POCHINTAddendum 3 all 1 .pdf
PDF 12 MB Posted
- Attached to
- POCH/INTERIOR RENOVATIONS
- Solicitation number
- GS-03P-10-AZ-C-0039
About this file
Specs/drawings
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interior Renovations at U.S. Courthouse GSA Number GS-03P-98-CDC-0019 Pittsburgh, Pennsylvania
November 3, 2010 Addendum 3 - 2 - Table of Contents
DIVISION 2 - SITE CONSTRUCTION
02085 02080
Asbestos Abatement Procedures
02089 PCB Ballast and HG Tube Abatement 02090 Lead Paint Demolition Procedures
DIVISION 3 - CONCRETE
03310 Cast-in-Place Concrete 03540 Cementitious Underlayment
DIVISION 4 - MASONRY
04060 Unit Masonry Mortar and Grout 04065 Stone Mortar and Grout 04210 Unit Masonry 04400 Stonework 04500 Marble Repair and Restoration
DIVISION 5 - METALS
05080 Fluoropolymer Finish 05500 Metal Fabrications 05700 Ornamental Metals 05750 Ornamental Metal Restoration
DIVISION 6 - WOOD AND PLASTIC
06070 Wood Treatment 06100 Rough Carpentry 06200 Finish Carpentry 06400 Architectural Woodwork 06500 Wood Repair and Refinishing
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07590 Roof Repairs 07620 Sheet Metal Flashing and Trim 07810 Applied Fireproofing 07840 Firestopping 07900 Joint Sealants
Addendum 3 Page 1 of 3
ADDENDUM NO. 3
TO THE BIDDING DOCUMENTS FOR
INTERIOR RENOVATIONS AT U.S. COURTHOUSE
PITTSBURGH, PENNSYLVANIA
ISSUE DATE: NOVEMBER 3, 2010
1.1 GENERAL REQUIREMENTS
A. This Addendum covers changes to the Documents and in closing the Contract will become a part thereof. Each Bidder shall include these items to the extent they affect this Bid.
B. These items modify only the portion of the Documents specifically noted. All other wording and Drawings remain in effect.
1.2 DRAWING REVISIONS
A. Sheets A.1.10, A.1.11, A.1.12, and A.1.13 reissued, with General Note 3 revision and tagged.
B. Sheet A.1.10 reissued, with revisions bubbled.
C. Sheet A.1.17 reissued, with revisions bubbled.
D. Sheet A.1.26 & A.1.27 reissued, with demolition note D01 revision and tagged.
E. Sheets A.1.36 and A.1.37 reissued, with note revisions and tagged.
F. Sheet A.1.47 reissued, with revisions bubbled.
G. Sheet A.1.50 reissued, with revisions bubbled.
H. Sheets A.2.01, A.2.02, A.2.03, A.2.04, A.2.05, reissued, with note revisions and tagged.
I. Sheet A.2.02 reissued, with revisions bubbled.
J. Sheet A.2.06, A.2.07 reissued, with revisions bubbled.
K. Sheet A.2.10 reissued, with note revisions and tagged.
L. Sheet A.4.06 reissued, with note revisions and tagged.
M. Sheet A.4.07 reissued, with revisions bubbled.
Addendum 3 Page 2 of 3
N. Sheet A.5.03 reissued, with note revisions and tagged.
O. Sheet A.5.04 reissued, with revisions bubbled.
P. Sheet A.5.05 reissued, with revisions bubbled.
Q. Sheet A.5.10 reissued, with revisions bubbled.
R. Sheet A.5.15 reissued, with revisions bubbled
S. Sheet A.6.02 reissued, with revisions bubbled
T. Sheet A.6.06 reissued, with revisions bubbled
U. Revise Keynote 3, Sheets M.10.01 and M.10.02 to read, “REPAIR OPENINGS IN WALL
WHERE DUCTWORK SHALL BE REMOVED. REFER TO ARCHITECTURAL DWGS
FOR DETAILS. COORDINATE INFILL WITH ALL NEW WALL OPENINGS FOR NEW
DUCTWORK.”
V. Revised drawing P10 07: revised note for Drinking fountain DF-1 at col J/3
W. Revised drawing P10 08: revised note for Drinking fountain DF-1 at col P/3
1.3 SPECIFICATION REVISIONS
A. Project Manual Table of Contents Page 2 reissued with revisions noted in bold underline/bold strikethrough.
B. Specifications Section 01270, Unit Prices reissued with revisions noted in bold underline/bold strikethrough.
C. Specifications Section 02080, Asbestos Abatement Page 3 reissued with revisions noted in bold underline/bold strikethrough.
D. Specifications Section 02085, Asbestos Abatement Procedures deleted in its entirety.
E. Specifications Section 08000, Door Schedule Notes Page 3 and Second Floor Door Schedule reissued with revisions noted in bold underline/bold strikethrough.
F. Specifications Section 09001, Room Finish Schedule Page 1 reissued with revisions noted in bold underline/bold strikethrough.
G. Drinking Fountains, DF-1: for marble-faced walls.
1. Supply and install where shown on the plans dual wall mounted circular drinking fountains. Mount fountains so lower bubbler stream is 36” above the floor. Receptors to be 16” in diameter with integral drains and seamless double bowl design with welded rims ground and polished to a finely tapered edge with 1/32” radius. Underbowls to be raised from support arms by 1/2” collar to provide an aesthetically pleasing profile.
Support arm on low bowl not to exceed 4 3/8” wide by 2 5/8” high. Support arm on high
Addendum 3 Page 3 of 3 bowl to include are extension so bottom of high arm is equal to bottom of the low arm.
