TEAM TRANSMITTAL
DATE: 27 August 2010
PROJECT: Pittsburgh Courthouse – Interior Renovations at U.S. Courthouse, ITEMS SENT: For Construction
COMMENTS: PDF’s of this distribution are posted on the project FTP site in folder:
\SBA\2010 0827 - Interior Renovations - For Construction - all documents
NO. OF PAGES: 1
FOR:
Approval Information As Requested Review & Comment
COMPANY NAME PHONE/FAX CONTACT QUANTITY
GSA Region 3
Project Manangement Division The Strawbridge Building 20 North 8th Street Philadelphia, PA 19107-3191
(215) 446-4512
Chris McAlee Project Manager
Ten half size drawings
Three 8 ½ x 11 addendum 1 documents
URS Corporation Room 1355 U.S. Post Office and Courthouse 700 Grant Street Pittsburgh, PA 15219
P (412) 644-5202
Bill Weyers Two half size drawings
One full size drawings
Three 8 ½ x 11 addendum 1 documents
Shalom Baranes Associates 3299 K Street, NW #400 Washington, DC 20007
P (202) 342-2200
John N Nammack Two half size
One 8 ½ x 11 addendum 1 documents
URS Corporation 1375 Euclid Avenue Cleveland, OH 44115
P (216) 622-2282
Mark Blasco One half size
One 8 ½ x 11 addendum 1 documents
FROM: John Nammack CC: ABC, File
Interior Renovations at U.S. Courthouse GSA Number GS-03P-98-CDC-0019 Pittsburgh, Pennsylvania
Addendum #1 Page 1 of 1
ADDENDUM NO. 1
TO THE BIDDING DOCUMENTS FOR
INTERIOR RENOVATIONS AT U.S. COURTHOUSE
PITTSBURGH, PENNSYLVANIA
ISSUE DATE: OCTOBER 4, 2010
1.1 GENERAL REQUIREMENTS
A. This Addendum covers changes to the Documents and in closing the Contract will become a part thereof. Each Bidder shall include these items to the extent they affect this Bid.
B. These items modify only the portion of the Documents specifically noted. All other wording and Drawings remain in effect.
1.2 DRAWING REVISIONS
A. Reissue sheets E-10-13 and E-10-14 with clouded changes (remove electronic security devices from tenth floor communications closet doors).
B. Reissue sheets M401, M402, and M403 with clouded changes (note revisions).
1.3 SPECIFICATION REVISIONS
A. Room Finish Schedule General Notes, Key, and Remarks Column Notes (which apply to entries on the finish schedule) issued in their entirety.
B. Room Finish Schedule reissued with corrections in bold (Correct typo’s).
C. Door Schedule reissued with corrections in bold (change hardware sets on doors to Communications Closets on floors 1, 2, and 10 to remove electronic security hardware and devices).
D. Reissue Sections 01140 and 01593 with changes revisions bolded and underlined.
October 4, 2010 Addendum #1 01140 - 1 Work Restrictions
SECTION 01140 - WORK RESTRICTIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 CONTRACTOR USE OF PREMISES
A. The Contracting Officer or Contracting Officer's Representative will conduct a pre-construction survey with the Contractor to review and document the existing conditions surrounding the project premises prior to the beginning of any construction activity. Existing damage shall be recorded by the Construction Manager at the request of the Contractor. No work shall proceed in any area until pre-construction survey has been reviewed by the Contracting Officer.
B. The Contractor shall limit use of the premises to the work in areas indicated only, to allow for Government occupancy and public use.
1. Confine operations to areas indicated. Do not disturb portions of the building beyond the areas in which Work is indicated.
2. Subject to phasing requirements, keep driveways and entrances serving the premises clear and available at all times to the Government, Government employees and visitors. Do not use these areas for parking or storage of materials.
3. Schedule deliveries to minimize space and time requirements. Contractor will have access to the loading dock area within specific time limitations determined by the Contracting Officer.
4. No storage of materials on site will be permitted. Space on the premises will be made available for the Contractor's storage and related activities, provided that its use will not interfere with operations of the Government.
5. Without exception, the Contractor, his sub-contractors and their personnel are prohibited from using any facilities other than those which are designated for his use. Temporary offices and storage will be supplied on the 10th Floor. Violation of this restriction will result in the employee’s removal from the site.
6. Single-use restrooms on the 10th Floor will be available for the Contractor’s use. After those have been demolished, the Contractor will make new arrangements with the Contracting Officer.
