This document provides details on a federal solicitation and related construction project. The solicitation number is 36C77622R0069 from the Department of Veterans Affairs Technology Acquisition Center Austin for the Y1DZ--589A4-21-700 EHRM Infrastructure Upgrades Construction project in Columbia, MO. The contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as drawn in the specifications for the EHRM Infrastructure Upgrades Construction project. The final drawings for part 9 of the project are referenced but not included.

View the file

Other files

File Type Posted
Answers to Technical Questions 7-15-22.pdf PDF
36C77622R0069 0007 Amendment 0007 7-15-22.pdf PDF
TERRACON ASBESTOS SURVEY Final Report-NESHAP Survey Report_updated as removed.pdf PDF
36C77622R0069 0006 Amendment 0006 7-7-2022.pdf PDF
Answers_Clarifications to Technical Questions 7-7-22.pdf PDF
Attachment A _Roof Plans_Site Layout.pdf PDF
Answers to Technical Questions 6-29-22.pdf PDF
36C77622R0069 0005 Amendment 0005 6-29-2022.pdf PDF
36C77622R0069 0004 Amendment 0004 6-27-2022.pdf PDF
36C77622R0069 0003 - Amendment 0003 - 6-22-2022.pdf PDF
36C77622R0069 0002 - Amendment 0002 - 6-16-2022.pdf PDF
Construction Wage Rates - Boone County - 5-27-22.pdf PDF
Site Visit Sign-In-Sheet 6-9-22.pdf PDF
36C77622R0069 0001 - Amendment 0001 - 6-9-22.pdf PDF
Attachment C - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Final Drawings_Part3.pdf PDF
Construction Wage Rates - Boone County - 4-22-22.pdf PDF
Attachment A - PPQ.docx DOCX document
Final Specifications-Vol 1_Rev2 - 3-28-22.pdf PDF
Attachment D - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment B - VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Final Specifications-Vol 2_Rev2 - 3-28-22.pdf PDF
Final Drawings_Part6.pdf PDF
Final Drawings_Part7.pdf PDF
Final Drawings_Part2.pdf PDF
Final Drawings_Part1.pdf PDF
36C77622R0069 Columbia EHRM Infra - 5-19-22.pdf PDF
Final Drawings_Part8.pdf PDF
Final Narrative.pdf PDF
Final Drawings_Part4.pdf PDF
Final Drawings_Part5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXIST.

TELECOM

A056A

OFFICE

STORAGE

A060B

TELECOM

ROOM

A060

TELECOM

DEMARK ENTRANCE

A060A

A058

B013

B013A

B011B

B011A

B011C B011D B011E B011F B011G

B011

B011H

B011J B009

B007

B010

B010A

B006C

B006

B006B

B006A

B009A

B034 B036

A056

STR #1

B024 B019

B026 B023

B014

B016

B018

B022 B021

B017

B045

B015

B012

B046A

B047 B046 B049

B050

C B

A

B051B048B042B039AB039

CBB3

A055

A054B

A004

A001

A002

A003

CBA2

A007 A009

CBA3 CBA4

A005

A004A

A006 A008A A008

A012

A013

A047

CBA8

D004L

A048

A049

A006A

A051

A51A

A050

CBA9

A052

CBA10

A053

A059A

A059

A057

D004M

D004N

D002

D001B

D001A

D001

D004E

D004B

D004AD004O

D003

D003B

D004G

CBB1

B037

A009A

B002D

B002G

B002F

B002K

B002A

B002

B001F

B002E

C009D

C009

C009B

C001

C009A

B001E

B001B

B001D

B

1C

B001A

C001A C001C

C001D

CBD1

C B

B

A054

A016A

A016

DN

UP

DN

UP

#4

#5

#7

#8

#1#2#3

REX

FX-401-C-1.B

FX-401-C-1.B

1 1 1 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:1

P

M

FX-105-C-1.B

FIRE PROTECTION BASEMENT

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - BASEMENT FIRE PROTECTION - AREA 3 & 4

04 8 16268

SCALE: 1/8"=1'-0"

KEYED NOTES

1. EXISTING CEILING TO BE REMOVED AND REPLACED. CONTRACTOR TO

VERIFY EXISTING SPRINKLER HEADS AND REWORK AS REQUIRED.

PLAN NORTH

Revisions: Date:

