Final Drawings_Part4.pdf
PDF 17 MB Posted
- Solicitation number
- 36C77622R0069
About this file
This document outlines a federal contract opportunity for infrastructure upgrades construction services. The solicitation is for the EHRM Infrastructure Upgrades Construction project at the Department of Veterans Affairs Technology Acquisition Center in Columbia, Missouri. Under solicitation number 36C77622R0069, the selected contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as depicted in the drawings and specifications to complete the necessary construction work.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
#4
#5
#10
#9
#11
#6
#7
#8
REX
DN
DN
UP
#14
#15
DN
DN
#1#2#3
UP
UP
UP
DN DN
UP
UP
#13 #12
DN
UP
DN
DN
DN
DN
UP
UP
DN
DN
DN
DN
F
F
F
F
F
F
F
PALLETS WILL
BE STACKED
TWO HIGH ON
RACKS
ENGINEERING
ENV
PR
OC
ES
S
ST
OR
ES
TSS STORAGE
EQ
UI
PM
EN
T
SPS
TS
S
12111098
TSS STORAGE
TSS STORAGE
TSS STORAGE
PS
PS
TO HOSPITAL
W03A
W03B
W03
W04A
W04
CWA3 W08
W09 W07
C W
A
CWA1
W05A
W06
W02 W01
N1
F
F
F
F
F
F
EXIST.
ROOM
W05
EXIST.
TELECOM
W05B
CB
E3
F023A CBF3
F024
F001A F004
F021
F018
F020 F019 F017 F016
F015A
F015
F014
CB
F4
F005 F010
F012F013
F036F011
F009A
F009F008F007F006F003
CBF5
F001B F001
F002A
F002
E012 E001G
CBF1
E001
E009
E010
E008
E007
CBE1CBE2
E004
E005
G014
D027
CBD3
C006A
C006
STR #7
D021A
D021
STR #6
CBD7
A058
B013
B013A
B011B
B011A
B011C B011D B011E B011F B011G
B011
B011H
B011J B009
B007
B010
B010A
B006C
B006
B006B
B006A
B009A
A063C A063G
A063
A063A
A063H
A063D A063F
B036A
ST
R
B036B
B034 B036
F037STR #11
A024A
A056
STR #1
D015
W010
D022
D020
D023
D022B
D022CD022D
D022A
D012
D010
D008 D004
D017
D016
D013
D0
A
D015A
ST
R
D011
D009
CB
D2
D007
D005AD005
D006
D004C
D004F
D014
B025
B027A
B024 B019
B027
B031
CB
B3
B030
B026 B023
B032
B014
B016
B018
B022 B021
B017
B045
B015
B012
B046A
B047 B046 B049
B050
CB
A1
B051B048B042B039AB039
CBB3
A055
A054B
A004
E001AE001CE001D
E001B
E002NE002M
E002O
E002F
E002E
E002D E002C E002Q
E001E
E002A
E002
E002B
E002H E002I E002J E002K E002L E001F
A001
A002 A003
CBA2
A007 A009
CBA3 CBA4
A005
A004A
A006 A008A A008
A012
A013
A010A
A010 A019 A020
A024
A024B
ST
R
A026
A027A
A027
A028
A022
A018
A025BA025CBA5
A023 A029
A023A A031
CB
A7
CB
A6
A021
A045A
A015A A015
A011
A014 A030
A032
A034 A033
A033
A035
A042A
A042A043A045A017
A033A
A033B
A038
A037
A036
A039A040A041
CBA8
A046
A047A
A047
CBA11
CBA8
D004L
A048
A049
A006A
A051
A51A
A050
CBA9
A052
CBA10
A053
A059A
A059
A057
D004M
D004N
D002
D001B
D001A
D001
D004E
D004BD004AD004O
D031
D003
D003B D004G
D004H
D028
D029
D003A
D003C
D004I
D004J
D004KD003D
CBD5
D025D030
D024
D019C
CBB1
C003A
C003B
C003C
C004D
C004BC004AC004
C005A
C005
C003
C003E
C011
C014C013C013A
B033
B033A
B037A
B037
F029A F029 F028
F027A
F028A F025
F025A
F027 F026
F034
F034A F035A
F035
F033F032F031F030 F030A
F023 F022
E003
CBE4
CBG2
G001
CB
G1
G012
G013
G048
G047
G043A
G052C
G045
G046
G043
G016 G052B
G052
G036
G032
G032A
G055 G059
G052A
G030
G029
G027A
G027
CBG6
G026
G015
G031 G024A G024B
CBG5
G004
CB
G3
G040A
G042 G023
G024 G018 G017
CBG4
G037
G040 G038 G019C
A009A
G019A
G019B
G019
G008
G004A
B002D
B002G
B002F
B002K
B002A
B002
B001F
B002E
C009D
C009
C009B
C001
C009A
B001E
B001B
B001D
B0
C
B001A
C001A C001C
C001D
CB
D4
C002
C002B C008
C0
J
C009C
C009E
C009F C009G
C009I
C009K
CBC1
C009H
C009M
C010
C009N
CBC1A
C003F C003D
D019A
D019B
D019D D019
D019C
CBC2
CB
F2
G038A
CB
C3
CBD1
C002A
CB
B4
A020A
A054
A016A
A016
A063EA063B
G015A
STR #G1
D026
STR#9
PB01C
STR #12
D018
STR #17
EXIST.
OFFICE
G051
EXIST.
TELECOM
G050
EXIST.
ELEV. LOBBY
CBE5
EXIST.
TELECOM
E006
EXIST.
TELECOM
A056A
OFFICE
STORAGE
A060B
TELECOM
ROOM
A060
TELECOM
DEMARK ENTRANCE
A060A
NOT IN SCOPE.
KITCHEN RENO PROJECT
NOT IN SCOPE.