7. Maintain existing building in a safe and weathertight condition throughout the construction period. Repair damage caused by construction operations. Take precautions to protect the building, its occupants and the public during the construction period.
8. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction materials.
All debris shall be removed from the building on a daily basis.
Addendum #1 01140 - 2 Work Restrictions
9. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government or other's property, shall become the property of the Contractor and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.
10. No parking will be available onsite. The Contractor and Contractor's employees shall make their own arrangements for vehicle parking off site.
11. Vertical transportation will be restricted to building management-specified elevators.
Violation of this restriction will result in the employee’s removal from the site.
12. As part of the Project, include removal of elevator car panels and protection of the panels and the associated padding for two elevators in the main elevator banks.
13. Corridors on 1st and 2nd Floors must maintain safe access for tenants. These Floors can never be shut down. Any spaces behind these corridor walls must also be kept secure.
1.3 GOVERNMENT OCCUPANCY
A. The Government will occupy the site and the existing building during the entire period of construction. Cooperate with the Government's representatives during construction operations to minimize conflicts and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.
1. All work to be performed in occupied tenant space, including, but not limited to
Chambers, Courtrooms, and Jury Rooms on the 9th Floor, is to be restored to a clean operating condition prior to the start of Government-occupied hours. There is to be no inconvenience to the tenants.
B. The Government reserves the right to occupy and to place and install equipment in completed areas of the project site prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The Government's installation of equipment and partial occupancy shall not constitute acceptance of the total Work.
1. Prior to partial Government occupancy, mechanical and electrical systems for the project site shall be fully operational, and required inspections and tests shall be successfully completed. Upon occupancy, the Government will operate and maintain mechanical and electrical systems serving the occupied portions of the project site.
2. Upon occupancy, the Government will assume responsibility for maintenance and custodial service for the occupied portions of the project site.
3. The warranty period for the occupied portion of the project site only will commence on the date of occupancy by the Government.
1.4 WORKING HOURS
A. Government Occupied Hours: Government personnel are scheduled to occupy the building during the following hours on weekdays, Monday through Friday, except for established Government Holidays: 6:00 AM to 6:00 PM, with the exception of the U.S. Marshals suite, at the north end of the Second Floor, which is occupied 24/7.
Addendum #1 01140 - 3 Work Restrictions
B. Contractor's General Working Hours: Contractors work hours shall be 6:00 p.m. to 6:00 a.m.
Contractor is to schedule all deliveries between 10:30 a.m. and 2:30 p.m., in advance.
Contractor is to avoid all deliveries after 10:00 a.m. on Saturdays. Request to work outside normal working hours must be submitted to the Contracting Officer 10 working days in advance of the start of such work.
C. Demolition work must be conducted during Government Unoccupied Hours. Demolition work is defined as any destruction and removal of an existing substrate or structure from the building necessary to prepare the building for new construction. Demolition work is indicated on the drawings.
D. Noisy and dusty work must be conducted during Government Unoccupied Hours.
E. Work accomplished during Government Unoccupied Hours shall be performed at no additional cost to the Government. Contractor shall submit a proposed schedule and gain the Contracting Officer's approval at least 72 hours before proceeding with any work during Government Hours.
1.5 NOISE RESTRICTIONS
A. Comply with all applicable state and local laws, ordinances, and regulations relative to noise control.
B. Construction activities that produce noise or vibration that disrupts government operations and employees are to be performed after normal working hours.
C. Immediately discontinue disruptive operations when directed to do so by the Contracting Officer or its agent. Any person or persons that continue with disruptive operations following the issuance of a notice to discontinue operations will be dismissed and not permitted to return to the site.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01140
Addendum #1 01593 - 1 Security Regulations
SECTION 01593 - SECURITY REGULATIONS
PART 1 - GENERAL
1.1 GENERAL SECURITY REQUIREMENTS
A. Bidding Clearances: Bidders will be required to comply with security regulations imposed by the occupying agency including any necessary clearances. Access to the project site will be limited to specific times established by the Government.
B. Construction Clearances: After award of the Contract, all Contractor employees shall be required to furnish information for security clearances and shall comply with security regulations as imposed by the occupying agency.
1. Building Security and federal regulations require that background checks be completed on all employees that are to be working on the project.