A158

F175

F174C

F174B

F174A

A160A161 A159

A128A

A128B

C1E33

C1E31

E109 E110E125F

E125EC1E24

E125DE125CE125BE125A

E124

E123

E126

C E

E133

E122 E121 E120

E117

E116

E115

E114

E130

E131

E132

E112

E111

E129

E127

A144G

C A

A136

A184

A183

A179

C A

A144B

A177

A144C

A174 A176

D

D115D118BD118A

D122

D123

D125

D119A

D108

D119

D115A

D114

D113D112D111D110D109D107

D124

D124A

D126

D127

D128

D129D129B

D100A

C168 C170 C171

C174

C175

C173

C172C167C146

C182 C103 C102C1C2

C137C125C126C127C128

C192

C191

C189 C184

C188

C185

C187

C186

C193

C180

C181

D194

C107

C136

C124

C123

C133

C134

C142AC142C140AC140C139C138

C137A

C135

C134B

C136

C A

C133C

C133B C1C10

C132

C106

C109

C113

C111

C112

C114

C115

C116

C117

C118

C119

C132

C120 C121 C122

B168

B172

B176

B176C

B176B

B176A

B152

B148

B154 B167B

B160

B164

B166

B167A B167

B129

B128

B165

B136B

B136 B132

B136A

B175A

B112AB108

B108A

B107A

B107

B104 B105

B109 B110 B112

B135

B133

C1D3

A103

C179

F181

F100

D198

D199C

D199B

D193A

D193

D E

D199

D183 D182 D155

D181

D180

C1C23

D A

D

C C

D179

D B

C C

D194A D189D

D185

D C

D186

D187

D194

D199A

D195A

C152

D195

C1D23

D191 D190 D189 D170

D134

D152

D159A

D159B

D159

D160

D161

D158

D157

C D

D162

D156

D154 D153

D153A

D163 D175A

D175

D173 D174

D164

D165

D173A

D166D167D168

C1D21

D169

D172A

D172D171

D171A

D121

C133

A130

B150

D117

D118C

D118

D105 C1A10C1A8

A153

A152A

A191

A149

A148A187A188

C1A9

A167

C A

A162

A165

A166

A168

A

G

G176

G100

G101

G102

G102A

G160

G103

G

G105

G106

G

G105A

G108

G114A

G

G116

G114

G115

G113G112

G156

G173G

G111

G110

G110A

G

G148 G147 G146 G171

G145

G143A

G144

G142A

G168

G142

G170

G169

G143

G107

G136 G139

G155

G155B

G137

G138

G163 G162

G120

G121

G123

G122

G133

G127 G128

G159

G

G

G129

G130

G131

G132

G119

G124

G

G118 G161

G164A C104

G164

C110

G135 G140

G A

G193

G149

G150

G150A

G151 G153

B176D

G152

C135

G196E

G194B

G195G196DG196CG196BG196AG181

G196H G196G G196F

G182

G184B

G A

G184G183

G185E G185

G185CG185D G185B

G185A

G188 G190

G189 G190A

G191

G194G197AG197G197B

B106

B131A

B131B

B

B179

B126 B129

B174

C B

B119

B170

C169

C168 B121 B120 B122

C1B4

B127

B128

B130 B131 B164

B165

C B

B123

C176

D149

D101

C1C1 D101B

D150

D151B

C143

C101

C C

C101C

D129C

D151

D151C

C101D

C1D5

C198

C1C9

A189

A147

A106A107

A194

A110

A117G

A117F

A117E

A117A

A117B A116

A115

C B

A116A

A153C

A117C

C1A7 A117D

A156C

A156B

A156A

A157

A101

A102A108A109A111A112A113A114

C E

A145

A153B

B149

A186

C1A2

E137

A193 A192

G192

D102H D102K

D104

D102L

D106

D130

D A

C D

D

D102A

D102B

D102C

D102D D120

D102F

D102E

C D

C1D4

D102G D103

C137

C144

E102LE102G

C1E35

A

A139

A138 A146

A142

C A

A141

A140

A141BA141A

A133

A131

C1E29

F176

F174

E102F E102E E102D E102C E102B E102A

A163

F129

F135

B139

E-1100

C1E14

E102J E102K

F104

E-1204

F171

F128

F134

B146

C1E13

E108B

E105

C1A1

F122

C1E21

F171A

F150

F101

F125

E102H

E104

E107

E108

B139A

C F

F123

F151B

F102

F126

E102

E103

E106

E108C

B145

C1F11

F124

F151A

C1F7

C1E12

E144

E140

F168

B116

F137A

C1F7

F121

F137

B116A

F169

E146

E148

E138

C1E11

C1F1

C1F19

C F

C1F2

C1F21

E147

C1E8 E145

E143

F136

F118

F117

B138

F163

C1E15

F179B

F177

C1F20

F103

F160

F177A

F178

F161

B134

F116

C1F6

C F

F115

C1E16

F164

F F

E134

C1E32

C1E10

F166

F167

F165

F162

B137

C F

F109

F108

C1F8

F146

F179

F131

C1F15

F105

F113

F114A

C1F22

F170

F127 F130

F103B

F114

F132

F151

F180

F149

C1E17

F119

F107

F106

F112 F155

F147

F152

C F

C F

F144

F138

F153

F138A

F145

F148

F110 F111 F142F141F140F139 F156

C1F12 C1F13

F133

F157 F158 F159

C1F17

F142 F154

F120

E127A

B132A

B166A

C A

C1C2

C B

B152A

B173

F103A

A126A124A122

A A

A

A119A A121 A123 A125

C1A3 A129A129B

A118

A

A

A129A

A128

B134A

C1E30

A172 A171 A169

A143

A142A

B175

A144

A137

A144A

B160A

E100A

E142

E141

E100

E101

EXIST.

TELECOM

G141

EXIST.

CORRIDOR

G191

EXISTING

U/C WAITING

C178

EXIST.

TELECOM

C105

EXIST.

TELECOM

A153A

BREAK

ROOM

B144

EXIST.

TELECOM

B144A

LOCKERS

B143

EXIST.

TOILET

B144B

EXIST.

ELEV. LOBBY

C1E9

EXIST.

TELECOM

E139

ELECTRIC

SHAFT

D202A

# SF

# SF

# SF

# SF

# SF

# SF# SF

# SF

# SF

# SF

# SF

# SF # SF

# SF

# SF

# SF# SF

# SF

16 SF

A174A

A145A

A144C

A174B

A144A

A144B

A183

A184

A145B

108A1

#4

#5

#6

#10

#9

#11

#1#2#3

#14

#13 #12

#15

UP

UP

DNUP UPDN

UPDN

UP

DN

DN

UP

DN

UPUP

DN

UP

DN

DN

DN

SLOPE

DN

DN

E X

T

E

X T

E X

T

EXT30EXT36

E X

T

EXT30 EXT36

NG

NG NG

NG NG NG

NGNGNG

MV MV MV MV

MV

MV

MV

MV

M V

M V

O2 O2 O2 O2

O2

O2

O2

O

O

MA MA MA MA

MA

MA

MA MA MA MA

MAMAMAMA

MA

M A

M A

E.5

F.1

F.2

F.9

G.5

10.1 11.8

G.5

F.9

F.2

F.1

E.5

13.6

AaEbFaMbNb

13.4

13.6

13.4

Sb Nb Mb Fa Eb Aa

C

C.3

D

D.1

E

E.1

F

G

H

0 0.1 1 2 3 4 5 5.6 6 6.3 7 8 9 10 10.6 11 11.5 12 13 14

H

G

F

E.1

E

D.8

D.5

D2

D

C.3

C

B.9

D.8 D.1 C.3

D

11 11.5 12

C

B.8 B.5

B

B.1 A.1 AZ AY.8 AY AX.8

B

AX.5 AX.1 AX AW.8 AW AV.9

1.09

1.1

1.7

2.2

2.8

1.9

3.1

3.7

4.4

4.6

5.4

5.5

6.3

6.7

7.2

8.2

9.1

10.4

11.5

12.5

13.5

ABBaBbCDEEaFGGaHHaJJaKLLaMNNaPQRRaRbSSbT

13.5

12.5

11.5

UU.5VWW.4XYZAABBCCCC.6DD

10.4

10.2

9.8

9.1

8.9

8.3

8.2

7.6

7.2

7.1

6.7

6.3

6.2

6.1

5.5

5.4

5.1

4.7

4.6

4.1

DD CC.6 CC BB AA

3.7

3.6

3.2

2.8

2.7

1.9

1.6

1.09

0.9

0.5

Z X.5 W V U.2 U

B

0.5

0.9 T S

R

0.1 1

Q

2 3

P Na N M La L

4 5

K

5.6 6

Jb

6.3

J Hb

H Ga G

F Ea E

A

5.7

Bd

9*

N7

F

FE

FE

FE

FE

FE

FE

FE

F

F

F F

F

F

F

F

F

FE

FE

REFG.

REFG.

AREA 1 AREA 1A

AREA 2

AREA 2A

AREA 3

AREA 3A

AREA 5

AREA 5A

NO WORK THIS AREA

NO WORK THIS AREA

NO WORK THIS AREA

NO WORK THIS AREA

AREA 4

AREA 4A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:3

P

M

FX-106-C-1.1

FIRE PROTECTION FIRST FLOOR

OVERALL

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1" = 20'-0"

FLOOR PLAN - FIRST FLOOR FIRE PROTECTION OVERALL

E109 E110E125F

E125EC1E24

E125DE125CE125BE125A

E124

E123

E126

C

E

E133

E122 E121 E120

E117

E116

E115

E114

E130

E131

E132

E112

E111

E129

E127

F100

E137

E102F E102E E102D E102C

F129

F135

F104

E-1204

F171

F128

F134

C1E13

F122

C1E21

F150

F101

F125

C F

F123

F102

F126

E106

C1F11

F124

C1F7

C1E12

F168

F137A

C1F7

F121

F137

E148

E138

C1E11

C1F1

C1F19

C1F2

C1F21

E147

C1E8

F136

F118

F117

C1E15

C1F20

F103

F116

C1F6

C F

F115

E134

C1E10

C

F

F109

F108

C1F8

F146

F131

C1F15

F105

F113

F114A

F127 F130

F103B

F114

F132

F151

F149

F119

F107

F106

F112 F155

F147

F152

C

F

C

F

F144

F138

F153

F138A

F145

F148

F110 F111 F142F141F140F139 F156

C1F12 C1F13

F133

C1F17

F142 F154

F120

E127A

F103A

#10

#9

#11

UP

E X

T

EXT30EXT36

E X

T

EXT30 EXT36

M V

M V

O

O

M A

M A

E.5

F.1

F.2

F.9

G.5

C

C.3

D

D.1

E

E.1

F

G

H

0 0.1 1 2 3 4 5 5.6 6 6.3 7 8

B

FE

FE FE

FE

FE

FX-402-C-1.1

FX-402-C-1.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:3

P

M

FX-107-C-1.1

FIRE PROTECTION FIRST FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR FIRE PROTECTION - AREA 1

04 8 16268

SCALE: 1/8"=1'-0"

C133C

G

G176

G100

G101

G102

G102A

G160

G103

G

G105

G106

G

G105A

G108

G114A

G

G116

G114

G115

G113G112

G156

G173G

G111

G110

G110A

G

G148 G147 G146 G171

G145

G143A

G144

G142A

G168

G142

G170

G169

G143

G107

G136 G139

G155

G155B

G137

G138

G163 G162

G120

G121

G123

G122

G133

G127 G128

G159

G

G

G129

G130

G131

G132

G119

G124

G

G118 G161

G164A

G164

G135 G140

G

A

G193

G149

G150 G151 G153

B176D

G152

G192

G191

EXIST.