MORGUE RENO. PROJECT
TN-404-14.B
TN-403-1.B
TN-401-1.B
TN-402-1.B
1 OVERALL FLOOR PLAN - FIBER OPTIC - BASEMENT
SCALE: 1" = 20'-0"
1/TN-430
TN-300-1.B
BASEMENT FLOOR PLAN
FIBER OPTIC PATHWAY
VV
N
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
FO-SIDE A
FO
-S
ID
E
A
FO
-S
ID
E A
FO
-S
ID
E
A
FO
-S
ID
E A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO
-S
ID
E
A
FO-SIDE A
FO-SIDE A FO-SIDE A
FO
-S
ID
E
A
FO
-S
ID
E A
FO
-S
ID
E
A
FO
-SID
E A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO
-S
ID
E
A
FO
-S
ID
E A
FO
-S
ID
E
A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO-SIDE B FO-SIDE B
FO-SIDE B FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B FO-SIDE B
FO
-SID
E B
FO-SIDE B
FO-SIDE B FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE B
FO
-SID
E B
FO-SIDE B
FO-SIDE BFO-SIDE B
FO-SIDE BFO-SIDE BFO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B
FO-SIDE A FO-SIDE A
FO-SIDE A FO-SIDE A
FO
-SID
E A
FO
-SID
E A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO
-SID
E A
FO
-SID
E A
FO-SIDE A
FO-SIDE B FO-SIDE B
FO-SIDE B FO-SIDE B
FO-SIDE B
FO
-SID
E B
FO-SIDE B
FO
-SID
E B
FO-SIDE B
FO
-SID
E B
FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B
25-JAN-22
1 OVERALL FLOOR PLAN - FIBER OPTIC - FIRST FLOOR
SCALE: 1" = 20'-0"
9*
O2
MV
MA
O2
MA
MV
NG O2
MA
MV
NG
O2
MA
MV
NG
O2
MA
MV
MV
MA
O2
NG MA NG MA NG MA MA
MANGNGMAMANGMA
O2
MA
MV
MV
M V
M
AO2
M V
M
AO2
EX
T1
EX
T1
N7
F
FE
FE
FE
FE
FE
FE
FE
F
F
F F
F
F
F
F
F
FE
FE
DN
UP
UP
DNUP UPDN
UPDN
UP
DN
DN
UP
DN
UPUP
DN
UP
DN
DN
DN
SLOPE
DN
#4
#5
#6
#10
#9
#11
#1#2#3
#14
#13 #12
#15
108A1
A158
F175
F174C
F174B
F174A
A160A161 A159
A128A
A128B
C1E33
C1E31
E109 E110E125F
E125EC1E24
E125DE125CE125BE125A
E124
E123
E126
C
E2
E133
E122 E121 E120
E117 E116
E115
E114
E130
E131
E132
E112
E111
E129
E127
A144G
C
A
A136
A184
A183
A179
C
A
A144B A177
A144C
A174 A176
D
D115D118BD118AD122
D123
D125
D119A
D108
D119
D115A
D114
D113D112D111D110D109D107
D124
D124A
D126
D127
D128
D129D129B
D100A
C168 C170 C171
C174
C175
C173 C172C167C146
C182 C103 C102C1C2
C137C125C126C127C128
C192
C191
C189 C184
C188
C185
C187
C186
C193 C180
C181
D194
C107
C136 C124
C123
C133
C134
C142AC142C140AC140C139C138
C137A
C135
C134B
C136
C
A
C133C
C133B C1C10
C132
C106
C109
C113
C111
C112
C114
C115
C116
C117
C118 C119
C132
C120 C121 C122
B168 B172
B176
B176C
B176B
B176A B152
B148
B154B167B
B160
B164
B166
B167AB167B129
B128
B165
B136B
B136B132
B136A
B175A
B112AB108
B108A
B107A
B107
B104 B105 B109 B110 B112
B135
B133
C1D3
A103
C179
F181 F100
D198
D199C
D199B
D193A
D193
D
E
D199
D183 D182 D155
D181
D180
C1C23
D
A
D
C
C
D179
D
B
C
C
D194A D189D D185
D
C
D186
D187
D194
D199A
D195A
C152
D195
C1D23
D191 D190 D189 D170
D134
D152
D159A
D159B
D159 D160
D161 D158
D157 C
D
D162
D156
D154 D153
D153A
D163D175A
D175
D173 D174
D164
D165
D173A
D166D167D168
C1D21
D169
D172A
D172D171
D171A
D121 C133
A130
B150
D117
D118C
D118
D105 C1A10C1A8
A153
A152A
A191
A149
A148A187A188
C1A9
A167
C
A
A162
A165
A166
A168
A
G
G176
G100
G101
G102
G102A
G160
G103
G
G105
G106
G
G105A
G108
G114A
G
G116
G114
G115
G113G112
G156
G173G
G111
G110
G110A
G
G148 G147 G146 G171
G145 G143A
G144
G142A G168
G142
G170
G169 G143
G107
G136 G139
G155
G155B
G137
G138
G163 G162
G120
G121
G123
G122
G133
G127 G128
G159
G
G
G129
G130
G131
G132
G119
G124 G
5 G118 G161
G164A C104
G164
C110
G135 G140
G
A
G193
G149
G150
G150A
G151 G153
B176D
G152
C135
G196E
G194B
G195G196DG196CG196BG196AG181
G196H G196G G196F
G182
G184B
G
AG184G183
G185E G185
G185CG185D G185B
G185A
G188 G190
G189 G190A
G191
G194G197AG197G197B
B106
B131A
B131B
B1
B179
B126 B129
B174
C 1B
B119
B170
C169
C168 B121 B120 B122
