Amendment_0012.pdf

PDF 32 KB Posted

Attached to
New U. S. Courthouse in Harrisburg, Pennsylvania
Solicitation number
GS-03-P-17-AZ-C-0014
Issued by

About this file

Amendment 0012

View the file

Other files

File Type Posted
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Proposal_Form_and_Staffing_Plan.xlsx XLSX spreadsheet
Amendment_0014.pdf PDF
Harrisburg_Proposal_Form_12.15.17.xlsx XLSX spreadsheet
Harrisburg_Proposal_Form_10.24.17.xlsx XLSX spreadsheet
2005_Pub_64_Vol_3_JSS_Req_&_Specs.pdf PDF
Amendment_0011.pdf PDF
Proposal_Form_10.16.17.xlsx XLSX spreadsheet
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0005.pdf PDF
Form_DS-1_(BLANK).pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Attachment_3_-_Small_Business_Utilization_Form.doc DOC document
Attachment_2_-_Past_Performance_Questionnaire.doc DOC document
GSA527.pdf PDF
Attachment_1_-_Past_Project_Form.docx DOCX document
RFP_GS-03-P-17-AZ-C-0014.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

3PQCP

See attached.

3PQCP

General Services Administration 100 S Independence Mall West Philadelphia, PA 19106

General Services Administration 100 S Independence Mall West Philadelphia, PA 19106

GS-03-P-17-AZ-C-0014

1 7

10/24/2017

05/26/2017

Amendment 0012 Solicitation GS-03-P-17-AZ-C-0014

Block 14 continuation:

a) This amendment hereby:

1. removes the Proposal Form, dated October 16, 2017, from the solicitation;

2. incorporates the Proposal Form, dated October 24, 2017, as attached to this amendment.

i) The government will provide this form in Microsoft Excel; however, the burden of accuracy with regard to formulas shall be on the offeror.

b) All other solicitation provisions shall remain unchanged.

CLIN DESCRIPTION

0001 Base: Design Phase Services:

Firm Fixed Price proposal which shall be valid for 180 calendar days from submission).

0002 Option 1: Site Preparation and Utility Relocation:

General Conditions - Staffing -$

General Conditions - Other -$

Division 01-General Requirements -$

Division 02-Site Construction - G10 Site Preparation -$

Division 02-Site Construction - G20 Site Improvements -$

Division 02-Site Construction - G30 Liquid Site Utilities -$

Division 02-Site Construction - G40 Electrical Site Improvements -$

Division 02-Site Construction - G50 Site Communications -$

Bond/Insurance -$

Overhead -$

Profit -$

Firm Fixed Price (Sum of General Conditions, Division 1 and 2, Bonds/Insurance, Overhead, and Profit)

AMOUNT

PROPOSAL FORM

24-Oct-17

0003 Option 2: Construction Phase Services:

General Conditions - Staffing (30 months) -$

General Conditions - Other (GMP award on 7/30/18) -$

Division 01-General Requirements -$

Division 02-Site Construction -$

Division 03-Concrete -$

Division 04-Masonry -$

Division 05-Metals -$

Division 06-Wood and Plastics -$

Division 07-Thermal and Moisture Protection -$

Division 08-Doors and Windows -$

Division 09-Finishes -$

Division 10-Specialties -$

Division 11-Equipment -$

Division 12-Furnishings -$

Division 13-Special Construction -$

Division 14-Conveying Systems -$

Division 15-Mechanical -$

Division 16-Electrical -$

Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16)

CCA (Multiply ECW by 3% -$

Bonds/Insurance -$

Fee (Overhead) -$

Fee (Profit) -$

GMP Option 2 (Sum of ECW, CCA, Bonds/Insurance and Fees) -$

0004 Option 3: Additional Construction Phase Services:

General Conditions - Staffing (33 months, instead of 30 months) -$

General Conditions - Other (GMP award on 10/30/18) -$

Additional ECW to award Option 2 on 10/30/18, instead of 7/30/18

Division 01-General Requirements -$

3.01 - Larger Surface Parking Lot, instead of smaller lot. -$

3.03 - Increase Warranty Period of Building Enclosure from 10 to 20 years

3.04 - Add Acoustical Isolation at USMS FIT Room -$

Estimated Cost of Work (ECW) (Sum of General Conditions, Additional ECW to Option 2, Division 01, 3.01, 3.03 and 3.04)

CCA (Multiply ECW by 3% -$

Bonds/Insurance -$

Fee (Overhead) -$

Fee (Profit) -$

GMP Option 3 (Sum of ECW, CCA, Bonds/Insurance and Fees) -$

AMOUNT

0005 Option 4: Additional Construction Phase Services:

General Conditions - Staffing (36 months, instead of 33 months) -$

General Conditions - Other (GMP award on 1/30/19) -$

Additional ECW to award Option 2 and 3 on 1/30/19, instead of 10/30/18

Division 01-General Requirements -$

4.01 - Add strom water filtration and re-use system -$

4.02 - Add 25 tons of steeI at roof L3 -$

4.03 - Increase soil depth at roof L3 -$

4.04 - Add parking lot fence -$

4.05 - Increase quality of site retaining wall -$

4.06 - Increase site vegetation -$

4.07 - Add perimeter vehicular bollards -$

4.08 - Increase Warranty Period of Building Enclosure from 20 to 30 years

4.09 - Increase envelop air-tightness -$

4.10 - Add self-cleaning and de-polluting additive -$

4.11 - Add demountable wall systems -$

4.12 and 4.13 - Replace GWB column surrounds with GFRG -$

4.14 - Add EV charging stations in parking areas -$

Estimated Cost of Work (ECW) (Sum of General Conditions, Additional ECW to Option 2 and 3, Division 01, and 4.01 through 4.14)

CCA (Multiply ECW by 3% -$

Bonds/Insurance -$

Fee (Overhead) -$

Fee (Profit) -$

GMP Option 4 (Sum of ECW, CCA, Bonds/Insurance and Fees) -$

TOTAL CONTRACT PRICE (Sum of CLINS 0001 through 0005) -$

AMOUNT

PROPOSAL FORM DEFINITIONS:

Estimated Cost of Work (ECW) is the estimated direct cost of the construction work. The proposed ECW incorporated at award is the target ECW. The final ECW is negotiated during the design phase services and is incorporated into the option for the construction services.

CMc Contingency Allowance (CCA) is an allowance for the exclusive use of the CMc to cover reimbursable costs during construction that are not the basis of a change order as defined by the FAR. These costs could include estimating and planning errors in the Final ECW or other CMc Errors. This allowance is the beginning pool for the shared savings incentive. The CCA is a set 3 percent of the

ECW.

Fee is a fixed amount established in the construction contract for all of the contractor’s indirect costs, including overhead and profit, for the construction work.

Guaranteed Maximum Price (GMP) is the equivalent of the ceiling price described in FAR 16.403-2. At contract award, the GMP for the contract is established as the sum of the target ECW, the CCA and Fee for the construction services work.