Overall fountain bowl height not to exceed 3”. Bowls to be manufactured of 16 gauge solid bronze, hand polished to a #4 satin finish with matching 14 gauge support arms with tamper proof protection. Bubblers to have a matching finish with soft touch button valve.
All water contact surfaces shall be lead-free, stainless steel (brass bubbler and flow regulator not acceptable). Bowl toward the flow of traffic shall be 6” lower than other receptor. Fountain shall include mounting bracket to be mounted in the wall behind marble wainscot with 3/8” tongue projecting through marble to insure rigidity of the fountain. For those fountains installed on GWB, the mounting bracker to be mounted on the surface of the wall. A coverplate is used to conceal the mounting bracket. Cover plate shall be in 16-gauge solid bronze with a matching finish to the drinking fountains. No fasteners will be used to hold cover plate in place. Shut off for water supply shall be installed out of sight, underneath and inside the housing of the arm. Some fountains as shown on the plans will be connected to the dedicated drinking water loop already installed in the building. Other fountains, as noted on the plans, will be corrected to a remote Filtrine ES chiller/purifier as described in section 2.2D. Length of the supply from this dedicated drinking water loop to the fountain shall be no longer than 6 feet.
Fountain shall have no name plate lettering or symbols of any kind and carry a lifetime warranty.
2. Available Products:
a. Filtrine Manufacturing Model 107-16-HL
Addendum 3 Page 1 of 2
ADDENDUM NO. 3
TO THE BIDDING DOCUMENTS FOR
INTERIOR RENOVATIONS AT U.S. COURTHOUSE
PITTSBURGH, PENNSYLVANIA
ISSUE DATE: NOVEMBER 3, 2010
1.1 GENERAL REQUIREMENTS
A. This Addendum covers changes to the Documents and in closing the Contract will become a part thereof. Each Bidder shall include these items to the extent they affect this Bid.
B. These items modify only the portion of the Documents specifically noted. All other wording and Drawings remain in effect.
1.2 DRAWING REVISIONS
A. Delete text "ASSUME ONE LAYER OF CARPETING ON PADDING OVER RESILIENT TILE, TYP, UNO" from General Note 3 on Sheets A.1.10, A.1.11, A.1.12, and A.1.13.
B. Sheet A.1.10 reissued, with revisions bubbled. [keynote above, plus hatch in closet]
C. Sheet A.1.17 reissued, with revisions bubbled. [Jury box salvage clarification]
D. Revise General Note 3, Sheets A.1.36 and A.1.37 to read, "PATCH EXIST WALL SURFACES
TO REMAIN FOLLOWING REMOVALS. MATCH ADJ SURFACES. PATCH IN KIND,
UNO."
E. Revise General Note 4, Sheets A.1.36 and A.1.37 to read, “PATCH VOIDS IN EXIST CONC
TOPPING SLAB WITH CEMENTITIOUS FILL FOLLOWING PARTITION REMOVAL.
MATCH ADJ SURFACES. ASSUME 50% OF PARTITION REMOVAL LOCATIONS.”
F. Sheet A.2.02 reissued, with revisions bubbled. [Hatch area added per Question 76]
G. Sheet A.2.06 reissued, with revisions bubbled. [Finishes at North Lobby corrected]
H. Revise Keynote 16E, Sheet A.2.10 to read, “REPLACE EXISTING CLOCK MECHANISM
WITH UL RATED MECHANISM. ADJUST AS REQUIRED TO MAKE CLOCK
OPERATIONAL.”
Addendum 3 Page 2 of 2
I. Revise Legend Note, Sheets A.4.06 and A.4.07 to read, "INDICATES ACOUSTICALLY
TREATED WALLS. ALL PENETRATIONS AND DOORS TO BE ACOUSTICALLY
SEALED. RE: 12/A.5.03."
J. Revise Keynote 3, Sheet A.5.04 to read, “CLEAN EXISTING JURY CHAIR WITH MILD
DETERGENT AND WATER. WIPE DRY.”
K. Delete text "RE A.4.06 & A.4.07 FOR EXTENT OF ACOUSTICALLY TREATED PARTITIONS (BOTH NEW & EXIST)" from General Note 6, Sheet A.6.02
L. Revise Keynote 3, Sheets M.10.01 and M.10.02 to read, “REPAIR OPENINGS IN WALL
WHERE DUCTWORK SHALL BE REMOVED. REFER TO ARCHITECTURAL DWGS
FOR DETAILS. COORDINATE INFILL WITH ALL NEW WALL OPENINGS FOR NEW
DUCTWORK.”
1.3 SPECIFICATION REVISIONS
A. Project Manual Table of Contents Page 2 reissued with revisions noted in bold underline/bold strikethrough.
B. Specifications Section 01270, Unit Prices reissued with revisions noted in bold underline/bold strikethrough.
C. Specifications Section 02080, Asbestos Abatement Page 3 reissued with revisions noted in bold underline/bold strikethrough.
D. Specifications Section 02085, Asbestos Abatement Procedures deleted in its entirety.
E. Specifications Section 08000, Door Schedule Notes Page 3 and Second Floor Door Schedule reissued with revisions noted in bold underline/bold strikethrough.
F. Specifications Section 09001, Room Finish Schedule Page 1 reissued with revisions noted in bold underline/bold strikethrough.