C1B4
B127
B128
B130 B131 B164
B165
C
B
B123
C176
D149
D101
C1C1 D101B
D150
D151B
C143
C101
C
C
0 C101C
D129C
D151
D151C C101D
C1D5
C198
C1C9
A189
A147
A106A107
A194
A110 A117G
A117F
A117E
A117A
A117BA116
A115
C
B
A116A
A153C
A117C
C1A7 A117D
A156C
A156B
A156A
A157
A101
A102A108A109A111A112A113A114
C
E6
A145
A153B
B149
A186
C1A2
E137
A193 A192
G192
D102H D102K
D104
D102L
D106
D130
D
A
C 1D
D
D102A
D102B
D102C
D102D D120
D102F
D102E
C 1D
C1D4
D102G D103
C137
C144
E102LE102G
C1E35
A
A139
A138 A146
A142
C
A
A141
A140
A141BA141A
A133
A131
C1E29
F176
F174
E102F E102E E102D E102C E102B E102A
A163
F129
F135
B139
E-1100
C1E14
E102J E102K
F104
E-1204
F171
F128
F134
B146
C1E13
E108B
E105
C1A1
F122
C1E21
F171A F150
F101
F125
E102H
E104
E107
E108
B139A
C 1F
F123
F151B
F102
F126
E102
E103
E106
E108C
B145
C1F11
F124
F151A
C1F7
C1E12
E144 E140
F168
B116
F137A
C1F7
F121
F137
B116A
F169
E146
E148
E138
C1E11
C1F1
C1F19
C
F1
C1F2
C1F21
E147
C1E8 E145
E143
F136
F118
F117
B138
F163
C1E15
F179B
F177
C1F20
F103
F160 F177A
F178
F161
B134
F116
C1F6
C 1F
F115
C1E16
F164
F1 F2
E134
C1E32
C1E10
F166
F167
F165
F162
B137
C
F9
F109
F108
C1F8
F146
F179
F131
C1F15
F105
F113
F114A
C1F22
F170
F127 F130
F103B
F114
F132
F151
F180
F149
C1E17
F119
F107
F106
F112 F155
F147
F152
C
F1
C
F1 4 F144
F138
F153
F138A
F145
F148
F110 F111 F142F141F140F139 F156
C1F12 C1F13
F133
F157 F158 F159
C1F17
F142 F154
F120
E127A
B132A
B166A
C
A
C1C2
C
B
B152A B173
F103A
A126A124A122
A1
A
A
A119A A121 A123 A125
C1A3 A129A129B
A118
A
A
A129A
A128
B134A
C1E30
A172 A171 A169
A143
A142A
B175
A144
A137
A144A
B160A
E100A
E142
E141
E100
E101
REFG.
EXIST.
TELECOM
G141
EXIST.
CORRIDOR
G191
EXISTING
U/C WAITING
C178
EXIST.
TELECOM
C105
EXIST.
TELECOM
A153A
BREAK
ROOM
B144
EXIST.
TELECOM
B144A
LOCKERS
B143
EXIST.
TOILET
B144B
EXIST.
ELEV. LOBBY
C1E9
EXIST.
TELECOM
E139
TN-410-1.1
TN-407-1.1
TN-409-1.1
TN-408-1.1
TN-406-1.1
2 FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO-SIDE B
FO
-SID
E B
FO
-S
ID
E
A
FO-SIDE A FO-SIDE A FO-SIDE A
FO
-S
ID
E
A
FO
-S
ID
E A
FO-SIDE AFO-SIDE A
FO
-S
ID
E A
FO
-S
ID
E
A
FO
-S
ID
E
A
FO
-S
ID
E A
FO-SIDE A FO-SIDE A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO-SIDE B FO-SIDE B
FO
-S
ID
E
B
FO-SIDE B
FO
-SID
E B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO-SIDE B FO-SIDE B
FO-SIDE B FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-S
ID
E
A
FO-SIDE A FO-SIDE A
FO-SIDE A
FO-SIDE B FO-SIDE B FO-SIDE B
FO
-S
ID
E
B
FO
-SID
E A
FO-SIDE A
FO
-SID
E A
FO
-SID
E A
FO-SIDE AFO-SIDE AFO-SIDE A
1/TN-431
2/TN-430
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-301-1.1
FIRST FLOOR PLAN
FIBER OPTIC PATHWAY
VV
N
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
10 9
1 OVERALL FLOOR PLAN - FIBER OPTIC - SECOND FLOOR
3 2 1
6 5 4
0 #
3 2 1
6 5 4
0 #
BMS
BMS
PATIENT ED
DP-CRITICAL-1
F
F
FE
FE
F
N7
N2
N2
F
F
F
F
F F
F
OPEN TO
ROOF ACCESS
OPEN TO
ROOF ACCESS
OPEN TO
ROOF ACCESS
OPEN TO
ROOF ACCESS
OPEN TO
ROOF
ACCESS
DN UP
1-2
MECH
EQPM RM
STOR
G200
G202
G201
G203
#13 #12
DN
UP
UPDNDNUP
UP
DN
DN
UP
DN
UP
DN
UPDN
UP
DN
DN
UP
#10
#9
#11
#7
#8
#2#3 #1
#4
#5
#6
C2A6
C235BC235AC234C233C232
C227
C252
C249E
C251 C257 C237A
C237
C235
C256 C236
C255 C238 C239
C241C240C254
C253 C242 C243
C250
C249C
C249
C227B
C227A C249D
C247
C2 C2
C225
C224
C223
C222
C246
C2C3
C248
C249B C249A
C221
C2 D2
D212A D212D
D212B D212E
D212C D212F D205C
D205B
D200A
D205
D206A
D207C D207B
C201C
C201B
D202
D202B
D212
D201
D206 D205A
D201A
C2 D1
D203
D204 D219C
D219B
D219 D220
D219H
D219G
D219F
D221 D222 D223
A223
A223A A223C
A258 A257
A228 A230
A256
D224 D225
A255
A232 A234
A254
D226
A253
A236
A235A233A229A227A225A222A