TELECOM

G141

#14

#13 #12

#15

UU.5VWW.4XYZAABBCCCC.6DD

10.4

10.2

9.8

9.1

8.9

8.3

8.2

7.6

7.2

7.1

6.7

6.3

6.2

6.1

5.5

5.4

5.1

4.7

4.6

4.1

5.7

N7

F

F

F F

F

F

F

FX-402-C-1.1

FX-402-C-1.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:3

P

M

FX-108-C-1.1

FIRE PROTECTION FIRST FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR FIRE PROTECTION - AREA 2

04 8 16268

SCALE: 1/8"=1'-0"

A161

C168 C170 C171

C174

C175

C173

C172C167C146

C182 C103 C102C1C2

C137C125C126C127C128

C189 C184

C136

C124

C123

C133

C134

C113

C111

C112

C114

C115

C116

C117

C118

C119

C132

C120 C121 C122

B168

B172

B176

B176C

B176B

B176A

B152

B148

B154 B167B

B160

B164

B166

B167A B167

B129

B128

B165

B136B

B136B132

B136A

B175A

B112AB108

B108A

B107A

B107

B104 B105

B109 B110 B112

B135

B133 B150

A153

A152A

A191

A162

A165

A166

C104

B176D

C135

G196E

G194B

B106

B131A

B131B

B

B179

B126 B129

B174

C B

B119

B170

C169

C168 B121 B120 B122

C1B4

B127

B128

B130 B131 B164

B165

C

B

B123

C176

D149

D101

C1C1 D101B

C143

A106A107

A194

A110

A117G

A117F

A117E

A117A

A117B A116

A115

C

B

A116A

A153C

A117C

C1A7 A117D

A156C

A156B

A156A

A157

A108A109A111A112A113A114

A153B

B149

C1A2

A193

D

A

C D

D

D102A

D102G

E102G

A163

B139

C1E14

B146

E108B

E105

C1A1

E104

E107

E108

B139A

E103

E108C

B145

B116

B116A

B138B134

B137

C1E17

B132A

B166A

C1C2

C

B

B152A

B173

B134A

B175

B160A

B144

B143

B144B

EXIST.

TELECOM

A153A

EXIST.

TELECOM

EXIST.

TELECOM

B144A

#4

#5

#1#2#3

UPDN

UP

DN

E X

T

E X

T

Sb Nb MbT S R Q P Na N M La L

4 5

K

5.6 6

Jb

6.3

J Hb

H

T V

REFG.

REFG.

FX-402-C-1.1

FX-402-C-1.1

FX-402-C-1.1

FX-402-C-1.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:4

P

M

FX-109-C-1.1

FIRE PROTECTION FIRST FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR FIRE PROTECTION - AREA 3 & 4

04 8 16268

SCALE: 1/8"=1'-0"

D100A

C182 C103 C102C1C2

C192

C191

C189 C184

C188

C185

C187

C186

C193

C180

C181

D194

C107

C142AC142C140AC140C139C138

C137A

C135

C134B

C136

C

A

C133C

C133B C1C10

C132

C106

C109

C179

D198

D199C

D199B

D193A

D193

D

E

D199

D183 D182 D155

D181

D180

C1C23

D

A

D

C

C

D179

D

B

C

C

D194A

D189D

D185

D

C

D186

D187

D194

D199A

D195A

C152

D195

C1D23

D191 D190 D189 D170

D154

D169

D171

D171A

C133

G155B

G164A C104

G164

C110

G135 G140

G

A

G193

C1C1 D101B

D150

D151B

C143

C101

C

C

C101C

D129C

D151

D151C

C101D

C1D5

C198

C1C9C137

C144

C1C2

EXIST.

TELECOM

C105

EXISTING

U/C WAITING

C178

#6

UP

DNUP

MbNb

13.4

13.6

13.4

HaJJaKLLaMNNaPQRRaRbSSbT

13.5

12.5

11.5

U

N7

FX-402-C-1.1

FX-402-C-1.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:4

P

M

FX-110-C-1.1

FIRE PROTECTION FIRST FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - FIRST FLOOR FIRE PROTECTION - AREA 3A &4A

04 8 16268

SCALE: 1/8"=1'-0"

C2A6

C235BC235AC234C233C232

C227

C252

C249E

C251

C257 C237A

C237

C235

C256 C236

C255 C238

C239

C241

C240C254

C253 C242 C243

C250

C249C

C249

C227B

C227A C249D

C247

C 2C

C225

C224

C223

C222

C246

C2C3

C248

C249B

C249A

C221

C 2D

D212A D212D

D212B D212E

D212C D212F D205C

D205B

D200A

D205

D206A

D207C D207B

C201C

C201B

D202

D202B

D212

D201

D206

D205A

D201A

C 2D

D203

D204 D219C

D219B

D219

D220

D219H

D219G

D219F

D221

D222

D223

A223

A223A

A223C

A258 A257

A228 A230

A256

D224 D225

A255

A232 A234

A254

D226

A253

A236

A235 A233A229A227A225A222A

A220

A226A205A207

A204

C2E8

C219

C220

S T R

C218

C216

C217

C215

C214

C213

C211

C209 C209A

C210 C208 C207 C206 C205 C204 C203

C207A C2B2 C203A

B211

B212

B209

B208

B207

B210

B212A

B227 B228 B230 B232

B206

B235

B205

B236

B204

B238

B203

B239A

B239

B241

A212

B200

C2B4

B242A201

A200

B237B234B233B231B229B226B223

B225

B224

B213

B215

B214

B216

B217

B218

C 2B

B221B

B219

B220

B221A

B221

B245

S T R

B222 B222A

B221D

D209A

D219E

D221A

D213A

C2D3

D210

D214 D215

C 2D

D213C

D213E

D218

D218C D218B D218A

D217

D213G

D218

C2C1

C 2C

C 2C

C226

D213D

D213J

D213K

D213H

D213F

D213B

D213L

C201

C201D

C202

C201F C201E

C201A

B201B A214 A215

A209

C2A05

C 2A

A202 A203 A218

C212

C 2C

D219D

A200A

C2E7

C2E12

F210 F211 F212 F214 F215 F217 F235 F236

F239 F240 F267 F266 F265

F269

C2F23

F268 F264 F263

F210A

C2F3

F204

C2F1

F201

F202

F206DF206C

C2F7

F203

E202

F224

C2F8

F206AF206B

F205

F242

F237

F206

F207

C2F20

E201

C2F20

F256

F245

F241

C 2F

F231

F223

C2F14 F257

F230

F232

F219

F238

F233

C2F16

F234

F243

F246

C 2F

E207

E204A

F209

C2F4

C2F6

F216

F208

C 2F

F209A

E204

C2E6

F247

F244

C2F17

F225

F228

E209

E205A C2E3

E222E223E225E226

F218

C2F12

F222

C 2E

E212A

E224A

E214

E213

E205

F221

C2F19

F227

F222A

E208

E217

E212E211

E

C 2E

C 2F

F250

F255

C 2F

F226

E216E255

C2E1 E253

E220

F211A

F248

F249

C 2F

F220

E211A

E254

E210

F256

C 2F

F213A

F213

E221

E219

E218

C 2F

E215

F252

F257

F260F271

F261F270

F262

C 2F

F258F273

F259F272

F229

F200

F274

A219

E209A

F275

F213B

E241

E239

E237

E236

C2E9

C2E11

E227E229

E230E232E233E234E235

E238 C2E16

C2E14

C 2E

E244

E240

E242 E243 E249

C2E18

E245

C 2E

E246

E247

E248 E250

E231

E228

C2E13

E251 E252

A249A

A249

A246

A244A

A244

C 2A

A241

A252A

A252

A251

A251A

D229

D227A D227

D228

D229A

D231A

D231

C 2D

D232

D230

D233 D235 D235A

D237

D239

D241

D238

S T R

D240

D234

C2A4

C2A03

A208

A216

A212

STR #1

C 2A

A222

A200

C2B4A

D207

D216D

C230

C228

C231

C226A

C226B

C227C

C229

F251

F253

A250

S T R

D236

D208

A201B C2A02

A200A

A206A

C2A01

A211

A213

A210

A223B

A223D

A221

C2A09

EXIST.

ELEV. LOBBY

C2E10

EXIST.

TELECOM

E203

EXIST.

TELECOM

A217

EXIST.