Addendum 3 - 2 - Table of Contents
DIVISION 2 - SITE CONSTRUCTION
02085 02080
Asbestos Abatement Procedures
02089 PCB Ballast and HG Tube Abatement 02090 Lead Paint Demolition Procedures
DIVISION 3 - CONCRETE
03310 Cast-in-Place Concrete 03540 Cementitious Underlayment
DIVISION 4 - MASONRY
04060 Unit Masonry Mortar and Grout 04065 Stone Mortar and Grout 04210 Unit Masonry 04400 Stonework 04500 Marble Repair and Restoration
DIVISION 5 - METALS
05080 Fluoropolymer Finish 05500 Metal Fabrications 05700 Ornamental Metals 05750 Ornamental Metal Restoration
DIVISION 6 - WOOD AND PLASTIC
06070 Wood Treatment 06100 Rough Carpentry 06200 Finish Carpentry 06400 Architectural Woodwork 06500 Wood Repair and Refinishing
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07590 Roof Repairs 07620 Sheet Metal Flashing and Trim 07810 Applied Fireproofing 07840 Firestopping 07900 Joint Sealants
Addendum 3 01270 - 1 UNIT PRICES
SECTION 01270 - UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. A unit price provides an amount proposed by the Contractor and stated on the Bid Form as a price per unit of measurement for materials or services that will be added to or deducted from the Contract price by change order if the estimated quantity of the corresponding work required by the Contract Documents is increased or decreased.
B. Unit prices include all necessary material and labor costs, overhead, profit, taxes, shipping and other related expenses for the added or deducted work.
1.2 PROCEDURES
A. Measurement: Method of measurement for each unit price is specified in the specification section applicable to the work.
B. Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured, at the Government's expense, by an independent surveyor acceptable to the Contractor.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 UNIT PRICE SCHEDULE
A. Unit Price No. 1: VCT Floor Tile Removal.
1. Description: Removal of VCT floor tile (including mastic) according to Division 09 Section RESILIENT FLOORING.
2. Measurement: Square Meters of VCT floor tile.
3. Base Bid Quantity included in the Contract Documents: 649 Square Meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
B. Unit Price No. 2: ACM Floor Tile Removal.
1. Description: Removal and disposal of Asbestos Containing Floor tile (including mastic) according to Division 09 Section RESILIENT FLOORING and Division 2 Section
ASBESTOS ABATEMENT.
2. Measurement: Square Meters of ACM floor tile.
Addendum 3 01270 - 2 UNIT PRICES
3. Base Bid Quantity included in the Contract Documents: 941 918.5 Square Meters
C. Unit Price No. 3: ACM Floor Tile Mastic Removal.
1. Description: Removal and disposal of floor tile mastic (tile previously removed) according to Division 09 Section RESILIENT FLOORING and Division 2 Section
ASBESTOS ABATEMENT.
2. Measurement: Square Meters of floor tile mastic.
3. Base Bid Quantity included in the Contract Documents: 1142 825.4 Square Meters
D. Unit Price No. 4: Plaster Ceiling Removal.
1. Description: Removal and patching of plaster walls and ceilings according to Division 09 Section PLASTER REPAIR.
2. Measurement: Square Meters of plaster walls or ceilings.
3. Base Bid Quantity included in the Contract Documents: 310 Square Meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
E. Unit Price No. 5: Ceiling Patching.
1. Description: Patching of plaster ceilings according to Division 09 Section PLASTER
REPAIR.
2. Measurement: Square Meters of plaster or ceilings.
3. Base Bid Quantity included in the Contract Documents: 170 Square Meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
F. Unit Price No. 6: Asbestos Containing Acoustic Plaster Ceilings Removal.
1. Description: Removal, disposal, and patching of asbestos containing acoustic plaster ceilings according to Division 02 Section ASBESTOS ABATEMENT PROCEDURES.
2. Measurement: Square Meters of asbestos containing acoustic plaster ceilings.
3. Base Bid Quantity included in the Contract Documents: 0 Square Meters
G. Unit Price No. 7: Asbestos Containing Pipe Insulation and Pipe Joints.
1. Description: Removal and disposal of asbestos containing pipe insulation and pipe joints according to Division 02 Section ASBESTOS ABATEMENT PROCEDURES.
2. Measurement: Square Meters of asbestos containing pipe insulation.
3. Base Bid Quantity included in the Contract Documents: 976 Meters 274.5 Square
Meters.
Addendum 3 01270 - 3 UNIT PRICES
H. Unit Price No. 8: Roof Infill.
1. Description: Infill of roof penetrations according to Division 07 Section ROOF REPAIRS and details.
2. Measurement: Square Meters of roof infill.
3. Base Bid Quantity included in the Contract Documents: 8 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
I. Unit Price No. 9: Floor Patching and Slab Leveling.
1. Description: Patch concrete floors and level at wall removal and inconsistencies in floor level according to Division 03 Section CEMENTITIOUS UNDERLAYMENT and Division 01 section CUTTING AND PATCHING.
2. Measurement: Square Meters of floor plate.
3. Base Bid Quantity included in the Contract Documents: 2,400 square meters 41 meters at 203 mm wide x 90 mm deep per meter.
J. Unit Price No. 10: Adhered Acoustic Tile Ceiling Removal.
1. Description: Removal of adhered acoustic tile ceilings according to Division 01 Section Selective Demolition.
2. Measurement: Square Meters of Adhered Acoustic Tile Ceiling.
3. Base Bid Quantity included in the Contract Documents: 431 square meters
K. Unit Price No. 11: Asbestos Containing Adhered Acoustic Tile Ceiling Removal.
1. Description: Removal of asbestos containing adhered acoustic tile ceilings according to Division 02 Section ASBESTOS ABATEMENTS PROCEDURES.