A220
A226A205A207
A204
C2E8
C219
C220
ST
R
C218
C216
C217
C215
C214
C213
C211
C209 C209A
C210 C208 C207 C206 C205 C204 C203
C207A C2B2 C203A
B211
B212
B209
B208 B207
B210
B212A B227 B228 B230 B232
B206
B235
B205
B236
B204
B238
B203 B239A
B239
B241
A212
B200
C2B4
B242A201
A200
B237B234B233B231B229B226B223B225
B224
B213
B215
B214
B216
B217
B218 C2
B3
B221B
B219
B220
B221A
B221
B245
ST
R
B222 B222A
B221D
D209A
D219E
D221A
D213A
C2D3 D210 D214 D215
C2 D4
D213C
D213E
D218 D218C D218B D218A
D217
D213G
D218
C2C1
C2 C4
C2 C6
C226
D213D D213J
D213K
D213H
D213F
D213B
D213L
C201
C201D
C202
C201F C201E
C201A
B201B A214 A215
A209
C2A05
C2 A0
A202 A203 A218
C212
C2 C1
D219D
A200A
C2E7
C2E12
F210 F211 F212 F214 F215 F217 F235 F236 F239 F240 F267 F266 F265
F269
C2F23
F268 F264 F263
F210A C2F3
F204
C2F1 F201
F202
F206DF206C
C2F7
F203
E202
F224
C2F8
F206AF206B
F205
F242
F237
F206
F207
C2F20
E201
C2F20
F256
F245
F241
C2 F1
F231
F223
C2F14 F257
F230
F232
F219
F238
F233
C2F16
F234
F243
F246
C2 F1
E207
E204A
F209
C2F4
C2F6
F216
F208
C2 F2
F209A
E204
C2E6
F247
F244
C2F17
F225
F228
E209
E205A C2E3
E222E223E225E226
F218
C2F12
F222
C2 E2
E212A
E224A E214
E213
E205
F221
C2F19
F227
F222A
E208
E217
E212E211
E2
C2 E4
C2 F5
F250
F255
C2 F1
F226
E216E255
C2E1E253
E220
F211A
F248
F249
C2 F1
F220
E211A
E254 E210
F256
C2 F2
F213A
F213
E221
E219
E218
C2 F2
E215
F252
F257
F260F271
F261F270
F262
C2 F2
F258F273
F259F272
F229
F200
F274
A219
E209A
F275
F213B
E241
E239
E237
E236
C2E9
C2E11
E227E229
E230E232E233E234E235
E238 C2E16 C2E14
C2 E1
E244
E240
E242 E243 E249
C2E18
E245
C2 E1
E246 E247
E248 E250
E231
E228
C2E13
E251 E252
A249A
A249
A246
A244A
A244
C2 A5
A241
A252A
A252 A251
A251A D229
D227A D227
D228
D229A
D231A
D231
C2 D6
D232
D230
D233 D235 D235A
D237
D239
D241
D238
ST
R
D240
D234
C2A4
C2A03
A208
A216
A212
STR #1
C2 A0
8A222
A200
C2B4A
D207
D216D
C230
C228
C231
C226A
C226B
C227C
C229
F251
F253
A250
ST
R
D236
EXIST.
ELEV. LOBBY
C2E10
EXIST.
TELECOM
E203
EXIST.
TELECOM
A217
D208
EXIST.
DATA CENTER
D216
RAMP UP
A201B C2A02
A200A
A206A
C2A01
A211 A213
A210
A223B
A223D
A221
C2A09
TN-413-1.2
TN-412-1.2
TN-425-1.2
3/TN-430
2/TN-431
AREA NOT IN SCOPE
PROJECT: 589A4-19-103
RELOCATE BEHAVIOR HEALTH CLINIC
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-302-1.2
SECOND FLOOR PLAN
FIBER OPTIC PATHWAY
VV
N
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
FO-SIDE B FO-SIDE B
FO
-SID
E B
FO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE BFO-SIDE B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO-SIDE B FO-SIDE B
FO
-S
ID
E
B
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO
-SID
E B
FO-SIDE B
FO
-SID
E B
FO-SIDE B
FO
-SID
E B
FO
-SID
E A
FO-SIDE AFO-SIDE A
FO
-S
ID
E
A
FO
-S
ID
E
A
FO
-S
ID
E
A
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
FO
-SID
E B
1 OVERALL FLOOR PLAN - FIBER OPTIC - THIRD FLOOR
4 7
9 *
ISTL
FE
FE
FE
OPEN TO
ROOF ACCESS
DN
UP
DN
UP
DN
DN
DN
DN
UPDN
DNDN
UP
DN
DN
DN
DN
UP
UP
DN
#13 #12
#11
#10
#9
#6
#7
#8 #4
#5
C360A
C363
C361AC362A
C349
C347
C348
C337
C335
C336 C345
C344
C343
C328
C329
C327
C321
C322
C325
C3C9
D308C
D302
D301
D301A
C323
C 3C
A346
C3F3
E312
E306
E308
E310 E311
E329 E332 E333 E334 E338
E339
E340
E341
E337E336
E331
D320
STR #6
D319
C358A
D321
D322
D323
D324
D326
D327
D328
D329
C 3D
C
3D
D330
D331D331B
D331C
C 3D
D352
D316C
D316
D316A
C358
C330
STR #7
C360C361C362C364C365
C363AC364AC365A
C3C4
C355
C353
C357
C359
C356
C346
C354C352
C356A
C357A
C351
C351A
C350 C350A
C349A C3C6
C348A
C337A C332
C334
C341
C333
C338
C 3C
C339
C340
D333 D333A D333B D334
D334A C3A6
D335 D336 D337 D338 D339 D341
D338A D339A D340
A347A335A348A332
D342