DATA CENTER

D216

#10

#9

#11

#2#3 #1

#4

#5

#6

DN

UP

UPDNDNUP

UP

DN

DN

UP

DN

UP

DN

UPDN

UP

DN

DN

UP

#13 #12

DN UP

1-2

MECH

EQPM RM

STOR

G200

G202

G201

G203

OPEN TO

ROOF ACCESS

OPEN TO

ROOF

ACCESS

OPEN TO

ROOF ACCESS

OPEN TO

ROOF ACCESS

OPEN TO

ROOF ACCESS

DP-CRITICAL-1

N7

N2

N2

PATIENT ED

W

D

A

B

2 3

C

D

F

G

H

1 2 3 4 5 6 7 8 9 10 11 11.6 12

H

G.5

G

F.2

F

E

D.8

D

C

B

A4 5 6 7 8 9 11 121

5.6 6.3 10.6 11.5 12.1

F.9

F.1

E.4

E.1

D.5

E.1

D.1

5.6 6.3 11.5

UVWW.4XYZ U.5W.3

10.4

10.2 10.1

9.1

8.9

8.2

7.6

7.2

6.3

5.1

4.1

3.6

8.3

6.1

7.1

4.7

4.5

U.5

PQRST

UVWW.4XYZ

EaFGHJKLMNNa ABCDE

5.5

6.3

7.2

8.2

9.1

10.4

T S R Q P B ANa N M L K J H G F Ea E D C

1.9

2.8

3.7

4.4

4.6

5.4

6.2

6.7

10.1

10.5

11.5

12.5

13.5

BaGaHaJaLaQaRaRb

13.5

12.5

10.5

6.7

6.3

6.2

5.7

5.5

5.4

4.6

3.7

2.8

1.9

Jb Hb

1.1

13.9

AaEbFaMaNbR.1Sb

13.9

1.1

Sb Qa Nb Ma Fa Eb Aa

3 2 1

6 5 4

0 #

3 2 1

6 5 4

0 #

BMS

BMS

F

F

F E

FE

F

F

F

F

F

F F

F

T V

T V

TV

AREA 1

AREA 2

AREA 3

AREA 4

AREA 4A

AREA 5

NO WORK THIS AREA

NO WORK THIS AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:5

P

M

FX-111-C-1.2

FIRE PROTECTION SECOND

FLOOR OVERALL

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1" = 20'-0"

FLOOR PLAN - SECOND FLOOR FIRE PROTECTION OVERALL

E203

EXIST.

ELEV. LOBBY

C2E10

C2E7

C2E12

F210 F211 F212 F214 F215 F217 F235 F236

F239 F240 F267 F266 F265

F269

C2F23

F268 F264 F263

F210A

C2F3

F204

C2F1

F201

F202

F206DF206C

C2F7

F203

E202

F224

C2F8

F206AF206B

F205

F242

F237

F206

F207

C2F20

E201

C2F20

F256

F245

F241

C 2F

F231

F223

C2F14 F257

F230

F232

F219

F238

F233

C2F16

F234

F243

F246

C 2F

E207

E204A

F209

C2F4

C2F6

F216

F208

C 2F

F209A

E204

C2E6

F247

F244

C2F17

F225

F228

E209

E205A C2E3

E222E223E225E226

F218

C2F12

F222

C 2E

E212A

E224A

E214

E213

E205

F221

C2F19

F227

F222A

E208

E217

E212E211

E

C 2E

C 2F

F250

F255

C 2F

F226

E216E255

C2E1 E253

E220

F211A

F248

F249

C 2F

F220

E211A

E254

E210

F256

C 2F

F213A

F213

E221

E219

E218

C 2F

E215

F252

F257

F260F271

F261F270

F262

C 2F

F258F273

F259F272

F229

F200

F274

E209A

F275

F213B

E241

E239

E237

E236

C2E9

C2E11

E227E229

E230E232E233E234E235

E238 C2E16

C2E14

C 2E

E244

E240

E242 E243 E249

C2E18

E245

C 2E

E246

E247

E248 E250

E231

E228

C2E13

E251 E252

F251

F253

#10

#9

#11

2 3

2 3 4 5 6 7 8 9 10 11 11.6 12

H

G.5

G

F.2

F

E

D.8

D

C

B

A4 5 6 7 8 9 11 12

5.6 6.3 10.6 11.5 12.1

F.9

F.1

E.4

E.1

D.5

5.6 6.3 11.5

F

F E

FE

F

F

F

F

F

FX-403-C-1.2

FX-403-C-1.2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:5

P

M

FX-112-C-1.2

FIRE PROTECTION SECOND

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - SECOND FLOOR FIRE PROTECTION - AREA 1

04 8 16268

SCALE: 1/8"=1'-0"

D209

TELECOM

A217

EXIST.

DATA CENTER

D216

C227

C252

C249E

C251

C257 C237A

C237

C235

C256 C236

C255 C238

C239

C241

C240C254

C253 C242 C243

C250

C249C

C249

C227B

C227A C249D

C247

C 2C

C225

C224

C223

C222

C246

C2C3

C248

C249B

C249A

C221

C 2D

D212A D212D

D212B D212E

D212C D212F D205C

D205B

D200A

D205

D206A

D207C D207B

C201C

C201B

D202

D202B

D212

D201

D206

D205A

D201A

C 2D

D203

D204 D219C

D219B

D219

D220

D219H

D219G

D219F

D221

A223

A223A

A223C

A258

C203

B236

B204

B238

B203

B239A

B239

B241

A212

B200

D209A

D219E

D221A

D213A

C2D3

D210

D214 D215

C 2D

D213C

D213E

D217

D213G

D218

C2C1

C 2C

C 2C

C226

D213D

D213J

D213K

D213H

D213F

D213B

D213L

C201

C201D

C202

C201F C201E

C201A

B201B A214 A215

A209

C2A05

C 2A

D219D

A200A

A208

A216 STR #1

C 2A

A222

A200

C2B4A

D207

D216DC228

C226A

C226B

C227C

C229

D208

A211

A213

A210

A223B

A223D

A221

C2A09

#2#3 #1

#4

#5

#6

DP-CRITICAL-1

N7

N2

3 2 1

6 5 4

0 #

3 2 1

6 5 4

0 #

BMS

BMS

F

TV

FX-403-C-1.2

FX-403-C-1.2

FX-404-C-1.2

FX-404-C-1.2

FX-405-C-1.2

FX-405-C-1.2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:5

P

M

FX-113-C-1.2

FIRE PROTECTION SECOND

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - SECOND FLOOR FIRE PROTECTION - AREA 3A & 4A

A306A

EXIST.

OFFICE

B345

# SF

# SF

# SF

# SF

# SF

#2#3 #1

#13 #12

#11

#10

#9

#6

#7

#8 #4

#5

DN

UP

DN

UP

DN

DN

DN

DN

UPDN

DNDN

UP

DN

DN

DN

DN

UP

UP

DN

OPEN TO

ROOF ACCESS

ISTL

4 7

9 *

AREA 1

AREA 2

AREA 3

AREA 4

AREA 4A

AREA 5

NO WORK THIS AREA

NO WORK THIS AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:0

P

M

FX-114-C-1.3

FIRE PROTECTION THIRD FLOOR

OVERALL

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1" = 20'-0"

FLOOR PLAN - THIRD FLOOR FIRE PROTECTION OVERALL

C3F3

E312

E306

E308

E310

E311

E329 E332 E333 E334 E338

E339

E340

E341

E337E336

E331

E328

E327

E324

E323 E322

E321

E319

C3E2

E320

E318 E317

C3F1

E316

E315 E314

E313

E300 E301

E301A

E307

E304

C3F5

E305

E309

F396

F395

F397

F370

F367

F300

F303

F302

F322

F304

F307

F 8 F305

F309F310

F312.1

F312

S T

R

F .2 F311

E325

C E

C3E4

C E

E330

E335

F348 F346 F345 F343 F340 F339 F338 F337

C3F9

F349

F350

F321

F320

F317

F316

C F

F347 F344

F342 F341

F336

F324 F325 F326

F334

F333

F335

F332

F331

F330 F329

F328F327

F323

F318

F314

F315

C3F7

C F

F352 F353 F354 F355 F356 F357

F393

F392

F391

F389

F388 F385

F382

F381 F380

F364

C3F17

F361

F360 F358

F365

F362

F366

F369

F373

F376 F378

F387

F375

F363

C F

F390

F383

F371

F377

C3F11

C3F15

F372

C F

F359

F368

F386

F379

F319

CSF13

EXIST.