2. Measurement: Square Meters of asbestos containing adhered acoustic tile ceiling including mastic.
3. Base Bid Quantity included in the Contract Documents: 485 251.2 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
L. Unit Price No. 12: Wall Patching.
1. Description: Patching of existing plaster walls per Division 1 section CUTTING AND
PATCHING.
2. Measurement: Square Meters of wall patching.
3. Base Bid Quantity included in the Contract Documents: 648 250 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
M. Unit Price No. 13: Masonry Wall Infill.
1. Description: Infill of 4” terracotta tile walls with 4” CMU per Division 4 section UNIT
MASONRY.
2. Measurement: Square Meters masonry infill.
3. Base Bid Quantity included in the Contract Documents: 410 200 square meters
Addendum 3 01270 - 4 UNIT PRICES
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
N. Unit Price No. 14: Roof Repair.
1. Description: Repair of roof membrane and flashings per Division 7 section ROOF
REPAIR.
2. Measurement: Square Meters of roof repair.
3. Base Bid Quantity included in the Contract Documents: 21 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
O. Unit Price No. 15: Replacement of laminate joint fillers in 10th floor Courtroom paneling.
1. Description: Replacement of black laminate strips filling joints between existing millwork wall panels per Division 6 section ARCHITECTURAL WOODWORK.
2. Measurement: Meters of filler replacement.
3. Base Bid Quantity included in the Contract Documents: 2 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
P. Unit Price No. 16: Marble Crack Repair.
1. Description: Repair marble cracks per Division 9 section MARBLE REPAIR AND
RESTORATION.
2. Measurement: Meters of marble crack repair.
3. Base Bid Quantity included in the Contract Documents: 31 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
Q. Unit Price No. 17: Marble Patching.
1. Description: Marble patching per Division 4 section MARBLE REPAIR AND
RESTORATION.
2. Measurement: Square Meters of marble patching.
3. Base Bid Quantity included in the Contract Documents: 15 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
R. Unit Price No. 18: Marble Dutchman Repair.
1. Description: Dutchman repairs at marble panels, base, casing per Division 4 section
MARBLE REPAIR AND RESTORATION.
2. Measurement: Number of Dutchman repairs.
3. Base Bid Quantity included in the Contract Documents: 0
S. Unit Price No. 19: Marble Salvage and Reinstallation = Remove/Salvage and Reinstall Marble Panels and Base.
1. Description: Salvage and reinstallation of marble panels per Division 4 section MARBLE
REPAIR AND RESTORATION.
2. Measurement: Number of panels.
3. Base Bid Quantity included in the Contract Documents: 8 panels
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 2 panels.
Addendum 3 01270 - 5 UNIT PRICES
T. Unit Price No. 20: Terrazzo Flooring Crack Repair.
1. Description: Repair of cracks in terrazzo floor per Division 9 section TERRAZZO
REPAIR AND RESTORATION.
2. Measurement: Meters of terrazzo crack repair.
3. Base Bid Quantity included in the Contract Documents: 31 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
U. Unit Price No. 21: Terrazzo Flooring Patching.
1. Description: Patch terrazzo floor per Division 9 section TERRAZZO REPAIR AND
RESTORATION.
2. Measurement: Square Meters of terrazzo flooring patching.
3. Base Bid Quantity included in the Contract Documents: 39 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
V. Unit Price No. 22: Terrazzo Flooring Replacement.
1. Description: Replacement of terrazzo flooring per Division 9 section TERRAZZO
REPAIR AND RESTORATION.
2. Measurement: Square Meters of terrazzo floor replacement.
3. Base Bid Quantity included in the Contract Documents: 0 square meters
W. Unit Price No. 23: Granite Flooring Crack Repair.
1. Description: Repair of cracks in granite floor per Division 4 section STONE
RESTORATION.
2. Measurement: Meters of granite floor crack repair.
3. Base Bid Quantity included in the Contract Documents: 5 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
X. Unit Price No. 24: Granite Flooring Patching.
1. Description: Repair of roof membrane and flashings per Division 4 section STONE
RESTORATION.
2. Measurement: Square Meters of Granite Floor Patching.
3. Base Bid Quantity included in the Contract Documents: 5 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
Y. Unit Price No. 25: Granite Flooring Replacement
1. Description: Patch and Repair Existing Terrazzo and Granite Floor according to Division
4 STONE RESTORATION
2. Measurement: Square Meters of Patch and Repair Existing Terrazzo and Granite Floor.
3. Base Bid Quantity included in the Contract Documents: 0 square meters
END OF SECTION 01270
Interior Renovations at U.S. Courthouse GSA Number: GS-03P-98-CDC-0019
Addendum 3 02080 - 3 Asbestos Abatement
Asbestos Containing Materials to be Removed Location
Estimated Quantity Asbestos Content
Thermal System Insulation (Includes Pipe Insulation and Hard Fittings)
See Drawing ENV01 and ENV02
274.5 SM
(2,950 SF)
30-40% Chrysotile (PI), 30% Chrysotile and 10%
Amosite (HF) 12” x 12” White Mottled Floor Tile and Associated
Mastics
See Drawing ENV01 and ENV02
558 SM
(6,000 SF)
3-4% Chrysotile
12” x 12” Green Floor Tile and Associated Mastics
See Drawing ENV01 and ENV02
7 25.6 SM
(75 275SF)
2-3% Chrysotile
Black Mastic (Under Carpet)
See Drawing ENV01 and ENV02
241.8 SM
(2,600 SF)
PACM
9” x 9” Brown/Beige Floor Tile
See Drawing ENV01 and ENV02
334.9 SM
(3,600 SF)
5% Chrysotile
Ceiling Tile (1’ x 1’ with Fissures)
See Drawing ENV01 and ENV02
251.2 SM
(2,700 SF)
6% Chrysotile
Fire Doors Throughout 10th Floor 20 Each PACM
NOTE: The following materials were also sampled and tested for asbestos: ceiling plaster, wall plaster, linoleum, 1’x1’ ceiling tile with rough texture, 1’x1’ ceiling tile with mastic, 2’x4’ ceiling tile, and 9”x9” brown/beige floor tile mastic. Analytical results indicated that these materials did not contain asbestos.