D345
D343
D344
D346 C 3D
D348
D349 D350
D347
D351
ST
R
A338A337
A340
A339A
A339
A341
C 3A
A342
A343
A345 A344
A330
A330A
A329A327A326A323A322
A318
C3A4A320
A331 A328
A325 A321
A352 A350 A351
A353
A321A
A354
A319
A356A357
A317
A358
A316
A318A
A318
A312
STR #1
C3A2
A313
A314
C 3A
D301B
D332
D332C
D325
C 3C
C3B8
C302
C
C308
C
C 3C
C305
C319
C318
C320
C307
C306
G320
ST
R
G322G323G315
G321
G313A G313
G317
G324G325G327
G373
G311A
G311
G325AG327AG330A
G347
G346
1-3
STR #G1
G355
G
G344
G300
G344A
G301
G340
C 3B
G302
G336
B313A
G371
G342
G330
G342A
G
G362
G375
G360
G309
G340A
G363
G307A
G305
G338
G332A
G336A
G361A
G361
G334A
G309A
G338A
G364
G334
B337
B311A
B333
G
G359
G307
G332
G304
G301A
G303
B332 B351 B334
36 SF
STAIRWELL
(*was B322)
ST
R
B331 B335
B313 B314
B314A
B311 C
3B
B312
B312A
B330 B329
B336 B310
B310A
B326
B327
B328 B309
B309A
B307
B307A
B305
B305A
B308A B306A
B325
B324 C3B1
B308 B306 B304
B304A
B302
B302A
B303A B301A
B303 B301 B300
B323 B322 B321
B320
C3B4
B342
B3 39B338
B340 C3B5
B315A
B315B
B315
B316A
B316
B316B
B341
B317A
B317
B348
B347
B344
B318A
B318
E328
E327
E324
E323 E322
E321
E319
C3E2
E320
E318 E317
C3F1
E316
E315 E314 E313
E300 E301
E301A
E307
E304
C3F5
E305
E309
F396
F395
F397
F370
F367 F300
F303
F302
F322
F304
F307
F3 08 F305
F309F310
F312.1
F312
ST
R
F3
.2 F311
E325
C 3E
C3E4
C 3E
E330
E335
A300
D332B D332A D332D
D353 D353A
F348 F346 F345 F343 F340 F339 F338 F337
C3F9
F349
F350
F321
F320
F317
F316
C 3F
F347 F344 F342 F341
F336
F324 F325 F326
F334
F333
F335
F332
F331
F330F329F328F327 F323
F318
F314
F315
C3F7
C 3F
F352 F353 F354 F355 F356 F357
F393
F392
F391
F389
F388 F385 F382
F381 F380
F364
C3F17
F361
F360 F358
F365 F362
F366 F369
F373
F376 F378
F387
F375
F363
C 3F
F390
F383
F371
F377
C3F11
C3F15
F372
C 3F
F359
F368
F386
F379 F400
F401 F402
G400
C368
C369
G329
G357
G356
F319
C328A
C324
CSF13
EXIST.
TELECOM
E326
EXIST.
OFFICE
B345
EXIST.
TELECOM
A306A
EXIST.
TELECOM
C316
EXIST.
TELECOM
C358C
NOT IN SCOPE.
PROJECT XXXX-XX-XXX
AREA NOT IN SCOPE.
PROJECT: 589A4-21-100
RELOCATE MEDICAL WARD
FOR PATIENT PRIVACY.
TN-417-1.3
TN-416-1.3
TN-415-1.3
TN-418-1.3
4/TN-430
3/TN-431
TN-303-1.3
THIRD FLOOR PLAN
FIBER OPTIC PATHWAY
VV
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
N
FO
-SID
E B
FO-SIDE B
FO
-SID
E A
FO
-SID
E A
FO-SIDE A
FO
-SID
E A
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO
-SID
E B
FO-SIDE B FO-SIDE B
FO
-S
ID
E
A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO-SIDE A
FO-SIDE B
FO
-SID
E A
FO-SIDE AFO-SIDE AFO-SIDE AFO-SIDE A
FO
-SID
E A
FO
-S
ID
E
B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO-SIDE B
FO
-SID
E B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
1 OVERALL FLOOR PLAN - FIBER OPTIC - SIXTH FLOOR
SCALE: 1/8' = 1'-0"
N
#4
#5
#7
#8
UPDN
#1#2#3 #1
UP
DN
STR #1
441 442 443A 443B 443C
444443K437
443D 451 454A
454 454B
454D
454C
455A
C45
445 448 452 456
443E443F
449 458
457A
443G
463A464465466433
431A
428A
C
427A
401A
C41
416416A419
425A 423A 420A C43 417A 415A 414 412C 412B
413A
ST
R
411A
C
405A
407A
411413415417420
414B
423425
426A
410A
439 451A
443H
401B 401C
NOT IN SCOPE.
PROJECT 589A4-19-103
NOT IN SCOPE.
AREA TO BE RENOVATED IN 2023
FO-SIDE B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE B
4/TN-431
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-304-1.4
FOURTH FLOOR PLAN
FIBER OPTIC PATHWAY
VV
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
#7
#8
UP
DN
U P
D N
#2#3 #1
#4
#5
F
F
F F
F
F
553 555 558
503A
501 501A
508B
501C 501B
508C
ST
R
508A
516 513
514A 512B512C 510A
C
557556
554A
550545544
545A
C57 C58
C
528 527
C53
515 511
C56
C51
520A
C54 512B
558A
EXIST.
ROOM
EXIST.
TELECOM
TN-421-1.5
1 OVERALL FLOOR PLAN - FIBER OPTIC - FIFTH FLOOR
SCALE: 1/8' = 1'-0"
N
5/TN-431
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-305-1.5
FIFTH FLOOR PLAN
FIBER OPTIC PATHWAY
VV
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
FO-SIDE B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE BFO-SIDE B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO-SIDE B FO-SIDE B
1 OVERALL FLOOR PLAN - FIBER OPTIC - SIXTH FLOOR
N
#2#3 #1
DN
F
F
F
F
#4
#5
UP
DN
625B
623 625F
625C 625D
619 615A
C67
625E 612A
615 614
612B 612C
613C 613B
612D
612G
612F
612E
STR #1
632A
645 646 647 648 656 657 663 664 666 668 670
607608
ST
R
605604603683
C
667665660
662656B
C65
660A 676 675
C003
682685
C004686
656A
670A 659 658
624654
650A
C
601A
601B
C
C63
617618621622
C
625A632
C
626A
C
C69
652A653
C71
C61
601C
EXIST.
TELECOM
TN-423-1.6
6/TN-431
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-306-1.6
SIXTH FLOOR PLAN
FIBER OPTIC PATHWAY
VV
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
FO-SIDE B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
FO
-S
ID
E B
FO-SIDE BFO-SIDE B
FO
-S
ID
E
B
FO
-S
ID
E B
FO
-S
ID
E
B
1 FIBER OPTIC PATHWAY - BLDG. 2 - BASEMENT - ROOM K007
SCALE: 1/8" = 1'-0"
2 FIBER OPTIC PATHWAY - BLDG. 2 - FIRST FLOOR - ROOM K136
SCALE: 1/8" = 1'-0"
DN 24R
RES. RM.
K112
RES. RM.
K113
RES. RM.
K114
CONF.
RM.
K121
MED.
DIRECT
K115 NURSE
K116
SOCIAL
WORKER
K117
MDS
K119
MANAGER/
ASSISTANT
MANAGER
K120
IT/COMM.
K136
LAUNDRY
K135
BATH
SUITE
K134
K137
WOMEN'S
TOILET
K138
UTILITY
K141
COPY/SUPPLY
RM.
K131
STAFF
TOILET
K133
LOCKERS
K132
CORRIDOR
C1K04
CORRIDOR
C1K07
CORRIDOR
C1K03
VESTIBULE
K100B
SALON
K130
CORRIDOR
C1K05
ELEC.
RM.
K125
ALCOVE
K124
CORRIDOR
C1K02
CHAPEL
K151
CORRIDOR
C1K11
ELEV
P-18
STAIR
K153
CORRIDOR
C1K09
TOILET
K114A
TOILET
K112A
BREAK
RM.
K122
SWAMP
K123
TOILET
K113A
STORAGE
K006
STORAGE
K002
ELEC.
ROOM
K003
MED.
GAS
EQUIPMENT
ROOM
K004
CORRIDOR
C0K03
LOADING
K005
MECHANICAL
K001
STAIR
K053
ELEV
P-18
CORRIDOR
C0K01
STORAGE
K007
EP-100A
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
TN-307-2
FLOOR PLAN FIBER OPTIC
PATHWAY - ROOMS K007&K136
RMJr
KEYED NOTES
1. SIDE A - VERTICAL RISER - PATHWAY
TERMINATE IN DATA CENTER D216 PASSING
THROUGH TR A217 - SECOND FLOOR.
2. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE DATA CENTER D216
PASSING THROUGH ROOM F202 - SECOND
FLOOR.
3. SIDE B - VERTICAL RISER - PATHWAY
TERMINATE IN THE TELECOM ROOM D216
(DATA CENTER) PASSING THROUGH ROOM
D207B - SECOND FLOOR.
4. SIDE A& SIDE B - UNDERGROUND PATHWAY.
CONTRACTOR SHALL PROVIDE 2 X 2"
CONDUIT PATHWAY TERMINATES IN BLDG.
15. COORDINATE WITH COR.
5. SIDE A ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-600.
6. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER IN TR
A217 AND DATA CENTER D216 - 2ND FLOOR;
FOR ALL TELECOM ROOMS SHOWN IN THE
RISER DIAGRAM TN-6000.
7. SIDE B ROUTE - FOR FIBER OPTIC CABLES
ROUTED FROM THE VERTICAL RISER F202
AND DATA CENTER - 2ND FLOOR; FOR ALL
TELECOM ROOMS SHOWN IN THE RISER
DIAGRAM TN-600.
8. SIDE A AND SIDE B BACKBONE FIBER TO
EXISTING RACK. COORDINATE WITH COR
FOR RACK LOCATION.
9. CONTRACTOR SHALL INSTALL TWO (2) FIRE
RATED STOP PENETRATION DEVICES FOR
SIDE A AND SIDE B FIBER OPTIC. PROVIDE EZ
PATH SERIES 22+ FIRE RATED PATHWAY
OR APPROVED EQUAL.
10. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 33+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
11. CONTRACTOR SHALL INSTALL FIRE RATED
STOP PENETRATION DEVICE WITH SPLIT
WALL PLATE. PROVIDE EZ PATH SERIES 44+
FIRE RATED PATHWAY OR APPROVED
EQUAL.
12. SIDE A & SIDE B - FIBER OPTIC PATHWAY
TERMINATE IN CLC BUILDING PASSING
THROUGH THE UTILITY TUNNEL. REFER TO
THE DRAWING TN-307-2.
13. CMU WALL
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL PRE-TERMINATED
FIBER OPTIC CABLES ACCORDING TO DRAWING
TN-600 AND SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
2. WHERE DIVERSE ROUTES ARE NOT POSSIBLE,
THE CONTRACTOR SHALL INSTALL FIBER OPTIC
CABLES WITH AS MUCH PHYSICAL SEPARATION
AS IS REASONABLY POSSIBLE.
3. CONTRACTOR SHALL INSTALL NEW J-HOOKS
WHERE THERE IS NO CABLE TRAY OR
COMMUNICATIONS CONDUIT UNLESS
OTHERWISE NOTED. REFER TO ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL INSTALL RACK MOUNTED,
OPTICAL FIBER ENCLOSURE IN THE
TELECOMMUNICATION ROOM(S) IN
ACCORDANCE WITH SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING.
5. CONTRACTOR SHALL INSTALL 4" SLEEVES FOR
VERTICAL RISERS ACCORDING TO SECTION 27
05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS AND 07 84 00 FIRESTOPPING,
UNLESS OTHERWISE NOTED.
6. FIBER OPTIC CABLES SHALL BE PROPERLY
SUPPORTED IN VERTICAL RISERS ACCORDING
TO SECTION 27 05 33 RACEWAYS AND BOXES
FOR COMMUNICATIONS SYSTEMS.
7. FIBER OPTIC CABLES SHALL BE ROUTED
THROUGH RIGID METAL CONDUITS FOR
PATHWAYS IN THE THE UTILITY TUNNEL AND
BRIDGE (2DN FLOOR) ACCORDING TO NEC
STANDARD.
FO
-S
ID
E
B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
FO-SIDE A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO
-S
ID
E
A
FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A FO-SIDE A
FO-SIDE B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
EXISTING VERTICAL RISER
TO THE IT ROOM K136.
SLEEVES IN FLOOR ABOVE
PROVIDE 2 X 2" SLEEVES
FO-SIDE B
FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B FO-SIDE B
#5
#10
#9
#11
#6
#7
#8
REX
DN
DN
UP
#14
#15
DN
DN
#1#2#3
UP
UP
UP
DN DN
UP
UP
#13 #12
DN
UP
DN
DN
DN
DN
UP
UP
DN
DN
DN
DN
F
F
F
F
F
F
F
PALLETS WILL
BE STACKED
TWO HIGH ON
RACKS
ENGINEERING
ENV
PR
OC
ES
S
ST
OR
ES
TSS STORAGE
EQ
UI
PM
EN
T
SPS
TS
S
12111098
TSS STORAGE
TSS STORAGE
TSS STORAGE
PS
PS
TO HOSPITAL
W03A
W03B
W03
W04A
W04
CWA3 W08
W09 W07
C W
A
CWA1
W05A
W06
W02 W01
N1
F
F
F
F
F
F
EXIST.
ROOM
W05
EXIST.
TELECOM
W05B
CB
E3
F023A CBF3
F024
F001A F004
F021
F018
F020 F019 F017 F016
F015A
F015
F014
CB
F4
F005 F010
F012F013
F036F011
F009A
F009F008F007F006F003
CBF5
F001B F001
F002A
F002
E012 E001G
CBF1
E001
E009
E010
E008
E007
CBE1CBE2
E004
E005
G014
D027
CBD3
C006A
C006
STR #7
D021A
D021
STR #6
CBD7
A058
B013
B013A
B011B
B011A
B011C B011D B011E B011F B011G
B011
B011H
B011J B009
B007
B010
B010A
B006C
B006
B006B
B006A
B009A
A063C A063G
A063
A063A
A063H
A063D A063F
B036A
ST
R
B036B
B034 B036
F037STR #11
A024A
A056
STR #1
D015
W010
D022
D020
D023
D022B
D022CD022D
D022A
D012
D010
D008 D004
D017
D016
D013
D0
A
D015A
ST
R
D011
D009
CB
D2
D007
D005AD005
D006
D004C
D004F
D014
B025
B027A
B024 B019
B027
B031
CB
B3
B030
B026 B023
B032
B014
B016
B018
B022 B021
B017
B045
B015
B012
B046A
B047 B046 B049
B050
CB
A1
B051B048B042B039AB039
CBB3
A055
A054B
A004
E001AE001CE001D
E001B
E002NE002M
E002O
E002F
E002E
E002D E002C E002Q
E001E
E002A
E002
E002B
E002H E002I E002J E002K E002L E001F
A001
A002 A003
CBA2
A007 A009
CBA3 CBA4
A005
A004A
A006 A008A A008
A012
A013
A010A
A010 A019 A020
A024
A024B
ST
R
A026
A027A
A027
A028
A022
A018
A025BA025CBA5
A023 A029
A023A A031
CB
A7
CB
A6
A021
A045A
A015A A015
A011
A014 A030
A032
A034 A033
A033
A035
A042A
A042A043A045A017
A033A
A033B
A038
A037
A036
A039A040A041
CBA8
A046
A047A
A047
CBA11
CBA8
D004L
A048
A049
A006A
A051
A51A
A050
CBA9
A052
CBA10
A053
A059A
A059
A057
D004M
D004N
D002
D001B
D001A
D001
D004E
D004BD004AD004O
D031
D003
D003B D004G
D004H
D028
D029
D003A
D003C
D004I
D004J
D004KD003D
CBD5
D025D030
D024
D019C
CBB1
C003A
C003B
C003C
C004D
C004BC004AC004
C005A
C005
C003
C003E
C011
C014C013C013A
B033
B033A
B037A
B037
F029A F029 F028
F027A
F028A F025
F025A
F027 F026
F034
F034A F035A
F035
F033F032F031F030 F030A
F023 F022
E003
CBE4
CBG2
G001
CB
G1
G012
G013
G048
G047
G043A
G052C
G045
G046
G043
G016 G052B
G052
G036
G032
G032A
G055 G059
G052A
G030
G029
G027A
G027
CBG6
G026
G015
G031 G024A G024B
CBG5
G004
CB
G3
G040A
G042 G023
G024 G018 G017
CBG4
G037
G040 G038 G019C
A009A
G019A
G019B
G019
G008
G004A
B002D
B002G
B002F
B002K
B002A
B002
B001F
B002E
C009D
C009
C009B
C001
C009A
B001E
B001B
B001D
B0
C
B001A
C001A C001C
C001D
CB
D4
C002
C002B C008
C0
J
C009C
C009E
C009F C009G
C009I
C009K
CBC1
C009H
C009M
C010
C009N
CBC1A
C003F C003D
D019A
D019B
D019D D019
D019C
CBC2
CB
F2
G038A
CB
C3
CBD1
C002A
CB
B4
A020A
A054
A016A
A016
A063EA063B
G015A
STR #G1
D026
STR#9
PB01C
STR #12
D018
STR #17
EXIST.
OFFICE
G051
EXIST.
TELECOM
G050
EXIST.
ELEV. LOBBY
CBE5
EXIST.
TELECOM
E006
EXIST.
TELECOM
A056A
OFFICE
STORAGE
A060B
TELECOM
ROOM
A060
TELECOM
DEMARK ENTRANCE
A060A
NOT IN SCOPE.
KITCHEN RENO PROJECT
NOT IN SCOPE.
MORGUE RENO. PROJECT
TN-404-14.B
TN-403-1.B
TN-401-1.B
TN-402-1.B
1 OVERALL FLOOR PLAN - GROUNDING - BASEMENT
SCALE: 1" = 20'-0"
TN-310-1.B
BASEMENT FLOOR PLAN
GROUNDING PATHWAY
VV
N
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
KEYED NOTES
1. CONTRACTOR SHALL PROVIDE AND INSTALL
GROUNDING BONDING CONDUCTOR FROM
THE EXISTING ELECTRICAL ENTRANCE
FACILITY TO THE PRIMARY BONDING BUS
BAR. REFER TO GROUNDING DIAGRAM
TN-601 AND ELECTRICAL DRAWINGS.
2. CONTRACTOR SHALL PROVIDE PRIMARY
BONDING BUS BAR.
3. CONTRACTOR SHALL PROVIDE
TELECOMMUNICATION BONDING BACKBONE
(TBB) IN VERTICAL RISER. CORE DRILL AND
SEAL 2" CONDUIT FLOOR SLEEVES FOR
VERTICAL RISER.
4. CONTRACTOR SHALL PROVIDE
TELECOMMUNICATION BONDING BACKBONE
(TBB) IN VERTICAL RISER IN SHAFT AT ACA
BUILDING. COORDINATE TO VERIFY
LOCATION WITH COR. REMOVE WALL AS
NEEDED TO ACCESS VERTICAL SHAFT FOR
CONDUIT PATHWAY. PATCH AND PAINT WALL
WHEN WORK IS COMPLETE.
5. CONTRACTOR SHALL PROVIDE BONDING
CONDUCTOR FROM TBB OR ADJACENT TR TO
THE SECONDARY BONDING BUS BAR (SBB) IN
EACH TELECOM ROOM. REFER TO SERIES
TN-400 FOR BUS BAR LOCATION.
GENERAL NOTES
1. ALL GROUNDING SHALL BE DONE IN
ACCORDANCE WITH TIA-607-C, J-STD-607
"COMMERCIAL BUILDING GROUNDING
(EARTHING) AND REQUIREMENTS FOR
TELECOMMUNICATIONS", NFPA 70, AND IN
COMPLIANCE WITH THE NATIONAL ELECTRICAL
CODE.
2. ALL EQUIPMENT SHALL BE GROUNDED PER
MANUFACTURE'S INSTRUCTIONS.
3. CONTRACTOR SHALL PROVIDE BONDING
CONDUCTOR ACCORDING TO NEC 70 AND
ANSI/TIA-607-D.
4. CONTRACTOR SHALL PROVIDE IRREVERSIBLE
COMPRESSION CONNECTIONS FOR RACK
BONDING CONDUCTORS.
5. A TELECOM SECONDARY BONDING BUS BAR
SHALL BE PROVIDED IN ALL TELECOM ROOMS .
REFER TO TELECOM ROOM LAYOUT DRAWINGS
FOR LOCATION.
6. RACEWAYS MAY NOT BE USED AS A GROUNDING
CONDUCTOR FOR POWER AND LIGHTING
CIRCUITS. ALL CONDUIT SHALL HAVE SEPARATE
CODE SIZED GREEN GROUND WIRE INSTALLED
IN THE CONDUIT TO INSURE A CONTINUOUS
GROUNDING PATH. REFER TO ELECTRICAL
DRAWINGS FOR EXISTING AND NEW CABLE TRAY
PATHWAYS.
1 OVERALL FLOOR PLAN - FIBER OPTIC - FIRST FLOOR
9*
O2
MV
MA
O2
MA
MV
NG O2
MA
MV
NG
O2
MA
MV
NG
O2
MA
MV
MV
MA
O2
NG MA NG MA NG MA MA
MANGNGMAMANGMA
O2
MA
MV
MV
M V
M
AO2
M V
M
AO2
EX
T1
EX
T1
N7
F
FE
FE
FE
FE
FE
FE
FE
F
F
F F
F
F
F
F
F
FE
FE
DN
UP
UP
DNUP UPDN
UPDN
UP
DN
DN
UP
DN
UPUP
DN
UP
DN
DN
DN
SLOPE
DN
#4
#5
#6
#10
#9
#11
#1#2#3
#14
#13 #12
#15
108A1
A158
F175
F174C
F174B
F174A
A160A161 A159
A128A
A128B
C1E33
C1E31
E109 E110E125F
E125EC1E24
E125DE125CE125BE125A
E124
E123
E126
C E2
E133
E122 E121 E120
E117 E116
E115
E114
E130
E131
E132
E112
E111
E129
E127
A144G
C A
A13…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .