifications Alternate A
JAN 2011
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7001
Disclosure of Ownership or Control by the Government of a Terrorist Country
JAN 2009
252.209-7002
Disclosure Of Ownership Or Control By A Foreign Government
JUN 2010
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
DEC 2006
252.215-7000
Pricing Adjustments
DEC 1991
252.219-7003
Small Business Subcontracting Plan (DOD Contracts)
OCT 2010
252.222-7005
Prohibition on Use of Nonimmigrant Alien--Guam
SEP 1999
252.223-7006
Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 1993
252.223-7008
Prohibition of Hexavalent Chromium
MAY 2011
252.225-7012
Preference For Certain Domestic Commodities
JUN 2010
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.227-7033
Rights in Shop Drawings
APR 1966
252.231-7000
Supplemental Cost Principles
DEC 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
252.232-7010
Levies on Contract Payments
DEC 2006
252.236-7000
Modification Proposals-Price Breakdown
DEC 1991
252.236-7005
Airfield Safety Precautions
DEC 1991
252.236-7006
Cost Limitation
JAN 1997
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
MAR 1998

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2010)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $33.5M].

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(__) Paragraph (d) applies.

(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvi) 52.225-4, Buy American Act--Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xix) 52.225-25, Prohibition on Engaging in Sanctioned Activities Relating to Iran--Certification. This provision applies to all solicitations.

(xx) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(Contracting Officer check as appropriate.)

----(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration Program.

------(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small Business Competitiveness Demonstration Program.

------(iii) 52.219-22, Small Disadvantaged Business Status.

------(A) Basic.

------(B) Alternate I.

------(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

------(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

------(vi) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--Certification.

------(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

------(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.

------(ix) 52.227-6, Royalty Information.

------ (A) Basic.

------ (B) Alternate I.

------(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below (offeror to insert changes, identifyingchange by clause number, title, date). These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

(End of Provision)

CLAUSES INCORPORATED BY FULL TEXT

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JAN 2011)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 days for the McGuire AFB Seed Project and the be determined at each task order for future projects calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than See each individual task order.

* The time stated for completion shall include final cleanup of the premises.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,433 for the McGuire AFB seed project and for and for all other projects the amount will be determined at the issuance of each request for proposal for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a IDIQ Contract with FFP Task Orders contract resulting from this solicitation.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.216-19 Order Limitations. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $25,000,000;

(2) Any order for a combination of items in excess of $100,000,000 (insert dollar figure or quantity); or

(3) A series of orders from the same ordering office within 3 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.216-22 Indefinite Quantity. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 2 years from the expiration of the final contract ordering period.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.219-17 SECTION 8(a) AWARD (DEC 1996)

(a) By execution of a contract, the Small Business Administration (SBA) agrees to the following:

(1) To furnish the supplies or services set forth in the contract according to the specifications and the terms and conditions by subcontracting with the Offeror who has been determined an eligible concern pursuant to the provisions of section 8(a) of the Small Business Act, as amended (15 U.S.C. 637(a)).

(2) Except for novation agreements and advance payments, delegates to the Defense Commissary Agency the responsibility for administering the contract with complete authority to take any action on behalf of the Government under the terms and conditions of the contract; provided, however that the contracting agency shall give advance notice to the SBA before it issues a final notice terminating the right of the subcontractor to proceed with further performance, either in whole or in part, under the contract.

(3) That payments to be made under the contract will be made directly to the subcontractor by the contracting activity.

(4) To notify the Defense Commissary Agency Contracting Officer immediately upon notification by the subcontractor that the owner or owners upon whom 8(a) eligibility was based plan to relinquish ownership or control of the concern.

(5) That the subcontractor awarded a subcontract hereunder shall have the right of appeal from decisions of the cognizant Contracting Officer under the “Disputes” clause of the subcontract.

The offeror/subcontractor agrees and acknowledges that it will, for and on behalf of the SBA, fulfill and perform all of the requirements of the contract.

(c) The offeror/subcontractor agrees that it will not subcontract the performance of any of the requirements of this subcontract to any lower tier subcontractor without the prior written approval of the SBA and the cognizant Contracting Officer of the Defense Commissary Agency.

CLAUSES INCORPORATED BY FULL TEXT

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 236220- assigned to contract number .

(Contractor to sign and date and insert authorized signer's name and title).

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)

(a) Definition. Ozone-depleting substance, as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II, including, but not limited to, hydrochlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:

“WARNING: Contains (or manufactured with, if applicable), a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.”----------------------------

The Contractor shall insert the name of the substance(s).

(End of clause4)

CLAUSES INCORPORATED BY FULL TEXT

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None.

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

This is the start of the file's text. The full file is on GovTribe.