D. The CONTRACTOR is responsible for the clean up of any loose asbestos debris that may be encountered throughout the Project Area, on floors, above the ceiling, or concealed within the wall and pipe chases. All non-asbestos containing building materials that are removed in order to access ACM must be decontaminated and removed from the containment area.
E. Coordination and Scheduling
1. The CONTRACTOR must begin and complete all Work within the time established in the Contract and the Notice to Proceed issued by the General Services Administration (GSA) to the CONTRACTOR. The CONTRACTOR shall provide preconstruction submittals as specified in Subparagraph 1.4.B through 1.4.I of this Section for review and approval at least two weeks prior to onsite asbestos hazard abatement work.
2. The CONTRACTOR shall coordinate with GSA, the OWNER’S
REPRESENTATIVE, and other contractors for the successful completion of the Work.
3. All work within asbestos regulated area(s) not related to asbestos abatement shall cease and shall not commence until asbestos hazard abatement operations are complete to the satisfaction of the OWNER’S REPRESENTATIVE.
Interior Renovations at U.S. Courthouse
GSA Number GS-03P-98-CDC-0019
D22 Electric hold-open wall magnets (120VAC) connected to fire alarm.
D24 Paint to be applied to corridor side of door only. Existing door and frame finish to remain at room side.
D25 New door in existing frame. Scheduled door dimensions are approximate and must be verified in field. Coordinate door hardware prep. With locations of hinges and strikes in existing frame.
D26 New Casing only D27 Provide metal impact protection rails on lower half of door D28 Re: 05/A6.05 for door protection rails D29 Panic Device D30 Replace existing hardware with same.
D31 Remove for reuse existing threshold, recut bevels as required to accommodate new epoxy terrazzo floor and reset threshold per 08/A6.06. Trim and repaint bottom of door as required to clear reset threshold.
D32 Provide specified Frame Type at both sides of door.
Addendum 3 08000 - 3
Door Schedule
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
201-1 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
201-2 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
202B-2 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31 202B-3 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31
203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 810 D25 206 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25 207 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
208 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
209 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
210 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
211 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
212 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
213 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
214 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
215 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
216-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 217 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
218 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
219 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 90 min. 725 D25, D27, D28
231 2 D2 SCW PT-19 Exist PT-75 (2) 914 2134 44 H4A J4A T8 -------- 725 D6, D25
233 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 725 D12, D25
245-1 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
C-201 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
C-202A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D12, D25
C-203A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811 D25
C-204A-1 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204S 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204T 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D14, D25
C-204U-2 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D12, D25
C-204V 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 45 min. 725 D25
C-205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D5, D25, D12
C-205B 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
C-205M 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D25, D12
E-201-1 2 D3 Wood/ Glass PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725
D14, D15, D25
E-201-2 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D16, D25
E-203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
M-206 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D13, D7
M-261 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A -------- Exist. D26
M-263 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811A D12, D25
P-204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
S-202 1 C4 FCW PT-19 Exist PT-19 940 2108 44 Exist Exist T8 90 min. 310 D9, D25,D29
S-216 1 C4 FCW PT-19 Exist PT-19 914 2134 44 Exist Exist 90 min. 310 D25, D29
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
Addendum 3 08000 - 2
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
S-217 1 C4 FCW PT-19 Exist PT-19 940 2134 44 H4A J4A T8 90 min. 310 D25,D29
S-218 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A 90 min. Exist. D31, D26
Addendum 3 08000 - 3
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks
102 Corridor BS-1 Exist TZ-1, TZ-2
Existing 9, 15
106A Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106B Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106C Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
107 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
108 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
201 Corridor North Elevator
Lobby
BS-1 [PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
Exist
9, 15
202 Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
202B Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
202C Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
203 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
204 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
216 South Elevator Lobby
BS-1 [PT-24] TZ-1,
TZ-2
Exist 15
217 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
218 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
305 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
306 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
317 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
318 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
505A Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
Addendum 3 09001 - 1
Room Finish Schedule
Addendum 3 01270 - 1 UNIT PRICES
SECTION 01270 - UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. A unit price provides an amount proposed by the Contractor and stated on the Bid Form as a price per unit of measurement for materials or services that will be added to or deducted from the Contract price by change order if the estimated quantity of the corresponding work required by the Contract Documents is increased or decreased.
B. Unit prices include all necessary material and labor costs, overhead, profit, taxes, shipping and other related expenses for the added or deducted work.
1.2 PROCEDURES
A. Measurement: Method of measurement for each unit price is specified in the specification section applicable to the work.
B. Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured, at the Government's expense, by an independent surveyor acceptable to the Contractor.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 UNIT PRICE SCHEDULE
A. Unit Price No. 1: VCT Floor Tile Removal.
1. Description: Removal of VCT floor tile (including mastic) according to Division 09 Section RESILIENT FLOORING.
2. Measurement: Square Meters of VCT floor tile.
3. Base Bid Quantity included in the Contract Documents: 649 Square Meters
B. Unit Price No. 2: ACM Floor Tile Removal.
1. Description: Removal and disposal of Asbestos Containing Floor tile (including mastic) according to Division 09 Section RESILIENT FLOORING and Division 2 Section
ASBESTOS ABATEMENT.
2. Measurement: Square Meters of ACM floor tile.
Addendum 3 01270 - 2 UNIT PRICES
3. Base Bid Quantity included in the Contract Documents: 941 918.5 Square Meters
C. Unit Price No. 3: ACM Floor Tile Mastic Removal.
1. Description: Removal and disposal of floor tile mastic (tile previously removed) according to Division 09 Section RESILIENT FLOORING and Division 2 Section
ASBESTOS ABATEMENT.
2. Measurement: Square Meters of floor tile mastic.
3. Base Bid Quantity included in the Contract Documents: 1142 825.4 Square Meters
D. Unit Price No. 4: Plaster Ceiling Removal.
1. Description: Removal and patching of plaster walls and ceilings according to Division 09 Section PLASTER REPAIR.
2. Measurement: Square Meters of plaster walls or ceilings.
3. Base Bid Quantity included in the Contract Documents: 310 Square Meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
E. Unit Price No. 5: Ceiling Patching.
1. Description: Patching of plaster ceilings according to Division 09 Section PLASTER
REPAIR.
2. Measurement: Square Meters of plaster or ceilings.
3. Base Bid Quantity included in the Contract Documents: 170 Square Meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
F. Unit Price No. 6: Asbestos Containing Acoustic Plaster Ceilings Removal.
1. Description: Removal, disposal, and patching of asbestos containing acoustic plaster ceilings according to Division 02 Section ASBESTOS ABATEMENT PROCEDURES.
2. Measurement: Square Meters of asbestos containing acoustic plaster ceilings.
3. Base Bid Quantity included in the Contract Documents: 0 Square Meters
G. Unit Price No. 7: Asbestos Containing Pipe Insulation and Pipe Joints.
1. Description: Removal and disposal of asbestos containing pipe insulation and pipe joints according to Division 02 Section ASBESTOS ABATEMENT PROCEDURES.
2. Measurement: Square Meters of asbestos containing pipe insulation.
3. Base Bid Quantity included in the Contract Documents: 976 Meters 274.5 Square
Meters.
Addendum 3 01270 - 3 UNIT PRICES
H. Unit Price No. 8: Roof Infill.
1. Description: Infill of roof penetrations according to Division 07 Section ROOF REPAIRS and details.
2. Measurement: Square Meters of roof infill.
3. Base Bid Quantity included in the Contract Documents: 8 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
I. Unit Price No. 9: Floor Patching and Slab Leveling.
1. Description: Patch concrete floors and level at wall removal and inconsistencies in floor level according to Division 03 Section CEMENTITIOUS UNDERLAYMENT and Division 01 section CUTTING AND PATCHING.
2. Measurement: Square Meters of floor plate.
3. Base Bid Quantity included in the Contract Documents: 2,400 square meters 41 meters at 203 mm wide x 90 mm deep per meter.
J. Unit Price No. 10: Adhered Acoustic Tile Ceiling Removal.
1. Description: Removal of adhered acoustic tile ceilings according to Division 01 Section Selective Demolition.
2. Measurement: Square Meters of Adhered Acoustic Tile Ceiling.
3. Base Bid Quantity included in the Contract Documents: 431 square meters
K. Unit Price No. 11: Asbestos Containing Adhered Acoustic Tile Ceiling Removal.
1. Description: Removal of asbestos containing adhered acoustic tile ceilings according to Division 02 Section ASBESTOS ABATEMENTS PROCEDURES.
2. Measurement: Square Meters of asbestos containing adhered acoustic tile ceiling including mastic.
3. Base Bid Quantity included in the Contract Documents: 485 251.2 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
L. Unit Price No. 12: Wall Patching.
1. Description: Patching of existing plaster walls per Division 1 section CUTTING AND
PATCHING.
2. Measurement: Square Meters of wall patching.
3. Base Bid Quantity included in the Contract Documents: 648 250 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
M. Unit Price No. 13: Masonry Wall Infill.
1. Description: Infill of 4” terracotta tile walls with 4” CMU per Division 4 section UNIT
MASONRY.
2. Measurement: Square Meters masonry infill.
3. Base Bid Quantity included in the Contract Documents: 410 200 square meters
Addendum 3 01270 - 4 UNIT PRICES
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
N. Unit Price No. 14: Roof Repair.
1. Description: Repair of roof membrane and flashings per Division 7 section ROOF
REPAIR.
2. Measurement: Square Meters of roof repair.
3. Base Bid Quantity included in the Contract Documents: 21 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
O. Unit Price No. 15: Replacement of laminate joint fillers in 10th floor Courtroom paneling.
1. Description: Replacement of black laminate strips filling joints between existing millwork wall panels per Division 6 section ARCHITECTURAL WOODWORK.
2. Measurement: Meters of filler replacement.
3. Base Bid Quantity included in the Contract Documents: 2 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
P. Unit Price No. 16: Marble Crack Repair.
1. Description: Repair marble cracks per Division 9 section MARBLE REPAIR AND
RESTORATION.
2. Measurement: Meters of marble crack repair.
3. Base Bid Quantity included in the Contract Documents: 31 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
Q. Unit Price No. 17: Marble Patching.
1. Description: Marble patching per Division 4 section MARBLE REPAIR AND
RESTORATION.