2. All employees must complete a Contractor Information Worksheet (CIW) and schedule an appointment with the security representative in the GSA Field Office.
a. Contractor shall bring the completed CIW form and a state-issued identification to the meeting, where their CIW will be reviewed for completion and correct information. The Contractor shall also be fingerprinted and set up in the eQuip system. To be entered into the eQuip system the Contractor must provide an email address.
3. An email will be sent out notifying the Contractor to complete the online forms, fill out the signature card at the end, and return them to the security representative within 7 days. Once this has been done the clearance process shall take about 30 days, depending on the volume of clearances in the system.
4. Upon the receipt of a prefavorable clearance the Contractor shall return and be photographed for their GSA ID badge. Employees may not work on site until the badge has been issued.
C. Notification: Notify the Contracting Officer, or his designated representative, not less than 48 hours prior to performing work in a security area. Include the following:
1. Companies: Name of each company performing the work.
2. Personnel: Name, social security number and date of birth of each individual who is to work.
3. Time: The exact time, date, and hours of work.
4. Areas: Specific areas of the building in which work is to be performed.
D. Any non-cleared Contractor on the site must be escorted by a Department of Homeland Security guard. The cost of the guard and associated fees will be the responsibility of the Contractor. No more than 5 non-cleared Contractors can be escorted by one DHS guard. All employees being escorted by a guard must be working in the sight of the guard. If this condition cannot be met, additional guards must be hired.
Addendum #1 01593 - 2 Security Regulations
1.2 GENERAL SECURITY REGULATIONS
A. Nonpublicity: It is a specific condition of this Contract that the Contractor, or any subcontractors performing work on this project, shall not use or allow to be used any aspect of this project for publicity or advertising brochures.
B. Agency Security Regulations: All persons employed within the boundaries of the property or restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations that have been established for this Contract.
1. The Contractor agrees on behalf of himself and all subcontractors that the following security regulations will be observed by Contractor and subcontractor personnel on the property. The Contractor shall make it a specific provision of his subcontracts that these regulations be accepted.
2. At the commencement of the work under this Contract, the following security facilities and procedures will apply:
a. The Contractor shall provide information about all Contractor and subcontractor personnel and others who require continuing access to the site, before access is required and when access ceases.
b. Within 10 calendar days after the award of the Contract, the Contractor shall submit a list on the Contractor's letterhead stationary of all employees, subcontractors and their employees, and others who will perform work or otherwise require access to the site. Personnel shall be listed in alphabetical order by company. The list shall include the full name, social security number and date of birth for each individual.
c. Name of any employee added later to the original list shall be submitted with the same information on the Contractor's letterhead stationary at least 8 calendar days in advance of the date of access by the employee.
d. The Contractor shall notify the Government in writing when personnel are no longer employed by the Contractor or a subcontractor. Individual's name, social security number and date of birth, and company who employed the individual, shall be included.
e. In order to permit the Government to supply badges for on-site personnel, the Contractor shall cause each individual to complete a personnel identification form.
These forms will be provided by the Government to the Contractor at the pre-construction conference. Processing of the forms will be performed by the Government at Government expense.
f. At a time designated by the Contracting Officer or when an individual reports to the site for work the first time after completion of security clearance, a period of 2 hours will be required for security processing, including review of identification forms and fabrication of a permanent badge. Personnel will then be permitted to go to work without further processing of identification forms by the Government, but 15 minutes should be allowed each day for signing in with security to obtain access to the site.
g. The permanent badge furnished by the Government to each Contractor employee or other person granted access to the site will serve to authorize the wearer to enter and leave the security area. The badge must be worn so as to be clearly visible at all times when on the work site. The badge will be retained by the individual as long as he requires continued admittance to the site, but the Contractor will arrange
Addendum #1 01593 - 3 Security Regulations for its immediate return to the Government when such need ceases. Temporary or visitor badges will be provided for persons who are identified as having an infrequent or temporary legitimate business need for access to the site.
3. At the commencement of the work under this contract, the following security procedures shall apply to the Contractor and all subcontractors.
a. Do not enter the building without building passes or park without parking permits.
