HAZMAT Reporting at Tinker AFB FEB 2025.pdf

PDF 23 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This document is an instructional guideline for hazardous material reporting procedures for construction projects at Tinker Air Force Base. The contractor and Quality Assurance Inspector must submit hazardous material Safety Data Sheets (SDS) or Material Safety Data Sheets (MSDS) directly to Tinker AFB environmental personnel—Tammy Detrixhe (tammy.detrixhe@us.af.mil) and Kandice Sanders (kandice.sanders@us.af.mil)—via email for verification and entry into the base's hazardous material database.

Per Tinker AFB specification 00 72 00 (Environmental Requirements for Construction on Tinker Air Force Base), contractors must complete and submit an AF3952 form along with an AF3000 form to the Contracting Officer/QA Inspector for review by environmental hazardous material management personnel. Additionally, contractors must add a line item to their AF66 submittal register documenting the hazardous materials being utilized on the project and resubmit the updated AF66 with a new AF3000 to the QA Inspector if the hazardous materials were not included on the original submittal.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00260001.pdf PDF
Wage Determination - OK20260049 05-18-2026.pdf PDF
Solicitation Amendment FA813727R00020001 SF 30.pdf PDF
WWYK250063 - Site Visit Sign In Sheet.jpg JPG image
00 70 00.pdf PDF
07 14 00.pdf PDF
23 05 15.pdf PDF
09 90 00.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
z400i.pdf_safe.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
220042 As Built Drawings.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
dafi91-202.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
250063_ATT 3_RMDF.pdf PDF
08 71 00.pdf PDF
afman91-203_oc-alcsup.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
01 50 00.pdf PDF
250063_ATT 4_ODS.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
Room finish schedule.xlsx XLSX spreadsheet
ARCH-COMBINED.pdf PDF
dafi21-101.pdf PDF
23 05 93.pdf PDF
4500-S.pdf PDF
07 84 00.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
05 05 23.16.pdf PDF
007200_Attch13_AF487.pdf PDF
250063_SOW.pdf PDF
23 09 23.02.pdf PDF
05 40 00.pdf PDF
REACT VII SA-01.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
ufc_3_601_02_2021.pdf PDF
07 21 16.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
03 01 00.pdf PDF
afman48-148.pdf PDF
01 33 00.pdf PDF
EM_385-1-1.pdf PDF
08 11 13.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
lrad331965pd_spec.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
250063_ATT 6_OPSEC Review Memo.pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Material Reporting for Construction Projects on Tinker AFB

The contractor/QA Inspector shall contact and send all hazardous material SDS/MSDS information directly to the Tinker AFB environmental personnel (Tammy Detrixhe -tammy.detrixhe@us.af.mil and Kandice Sanders -kandice.sanders@us.af.mil) in an email, so that they can verify and confirm that it’s been entered into Tinker AFB’s hazardous material database.

Also, according to the Tinker AFB specification 00 72 00 - ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE, on pg. 14 section 1.4 HAZARDOUS MATERIAL REPORTING, the construction contractor is to fill out an AF3952 form and submit it, along with an AF3000 directly to the Contracting Officer/QA Inspector to be reviewed by the appropriate environmental hazardous material management personnel and processed accordingly. The contractor will also need to add a line item to their AF66 (submittal register) pertaining to the hazardous materials being utilized on the project, and then resubmit the AF66 with a new AF3000 to the QA Inspector to be processed, if it is not already on the original AF66.

Blank Page

File details come from the government source that posted it. Updated .