Proposal_Form_10.16.17.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
New U. S. Courthouse in Harrisburg, Pennsylvania
Solicitation number
GS-03-P-17-AZ-C-0014
Issued by

About this file

Proposal Form, dated 10/16/17

View the file

Other files

File Type Posted
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Proposal_Form_and_Staffing_Plan.xlsx XLSX spreadsheet
Amendment_0014.pdf PDF
Harrisburg_Proposal_Form_12.15.17.xlsx XLSX spreadsheet
Harrisburg_Proposal_Form_10.24.17.xlsx XLSX spreadsheet
Amendment_0012.pdf PDF
2005_Pub_64_Vol_3_JSS_Req_&_Specs.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0005.pdf PDF
Form_DS-1_(BLANK).pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Attachment_3_-_Small_Business_Utilization_Form.doc DOC document
Attachment_2_-_Past_Performance_Questionnaire.doc DOC document
GSA527.pdf PDF
Attachment_1_-_Past_Project_Form.docx DOCX document
RFP_GS-03-P-17-AZ-C-0014.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROPOSAL FORM
16-Oct-17
CLINDESCRIPTIONAMOUNT
0001Base: Design Phase Services:
Firm Fixed Price proposal which shall be valid for
180 calendar days from submission).$ - 0
0002Option 1: Site Preparation and Utility Relocation:
General Conditions - Staffing$ - 0
General Conditions - Other$ - 0
Division 01-General Requirements$ - 0
Division 02-Site Construction - G10 Site Preparation$ - 0
Division 02-Site Construction - G20 Site Improvements$ - 0
Division 02-Site Construction - G30 Liquid Site Utilities$ - 0
Division 02-Site Construction - G40 Electrical Site Improvements$ - 0
Division 02-Site Construction - G50 Site Communications$ - 0
Bond/Insurance$ - 0
Overhead$ - 0
Profit$ - 0
Firm Fixed Price (Sum of General Conditions, Division 1 and 2, Bonds/Insurance, Overhead, and Profit)$ - 0

CLIN DESCRIPTION AMOUNT

0003 Option 2: Construction Phase Services:

General Conditions - Staffing (30 months)$ - 0
General Conditions - Other (GMP award on 7/30/18)$ - 0
Division 01-General Requirements$ - 0
Division 02-Site Construction$ - 0
Division 03-Concrete$ - 0
Division 04-Masonry$ - 0
Division 05-Metals$ - 0
Division 06-Wood and Plastics$ - 0
Division 07-Thermal and Moisture Protection$ - 0
Division 08-Doors and Windows$ - 0
Division 09-Finishes$ - 0
Division 10-Specialties$ - 0
Division 11-Equipment$ - 0
Division 12-Furnishings$ - 0
Division 13-Special Construction$ - 0
Division 14-Conveying Systems$ - 0
Division 15-Mechanical$ - 0
Division 16-Electrical$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 2 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0

CLIN DESCRIPTION AMOUNT

0004 Option 3: Additional Construction Phase Services:

General Conditions - Staffing (33 months)$ - 0
General Conditions - Other (Option 2 and 3 GMP award on 10/30/18)$ - 0
Division 01-General Requirements$ - 0
3.01 - Larger Surface Parking Lot, instead of smaller lot.$ - 0
3.03 - Increase Warranty Period of Building Enclosure from 10 to 20 years$ - 0
3.04 - Add Acoustical Isolation at USMS FIT Room$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions, Division 01. 3.01, 3.03 and 3.04)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 3 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0
CLINDESCRIPTIONAMOUNT
0005Option 4: Additional Construction Phase Services:
General Conditions - Staffing (36 months)$ - 0
General Conditions - Other (Option 2, 3, and 4 GMP award on 1/30/19)$ - 0
Division 01-General Requirements$ - 0
4.01 - Add strom water filtration and re-use system$ - 0
4.02 - Add 25 tons of steeI at roof L3$ - 0
4.03 - Increase soil depth at roof L3$ - 0
4.04 - Add parking lot fence$ - 0
4.05 - Increase quality of site retaining wall$ - 0
4.06 - Increase site vegetation$ - 0
4.07 - Add perimeter vehicular bollards$ - 0
4.08 - Increase Warranty Period of Building Enclosure from 20 to 30 years$ - 0
4.09 - Increase envelop air-tightness$ - 0
4.10 - Add self-cleaning and de-polluting additive$ - 0
4.11 - Add demountable wall systems$ - 0
4.12 and 4.13 - Replace GWB column surrounds with GFRG$ - 0
4.14 - Add EV charging stations in parking areas$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions, Division 01, and 4.01 to 4.14)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 4 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0

TOTAL CONTRACT PRICE (Sum of CLINS 0001 through 0005) $ - 0

PROPOSAL FORM DEFINITIONS:

Estimated Cost of Work (ECW) is the estimated direct cost of the construction work. The proposed ECW incorporated at award is the target ECW. The final ECW is negotiated during the design phase services and is incorporated into the option for the construction services.

CMc Contingency Allowance (CCA) is an allowance for the exclusive use of the CMc to cover reimbursable costs during construction that are not the basis of a change order as defined by the FAR. These costs could include estimating and planning errors in the Final ECW or other CMc Errors. This allowance is the beginning pool for the shared savings incentive. The CCA is a set 3 percent of the ECW.

Fee is a fixed amount established in the construction contract for all of the contractor’s indirect costs, including overhead and profit, for the construction work.

Guaranteed Maximum Price (GMP) is the equivalent of the ceiling price described in FAR 16.403-2. At contract award, the GMP for the contract is established as the sum of the target ECW, the CCA and Fee for the construction services work.

Sheet2

5AOverhead$ - 0
5BProfit$ - 0
5CGeneral Conditions$ - 0
6Option for Construction Services Guaranteed Maximum Price (2 + 4 + 5) (GMP Option)$ - 0
7Overhead Rate for Adjustments%
8Extended Overhead (Multiply CLIN 8 by $3,000,000.00)$ - 0
9Profit Rate for Adjustments%
10Extended Profit (Multiply CLIN 9 by $3,000,000.00)$ - 0
Total Contract Price (1 + 6 + 8 + 10 )$ - 0

Sheet3

File details come from the government source that posted it. Updated .