Revised specs

View the file

Other files

File Type Posted
SF1442POCH4.pdf PDF
SF30POCH4.pdf PDF
06500 Add 2.doc DOC document
15900 Add 2.doc DOC document
08750 Add 2.doc DOC document
15752 Add 2.DOC DOC document
15910 Add 2.doc DOC document
08710 Add 2.doc DOC document
08000-Door Schedule Add 2.xls XLS spreadsheet
SF1442POCH3.pdf PDF
09001 Room Finish Schedule Notes Add 2.doc DOC document
15840 Add 2.DOC DOC document
08000 Add 2.doc DOC document
09000 FinMatSched Add 2.doc DOC document
TOC Add 2.doc DOC document
15725 Add 2.DOC DOC document
15838 Add 2.doc DOC document
15056 Add 2.doc DOC document
SF30PochInteriors3.pdf PDF
15817 Add 2.doc DOC document
Cover sheet Add 2.DOC DOC document
09900 Add 2.doc DOC document
09001-RmFinishSched Add 2.xls XLS spreadsheet
POCHINTAddendum 3 all 1 .pdf PDF
POChINTamend2sf30.pdf PDF
Solicitation Questions and Responses2.pdf PDF
SF30POCHINTERAMED001.pdf PDF
POCHINTAMENDMENT.pdf PDF
Solicitation Questions and Responses 10-29-10.pdf PDF
pochinteriorsC101_Negotiated.doc DOC document
20100826 Issued for Const.pdf PDF
POCHSF1442interiors.pdf PDF
pochinterC301.doc DOC document
Addendum 1 Drawings.pdf PDF
C201SolpochInter.doc DOC document
Final Spec 2010-0823.pdf PDF
Addendum 1 Specs.pdf PDF
PA1_dvb.mht MHT file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Interior Renovations at U.S. Courthouse GSA Number GS‑03P‑98-CDC-0019

Pittsburgh, Pennsylvania

Retain this section if bid options are included in the project pricing.

SECTION 01260 BASE ITEMS AND OPTIONS

PART 1 - GENERAL

1.1 SUMMARY

A. An option provides an amount proposed by the Contractor and stated on the Bid Form for certain work that may be added by the Government to the project Work within a specific time after award of the Contract.

B. The amount for an option shall be the net total addition to the Contract price to incorporate the option work into the project Work.

C. Option work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the option description.

1.2 PROCEDURES

A. Selection: Each option must be accepted by the Government within the time stated following the option description in order to be included in the project Work.

B. Notification: If an option is accepted, the Contractor shall immediately notify each party involved, in writing.

C. Coordination: The Contractor shall adjust affected adjacent work as necessary to completely and fully integrate the accepted option work into the project Work.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 SCHEDULE OF BASE ITEMS

A. Base Item 1: All work items not called out in a base or option below. Base Item 1 includes Third Party Commissioning as specified for air handlers included in Base Item 1.

1. Base Items 1, 2 and 3 must be accepted by the Government at the time of initial award, or not at all.

B. Base Item 2: Provide all work required to replace air handlers serving Levels 6, 7, 8, and 9, as indicated on the Drawings, labeled Option No. 2, and as specified. Provide Third Party Commissioning as specified for these air handlers.

1. Base Items 1, 2 and 3 must be accepted by the Government at the time of initial award, or not at all.

C. Base Item 3: Provide all work required for Siphonic Drain System, as indicated on the Drawings labeled Option No. 3 and as specified.

3.2 Base Items 1, 2 and 3 must be accepted by the Government at the time of initial award, or not at all.

3.3 SCHEDULE OF OPTIONS

A.

1.

2.

3.

B.

1.

C.

1.

D.

1.

E.

1.

F.

1.

G.

1.

H.

1.

I. Priced Option No. 1: Provide all work required for renovation of First and Second Floor Toilet Rooms, as indicated on Drawings, labeled as Option No. 1, and as specified.

1. Option No. 1 must be accepted by the Government within 120 calendar days after award of the Contract, or not at all.

J. Priced Option No. 2: Provide all work required to replace air handlers AHU - 10A and AHU - 10C, as indicated on the Drawings, labeled Option No. 4, and as specified. Provide Third Party Commissioning as specified for these air handlers.

1. Priced Option No. 2 must be accepted by the Government within 120 calendar days after award of the Contract, or not at all.

K. Priced Option No. 3: Provide all work required to replace marble base with wood base, as indicated on Drawings, labeled Option No. 5, and as specified.

1. Priced Option No. 3 must be accepted by the Government within 120 calendar days after award of the Contract, or not at all.

L. Priced Option No. 4: Provide all work required to replace marble base with terrazzo base, as indicated on Drawings, labeled Option No. 6, and as specified.

1. Priced Option No. 4 must be accepted by the Government within 120 calendar days after award of the Contract, or not at all.

END OF SECTION 01260