Vehicle authorization requests shall be required for any vehicle entering the site, and shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies, and, with a permit issued by the Government, to parking in designated areas.
b. Comply with the security regulations of the building.
c. In the case of any questions as to the eligibility of an individual to obtain a pass, notify the Contracting Officer, who will obtain a determination whether the individual can obtain a pass.
d. Cameras are not permitted without written permission from the Occupant Agency and the Contracting Officer or his designated representative. If approved, permission will be granted in writing and will provide additional guidelines. In any case, all film will be turned over to the Contracting Officer or his designated representative. The Contractor shall be responsible for the costs of developing film.
e. Personnel may be subject to inspection of their personal effects when entering and leaving the facility. In addition, unscheduled inspections of personnel may be made while on site.
f. In any work is canceled, notify the Contracting Officer or his designated representative.
4. The Occupant Agency reserves the right to close down the job site and order Contractor personnel off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. The Contractor may only return to the site with verbal approval from the Occupant Agency and the Contracting Officer or his authorized representative.
5. The Government reserves the right to exclude or remove from the site or building any employee of the Contractor or a subcontractor whom the Government deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the work is deemed by the Government to be contrary to the public interests. The Government further reserves the right to complete processing of the security documentation for personnel assigned to work within restricted access areas prior to access to such areas by the personnel.
6. No interviews shall be conducted within the secured area. The Contractor and subcontractors will be required to maintain a field office, outside the limits established by the security area, for all public contacts. Applicants for employment and other persons not entitled to access to the secured area shall be required to contact the Contractor or subcontractor at these offices.
7. For overtime work, the Contractor shall give the Contracting Officer or his designated representative at least 3 calendar days notice. This notice is required so that security escorts may be provided and is separate and distinct from any notices required for utility shutdown or other outages. Also, the Contractor shall notify the Government if personnel
Addendum #1 01593 - 4 Security Regulations will not report to the job site on a particular day so that the security escort can be released for other duties.
8. A detailed weekly schedule shall be submitted once a week by the close end of business on the last day of Tuesday before the previous week's work. The schedule shall include the following:
a. Specific location of work for each trade.
b. Description of work for each trade.
c. Number of persons who will be on site for each location and trade.
d. Specific impacts required, such as equipment or utility shutdowns.
e. Hours of operation.
PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)
END OF SECTION 01593
Interior Renovations at U.S. Courthouse
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
103-1 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D22
103-2 2 D3 Wood/ Glass PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D22, D25
103H 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- -------- Exist. D7 104 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- -------- Exist. D7 107 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 108 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 109 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
110 1 C2 SCW PT-19 HM PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
111 1 C2 SCW PT-19 Exist PT-19 940 2108 44 H4B J4B T8 -------- 310 D25, D29 112 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 113 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31
114-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 115-1 2 Exist -------- Ex. St. Exist -------- -------- -------- -------- -------- -------- -------- 1114 D7, D31
C-101A-1 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D25 C-101B-1 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D25 C-101B-2 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
