Harrisburg_Proposal_Form_12.15.17.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
New U. S. Courthouse in Harrisburg, Pennsylvania
Solicitation number
GS-03-P-17-AZ-C-0014
Issued by

About this file

Proposal Form, dated 12/15/17

View the file

Other files

File Type Posted
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Proposal_Form_and_Staffing_Plan.xlsx XLSX spreadsheet
Amendment_0014.pdf PDF
Harrisburg_Proposal_Form_10.24.17.xlsx XLSX spreadsheet
Amendment_0012.pdf PDF
2005_Pub_64_Vol_3_JSS_Req_&_Specs.pdf PDF
Amendment_0011.pdf PDF
Proposal_Form_10.16.17.xlsx XLSX spreadsheet
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Proposal_Form.xlsx XLSX spreadsheet
Amendment_0005.pdf PDF
Form_DS-1_(BLANK).pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Attachment_3_-_Small_Business_Utilization_Form.doc DOC document
Attachment_2_-_Past_Performance_Questionnaire.doc DOC document
GSA527.pdf PDF
Attachment_1_-_Past_Project_Form.docx DOCX document
RFP_GS-03-P-17-AZ-C-0014.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROPOSAL FORM
15-Dec-17
CLINDESCRIPTIONAMOUNT
0001Base: Design Phase Services:
$ - 0
0002Option 1: Site Preparation and Utility Relocation:
General Conditions - Staffing$ - 0
General Conditions - Other$ - 0
Division 01-General Requirements$ - 0
Division 02-Site Construction - G10 Site Preparation$ - 0
Division 02-Site Construction - G20 Site Improvements$ - 0
Division 02-Site Construction - G30 Liquid Site Utilities$ - 0
Division 02-Site Construction - G40 Electrical Site Improvements$ - 0
Division 02-Site Construction - G50 Site Communications$ - 0
Bond/Insurance$ - 0
Overhead$ - 0
Profit$ - 0
Firm Fixed Price (Sum of General Conditions, Division 1 and 2, Bonds/Insurance, Overhead, and Profit)$ - 0
0003Option 2: Construction Phase Services:
General Conditions - Staffing (33 months)$ - 0
General Conditions - Other (GMP award on 7/30/18)$ - 0
Division 01-General Requirements$ - 0
Division 02-Site Construction$ - 0
Division 03-Concrete$ - 0
Division 04-Masonry$ - 0
Division 05-Metals$ - 0
Division 06-Wood and Plastics$ - 0
Division 07-Thermal and Moisture Protection$ - 0
Division 08-Doors and Windows$ - 0
Division 09-Finishes$ - 0
Division 10-Specialties$ - 0
Division 11-Equipment$ - 0
Division 12-Furnishings$ - 0
Division 13-Special Construction$ - 0
Division 14-Conveying Systems$ - 0
Division 15-Mechanical$ - 0
Division 16-Electrical$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions and Division 01 through 16)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 2 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0
0004Option 3: Additional Construction Phase Services for timing of Option 2 NTP:
Additional ECW to award Option 2 on 10/30/18, instead of 7/30/18$ - 0
Additional ECW to award Option 2 on 1/30/19, instead of 10/30/18$ - 0
Estimated Cost of Work (ECW) (Sum of additional ECW to Option 2)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 3 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0
0005Option 4: Additional Construction Phase Services for additional scope (add deduct scopes referenced in option 2):
General Conditions - Staffing (33 months)$ - 0
General Conditions - Other$ - 0
Division 01-General Requirements$ - 0
Add 2.01- isolation at USMS FIT$ - 0
Add 2.02 - low-iron glass$ - 0
Add 2.03 - solar hot-water array$ - 0
Add 2.04 - decentralized humidification$ - 0
Add 2.05 - stone finish at elevator lobby$ - 0
Add 2.06 - wood at café$ - 0
Add 2.07 - metal panel MP-3$ - 0
Add 2.08 - landscape drip irrigation system and planting$ - 0
Add 2.09 - blind-side waterproofing (WP-2) below B1$ - 0
Add 2.10 - emergency generator$ - 0
Add 2.11 - L3 roof occupancy$ - 0
Add 2.12 - atrium roof type$ - 0
Add 2.13 - "Eyebrow" canopy at south façade$ - 0
Add 2.14 - Judge's communicating stairs$ - 0
Add 2.15 - north & south screen wall material$ - 0
Add 2.16 - screen wall height$ - 0
Add 2.17 - L2 podium north façade system$ - 0
Add 2.18 - tower geometry and quantity of blades$ - 0
Add 2.19 - mullion profile at GS-4$ - 0
Add 2.20 - Brise-Soliel$ - 0
Add 2.21 - GS-1 lobby storefront$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions, Division 01, and add 2.01 through 2.21)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 4 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0
0006Option 5: Additional Construction Phase Services for additional scope to option 4:
General Conditions - Staffing (33 months)$ - 0
General Conditions - Other$ - 0
Division 01-General Requirements$ - 0
5.01 - Increase site vegetation$ - 0
5.02 - Provide color-coded low-voltage conduits$ - 0
5.03 - Replace demountable wall systems with glass partitions$ - 0
5.04 - Add electric vehicle charging stations$ - 0
5.05 - Add domestic hot water heat recovery$ - 0
5.06 - Enhance storm water reuse$ - 0
5.07 - Add back-up chiller$ - 0
5.08 - Add security fence$ - 0
5.09 - Add elevator stop at roof$ - 0
5.10 - Replace GWB colun surrounds with GFRG$ - 0
5.11 - Increase quantity of site retaining walls$ - 0
5.12 - Increase soil depth and vegetatio at L3 green roof$ - 0
Estimated Cost of Work (ECW) (Sum of General Conditions, Division 01, and 5.01 through 5.12)$ - 0
CCA (Multiply ECW by 3%$ - 0
Bonds/Insurance$ - 0
Fee (Overhead)$ - 0
Fee (Profit)$ - 0
GMP Option 5 (Sum of ECW, CCA, Bonds/Insurance and Fees)$ - 0

TOTAL CONTRACT PRICE (Sum of CLINS 0001 through 0006) $ - 0

PROPOSAL FORM DEFINITIONS:

Estimated Cost of Work (ECW) is the estimated direct cost of the construction work. The proposed ECW incorporated at award is the target ECW. The final ECW is negotiated during the design phase services and is incorporated into the option for the construction services.

CMc Contingency Allowance (CCA) is an allowance for the exclusive use of the CMc to cover reimbursable costs during construction that are not the basis of a change order as defined by the FAR. These costs could include estimating and planning errors in the Final ECW or other CMc Errors. This allowance is the beginning pool for the shared savings incentive. The CCA is a set 3 percent of the ECW.

Fee is a fixed amount established in the construction contract for all of the contractor’s indirect costs, including overhead and profit, for the construction work.

Guaranteed Maximum Price (GMP) is the equivalent of the ceiling price described in FAR 16.403-2. At contract award, the GMP for the contract is established as the sum of the target ECW, the CCA and Fee for the construction services work.

Sheet2

5AOverhead$ - 0
5BProfit$ - 0
5CGeneral Conditions$ - 0
6Option for Construction Services Guaranteed Maximum Price (2 + 4 + 5) (GMP Option)$ - 0
7Overhead Rate for Adjustments%
8Extended Overhead (Multiply CLIN 8 by $3,000,000.00)$ - 0
9Profit Rate for Adjustments%
10Extended Profit (Multiply CLIN 9 by $3,000,000.00)$ - 0
Total Contract Price (1 + 6 + 8 + 10 )$ - 0

Sheet3

File details come from the government source that posted it.