2. Measurement: Square Meters of marble patching.
3. Base Bid Quantity included in the Contract Documents: 15 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
R. Unit Price No. 18: Marble Dutchman Repair.
1. Description: Dutchman repairs at marble panels, base, casing per Division 4 section
MARBLE REPAIR AND RESTORATION.
2. Measurement: Number of Dutchman repairs.
3. Base Bid Quantity included in the Contract Documents: 0
S. Unit Price No. 19: Marble Salvage and Reinstallation = Remove/Salvage and Reinstall Marble Panels and Base.
1. Description: Salvage and reinstallation of marble panels per Division 4 section MARBLE
REPAIR AND RESTORATION.
2. Measurement: Number of panels.
3. Base Bid Quantity included in the Contract Documents: 8 panels
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 2 panels.
Addendum 3 01270 - 5 UNIT PRICES
T. Unit Price No. 20: Terrazzo Flooring Crack Repair.
1. Description: Repair of cracks in terrazzo floor per Division 9 section TERRAZZO
REPAIR AND RESTORATION.
2. Measurement: Meters of terrazzo crack repair.
3. Base Bid Quantity included in the Contract Documents: 31 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
U. Unit Price No. 21: Terrazzo Flooring Patching.
1. Description: Patch terrazzo floor per Division 9 section TERRAZZO REPAIR AND
RESTORATION.
2. Measurement: Square Meters of terrazzo flooring patching.
3. Base Bid Quantity included in the Contract Documents: 39 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
V. Unit Price No. 22: Terrazzo Flooring Replacement.
1. Description: Replacement of terrazzo flooring per Division 9 section TERRAZZO
REPAIR AND RESTORATION.
2. Measurement: Square Meters of terrazzo floor replacement.
3. Base Bid Quantity included in the Contract Documents: 0 square meters
W. Unit Price No. 23: Granite Flooring Crack Repair.
1. Description: Repair of cracks in granite floor per Division 4 section STONE
RESTORATION.
2. Measurement: Meters of granite floor crack repair.
3. Base Bid Quantity included in the Contract Documents: 5 meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
X. Unit Price No. 24: Granite Flooring Patching.
1. Description: Repair of roof membrane and flashings per Division 4 section STONE
RESTORATION.
2. Measurement: Square Meters of Granite Floor Patching.
3. Base Bid Quantity included in the Contract Documents: 5 square meters
4. Limits of Variation from the Base Bid Quantity Applicable to the Unit Price: 30%.
Y. Unit Price No. 25: Granite Flooring Replacement
1. Description: Patch and Repair Existing Terrazzo and Granite Floor according to Division
4 STONE RESTORATION
2. Measurement: Square Meters of Patch and Repair Existing Terrazzo and Granite Floor.
3. Base Bid Quantity included in the Contract Documents: 0 square meters
END OF SECTION 01270
Interior Renovations at U.S. Courthouse GSA Number: GS-03P-98-CDC-0019
Addendum 3 02080 - 3 Asbestos Abatement
Asbestos Containing Materials to be Removed Location
Estimated Quantity Asbestos Content
Thermal System Insulation (Includes Pipe Insulation and Hard Fittings)
See Drawing ENV01 and ENV02
274.5 SM
(2,950 SF)
30-40% Chrysotile (PI), 30% Chrysotile and 10%
Amosite (HF) 12” x 12” White Mottled Floor Tile and Associated
Mastics
See Drawing ENV01 and ENV02
558 SM
(6,000 SF)
3-4% Chrysotile
12” x 12” Green Floor Tile and Associated Mastics
See Drawing ENV01 and ENV02
7 25.6 SM
(75 275SF)
2-3% Chrysotile
Black Mastic (Under Carpet)
See Drawing ENV01 and ENV02
241.8 SM
(2,600 SF)
PACM
9” x 9” Brown/Beige Floor Tile
See Drawing ENV01 and ENV02
334.9 SM
(3,600 SF)
5% Chrysotile
Ceiling Tile (1’ x 1’ with Fissures)
See Drawing ENV01 and ENV02
251.2 SM
(2,700 SF)
6% Chrysotile
Fire Doors Throughout 10th Floor 20 Each PACM
NOTE: The following materials were also sampled and tested for asbestos: ceiling plaster, wall plaster, linoleum, 1’x1’ ceiling tile with rough texture, 1’x1’ ceiling tile with mastic, 2’x4’ ceiling tile, and 9”x9” brown/beige floor tile mastic. Analytical results indicated that these materials did not contain asbestos.
D. The CONTRACTOR is responsible for the clean up of any loose asbestos debris that may be encountered throughout the Project Area, on floors, above the ceiling, or concealed within the wall and pipe chases. All non-asbestos containing building materials that are removed in order to access ACM must be decontaminated and removed from the containment area.
E. Coordination and Scheduling
1. The CONTRACTOR must begin and complete all Work within the time established in the Contract and the Notice to Proceed issued by the General Services Administration (GSA) to the CONTRACTOR. The CONTRACTOR shall provide preconstruction submittals as specified in Subparagraph 1.4.B through 1.4.I of this Section for review and approval at least two weeks prior to onsite asbestos hazard abatement work.
2. The CONTRACTOR shall coordinate with GSA, the OWNER’S
REPRESENTATIVE, and other contractors for the successful completion of the Work.
3. All work within asbestos regulated area(s) not related to asbestos abatement shall cease and shall not commence until asbestos hazard abatement operations are complete to the satisfaction of the OWNER’S REPRESENTATIVE.