C-102 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25 E-101-1 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D25
E-102 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 E-102D-2 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
E-104A 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D25 E-122-1 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- -------- Exist. D7
E-122-2 1 C2 SCW PT-19 HM PT-19 914 2134 44 H4A J4A T8 -------- 711A D14
E123 2 D2 SCW PT-19 Exist PT-19 712, 914 2134 44 H4A J4A T8 -------- 725 D25 E-132 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
P-149J 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 P-149Q-2 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 P-149R-1 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31
P-149S 1 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 S-103 1 C4 FCW PT-19 Exist -------- 1067 2134 44 H4A J4A -------- 90 min. 310 D29 S-104 1 C4 FCW PT-19 Exist -------- 1067 2134 44 H4A J4A -------- 90 min. 310 D29 S-114 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- -------- Exist. D7 S-116 1 C4 FCW PT-19 Exist PT-19 914 2134 44 Exist Exist 90 min. 310 D25,D29 S-121 1 C4 FCW PT-19 Exist PT-19 940 2108 44 H4A J4A T8 90 min. 310 D25, D29 Z-100 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K811 D25 Z-101 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25 Z-102 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- -------- Exist. D7
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
Addendum #1 08000 - 2
Door Schedule
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e Ty pe
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
201-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 201-2 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31
202B-2 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31 202B-3 2 Exist -------- PT-19 Exist PT-19 -------- -------- -------- -------- -------- -------- Exist. D7, D31
203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25 205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 810 D25 206 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25 207 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
208 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
209 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25, D29
210 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
211 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
212 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
213 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
214 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
215 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K717 D25
216-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 217 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
218 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 111 D25
219 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 90 min. 725 D25, D27, D28
231 2 D2 SCW PT-19 Exist PT-75 (2) 914 2134 44 H4A J4A T8 -------- 725 D6, D25
233 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 725 D12, D25
245-1 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D7, D31 C-201 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- K816 D25
C-202A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D12, D25
C-203A 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811 D25
C-204A-1 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204S 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
C-204T 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D14, D25
C-204U-2 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 717 D12, D25
C-204V 2 D4 FCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 45 min. 725 D25
C-205 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D5, D25, D12
C-205B 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
C-205M 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 815A D25, D12
E-201-1 2 D2 Wood/ Glass PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725
D14, D15, D25
E-201-2 2 D2 SCW PT-19 Exist PT-19 (2) 914 2134 44 H4A J4A T8 -------- 725 D16, D25
E-203 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 711A D25
M-206 2 Exist -------- -------- Exist -------- -------- -------- -------- -------- -------- -------- Exist. D13, D7
M-261 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A -------- Exist. D26
M-263 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 811A D12, D25
P-204 1 C2 SCW PT-19 Exist PT-19 914 2134 44 H4A J4A T8 -------- 713 D25