TELECOM

E326

#11

#10

#9

FX-406-C-1.3

FX-406-C-1.3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:0

P

M

FX-115-C-1.3

FIRE PROTECTION THIRD FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - THIRD FLOOR FIRE PROTECTION - AREA 1

04 8 16268

SCALE: 1/8"=1'-0"

C348A

C337A

C3B8

C302

C

C308

C

C C

C305

C319

C318

C320

C307

C306

G320

S T

R

G322G323

G315

G321

G313A

G313

G317

G324G325G327

G373

G311A

G311

G325A

G327AG330A

G347

G346

1-3

STR #G1

G355

G

G344

G300

G344A

G301

G340

C B

G302

G336

G371

G342

G330

G342A

G

G362

G375

G360

G309

G340A

G363

G307A

G305

G338

G332A

G336A

G361A

G361

G334A

G309A

G338A

G364

G334

B337

B311A

G

G359

G307

G332

G304

G301A

G303

B311

C B

B312

B312A

B330

B329

B336 B310

B310A

B326

B327

B328

B309

B309A

B307

B307A

B305

B305A

B308A B306A

B325

B324 C3B1

B308 B306 B304

B304A

B303A

B303

G329

G357

G356

EXIST.

TELECOM

C316

#13 #12

4 7

9 *

FX-406-C-1.3

FX-406-C-1.3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:0

P

M

FX-116-C-1.3

FIRE PROTECTION THIRD FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - THIRD FLOOR FIRE PROTECTION - AREA 2

04 8 16268

SCALE: 1/8"=1'-0"

C360A

C363

C361AC362A

C349

C347

C348

C337

C335

C336

C345

C344

C343

C328

C329

C327

C321

C322

C325

C3C9

D308C

D302

D301

D301A

C323

C C

D320

STR #6

D319

C358A

D321

D322

D323

D324

D326

D327

D328

D329

C D

C

D

D330

D331

S T

R

D331B

D331C

C D

D352

D316C

D316

D316A

C358

C330

STR #7

C360C361C362C364C365

C363AC364AC365A

C3C4

C355

C353

C357

C359

C356

C346

C354C352

C356A

C357A

C351

C351A

C350

C350A

C349A

C3C6

C348A

C337A C332

C334

C341

C333

C338

C C

C339

C340

D333 D333A D333B D334

D334A

D335

A323A322

A318

A320

A321A

A354

A319

A356 A357

A317

A358

A316

A318A

A318

A312

STR #1

C3A2

A313

A314

C A

D301B

D332

D332C

D325

C C

B302

B302A

B301A

B301 B300

B323 B322

B321

B320

C3B4

B342

B

B338

B340 C3B5

B315A

B315B

B315

B316A

B316

B316B

B341

B317A

B317

B348

B347

B344

B318A

B318

A300

D332B D332A D332D

D353

D353A

C368

C369

C328A

C324

EXIST.

TELECOM

C358C

EXIST.

TELECOM

A306A

EXIST.

OFFICE

B345

#2#3 #1

#6

#7

#8 #4

#5

FE

FX-406-C-1.3

FX-406-C-1.3

FX-406-C-1.3

FX-406-C-1.3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:0

P

M

FX-117-C-1.3

FIRE PROTECTION THIRD FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

3/32" = 1'-0"

FLOOR PLAN - THIRD FLOOR FIRE PROTECTION - AREA 4 & 4A

ROOM

TELECOM

FaMb

#7

#8

#2#3 #1

#4

#5

ZONE 26

553 555 558

503A

501 501A

508B

501C 501B

508C

S T

R

508A

516 513

514A 512B512C

510A

C

557556

554A

550545544

545A

C57 C58

C

C53

C56

C51

520A

C54 512B

558A

6.7

Jb

4.4

5.4

6.2

6.7

FGGaHHbJJaKLLaMN

F

F

F

F

F

F

FX-407-C1.5,6

FX-407-C1.5,6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLANKEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:1

P

M

FX-118-C-1.5

FIRE PROTECTION FIFTH FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - FIFTH FLOOR FIRE PROTECTION

04 8 16268

SCALE: 1/8"=1'-0"

TELECOM

EXIST.

TELECOM

Ma Fa

2.9

10.1

#2#3 #1

#4

#5

625B

623 625F

625C 625D

619 615A

C67

625E 612A

615 614

612B 612C

613C 613B

612D

612G

612F

612E

STR #1

632A

645 646 647 648 656 657 663 664 666 668 670

607608

S T

R

605604603683

C

667665660

662656B

C65

660A 676 675

C003

682685

C004686

656A

670A 659 658

624654

650A

C

601A

601B

C

C63

617618621622

C

625A632

C

626A

C

C69

652A653

C71

C61

601C

GHHbJbKLM J

Ja

GaLaN F

4.4

5.4

6.2

6.7

F

F

F

F

FX-407-C1.5,6

FX-407-C1.5,6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

KEY PLAN

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:1

P

M

FX-119-C-1.6

FIRE PROTECTION SIXTH FLOOR

PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - SIXTH FLOOR FIRE PROTECTION

04 8 16268

SCALE: 1/8"=1'-0"

C1K18

K

P-18A

K

K A

K

K001

K

K

K005

K

C0K01

CORRIDOR

P-18

ELEV

K053

STAIR

K001

MECHANICAL

K005

LOADING

C0K03

CORRIDOR

K004

MED.

GAS

EQUIPMENT

ROOMK003

ELEC.

ROOM

K002

STORAGE

K006

STORAGE

K007

TELECOM

DEMARK

ENT. RM.

N.5

G.5

H

G

13121110

P

N

K

1.7

H.2

E.5

M

J

F

E

UP 24R

TELECOM DEMARK

ENTRANCE ROOM

K007

FX-120-C-2.B

1 1/2"

SPR

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

CABLE TRAY

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS

EX 1 1/2"

S P

R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:1

P

M

FX-120-C-2.B

FIRE PROTECTION BASEMENT

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - BASEMENT FIRE PROTECTION - COMMUNITY LIVING CENTER

1/4" = 1'-0"

BASMENT FIRE PROTECTION NEW WORK - K007

04 8 16268

SCALE: 1/8"=1'-0"

TU

W010

CBG2

10.4

11.5

12.5

13.5

10.2

13.4

EXIST.

TELECOM

W05B

N1

PALLETS WILL

BE STACKED

TWO HIGH ON

RACKS

ENGINEERING

ENV

P R

O C

E S

S S

T O

R E

S

TSS STORAGE

E Q

U

IP

M E

N T

SPS

T S

S

12111098

TSS STORAGE

TSS STORAGE

TSS STORAGE

W03A

W03B

W03

W04A

W04

CWA3 W08

W09 W07

C W

A

CWA1

W05A

W06

W02 W01

EXIST.

ROOM

W05

75 64321

A

B

C

D

F

E

G

PS

PS

F

FX-408-C-14.B

FX-408-C-14.B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:2

P

M

FX-121-C-14.B

FIRE PROTECTION BASEMENT

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/8" = 1'-0"

FLOOR PLAN - BASEMENT FIRE PROTECTION - WAREHOUSE

04 8 16268

SCALE: 1/8"=1'-0"

A060 A063C

E007

EXIST.

ELEV. LOBBY

CBE5 EXIST.

TELECOM

E006

G046

EXIST.

OFFICE

G051

EXIST.

TELECOM

G050

CBF1

E007

EXIST.

ELEV. LOBBY

CBE5 EXIST.

TELECOM

E006

OFFICE

STORAGE

A060B

TELECOM

ROOM

A060

TELECOM

DEMARK ENTRANCE

A060A

G046

EXIST.

OFFICE

G051

EXIST.

TELECOM

G050

UP

REMOVE/ REWORK/ EXTEND EXISTING

SPRINKLER PIPING AND SPRINKLER HEADS

AS REQUIRED FOR NEW IT/ DATA WORK.

FIRE PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE SPRINKLER SYSTEM.

SEE NEW WORK PLANS.

2 1/2" 2 1/2"

1 1/4"

1 1/2"

1 1/2"

1 1/4"

1"

1"

1"

SPR

SPR

S P

R

S P

R

EXISTING 1" SPR. TO

BE RECONNECTED.

EXISTING 1-1/2" SPR.

TO BE RE-EXTENDED

TO NEW SYSTEM.

REMOVE/ REWORK/ EXTEND

SPRINKLER PIPING AND

SPRINKLER HEADS AS

REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE

SPRINKLER SYSTEM. SEE NEW

WORK PLANS.

1" SPR

1 1/4" SPR

S P

R

1"

1"

E006 TO EXPAND INTO THIS AREA,

SPRINKLER PIPING AND HEADS MAY

NEED TO BE REWORKED. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A FULLY CODE COMPLIANT

WET SPRINKLER SYSTEM INSIDE AND

OUTSIDE OF E006

PROPOSED EXPANDED AREA

1 1/4"

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING AND

SPRINKLER HEADS AS REQUIRED

FOR NEW IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT AUTOMATIC WET

PIPE SPRINKLER SYSTEM. SEE

NEW WORK PLANS. SPRINKLER HEADS

AND PIPING OUTSIDE

PROPOSED TELECOM

ROOM MAY NEED TO

BE REWORKED TO

PROVIDE A CODE

COMPLIANT SYSTEM.

S P

R

1 1/2"

1" 1"

1 1/2" 1 1/2"

3"

3"

2"

1"

2"1"

1" 1"

SPR

SPR

S P

R

PROPOSED EXPANDED AREA

REMOVE SPRINKLER PIPE.

SEE NEW WORK PLAN FOR

ADDED PIPING.

REMOVE SPRINKLER

PIPING AND HEADS

EXISTING 3" TO REMAIN

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

SPRINKLER HEAD/S AS

REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

WET AUTOMATIC SPRINKLER

SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS,

LIGHTS AND RACKS, PROVIDE

ADDITIONAL SPRINKLER HEADS IF

REQUIRED DUE TO

OBSTRUCTIONS.

CABLE TRAY

DUE TO NEW ROOM

CONFIGURATION THIS AREA WILL

REQUIRE AN ADDITIONAL

SPRINKLER HEAD. REWORK

EXISTING SYSTEM AS NEEDED.

EXISTING SPRINKLER

HEADS TO REMAIN.

EX 1" SPR

EX 1"

EX 1"

EX 1 1/4"

EX 1 1/4"

S P

R

REMOVE/ REWORK/ EXTEND

SPRINKLER PIPING & SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

CABLE TRAY

RECONNECT EXISTING

SPRINKLER HEAD BRANCH

TO NEW TELECOM OFFICE

SPRINKLER SYSTEM

EXISTING 1 1/2" EXTEND AS NEEDED.

SPR SPR

EX 2 1/2" EX 2 1/2"

EX 1" SPR

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

SPRINKLER HEAD/S AS

REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

WET AUTOMATIC SPRINKLER

SYSTEM.

SPRINKLER HEADS

AND PIPING OUTSIDE

OF EXPANDED AREA

MAY NEED TO BE

REWORKED TO

PROVIDE A CODE

COMPLIANT SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

EX 3"

EX 1 1/2"

EX 1 1/2"EX 1 1/2"

EX 3"

EX 2"

CABLE TRAY

SPR

SPR

S P

R

CABLE TRAY

CONNECT NEW

TO EXISTING

EX 3"

CONNECT NEW TO EXISTING

SPR

S P

R

3"

CONNECT NEW

TO EXISTING

NEW SPRINKLER

BRANCH TO FEED NEW

TELECOM ROOM

HAZARD GROUP AND DENSITY REQUIREMENTS

A. TELECOM ROOMS AND DATA ROOMS TO BE PROVIDED WITH A DENSITY OF 0.1

GPM/SQ.FT. OVER THE HYDRAULIC REMOTE 1500 SQ.FT. (LIGHT HAZARD) WITH A

HOSE STREAM ALLOWANCE OF 100 GPM.

B. STORAGE ROOMS TO BE PROVIDED WITH A DENSITY OF 0.20 GPM/SQ.FT. OVER

THE HYDRAULIC REMOTE 1,500 SQ. FT. (ORDINARY HAZARD GROUP 2) WITH A

HOSE STREAM ALLOWANCE OF 250 GPM.

C. CORRIDORS/ BREAKROOMS/ OFFICES/ AND OTHER ROOMS ALIKE SHALL BE

PROVIDED WITH A DENSITY OF 0.10 GPM/ SQ.FT. (LIGHT HAZARD) OVER THE

HYDRAULIC REMOTE 1500 SQ.FT. WITH A HOSE STREAM ALLOWANCE OF 100 GPM

EXISTING SPRINKLERS TO REMAIN

1"

1"1"

SPR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:2

P

M

FX-401-C-1.B

FIRE PROTECTION ENLARGED

PLANS

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/4" = 1'-0"

FIRE PROTECTION DEMOLITION - A060

1/4" = 1'-0"

FIRE PROTECTION DEMOLITION - E006

1/4" = 1'-0"

FIRE PROTECTION DEMOLITION - G050

KEYED NOTES

1. EXISTING UPRIGHT SPRINKLER HEAD.

2. RECESSED SPRINKLER HEAD.

1/4" = 1'-0"

FIRE PROTECTION NEW WORK - E006

1/4" = 1'-0"

FIRE PROTECTION NEW WORK - A060

1/4" = 1'-0"

FIRE PROTECTION NEW WORK - G050

02 4 8134

SCALE: 1/4"=1'-0"

1/4" = 1'-0"

PIPE BASEMENT FIRE PROTECTION NEW WORK - HOISTWAY

GENERAL SHEET NOTES

PLAN NORTH

A. REFER TO OVERALL PLANS FOR RATED ASSEMBLIES, ANY THROUGH

PENETRATIONS ARE TO BE SEALED ACCORDINGLY.

B. CEILING PLANS NOT SHOWN FOR CLEARITY, REFER TO ARCHITECTURAL

PLANS FOR CEILING PLANS.

REFG.

B144

B143

B144B

EXIST.

TELECOM

B144A

E138

EXIST.

ELEV. LOBBY

C1E9

EXIST.

TELECOM

E139

G191

EXIST.

TELECOM

G141

A153

A156C

A153B

EXIST.

TELECOM

A153A

EXIST.

TELECOM

C105

REFG.

REFG.

BREAK

ROOM

B144

B144A

LOCKERS

B143

EXIST.

TOILET

B144B

E138

EXIST.

ELEV. LOBBY

C1E9

EXIST.

TELECOM

E139

EXIST.

TELECOM

G141

EXIST.

CORRIDOR

G191

A153

A156C

A153B

EXIST.

TELECOM

A153A

EXIST.

TELECOM

C105

UPRIGHT SPRINKLER HEAD

TELECOM ROOM TO

EXPAND INTO THIS AREA.

EXISTING WET AUTOMATIC

SPRINKLER SYSTEM MAY

NEED TO BE REWORKED

FOR NEW LAYOUT. SEE

NEW WORK PLAN.

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING

AND PROVIDE NEW

SPRINKLER HEADS AS

REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE

SPRINKLER SYSTEM. SEE

NEW WORK PLANS.

EXISTING

SPRINKLER HEAD

TO REMAIN

EXISTING TO REMAIN

S P

R

1 1/4"

S P

R

SPR SPR

1 1/4" 1 1/4"

EXISTING TO REMAIN

PROPOSED

EXPANDED AREA

REMOVE SPRINKLER

PIPING TO REROUTE

AROUND NEW

ELECTRICAL PANEL

EXISTING 1 1/4"

TO REMAIN

UPRIGHT SPRINKLER HEAD

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING AND

PROVIDE NEW SPRINKLER HEADS

AS REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE SPRINKLER

SYSTEM. SEE NEW WORK PLANS.

TELECOM ROOM TO

EXPAND INTO THIS

AREA. EXISTING WET

AUTOMATIC SPRINKLER

SYSTEM MAY NEED TO

BE REWORKED FOR

NEW LAYOUT. SEE NEW

WORK PLAN.

RECESSED SPRINKLER HEAD

RECESSED SPRINKLER HEAD

SPR

SPR

1"

1 1/4"

EXISTING 1" SPR TO REMAIN

EXISTING 1 1/4" SPR

TO REMAIN

1 1/4"

EXISTING 1 1/4" SPR

TO REMAIN

EXISTING TO REMAIN

PROPOSED EXPANDED AREA

RECESSED SPRINKLER HEAD

TELECOM ROOM TO

EXPAND INTO THIS AREA.

EXISTING WET AUTOMATIC

SPRINKLER SYSTEM MAY

NEED TO BE REWORKED

FOR NEW LAYOUT. SEE

NEW WORK PLAN.

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING AND

PROVIDE NEW SPRINKLER HEADS

AS REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE SPRINKLER

SYSTEM. SEE NEW WORK PLANS.

RECESSED SPRINKLER HEADS

RECESSED SPRINKLER HEADS

RECESSED SPRINKLER HEADS

1"

S P

R

PROPOSED EXPANDED AREA

EXISTING 2" TO REMAIN

EXISTING 2" TO REMAIN

REMOVE SPRINKLER

PIPING AND HEADS

SPR

REMOVE/ REWORK/

EXTEND EXISTING

SPRINKLER PIPING AND

PROVIDE NEW

SPRINKLER HEADS AS

REQUIRED FOR NEW IT/

DATA WORK. FIRE

PROTECTION

CONTRACTOR TO

PROVIDE A COMPLETE

CODE COMPLIANT

AUTOMATIC WET PIPE

SPRINKLER SYSTEM. SEE

NEW WORK PLANS.

UPRIGHT SPRINKLER HEAD

1" SPR

2 1/2"

1"

UPRIGHT SPRINKLER HEAD

EXISTING TO REMAIN

S P

R

TELECOM ROOM TO

EXPAND INTO THIS

AREA. EXISTING WET

AUTOMATIC SPRINKLER

SYSTEM MAY NEED TO

BE REWORKED FOR

NEW LAYOUT. SEE

NEW WORK PLAN.

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING AND

PROVIDE NEW SPRINKLER HEADS

AS REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE SPRINKLER

SYSTEM. SEE NEW WORK PLANS.

1 1/2"

RECESSED SPRINKLER HEAD

SPR

PROPOSED EXPANDED AREA

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

SPRINKLER HEAD/S AS

REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

WET AUTOMATIC SPRINKLER

SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

EX 1 1/4"

EX 1 1/4"

EX SPR

SPR

CABLE TRAY

CABLE TRAY

EXPANDED ROOM, REWORK EXISTING

SPRINKLER SYSTEM AS NEEDED.

NEWLY CREATED ROOM

WILL REQUIRE SPRINKLER

PROTECTION. EXTEND

SPRINKLER PIPING FROM

EXISTING TO NEW

SPRINKLER HEAD.

SPR

S P

R

1 1/4"

S P

R

CONNECT NEW TO EXISTING

REWORK SPRINKLER

PIPING AROUND NEW

ELECTRICAL PANEL.

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

EXISTING SPRINKLER HEAD

MAY NEED TO MOVE DUE TO

NEW WALL AND/OR CABLE

ENTRY. VERIFY SPRINKLER

HEAD IS IN COMPLIANCE WITH

NFPA 13. IF NOT IN

COMPLIANCE WITH NFPA 13,

RELOCATE SPRINKLER HEAD.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

S P

R

SPR

S P

R

S P

R

1"

1 1/4"

1 1/4"

1 1/4"

1"

CABLE TRAY

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

AUTOMATIC SPRINKLERS

OUTSIDE OF EXPANDED ROOM

MAY NEED TO BE REWORKED

TO PROVIDE A CODE

COMPLIANT SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

CABLE TRAY

EX 2"

CONNECT NEW TO EXISTING

EX 2"

CONNECT NEW TO EXISTING

S P

R

NEW SPRINKLER BRANCH TO

FEED NEW TELECOM ROOM

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

EXISTING 1" SPR

EXISTING 1" SPR

EXISTING 2 1/2" SPR

CABLE TRAY

S P

R

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

EXISTING 1 1/2" SPR TO REMAIN

CABLE TRAY

SPR

HAZARD GROUP AND DENSITY REQUIREMENTS

A. TELECOM ROOMS AND DATA ROOMS TO BE PROVIDED WITH A DENSITY OF 0.1

GPM/SQ.FT. OVER THE HYDRAULIC REMOTE 1500 SQ.FT. (LIGHT HAZARD) WITH A

HOSE STREAM ALLOWANCE OF 100 GPM.

B. STORAGE ROOMS TO BE PROVIDED WITH A DENSITY OF 0.20 GPM/SQ.FT. OVER

THE HYDRAULIC REMOTE 1,500 SQ. FT. (ORDINARY HAZARD GROUP 2) WITH A

HOSE STREAM ALLOWANCE OF 250 GPM.

C. CORRIDORS/ BREAKROOMS/ OFFICES/ AND OTHER ROOMS ALIKE SHALL BE

PROVIDED WITH A DENSITY OF 0.10 GPM/ SQ.FT. (LIGHT HAZARD) OVER THE

HYDRAULIC REMOTE 1500 SQ.FT. WITH A HOSE STREAM ALLOWANCE OF 100 GPM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:4

P

M

FX-402-C-1.1

FIRE PROTECTION ENLARGED

PLANS

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION DEMOLITION - B143/B144

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION DEMOLITION - E139

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION DEMOLITION - G141

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION DEMOLITION - A153A

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION DEMOLITION - C105

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION NEW WORK - B143/B144

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION NEW WORK - E139

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION NEW WORK - G141

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION NEW WORK - A153A

1/4" = 1'-0"

1ST FLOOR FIRE PROTECTION NEW WORK - C105

02 4 8134

SCALE: 1/4"=1'-0"

GENERAL SHEET NOTES

PLAN NORTH

A. REFER TO OVERALL PLANS FOR RATED ASSEMBLIES, ANY THROUGH

PENETRATIONS ARE TO BE SEALED ACCORDINGLY.

B. CEILING PLANS NOT SHOWN FOR CLEARITY, REFER TO ARCHITECTURAL

A216 STR #1

A210

DN

EXIST.

GREEN CLINIC

A202

EXIST.

CORRIDOR

C2A1

EXIST.

TELECOM

A213

E202

EXIST.

TELECOM

E203

A216

DN

EXIST.

GREEN CLINIC

A202

EXIST.

TELECOM

A217

E202

EXIST.

TELECOM

E203

ELEV. LOBBY

UPRIGHT SPRINKLER HEADS

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING AND

PROVIDE NEW SPRINKLER HEADS

AS REQUIRED FOR NEW IT/ DATA

WORK. FIRE PROTECTION

CONTRACTOR TO PROVIDE A

COMPLETE CODE COMPLIANT

AUTOMATIC WET PIPE SPRINKLER

SYSTEM. SEE NEW WORK PLANS.

TELECOM ROOM TO

EXPAND INTO THIS

AREA. EXISTING WET

AUTOMATIC SPRINKLER

SYSTEM MAY NEED TO

BE REWORKED FOR

NEW LAYOUT. SEE NEW

WORK PLAN.

RECESSED SPRINKLER HEADS

RECESSED SPRINKLER HEADS

S P

R

S P

R

2"

S P

R

1"

1"

1"

1"

PROPOSED EXPANDED AREA

REMOVE SPRINKLER

PIPING AND HEADS

EX 2" TO REMAIN

EX 2" TO REMAIN

REMOVE/ REWORK/ EXTEND

SPRINKLER PIPING AND

SPRINKLER HEADS AS REQUIRED

FOR NEW IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT AUTOMATIC WET PIPE

SPRINKLER SYSTEM. SEE NEW

WORK PLANS.

TELECOM ROOM TO

EXPAND INTO THIS

AREA. EXISTING WET

AUTOMATIC SPRINKLER

SYSTEM MAY NEED TO

BE REWORKED FOR

NEW LAYOUT. SEE NEW

WORK PLAN.

UPRIGHT SPRINKLER HEAD

1"

1 1/4"

1 1/2" 2"

1 1/4"

1"

RECESSED SPRINKLER HEADS

RECESSED SPRINKLER HEADS

1"

S P

R

S P

R

PROPOSED EXPANDED AREA

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

AUTOMATIC SPRINKLERS

OUTSIDE OF EXPANDED ROOM

MAY NEED TO BE REWORKED

TO PROVIDE A CODE

COMPLIANT SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

EXISTING 1" SPR

EX 2"

EX 2"

S P

R EX 1"

CABLE TRAY

AUTOMATIC SPRINKLERS

OUTSIDE OF EXPANDED ROOM

MAY NEED TO BE REWORKED

TO PROVIDE A CODE

COMPLIANT SYSTEM.

S P

R

CONNECT NEW TO EXISTING

CONNECT NEW TO EXISTING

NEW SPRINLER BRANCH TO

FEED NEW TELECOM ROOM

REMOVE/ REWORK/ EXTEND

EXISTING SPRINKLER PIPING &

PROVIDE NEW SPRINKLER

HEAD/S AS REQUIRED FOR NEW

IT/ DATA WORK. FIRE

PROTECTION CONTRACTOR TO

PROVIDE A COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

AUTOMATIC SPRINKLERS

OUTSIDE OF EXPANDED ROOM

MAY NEED TO BE REWORKED

TO PROVIDE A CODE

COMPLIANT SYSTEM.

FIRE PROTECTION CONTRACTOR

TO COORDINATE SPRINKLER HEAD

LOCATIONS WITH CABLE TRAYS

AND RACKS, PROVIDE ADDITIONAL

SPRINKLER HEADS IF REQUIRED

DUE TO OBSTRUCTIONS.

CABLE TRAY

EX 1 1/2"EX 1 1/4" EX 2"

HAZARD GROUP AND DENSITY REQUIREMENTS

A. TELECOM ROOMS AND DATA ROOMS TO BE PROVIDED WITH A DENSITY OF 0.1

GPM/SQ.FT. OVER THE HYDRAULIC REMOTE 1500 SQ.FT. (LIGHT HAZARD) WITH A

HOSE STREAM ALLOWANCE OF 100 GPM.

B. STORAGE ROOMS TO BE PROVIDED WITH A DENSITY OF 0.20 GPM/SQ.FT. OVER

THE HYDRAULIC REMOTE 1,500 SQ. FT. (ORDINARY HAZARD GROUP 2) WITH A

HOSE STREAM ALLOWANCE OF 250 GPM.

C. CORRIDORS/ BREAKROOMS/ OFFICES/ AND OTHER ROOMS ALIKE SHALL BE

PROVIDED WITH A DENSITY OF 0.10 GPM/ SQ.FT. (LIGHT HAZARD) OVER THE

HYDRAULIC REMOTE 1500 SQ.FT. WITH A HOSE STREAM ALLOWANCE OF 100 GPM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENT

FULLY SPRINKLERED

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PROJECT MANAGEMENTCONSULTANT

321 4 5 6 7 8 9 10

6 S. OLD ORCHARD AVE.

WEBSTER GROVES, MO 63119

PHONE #: 314-918-8383

Consultant POC

8718 Botts Lane San Antonio, Texas 78217 www.hfscompany.com

Phone: (210) 816-4784 Fax: (210) 881-6808 jbianco@hfscompany.com

D U s e rs

\j a c o b .n o le n \D o c u m e n ts

\0 -M

E P

F P

-H O

S -R ja c o b .n o le n .r v t

/2

/2

:4

:5

P

M

FX-403-C-1.2

FIRE PROTECTION ENLARGED

PLANS

EHRM INFRASTRUCTURE

UPGRADES - COLUMBIA, MO

800 HOSPITAL DR.

COLUMBIA, MO 65201

589A4-21-700

1/25/2022 JDB JCN

1/4" = 1'-0"

2ND FLOOR FIRE PROTECTION DEMOLITION - A213

1/4" = 1'-0"

2ND FLOOR FIRE PROTECTION DEMOLITION - E203

1/4" = 1'-0"

2ND FLOOR FIRE PROTECTION NEW WORK - A213

1/4" = 1'-0"

2ND FLOOR FIRE PROTECTION NEW WORK - E203

02 4 8134

SCALE: 1/4"=1'-0"

GENERAL SHEET NOTES

PLAN NORTH

A. REFER TO OVERALL PLANS FOR RATED ASSEMBLIES, ANY THROUGH

PENETRATIONS ARE TO BE SEALED ACCORDINGLY.

B. CEILING PLANS NOT SHOWN FOR CLEARITY, REFER TO ARCHITECTURAL

D217

DP-CRITICAL-1

TV

D209

EXIST.

DATA CENTER

D216

D217

DP-CRITICAL-1

D209

EXIST.

DATA CENTER

D216

D217

D209

EXIST.

DATA CENTER

D216

D217

EXIST.

DATA CENTER

D216

EXISTING AREA IS PROVIDED

WITH WET TYPE AUTOMATIC

SPRINKLER SYSTEM. SEE

NEW WORK PLAN FOR NEW

WORK IN THIS AREA.

1 1/2"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1 1/2"

DRAIN

S P

R S

P R

2"

1 1/4"

1 1/4"

1"

1 1/4"

1"

SPR

S P

R

SPR

S P

R S

P R

1" 2"

ABANDONED FLOW SWITCH

SPR

SPR

RECESSED

SPRINKLER HEAD

(TYP.)

SHUT OFF VALVE

TO BE REMOVED

REMOVE AND CAP

SPRINKLER TO A

POINT PAST THE

TEMPORARY WALL

REMOVE EXISTING SPRINKLER HEAD AND CAP OR PLUG PIPE AT BRANCH.

EXISTING AREA IS PROVIDED

WITH WET TYPE AUTOMATIC

SPRINKLER SYSTEM. SEE

NEW WORK PLAN FOR NEW

WORK IN THIS AREA.

1 1/2"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

DRAIN

S P

R S

P R

2"

1 1/4"

1 1/4"

S P

R

SPR

S P

R S

P R

RECESSED

SPRINKLER HEAD

(TYP.)

NEW INDICATING SHUT

OFF VALVE WITH

TAMPER SWITCH

CONNECT NEW TO EXISTING

CAP

PHASE ONE

2" VALVED SPRINKLER

BRANCH TO BE EXTENDED TO

PHASE 1 AND PHASE 2 WET

TYPE SPRINKLER SYSTEM.

THE EXISTING SPRINKLER

SYSTEM FEEDING THE

PHASE 2 EXISTING AREA TO

BE TEMPORARILY BACK FED

FROM EXISTING 2"

SPRINKLER BRANCH.

FIRE PROTECTION CONTRACTOR TO

COORDINATE SPRINKLER HEADS AND

PIPING WITH EXACT LOCATION OF DIVIDER

CURTAIN, SEE ARCHITECTURAL SET.

EXISTING AREA IS PROVIDED

WITH NEW WET TYPE

AUTOMATIC SPRINKLER

SYSTEM. SEE NEW WORK

PLAN FOR NEW WORK IN THIS

AREA.

1 1/2"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

DRAIN

S P

R S

P R

2"

1 1/4"

1 1/4"

S P

R

SPR

S P

R S

P R

RECESSED

SPRINKLER HEAD

(TYP.)

EXISTING WET TYPE

SPRINKLER SYSTEM

INCLUDING TEMPORARY

CONNECTION TO BE

REMOVED.

FIRE PROTECTION

CONTRACTOR TO PROVIDE A

NEW COMPLETE CODE

COMPLIANT WET AUTOMATIC

SPRINKLER SYSTEM.

EX 2"

S P

R

S P

R

EX 1 1/4"

EX 1 1/4"

CABLE TRAY

NOTE: ROOM D216 SHALL BE

PROVIDED WITH BOTH A

CLEAN AGENT SYSTEM AND

A WET PIPE SYSTEM.

CABLE TRAY

PHASE 2

FIRE PROTECTION CONTRACTOR TO

COORDINATE SPRINKLER HEADS AND

PIPING WITH EXACT…