Proposal_Form.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- New U. S. Courthouse in Harrisburg, Pennsylvania
- Solicitation number
- GS-03-P-17-AZ-C-0014
About this file
Proposal Form per Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0016.pdf | ||
| Amendment_0015.pdf | ||
| Proposal_Form_and_Staffing_Plan.xlsx | XLSX spreadsheet | |
| Amendment_0014.pdf | ||
| Harrisburg_Proposal_Form_12.15.17.xlsx | XLSX spreadsheet | |
| Harrisburg_Proposal_Form_10.24.17.xlsx | XLSX spreadsheet | |
| Amendment_0012.pdf | ||
| 2005_Pub_64_Vol_3_JSS_Req_&_Specs.pdf | ||
| Amendment_0011.pdf | ||
| Proposal_Form_10.16.17.xlsx | XLSX spreadsheet | |
| Amendment_0010.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Proposal_Form.xlsx | XLSX spreadsheet | |
| Amendment_0005.pdf | ||
| Form_DS-1_(BLANK).pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Attachment_3_-_Small_Business_Utilization_Form.doc | DOC document | |
| Attachment_2_-_Past_Performance_Questionnaire.doc | DOC document | |
| GSA527.pdf | ||
| Attachment_1_-_Past_Project_Form.docx | DOCX document | |
| RFP_GS-03-P-17-AZ-C-0014.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROPOSAL FORM | ||
| 14-Sep-17 | ||
| CLIN | DESCRIPTION | AMOUNT |
| 0001 | Base: Design Phase Services: | |
| Firm Fixed Price proposal which shall be valid for | ||
| 180 calendar days from submission). | $ - 0 |
| 0002 | Option 1: Site Preparation and Utility Relocation: | |
| $ - 0 |
0003 Option 2: Construction Phase Services:
| General Conditions - Staffing | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Division 01-General Requirements | $ - 0 | |
| Division 02-Site Construction | $ - 0 | |
| Division 03-Concrete | $ - 0 | |
| Division 04-Masonry | $ - 0 | |
| Division 05-Metals | $ - 0 | |
| Division 06-Wood and Plastics | $ - 0 | |
| Division 07-Thermal and Moisture Protection | $ - 0 | |
| Division 08-Doors and Windows | $ - 0 | |
| Division 09-Finishes | $ - 0 | |
| Division 10-Specialties | $ - 0 | |
| Division 11-Equipment | $ - 0 | |
| Division 12-Furnishings | $ - 0 | |
| Division 13-Special Construction | $ - 0 | |
| Division 14-Conveying Systems | $ - 0 | |
| Division 15-Mechanical | $ - 0 | |
| Division 16-Electrical | $ - 0 | |
| Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16) | $ - 0 | |
| CCA (Multiply ECW by 3% | $ - 0 | |
| Fee (Overhead) | $ - 0 | |
| Fee (Profit) | $ - 0 | |
| GMP Option 2 (Sum of ECW, CCA, and Fees) | $ - 0 |
CLIN DESCRIPTION AMOUNT
0004 Option 3: Additional Construction Phase Services:
| General Conditions - Staffing | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Division 01-General Requirements | $ - 0 | |
| Division 02-Site Construction | $ - 0 | |
| Division 03-Concrete | $ - 0 | |
| Division 04-Masonry | $ - 0 | |
| Division 05-Metals | $ - 0 | |
| Division 06-Wood and Plastics | $ - 0 | |
| Division 07-Thermal and Moisture Protection | $ - 0 | |
| Division 08-Doors and Windows | $ - 0 | |
| Division 09-Finishes | $ - 0 | |
| Division 10-Specialties | $ - 0 | |
| Division 11-Equipment | $ - 0 | |
| Division 12-Furnishings | $ - 0 | |
| Division 13-Special Construction | $ - 0 | |
| Division 14-Conveying Systems | $ - 0 | |
| Division 15-Mechanical | $ - 0 | |
| Division 16-Electrical | $ - 0 | |
| Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16) | $ - 0 | |
| CCA (Multiply ECW by 3% | $ - 0 | |
| Fee (Overhead) | $ - 0 | |
| Fee (Profit) | $ - 0 | |
| GMP Option 3 (Sum of ECW, CCA, and Fees) | $ - 0 |
| CLIN | DESCRIPTION | AMOUNT |
| 0005 | Option 4: Additional Construction Phase Services: |
| General Conditions - Staffing | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Division 01-General Requirements | $ - 0 | |
| Division 02-Site Construction | $ - 0 | |
| Division 03-Concrete | $ - 0 | |
| Division 04-Masonry | $ - 0 | |
| Division 05-Metals | $ - 0 | |
| Division 06-Wood and Plastics | $ - 0 | |
| Division 07-Thermal and Moisture Protection | $ - 0 | |
| Division 08-Doors and Windows | $ - 0 | |
| Division 09-Finishes | $ - 0 | |
| Division 10-Specialties | $ - 0 | |
| Division 11-Equipment | $ - 0 | |
| Division 12-Furnishings | $ - 0 | |
| Division 13-Special Construction | $ - 0 | |
| Division 14-Conveying Systems | $ - 0 | |
| Division 15-Mechanical | $ - 0 | |
| Division 16-Electrical | $ - 0 | |
| Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16) | $ - 0 | |
| CCA (Multiply ECW by 3% | $ - 0 | |
| Fee (Overhead) | $ - 0 | |
| Fee (Profit) | $ - 0 | |
| GMP Option 4 (Sum of ECW, CCA, and Fees) | $ - 0 |
TOTAL CONTRACT PRICE (Sum of CLINS 0001 through 0005) $ - 0
PROPOSAL FORM DEFINITIONS:
Estimated Cost of Work (ECW) is the estimated direct cost of the construction work. The proposed ECW incorporated at award is the target ECW. The final ECW is negotiated during the design phase services and is incorporated into the option for the construction services.
CMc Contingency Allowance (CCA) is an allowance for the exclusive use of the CMc to cover reimbursable costs during construction that are not the basis of a change order as defined by the FAR. These costs could include estimating and planning errors in the Final ECW or other CMc Errors. This allowance is the beginning pool for the shared savings incentive. The CCA is a set 3 percent of the ECW.
Fee is a fixed amount established in the construction contract for all of the contractor’s indirect costs, including overhead and profit, for the construction work.
Guaranteed Maximum Price (GMP) is the equivalent of the ceiling price described in FAR 16.403-2. At contract award, the GMP for the contract is established as the sum of the target ECW, the CCA and Fee for the construction services work.
Sheet2
| 5A | Overhead | $ - 0 |
| 5B | Profit | $ - 0 |
| 5C | General Conditions | $ - 0 |
| 6 | Option for Construction Services Guaranteed Maximum Price (2 + 4 + 5) (GMP Option) | $ - 0 |
| 7 | Overhead Rate for Adjustments | % |
| 8 | Extended Overhead (Multiply CLIN 8 by $3,000,000.00) | $ - 0 |
| 9 | Profit Rate for Adjustments | % |
| 10 | Extended Profit (Multiply CLIN 9 by $3,000,000.00) | $ - 0 |
| Total Contract Price (1 + 6 + 8 + 10 ) | $ - 0 |
Sheet3
File details come from the government source that posted it. Updated .