S-202 1 C4 FCW PT-19 Exist PT-19 940 2108 44 Exist Exist T8 90 min. 310 D9, D25,D29
S-216 1 C4 FCW PT-19 Exist PT-19 914 2134 44 Exist Exist 90 min. 310 D25, D29
S-217 1 C4 FCW PT-19 Exist PT-19 940 2134 44 H4A J4A T8 90 min. 310 D25,D29
S-218 1 Exist -------- PT-19 Exist PT-19 -------- -------- -------- H4A J4A 90 min. Exist. D31, D26
H ar dw ar e Se t
R em ar ks
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrameDoor
Addendum #1 08000 - 2
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e M at er ia l
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
1001A 10EN1* 2 D2 SCW PT-19 HM PT-19 (2) 813 2134 44 H2 J2 EXIST 126 D25
1001B 10EN3* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1
1002-01 1032 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D21, D25
1002-02 ---------- 1 F HM PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D21, D25
1002-03 ---------- 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST K1111 D21, D25
1002-04 1021A* 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST K1111 D21, D25
1002-05 1012 2 D2 SCW PT-19 HM PT-19 1828 2134 44 H2B J2B T8 SMK K820 D25
1002-06 1024* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1
1002-07 1020 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D20, D21, D25
1002-08 1018* 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111
D3, D20, D21, D25
1002-09 1016 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111
D24, D20, D21, D25
1002-10 E10 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2A J2A EXIST 1111 D3, D21, D25
1002-11 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H2B J2B T8 K811A D2, D3
1002-12 1012-1 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H2B J2B T8 SMK K811A D3
1002-13 1012 2 D2 SCW PT-19 HM PT-19 1828 2134 44 H2B J2B T8 SMK K820
1002-14 1010 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST K1111 D21, D25
1002-15 1010-1 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1
1002-16 C1005-02 1 C3 WD/ GL PT-19 HM PT-19 914 2134 44 H3A J3A T8 815A D2, D21, D25
1002-17 1008 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H3 J3 EXIST 111 D3, D25
1002-18 1007* 2 Exist -------- PT-19 HM PT-19 (2) 762 2134 44 H2 J2 EXIST EXIST D1 1002-19 1009* 2 Exist -------- PT-19 HM PT-19 (2) 762 2134 44 H2 J2 EXIST EXIST D1
1002-20 1011 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D21, D25
1002-21 1013 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D21, D25
1002-22 1015 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D21, D25
1002-23 1017 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D21, D25
1002-24 1019 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D25
1002-25 1021 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D25
1002-26 1023 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D2, D25
1002-27 1025 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D2, D25
1002-28 1027 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D2, D25
1002-29 E10 1 C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1111 D24, D2, D25
1002-30 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H2B J2B T8 SMK K811A D3 1002-31 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H2B J2B T8 K811A D3, D2 1002-32 1033* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1 1002-33 1035* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1
1002A-1 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H3 J3 T8 111 D3, D25
1002A-2 ---------- 1 C2 SCW PT-19 HM PT-19 914 2134 44 H3 J3 T8 1111
1002B-1 1021-1* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 1112 D1
1002B-2 1022-2* C2 SCW PT-19 HM PT-19 914 2134 44 H2 J2 EXIST 815A D2, D25
1003B ---------- 1 C2 SCW PT-16 HM PT-16 914 2134 44 H1 J1 -- 210 D4, D25
1016-3 E10 2 D2 SCW PT-19 HM PT-19 (2) 813 2134 44 H2 J2 EXIST 126 D25
1016B 10E53* 1 Exist -------- PT-19 HM PT-19 914 2134 44 H2 J2 EXIST EXIST D1
1017A ---------- 1 C2 SCW PT-16 HM PT-16 610 2134 44 H1 J1 -- 210 D4, D25
1017B ---------- 1 C2 SCW PT-16 HM PT-16 914 2134 44 H1 J1 -- 810 D4, D25
1018 ---------- 1 Exist -------- PT-2 HM PT-2 914 2134 44 H1 J1 -- EXIST D1
1020 ---------- 1 A STL PT-2 HM PT-2 914 2134 44 H1 J1 T9 K811A D6
1022 ---------- 2 B STL PT-2 HM PT-2 1828 2134 44 H1 J1 T9 K824 D6
10L1 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H3 J3 T8 830 D3, D25
10L2 ---------- 1 C2 SCW PT-19 HM PT-19/40 914 2134 44 H3 J3 T8 830 D3, D25
C-1003-1 E10 2 Exist -------- WD-2 Wood WD-2 1828 2134 44 EXIST EXIST EXIST 1113 D19, D30
C-1003B ---------- 2 Exist -------- WD-2 Wood WD-2 914 2134 44 EXIST EXIST EXIST 1113 D19, D30
C-1003D-1 ---------- Exist -------- WD-2 Wood WD-2 914 2134 44 EXIST EXIST EXIST 1112A D6, D19, D17, D21, D30
Door
H ar dw ar e Se t
R em ar ks
N ew
D oo r N um be r
Ex is tin g
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrame
Addendum #1 08000 - 2
GSA Number GS-03P-98-CDC-0019
Ex is tin g
N ew
D oo r T yp es
D oo r M at er ia l
Fi ni sh
Ex is tin g
N ew
Fr am e M at er ia l
Fi ni sh
W id th
H ei gh t
Th ic k.
H ea d
Ja m b
Th re sh ol d
Door
H ar dw ar e Se t
R em ar ks
N ew
D oo r N um be r
Ex is tin g
D oo r N um be r of
L ea ve s
Fi re
R at in g
DetailsDimensionsFrame
C-1003D-2 ---------- Exist -------- WD-2 Wood WD-2 914 2134 44 EXIST EXIST EXIST 1115 D6, D19, D21, D29
C-1003D-3 ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A -- 815A
C-1003D-4 ---------- 1 Exist -------- WD-2 Wood WD-2 914 2134 44 EXIST EXIST EXIST 1112A D6, D10, D19, D30
C-1003E ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H10A J10A -- 112A C-1003F ---------- C1 SCW PT-2 Wood PT-2 914 2134 44 H9C J9C T8 716 D6 C-1003G ---------- 2 D1 SCW PT-2 Wood PT-2 1220 2134 44 H10A J10A -- 126 C-1003H ---------- 1 C1 SCW WD-1 Wood PT-2 914 2134 44 H10A J10A T8 112A C-1003I ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A -- 714 D6 C-1003J ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A -- 714 D6 C-1003K ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A -- 714 D6 C-1003L ---------- 2 D1 SCW PT-2 Wood PT-2 1220 2134 44 H9A J9A -- 126 C3-1003B ---------- 1 C5 SCW PT-2 Wood PT-2 914 2134 44 H9C J9C 510 C3-1003B-1 ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9C J9C 815A C3-1003C ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C3-1003D ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C3-1003E ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C3-1003F ---------- 1 C1 SCW WD-1 Wood WD1/PT3 914 2134 44 H9C J9C 516 D6 C3-1003H ---------- 1 C1 SCW WD-1 Wood WD1/PT3 914 2134 44 H10 J10 T8 112A C3-1003I-1 ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H10 H10 713 C3-1003I-2 ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H10 J10 713 C3-1003J-1 ---------- 1 C1 SCW WD-1 Wood WD1/PT2 914 2134 44 H9C J9C 712 D6, D2 C3-1003J-2 ---------- 1 C1 SCW WD-1 Wood WD1/PT2 914 2134 44 H9C J9C 712 D6, D2 C3-1003N ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C3-1003O ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C3-1003P-1 ---------- 2 D1 SCW PT-2 Wood PT-2 1219 2134 44 H10A J10A 126 C3-1003P-2 ---------- 2 D1 SCW PT-2 Wood PT-2 1219 2134 44 H10A J10A 126 C3-1003P-3 ---------- 2 D1 SCW PT-2 Wood PT-2 1219 2134 44 H10A J10A 126 C4-1003A ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C4-1003B ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C4-1003C ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 815A D2 C4-1003D ---------- 1 C5 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C4-1003E ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H9A J9A 510 C4-1003F ---------- 1 C1 SCW WD-1 Wood WD-1/PT-3 914 2134 44 H9C J9C 516 D6 C4-1003F-1 ---------- 2 D1 SCW WD-1 Wood WD-1 1219 2134 44 H10 J10 126 C4-1003G ---------- 1 C1 SCW PT-2 Wood PT-2 914 2134 44 H10 J10 510 D6 C4-1003H ---------- 1 C1 SCW WD-1 Wood WD-1 914 2134 44 H10 J10 T8 112A C4-1003I ---------- 1 C1 SCW WD-1 Wood WD-1 914 2134 44 H10 J10 112A
S-1001 1 C4 FCW PT-19 HM PT-19 914 2134 44 H2A J2A 90 MIN 310 D29
S-1002 1 C4 FCW PT-19 HM PT-19 914 2134 44 H2A J2A 90 MIN 310 D29
Addendum #1 08000 - 3
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks
102 Corridor BS-1
ALT - BS-2
ALT - BS-3
Exist TZ-1, TZ-2
Existing 9, 15
106A Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106B Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
106C Corridor BS-1
ALT - BS-2
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
107 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
108 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
201 Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
202 Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
202B Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
202C Corridor BS-1
ALT - BS-2
ALT - BS-3
[PT-24] TZ-1,
TZ-2
ACT-1,CL-1,
PT-25A
9, 15
203 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
204 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
217 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
218 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
305 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
306 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
317 Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
318 Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
505A Men's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
505B Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
Addendum #1 09001 - 1
Room Finish Schedule
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks C-902G Jury Room [ETR] [R] [ETR] PT-5 3
C-905G Jury Room [ETR] [R] [ETR] PT-5 3
C-909G Jury Room [ETR] [R] [ETR] CL-1, PT-5
1001 North Elev. Lob. EXIST [PT-24] EXIST [PT-25] [R] 3, 9 1001A Storage EXIST EXIST EXIST EXIST [R] 1001B Janitor EXIST EXIST EXIST EXIST [R] 1002 Main Corridor EXIST [PT-24] EXIST ACT-1,CL-1, PT-25A
[R] 3, 9
1002A Corridor EXIST [PT-24] TZ-1 ACT-1,CL-1, PT-25A
1002B Court Lobby EXIST [PT-24] EXIST EXIST, PT- 25A
[R] 3, 9
1003A Toilet Vestibule CT-4 PT-12 CT-6/CT-7/
CT-8/CT-9
PT-9
1003B Women's Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8,12
1004 Janitor EXIST EXIST EXIST EXIST [R]
1005 RM EXIST EXIST EXIST EXIST [R]
1006 Communication RB-3 PT-12 VCT-4/VCT-
EXIST 11
1007 Electric RB-3 PT-12 EXIST 11 1008 Closet EXIST EXIST EXIST EXIST [R] 1009 Shell Space NONE EXIST EXIST
CONC
NONE [R] 13,11
1011 Communications RB-3 PT-12 VCT-4/VCT-
EXIST 11
1012 Electric RB-3 PT-12 EXIST EXIST 11 1013 Closet EXIST EXIST
1014 Closet -- -- EXIST EXIST [R]
1015 Lift EXIST EXIST 1016 South Elev. Lob. EXIST [PT-24] EXIST [PT-25] [R] 3, 9 1016A Storage EXIST EXIST EXIST EXIST [R] 1016B Storage EXIST EXIST EXIST EXIST [R] 1017A Toilet Vestibule CT-4 PT-12 CT-6/CT-7/
CT-8/CT-9
PT-9
1017B Janitor CT-4 PT-12 CT-6/CT-7/
CT-8/CT-9
PT-9
1017C Mens Toilet CT-4 CT-5/CT-6/CT-
10/PT-12
CT-6/CT-7/
CT-8/CT-9
PT-9 8, 12
1018 Mechanical NONE EXIST EXIST
CONC
NONE [R] 11
1019 Mechanical NONE EXIST EXIST
CONC
NONE [R] 11
1020 Mechanical NONE EXIST EXIST
CONC
NONE [R] 11
Addendum #1 09001 - 2
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks
1021 Mechanical NONE EXIST EXIST
CONC
NONE [R] 11
1022 Electric NONE EXIST EXIST
CONC
NONE [R] 11
1023 Shell Space NONE EXIST EXIST
CONC
NONE [R] 13, 11
1024 Mechanical NONE EXIST EXIST
CONC
NONE [R] 11
C-1003 Court Room EXIST. EXIST
PANELING
CPT-12D ACT-1
C-1003A Closet WB-2 PT-1 CPT-12D ACT-1 4 C-1003B Closet WB-2 PT-1 CPT-12D ACT-1 4 C-1003D Corridor WB-2 PT-1 CPT-12D ACT-1 C-1003E Toilet CT-13 CT-2C, CT-2D, PT-6
CT-11 PT-5
C-1003F Jury Room RB-1 WC-7 CPT-12D ACT-1 10, 11 C-1003G Closet WB-2 PT-1 CPT-12D ACT-1 4 C-1003H Toilet CT-13 CT-2C, CT-2D, PT-6
CT-11 PT-5
C-1003I Vestibule WB-2 PT-1 CPT-12D ACT-1 C-1003J Attorney Conf. WB-2 PT-1 CPT-12D ACT-1 C-1003K Attorney Conf. WB-2 PT-1 CPT-12D ACT-1 C-1003L Closet WB-2 PT-1 CPT-12D ACT-1 4 C2-1003L North Judge's
Elev. Lob.
RB-1 EXIST MTL
PAN.
CPT-1C CL-1 14
C3-1003A Reception/ Secretary
WSC-1A WSC-1A,WC-
2C
CPT-1C ACT-1,CL-
1,PT-5
C3-1003B Corridor WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003C Corridor WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003D Clerk WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003E Clerk WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003F Judge's Chamber WSC-1A WSC-1A,WC-
1C
CPT-2C ACT-1,CL-
1,PT-5
C3-1003G Closet WB-5 PT-1, PT-2 CPT-1C ACT-1 4 C3-1003H Toilet CT-3 CT-2C, WC-3, PT-3
CT-1 PT-5A
C3-1003I Copy Room RB-1 -- VCT-2 ACT-1 7 C3-1003J Conference/Lib. WSC-1A WSC-1A,WC-
1C
CPT-1C ACT-1,CL-1,
PT-5
C3-1003K Vestibule WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003L South Judge's
Elev. Lob.
RB-1 EXIST MTL
PAN./PT-1
CPT-1C CL-1 14
C3-1003M Corridor WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003N Clerk WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003O Courtroom Dep. WB-2 PT-1, PT-2 CPT-1C ACT-1 C3-1003P Closet WB-2 PT-1, PT-2 CPT-1C ACT-1 4 C4-1003A Courtroom Dep. WB-2 PT-1, PT-2 CPT-1C ACT-1 C4-1003B Storage RB-1 PT-1, PT-2 VCT-2 ACT-1 C4-1003C Corridor WB-2 PT-1, PT-2 CPT-1C ACT-1
Addendum #1 09001 - 3
GSA No. GS-03P-98-CDC-0019
Room Number Room Name Base Wall Floor Ceiling Scope Remarks
C4-1003D Clerk WB-2 PT-1, PT-2 CPT-1C ACT-1 C4-1003E Clerk WB-2 PT-1, PT-2 CPT-1C ACT-1 C4-1003F Judge's Chamber WSC-1A WSC-1A,WC-
1C
CPT-2C ACT-1,CL-1,
PT-5
C4-1003G Corridor WB-2 PT-1, PT-2 CPT-1C ACT-1 C4-1003H Toilet CT-3 CT-2C, WC-3, PT-3
CT-1 PT-5A
C4-1003I Closet WB-5 PT-1, PT-2 CPT-1C ACT-1 4 C4-1003J Closet WB-5 PT-1, PT-2 CPT-1C ACT-1 4 S-1001 Stair #1 EXIST EXIST EXIST EXIST ETR S-1002 Stair #2 EXIST EXIST EXIST EXIST ETR S-1003 Stair #3 EXIST EXIST EXIST EXIST ETR
Addendum #1 09001 - 4
File details come from the government source that posted it. Updated .