Interior Renovations at U.S. Courthouse GSA Number GS‑03P‑98-CDC-0019
Pittsburgh, Pennsylvania
09001 – ROOM FINISH SCHEDULE NOTES
The following Notes are issued in their entirety in Addendum 2.
General Schedule Notes:
1.
All painted ceiling and bulkheads are of gypsum board construction UNO.
2.
For rooms calling for multiple finishes of a given category (schedule column), see floorplans, reflected ceiling plans and elevations for locations and extent of application.
3.
All work is of entirely or predominantly new construction and/or restoration scope UNO in Scope column.
4.
For all references to millwork in Remarks Column, see architectural drawings & specifications for further detail regarding design, dimensions, or quantity.
5.
All gypsum board and gypsum plaster surfaces to be painted UNO.
6.
All exposed conduit shall be painted to match adjacent surfaces.
7.
See Door Schedule for paint on doors, frames, and casings.
8.
In all spaces labeled as "Shell Space", finish all existing and new walls to a level suitable for final painting. New walls to be taped, spackeled and sanded. Existing walls to be patched and sanded. Floors to be patched and leveled so they are suitable for tenant floor finishes. Remove any loose items in exposed ceiling and clean ductwork, piping and other MEP equipment. Remove paint from windows and clean windows.
Key:
ETR
Existing to remain.
[R] Existing floor, wall and ceiling finishes in the room are to remain UNO. Repair collateral damage to floor, walls and ceiling caused by new MEP/F work to match existing finishes UNO. Match existing finishes where new walls or ceilings are required, UNO
[XX-Y]
Same as [R]. Patch and repair with finish noted.
RES
Historical restoration work; see architectural drawings & specifications.
DEL
Deleted from schedule
Remarks Column Notes:
1.
See Architectural Drawings and Specifications for finishes.
2.
See MEP Drawings and Specifications.
3.
Existing ceiling in cement plaster.
4.
Provide shelf finished in PL-2 and rod, see 05/A5.06
5.
Provide millwork finished in WD-1.
6.
Provide Service Unit finished in PL-1/PL-2.
7.
Provide Service Unit finished in PL-7/PL-8.
8.
Metal toilet partitions to receive manufacturer's standard baked enamel finish.
9.
See interior elevations and floorplans for scope of restoration work.
10.
Provide chair rail.
11.
No new ceiling; exposed construction only.
12.
Tile wainscot on wet walls only, see 02/A5.01.
13.
Shell Space, see General Note 8.
14.
Tape, spackle, paint unfinished gyp bd walls.
15.
BS-1, see 06/A6.05.
Base Condition - Marble Base.
Option 5 – Painted Wood Base, PT-19.
Option 6 -Terrazzo Base, Color to match Marble ST-8. Submit sample to Contracting Officer for approval.
END OF SECTION 09001
October 26, 2010
Addendum 2 09001-6 Room Finish Schedule