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
201-1 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
201-2 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
202B-2 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31 202B-3 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31
203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 810 D25 206 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25 207 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
208 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
209 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
210 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
211 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
212 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
213 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
214 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
215 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
216-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 217 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
218 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
219 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 90 min. 725 D25, D27, D28
231 2 D2 SCW PT-19 Exist PT-75 (2) 914 2134 44 H4A J4A T8 -------- 725 D6, D25
233 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 725 D12, D25
245-1 2 Exist -------- -------- Exist -------- -------- -------- -------- H4A J4A -------- Exist.
D7, D31, D32
C-201 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
C-202A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D12, D25
C-203A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811 D25
C-204A-1 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204S 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204T 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D14, D25
C-204U-2 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D12, D25
C-204V 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 45 min. 725 D25
C-205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D5, D25, D12
C-205B 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
C-205M 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D25, D12
E-201-1 2 D3 Wood/ Glass PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725
D14, D15, D25
E-201-2 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D16, D25
E-203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
M-206 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D13, D7
M-261 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A -------- Exist. D26
M-263 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811A D12, D25
P-204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
S-202 1 C4 FCW PT-19 Exist PT-19 940 2108 44 Exist Exist T8 90 min. 310 D9, D25,D29
S-216 1 C4 FCW PT-19 Exist PT-19 914 2134 44 Exist Exist 90 min. 310 D25, D29
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
Addendum 3 08000 - 2
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
S-217 1 C4 FCW PT-19 Exist PT-19 940 2134 44 H4A J4A T8 90 min. 310 D25,D29
S-218 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A 90 min. Exist. D31, D26
Addendum 3 08000 - 3
GSA Number GS-03P-98-CDC-0019
General Notes:
1 Reference General Notes to Door Schedule 2 Reference Finish Materials Schedule for description of finish materials.
3 Remove door numbers and signage at existing doors for painting and reinstall after painting, UNO.
4 Clean and block existing transom transfer grilles with 18 ga sheet metal painted flat black.
5 Paint all fire cabinet doors to match new corridor door color, PT-19, UNO.
6 Where new doors are scheduled in existing frames, field verify frame dimensions and size new door to fit. Coordinate door hardware prep with existing hinge and strike locations.
7 Not Used 8 Not used 9 Dimensions for existing doors to remain are approximate and provided to determine scope of painting and refinishing
10 Restore all existing hardware to remain per Hardware Restoration specification.
11 Approximate dimensions of existing doors to remain are provided for information only. New casing dimensions must be verified in field.
12 Door numbers are on 1:100 scale plans except for 3rd and 5th floor toilet rooms, where no 1:100 scale plans are included in the drawings. Doors at these toilet rooms are keyed on 1:50 scale plans.
13 Some doors at the 10th floor main corridor were purchased in an earlier project and may exist on-site. These are available to the contractor, however the contractor is responsible for confirming availability and suitability of these doors.
Door Legend:
HM Hollow metal door or frame WD Wood door or frame
AWD Acoustic wood door STL Acoustic steel door SCW Solid core wood door FCW Fire rated core
K Hardware set preceded by K means machined grooves in handle for handicapped identification
DOOR NOTES:
D1 Existing door and transom panel, paint only.
D2 Security devices, reference security documents & electrical documents D3 New material furnished by the Government (doors purchased and stored in earlier renovation project) D4 New door hardware furnished by the Government D5 Existing card reader, electric strike and intercom to remain D6 Provide sound seals (re: 13/A6.06) and drop bottom seal D7 Existing door, reset threshold for new finish and paint where noted on schedule.
D8 Existing door, paint door, frame, casing.
D9 Patch and grind smooth frame at butt relocations, 3 per frame
D10 Door and frame to be dismantled for mechanical room access and reassembled after MEP installation.
D11 Existing door opening. Remove marble wainscot and marble surround. Install new CMU at jambs and lintels, reinstall marble.
D12 Existing card reader or keypad, sensor, and electric strike to remain D13 Existing storefront entrance with 660mm wide sidelight to remain D14 Existing cyber lockset to be relocated on new door D15 Existing automatic opener to be relocated on new door D16 Provide deadbolt D17 Cut top of existing door and rehang at raised elevation to allow for new raised platform. Fill strike and hinge recesses in frame and cut new recesses.
D18 Paint metal frame only.
D19 Clean and wax existing varnished wood door.
D20 Existing door opening blocked by new partition. Active door to be locked.
D21 Field verify new door dimension with existing frame
Addendum 3 08000 - 2
GSA Number GS-03P-98-CDC-0019
D22 Electric hold-open wall magnets (120VAC) connected to fire alarm.
D24 Paint to be applied to corridor side of door only. Existing door and frame finish to remain at room side.
D25 New door in existing frame. Scheduled door dimensions are approximate and must be verified in field. Coordinate door hardware prep. With locations of hinges and strikes in existing frame.
D26 New Casing only D27 Provide metal impact protection rails on lower half of door D28 Re: 05/A6.05 for door protection rails D29 Panic Device D30 Replace existing hardware with same.
D31 Remove for reuse existing threshold, recut bevels as required to accommodate new epoxy terrazzo floor and reset threshold per 08/A6.06. Trim and repaint bottom of door as required to clear reset threshold.
D32 Provide specified Frame Type at both sides of door.
Addendum 3 08000 - 3
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks
102 Corridor BS-1 Exist TZ-1, TZ-2
Existing 9, 15
106A Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106B Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106C Corridor BS-1 [PT-24] TZ-1, TZ-2
ACT-1,CL-1,
PT-25A
9,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .