PA1_dvb.mht
MHT file 23 KB Posted
- Attached to
- POCH/INTERIOR RENOVATIONS
- Solicitation number
- GS-03P-10-AZ-C-0039
About this file
Wage Determination
Text of this file
From: <Saved by Windows Internet Explorer 7> Subject:
Date: Tue, 5 Oct 2010 06:22:47 -0400 MIME-Version: 1.0 Content-Type: text/html;
charset="Windows-1252" Content-Transfer-Encoding: quoted-printable Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/PA1.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5994
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=3DContent-Type content=3D"text/html; = charset=3Dwindows-1252"> <META content=3D"MSHTML 6.00.6000.17080" name=3DGENERATOR></HEAD> <BODY><PRE>General Decision Number: PA100001 09/10/2010 PA1
Superseded General Decision Number: PA20080001
State: Pennsylvania
Construction Type: Building
Counties: Allegheny, Beaver, Butler, Fayette, Greene,=20 Washington and Westmoreland Counties in Pennsylvania.
BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) EXCLUDING
SEWAGE AND TREATMENT PLANT PROJECTS
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 03/26/2010 3 04/30/2010 4 05/07/2010 5 06/04/2010 6 06/11/2010 7 06/25/2010 8 07/02/2010 9 08/13/2010 10 09/10/2010
ASBE0002-001 08/01/2009
Rates Fringes
Asbestos Workers/Insulator =20 Includes the application=20 of all insulating=20 materials, protective=20 coverings, coatings and=20 finishings to all types of=20 mechanical systems..........$ 31.32 19.11
BOIL0154-001 06/01/2009
Rates Fringes
BOILERMAKER......................$ 36.70 20.82
BRPA0009-023 12/01/2009
BEAVER COUNTY
Rates Fringes
BRICKLAYER.......................$ 26.40 14.90
BRPA0009-024 12/01/2009
WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY
Rates Fringes
BRICKLAYER.......................$ 28.30 14.75
BRPA0009-027 12/01/2009
FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), WASHINGTON (Remainder), AND WESTMORELAND (Rostraver Twp) COUNTIES
BRICKLAYER.......................$ 27.55 14.84
BRPA0009-028 12/01/2009
Rates Fringes
MASON - STONE (ALLEGHENY AND =20
WASHINGTON (Cross Creek, =20 Hanover, Jefferson, Mt =20 Pleasant, Nottingham, Peters, =20 Robinson, Smith, and Union =20 Twps) COUNTIES)..................$ 28.92 14.55
TILE SETTER (ALLEGHENY, =20
BEAVER, GREENE, AND =20
WASHINGTON COUNTIES).............$ 27.10 13.38
BRPA0009-029 12/01/2009
Rates Fringes
BRICKLAYER.......................$ 26.40 14.78
CARP0142-001 06/01/2010
ALLEGHENY, BEAVER, BUTLER, FAYETTE,GREENE, WASHINGTON AND
WESTMORELAND COUNTIES
Carpenter/Lather.................$ 28.11 11.74
* CARP1759-001 06/16/2010
ALLEGHENY, BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND
FLOOR LAYER: Carpet.............$ 28.11 11.76
CARP2235-001 06/01/2010
Rates Fringes
MILLWRIGHT.......................$ 34.42 15.02
CARP2235-007 01/01/2010
Rates Fringes
PILEDRIVERMAN....................$ 29.95 12.35
ELEC0005-005 12/25/2009
BUTLER COUNTY
Rates Fringes
ELECTRICIAN......................$ 34.26 17.88
ELEC0005-007 12/25/2009
ALLEGHENY, FAYETTE, GREENE, WASHINGTON, AND WESTMORELAND
COUNTIES
ELECTRICIAN......................$ 34.26 17.88
ELEC0126-006 01/01/2010
ALLEGHENY, BEAVER, FAYETTE, GREENE, WASHINGTON, AND
Line Construction: =20 Groundhand..................$ 16.25 5.55+26% Line Truck Operator.........$ 23.09 26%+5.55 Lineman.....................$ 38.00 7.50+26% Truck driver................$ 23.43 5.55+26% Winch Truck Operator........$ 24.96 26%+5.55 Winch truck operator........$ 25.33 5.55+26%
ELEC0712-005 03/02/2009
BEAVER COUNTY
Rates Fringes
ELECTRICIAN......................$ 29.20 17.48
ELEC1319-005 08/31/2008
BUTLER COUNTY
Rates Fringes
Line Construction: =20 Groundman...................$ 24.53 17.13 Heavy Equipment Operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck Operator..............$ 25.72 17.13
ELEV0006-001 01/01/2010
Rates Fringes
ELEVATOR MECHANIC................$ 39.88 20.04
FOOTNOTE: A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
* ENGI0066-001 06/01/2010
Rates Fringes
Power equipment operators: =20
CLASS 1.....................$ 30.215 15.22
CLASS 2.....................$ 26.78 15.22
CLASS 3.....................$ 25.06 15.22
POWER EQUIPMENT OPERATORS CLASSIFICATIONS =20
CLASS I
Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey Loader, Auger (Truck or Tractor Mounted), Auto Grader (C.M.I. and similar), Backhoe (180=EF=BF=BD and 360=EF=BF=BD swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with Blade, Concrete Pump (all types), Over-Head Crane, Crane (Crawler or Truck Mounted)*, Tower Crane (Stationary or Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick (all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid Mounted), Elevator, Excavating Equipment (all other), Fork Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating Grader, Equipment Greaser, Helicopter, Helicopter Hoist Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver (C.M.I. and similar), Spreader (Concrete, Asphalt, or Stone), Tire Repairman (when assigned to a jobsite), Tower Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer Saw, Welder (repairman), Whirley
* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.
CLASS II
Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller (powered), Pipe Cleaning Machine, Pipe Dream, Power Broom (except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross Carrier (or similar), Seeding Machine, Skid Steer Loader (or similar), Slab Lifting Machine (hydraulic), Soil Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny (or similar), Stone Crusher, Stone Spreader (self-propelled), Siphon (steam or air), Tie Tamper (multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water Blaster, Welding Machine, Well Point System
CLASS III
Brakeman, Deck Hand, Helicopter Signalman, Oiler*, Elevator (Alterations & Remodeling Commercial Buildings),
* Oilers on Truck Cranes: less than 50 ton shall receive $.10 over the Class III base rate; 50 ton up to 100 ton rated capacity shall be paid an additional $.25 per hour over the Class III base rate; 100 ton and over shall be paid an additional $1.00 per hour over the Class III base rate.
General Note: Hazardous Material Sites Level C & D receive $1.00 per hour premium for all classifications and Levels A & B receive $2.50 premium for all classifications
IRON0003-002 06/01/2010
ALLEGHENY, BEAVER, BUTLER, FAYETTE, WASHINGTON, AND
IRONWORKER.......................$ 30.03 22.55
IRON0549-002 12/01/2008
GREENE COUNTY
Rates Fringes
IRONWORKER.......................$ 28.75 10%+15.69
LABO0613-002 12/01/2008
Rates Fringes
Laborers: =20
GROUP 1.....................$ 20.52 9.16
GROUP 2.....................$ 20.67 9.16
GROUP 3.....................$ 20.80 9.16
GROUP 4.....................$ 21.27 9.16
LABORERS CLASSIFICATIONS
GROUP 1: COMMON LABORER - Building laborer; Brick removal for alterations; Carryable pumps; West brick buggy or similar; Walk behind forklift or similar (non self-propelled); Stripper and mover of forms; Toolroom man;
all material conveyors (regardless of power used, including starting and stopping); Pouring of mortar or aggregate into blocks of voids
GROUP 2: SKILLED LABORER - West brick buggy or similar (self propelled); Power wheelbarrows and buggies; walk behind forklift or similar (self-propelled); Drill runner; All operators of compacting equipment; Pipe layer; Burner;
Jackhammer man - concrete buster; Vibrator operator; Clay spade and/or similar; Gunnite nozzleman; Blaster; Concrete saw operator; Hod carrier; Scaffold builder; Air track operator; Bell and Bottom Man on furnace and stacks; Grout machine feeder and pump operator; Gunnite machine operator or similar; Gunnite machine potman or similar; Mortar Mixer; Mortar mixer machine (regardless of power used, including starting and stopping); Wagon drill operator;
Laser cleaner; Lancer
GROUP 3: Asbestos removal or abatement laborer
GROUP 4: Toxic or Hazardous waste handling laborer
LABO0952-004 07/01/2009
Rates Fringes
Landscaping =20
GROUP 1.....................$ 18.25 9.05
GROUP 2.....................$ 18.67 9.05
GROUP 3.....................$ 18.97 9.05
LANDSCAPING CLASSIFICATIONS
GROUP 1: Landscape laborer to include general landscaping work and the driving of trucks for the distribution of materials on the job site but not to include trucks used to transport supplies to the job
GROUP 2: Skilled Landscape Laborer to plant all types of trees and shrubs without direct supervision.
GROUP 3 - Landscape tractor operator to operate small industrial rubber tire tractor equipped with front end loader and backhoe attachment or a skid loader with landscape attachments used for the sole purpose of landscape work including soil spreading, unloading and loading of materials and such other landscaping work but not for heavy and highway construction work
PAIN0057-003 06/01/2010
ALLEGHENY, FAYETTE, GREENE AND WASHINGTON COUNTIES
Rates Fringes
PAINTER =20
Brush.......................$ 25.28 13.34
PAIN0057-004 06/01/2010
BEAVER, BUTLER, AND WESTMORELAND COUNTIES
Rates Fringes
Painters: =20 Brush.......................$ 25.28 13.34 Spray.......................$ 25.28 13.34
PAIN0057-005 06/01/2010
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 24.55 13.65
PAIN0751-001 09/01/2009
Rates Fringes
GLAZIER..........................$ 27.28 17.15
PLAS0031-014 06/01/2010
ALLEGHENY, BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND
PLASTERER........................$ 26.13 12.15
PLAS0526-007 06/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 26.79 12.27
PLUM0027-002 06/01/2010
ALLEGHENY, GREENE (except extreme Eastern portion), WASHINGTON (Area West of a North-South line drawn from East of McMurray to West of Fredericktown) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES
PLUMBER..........................$ 34.75 17.57
PLUM0047-001 05/01/2010
BEAVER AND BUTLER COUNTIES
Rates Fringes
Plumber and Steamfitter..........$ 33.38 17.05
PLUM0354-001 06/01/2010
FAYETTE, GREENE, WASHINGTON (Area East of a North-South line drawn from East of McMurray to West of Fredericktown) AND
PLUMBER/PIPEFITTER...............$ 30.14 18.73
PLUM0449-001 06/01/2010
ALLEGHENY AND WASHINGTON COUNTIES (Area West of a North-South line drawn from East of McMurray to West of Fredericktown)
PIPEFITTER.......................$ 34.93 17.64
ROOF0037-001 06/01/2010
Rates Fringes
ROOFER, Including Built Up, =20 Composition and Single Ply =20 Roofs............................$ 27.00 12.19
SFPA0542-001 07/01/2009
ALLEGHENY COUNTY
Rates Fringes
SPRINKLER FITTER.................$ 30.84 16.60
SFPA0669-002 04/01/2010
BEAVER, BUTLER, FAYETTE, GREENE, WASHINGTON, AND WESTMORELAND
COUNTIES
SPRINKLER FITTER.................$ 33.35 18.10
SHEE0012-002 07/01/2010
Rates Fringes
Sheet metal worker...............$ 31.46 18.90
TEAM0040-002 01/01/2010
Rates Fringes
Truck drivers: =20 GROUP 1.....................$ 24.98 $12.04+a+b GROUP 2.....................$ 25.13 $12.11+a+b GROUP 3.....................$ 25.64 $12.37+a+b
FOOTNOTES:
A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate
B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Single Axle (2 axles including steering axle);
Includes partsman and warehoueman
GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)
GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);
Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
END OF GENERAL DECISION
</PRE></BODY></HTML>
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .