Final Drawings_Part3.pdf

PDF 17 MB Posted

Attached to
Y1DZ--589A4-21-700 EHRM Infrastructure Upgrades Construction Columbia, MO
Solicitation number
36C77622R0069
Issued by

About this file

This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation seeks a contractor to complete EHRM Infrastructure Upgrades Construction at a location in Columbia, Missouri. The selected vendor will be responsible for providing all necessary labor, project management, materials, tools, and equipment as required by the drawings and specifications to fully carry out the infrastructure upgrades project.

View the file

Other files

File Type Posted
Answers to Technical Questions 7-15-22.pdf PDF
36C77622R0069 0007 Amendment 0007 7-15-22.pdf PDF
TERRACON ASBESTOS SURVEY Final Report-NESHAP Survey Report_updated as removed.pdf PDF
36C77622R0069 0006 Amendment 0006 7-7-2022.pdf PDF
Answers_Clarifications to Technical Questions 7-7-22.pdf PDF
Attachment A _Roof Plans_Site Layout.pdf PDF
Answers to Technical Questions 6-29-22.pdf PDF
36C77622R0069 0005 Amendment 0005 6-29-2022.pdf PDF
36C77622R0069 0004 Amendment 0004 6-27-2022.pdf PDF
36C77622R0069 0003 - Amendment 0003 - 6-22-2022.pdf PDF
36C77622R0069 0002 - Amendment 0002 - 6-16-2022.pdf PDF
Construction Wage Rates - Boone County - 5-27-22.pdf PDF
Site Visit Sign-In-Sheet 6-9-22.pdf PDF
36C77622R0069 0001 - Amendment 0001 - 6-9-22.pdf PDF
Attachment C - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Construction Wage Rates - Boone County - 4-22-22.pdf PDF
Attachment A - PPQ.docx DOCX document
Final Specifications-Vol 1_Rev2 - 3-28-22.pdf PDF
Attachment D - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment B - VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Final Specifications-Vol 2_Rev2 - 3-28-22.pdf PDF
Final Drawings_Part6.pdf PDF
Final Drawings_Part7.pdf PDF
Final Drawings_Part2.pdf PDF
Final Drawings_Part1.pdf PDF
36C77622R0069 Columbia EHRM Infra - 5-19-22.pdf PDF
Final Drawings_Part9.pdf PDF
Final Drawings_Part8.pdf PDF
Final Narrative.pdf PDF
Final Drawings_Part4.pdf PDF
Final Drawings_Part5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

9.1

10.4

11.5

12.5

13.5

PALLETS WILL

BE STACKED

TWO HIGH ON

RACKS

ENGINEERING

ENV

PR

OC

ES

S

ST

OR

ES

TSS STORAGE

EQ

UI

PM

EN

T

SPS

TS

S

12111098

TSS STORAGE

TSS STORAGE

TSS STORAGE

PS

PS

TO HOSPITAL

W03A

W03B

W03

W04A

W04

CWA3 W08

W09 W07

C W

A

CWA1

W05A

W06

W02 W01

N1

F

F

F

F

F

F

EXIST.

TELECOM

W05B

EXIST.

ROOM

W05

STR #CP1

UP

CH101

G014

W010 C013A

CBG2

CB

G1

G012

G048

CBC2

M

AT

C H

L

IN

E 'B

1 DEMO FLOOR PLAN - BASEMENT

SCALE: 1/8' = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TD-128-14.B

BASEMENT FLOOR

TECHNOLOGY DEMO PLAN

VV

KEY PLAN

N

DEMO NOTES

1. EXISTING CABLE TRAYS SHALL BE RE-USED

UNLESS OTHERWISE NOTED.

2. EXISTING J-HOOKS SHALL BE RE-USED UNLESS

OTHERWISE NOTED.

3. EXISTING TELECOMMUNICATIONS ROOM.

CONTRACTOR SHALL DEMO ALL PATCH PANELS

AND CABLING RELATED TO THIS PROJECT.

CONTRACTOR SHALL REMOVE ALL DATA CABLES

FROM THE DEVICE TO THE SOURCE.

CONTRACTOR SHALL COORDINATE WITH THE

COR PRIOR TO BEGINNING WORK IN EACH

TELECOM ROOM (TR).

4. DO NOT REMOVE ANY WALL MOUNT EQUIPMENT,

ELECTRICAL CABLES AND EQUIPMENT, OR ANY

CABLING OR DEVICE THAT IS NOT DATA

RELATED. COORDINATE WITH COR PRIOR TO

REMOVING CABLING FROM WALL FIELDS OR

FROM WALL MOUNTED EQUIPMENT.

5. BUILDING AUTOMATION SYSTEMS (BAS) OR

ELECTRONIC SECURITY SYSTEMS CABLES

SHALL NOT BE REMOVED. COORDINATE WITH

COR TO IDENTIFY BAS OR SECURITY CABLES.

6. EXISTING TELECOMMUNICATIONS OUTLET.

CONTRACTOR SHALL REMOVE ALL DEVICE

FACEPLATES AND MODULAR JACKS. EXISTING

OUTLET BOXES AND CONDUITS SHALL BE

PRESERVED FOR REUSE.

7. CONTRACTOR SHALL REMOVE ALL DATA CABLES

EXCEPT CATEGORY 6A OR UNLESS OTHERWISE

NOTED. CONTRACTOR SHALL COORDINATE

WITH THE COR PRIOR TO REMOVING CABLES,

OUTLETS, FACE PLATES, PATCH PANELS, AND

PATCH CABLES.

8. CABLES SHALL NOT BE ABANDONED IN PLACE

WITHOUT PRIOR APPROVAL OF THE COR.

9. WHERE CABLES ARE TO BE REMOVED,

CONTRACTOR SHALL COMPLETELY REMOVE THE

CABLE FROM OUTLET TO PATCH PANEL.

10.CONTRACTOR SHALL REMOVE NON-CATEGORY

6/6A FACE PLATES, MODULAR JACKS, AND

PATCH PANELS AFTER CUT OVER TO NEW

CATEGORY 6A CABLE PLANT.

11.CABLE SUPPORTS, SUCH AS CABLE TRAYS, OR

J-HOOKS, THAT ARE NOT TO BE REUSED SHALL

BE PRESERVED FOR REUSE. COORDINATE WITH

THE COR PRIOR TO REMOVING CABLE

SUPPORTS.

12.NURSE CALL SYSTEM TO BE MAINTAINED IN TR

ROOM. CONTRACTOR SHALL COORDINATE NEW

EQUIPMENT LOCATION WITH THE COR PRIOR TO

MOVING THE NURSE CALL SYSTEM OR BEFORE

WALL DEMOLITION BEGINS.

13.PRIOR TO RELOCATING WALL MOUNTED TV,

CONTRACTOR SHALL COORDINATE WITH THE

COR FOR THE NEW LOCATION AND PROVIDE

NEW CATEGORY 6A DATA AND ELECTRICAL

OUTLETS.

25-JAN-22

FILE C

AB

FILE C

AB

103 104 106

100 C1A1

100A 100C

100B

107A

112 113

110105A

C 1B

100D

114A

109A

2 2

2 2

1 BLDG. 22 FLOOR PLAN

SCALE: 1/8" = 1'-0"

APPROX. LOCATION

OF UNDERGROUND

CONDUIT PATHWAY

(EXISTING)

APPROX. LOCATION

OF BLDG. 15

TELECOM ROOM

(EXISTING)

AREA NOT IN SCOPE

BUILDING 15

(1) 4" CONDUIT ROUTED TO PIPE SPACE

UNDER BLDG. 1 MAIN HOSPITAL

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TD-129-22.1

FIRST FLOOR

TECHNOLOGY DEMO PLAN

VV

N

DEMO NOTES

1. EXISTING CABLE TRAYS SHALL BE RE-USED

UNLESS OTHERWISE NOTED.

2. EXISTING J-HOOKS SHALL BE RE-USED UNLESS

OTHERWISE NOTED.

3. EXISTING TELECOMMUNICATIONS ROOM.

CONTRACTOR SHALL DEMO ALL PATCH PANELS

AND CABLING RELATED TO THIS PROJECT.

CONTRACTOR SHALL REMOVE ALL DATA CABLES

FROM THE DEVICE TO THE SOURCE.

CONTRACTOR SHALL COORDINATE WITH THE

COR PRIOR TO BEGINNING WORK IN EACH

TELECOM ROOM (TR).

4. DO NOT REMOVE ANY WALL MOUNT EQUIPMENT,

ELECTRICAL CABLES AND EQUIPMENT, OR ANY

CABLING OR DEVICE THAT IS NOT DATA

RELATED. COORDINATE WITH COR PRIOR TO

REMOVING CABLING FROM WALL FIELDS OR

FROM WALL MOUNTED EQUIPMENT.

5. BUILDING AUTOMATION SYSTEMS (BAS) OR

ELECTRONIC SECURITY SYSTEMS CABLES

SHALL NOT BE REMOVED. COORDINATE WITH

COR TO IDENTIFY BAS OR SECURITY CABLES.

6. EXISTING TELECOMMUNICATIONS OUTLET.

CONTRACTOR SHALL REMOVE ALL DEVICE

FACEPLATES AND MODULAR JACKS. EXISTING

OUTLET BOXES AND CONDUITS SHALL BE

PRESERVED FOR REUSE.

7. CONTRACTOR SHALL REMOVE ALL DATA CABLES

EXCEPT CATEGORY 6A OR UNLESS OTHERWISE

NOTED. CONTRACTOR SHALL COORDINATE

WITH THE COR PRIOR TO REMOVING CABLES,

OUTLETS, FACE PLATES, PATCH PANELS, AND

PATCH CABLES.

8. CABLES SHALL NOT BE ABANDONED IN PLACE

WITHOUT PRIOR APPROVAL OF THE COR.

9. WHERE CABLES ARE TO BE REMOVED,

CONTRACTOR SHALL COMPLETELY REMOVE THE

CABLE FROM OUTLET TO PATCH PANEL.

10.CONTRACTOR SHALL REMOVE NON-CATEGORY

6/6A FACE PLATES, MODULAR JACKS, AND

PATCH PANELS AFTER CUT OVER TO NEW

CATEGORY 6A CABLE PLANT.

11.CABLE SUPPORTS, SUCH AS CABLE TRAYS, OR

J-HOOKS, THAT ARE NOT TO BE REUSED SHALL

BE PRESERVED FOR REUSE. COORDINATE WITH

THE COR PRIOR TO REMOVING CABLE

SUPPORTS.

12.NURSE CALL SYSTEM TO BE MAINTAINED IN TR

ROOM. CONTRACTOR SHALL COORDINATE NEW

EQUIPMENT LOCATION WITH THE COR PRIOR TO

MOVING THE NURSE CALL SYSTEM OR BEFORE

WALL DEMOLITION BEGINS.

13.PRIOR TO RELOCATING WALL MOUNTED TV,

CONTRACTOR SHALL COORDINATE WITH THE

COR FOR THE NEW LOCATION AND PROVIDE

NEW CATEGORY 6A DATA AND ELECTRICAL

OUTLETS.

#10

#9

#11

DN

UP

UPDN

Q P N M L K J H G F E DEaHbJbNa

F

F

F

F

F

F

F

CB

E3

F023A CBF3

F024

F001A F004

F021

F018

F020 F019 F017 F016

F015A

F015

F014

CB

F4

F005 F010

F012F013

F036F011

F009A

F009F008F007F006F003

CBF5

F001B F001

F002A

F002

E012 E001G

CBF1

E001

E009

E010

E008

E007

CBE1CBE2

E004

E005

F037STR #11

B051B048B042B039AB039

E001AE001CE001D

E001B

E002NE002M

E002O

E002F

E002E

E002D E002C E002Q

E001E

E002A

E002

E002B

E002H E002I E002J E002K E002L E001F

A001

A003 A007 A009

A010A

A010 A019 A020

37A

F029A F029 F028

F027A

F028A F025

F025A

F027 F026

F034

F034A F035A

F035

F033F032F031F030 F030A

F023 F022

E003

CBE4

A009A

CB

F2

A020A

MATCH LINE 'A'MATCH LINE 'A'

EXIST.

ELEV. LOBBY

CBE5

EXIST.

TELECOM

E006

1 FLOOR PLAN - BASEMENT - AREA 1

SCALE: 1/8 = 1'-0"

TN-402-1.B

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-200-1.B

BASEMENT TECHNOLOGY

FLOOR PLAN - AREA 1

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

UP

#14

#15

#13 #12

DN

DN

DN

G014

B025

B027A

B027 CB

B3

CBG2

G001

CB

G1

G012

G013

G048

G047

G043A

G052C

G045

G046

G043

G016 G052B

G052

G036

G032

G032A

G055 G059

G052A

G030

G029

G027A

G027

CBG6

G026

G015

G031 G024A G024B

CBG5

G004

CB

G3

G040A

G042 G023

G024 G018 G017

CBG4

G037

G040 G038 G019C G019A

G019B

G019

G008

G004A

G038A

G015A

STR #G1

M

AT

C H

L

IN

E 'B

EXIST.

OFFICE

G051

EXIST.

TELECOM

G050

1 FLOOR PLAN - BASEMENT - AREA 2

SCALE: 1/8" = 1'-0"

TN-403-1.B

KEYED NOTES

1. CATEGORY 6 CABLES TO REMAIN. PRESERVE

CABLES, MODULAR JACKS, AND PATCH PANELS

FOR REUSE.

2. CONTRACTOR SHALL RELOCATE NURSE CALL

CABINET OR TELEPHONE BACKBOARD

COORDINATING THE NEW LOCATION WITH THE

COR.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-201-1.B

BASEMENT TECHNOLOGY

FLOOR PLAN - AREA 2

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

#4

#5

#7

#8

REX

#1#2#3

DN

UP

DN

A058

B013

B013A

B011B

B011A

B011C B011D B011E B011F B011G

B011

B011H

B011J B009

B007

B010

B010A

B006C

B006

B006B

B006A

B009A

B036A

ST

R

B036B

B034 B036

A056

STR #1

B025

B027A

B024 B019

B027

B031

CB

B3

B030

B026 B023

B032

B014

B016

B018

B022 B021

B017

B045

B015

B012

B046A

B047 B046 B049

B050

CB

A1

B051B048B042B039AB039

CBB3

A055

A054B

A004

E001E

E002B

E002H E002I E002J E002K E002L

A001

A002 A003

CBA2

A007 A009

CBA3 CBA4

A005

A004A

A006 A008A A008

A012

A013

A047

CBA8

D004L

A048

A049

A006A

A051

A51A

A050

CBA9

A052

CBA10

A053

A059A

A059

A057

D004M

D004N

D002

D001B

D001A

D001

D004E

D004BD004AD004O

D031

D003

D003B D004G

D004H

D028 D003A D004I

CBB1

B033

B033A

B037A

B037 A009A

B002D

B002G

B002F

B002K

B002A

B002

B001F

B002E

C009D

C009

C009B

C001

C009A

B001E

B001B

B001D

B0

C

B001A

C001A C001C

C001D

CB

D4

C009C

CBD1

CB

B4

A054

A016A

A016

MATCH LINE 'A'

MATCH LINE 'C'

EXIST.

TELECOM

A056A

OFFICE

STORAGE

A060B

TELECOM

ROOM

A060

TELECOM

DEMARK ENTRANCE

A060A

NOT IN SCOPE.

KITCHEN RENO PROJECT

1 FLOOR PLAN - BASEMENT - AREA 3 & 4

SCALE: 1/8" = 1'-0"

TN-401-1.B

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-202-1.B

BASEMENT TECHNOLOGY

FLOOR PLAN AREA 3 & 4

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

#5

#6

REX

DN

DN

DN

UP

DN DN

UP

UP

DN

DN

DN

DN

UP

UP

D027

CBD3

C006A

C006

STR #7

D021A

D021

STR #6

CBD7

D022

D020

D023

D022CD022D

D022A

D002D001

D004BD004AD004O

D031

D003

D003B D004G

D004H

D028

D029

D003A

D003C

D004I

D004J

D004KD003D

CBD5

D025D030

D024

D019C

C003A

C003B

C003C

C004D

C004BC004AC004

C005A

C005

C003

C003E

C011

C014C013C013A

B002E

C009D

C009

C009B

C001

C009A C001A C001C

C001D

CB

D4

C002

C002B C008

C0

J

C009C

C009E

C009F C009G

C009I

C009K

CBC1

C009H

C009M

C010

C009N

CBC1A

C003F C003D

D019A

D019B

D019D D019

D019C

CBC2

CB

C3

CBD1

C002A

D026

STR#9

D018

STR #17

MATCH LINE 'C'

NOT IN SCOPE.

MORGUE RENO. PROJECT

1 FLOOR PLAN - BASEMENT - AREA 3A & 4A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-203-1.B

BASEMENT TECHNOLOGY

FLOOR PLAN - AREA 3A & 4A

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

A063C A063G

A063

A063A

A063H

A063D A063F

A024A

D008 D004

D009

CB

D2

D007

D005AD005

D006

D004C

D004F

E001E2L E001F

CBA4

A012

A013

A010A

A010 A019 A020

A024

A024B

ST

R

A026

A027A

A027

A028

A022

A018

A025BA025CBA5

A023 A029

A023A A031

CB

A7

CB

A6

A021

A045A

A015A A015

A011

A014 A030

A032

A034 A033

A033

A035

A042A

A042A043A045A017

A033A

A033B

A038

A037

A036

A039A040A041

CBA8

A046

A047A

A047

CBA11

CBA8

004G

004H

004I

A009A

A020A

A016A

A016

A063EA063B

MATCH LINE 'A'

MATCH LINE 'C'

M

AT

C H

L

IN

E 'D

M

RANCE

1 FLOOR PLAN - BASEMENT - AREA 5

SCALE: 1/8" = 1'-0"

N

UP

DN

D021

STR #6

D015

D022B

D012

D010

D008 D004

D017

D016

D013

D0

A

D015A

ST

R

D011

D009

CB

D2

D007

D014

004G

004H

004I

004J

004K

PB01C

STR #12 #17

MATCH LINE 'C'

M

AT

C H

L

IN

E 'D

2 FLOOR PLAN - BASEMENT - AREA 5

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-204-1.B

BASEMENT TECHNOLOGY

FLOOR PLAN - AREA 5

VV

KEY PLAN

NN

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

M V

M

AO2

M V

M

AO2

EX

T3

EXT30EXT36

EX

T3

EXT30 EXT36

FE

FE

FE

FE

FE

FE

FE

UP

UP

#10

#9

#11

E109 E110E125F

E125EC1E24

E125DE125CE125BE125A

E124

E123

E126

C

E2

E133

E122 E121 E120

E117 E116

E115

E114

E130

E131

E132

E112

E111

E129

E127

B109 B110 B112

F100

B131A

C

E6

E137

E102LE102G

E102F E102E E102D E102C E102B E102A

F129

F135

C1E14

E102J E102K

F104

E-1204

F171

F128

F134

C1E13

E108B

F122

C1E21

F171A F150

F101

F125

E102H

E107

E108

C 1F

F123

F151B

F102

F126

E102

E106

E108C

C1F11

F124

F151A

C1F7

C1E12

E144

E140

F168

F137A

C1F7

F121

F137

F169

E146

E148

E138

C1E11

C1F1

C1F19

C

F1

C1F2

C1F21

E147

C1E8 E145

E143

F136

F118

F117

B138

F163

C1E15

C1F20

F103

F160

F161

B134

F116

C1F6

C 1F

F115

C1E16

F164

E134

C1E10

F166

F167

F165

F162

B137

C

F9

F109

F108

C1F8

F146 F131

C1F15

F105

F113

F114A

F127 F130

F103B

F114

F132

F151

F149

C1E17

F119

F107

F106

F112 F155

F147

F152

C

F1

C

F1 4 F144

F138

F153

F138A

F145

F148

F110 F111 F142F141F140F139 F156

C1F12 C1F13

F133

F157 F158 F159

C1F17

F142 F154

F120

E127A

F103A

B134A

MATCH LINE 'A'

M

AT

C H

L

IN

E 'D

BREAK

ROOM

EXIST.

TELECOM

B144A

LOCKERS

B143

EXIST.

TOILET

B144B

EXIST.

ELEV. LOBBY

C1E9

EXIST.

TELECOM

E139

2 2 2

2 2 2

2 2 2 2

2 2 2 2 2 2

2 2

2 2

2 2 2

2 2

2 2

4 2 2

2 2

2 2

2 2

1 1

2 23

3 2

TN-407-1.1

1 FLOOR PLAN - FIRST FLOOR - AREA 1

SCALE: 1/8 = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-205-1.1

FIRST FLOOR TECHNOLOGY

FLOOR PLAN - AREA 1

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

FE

FE

DN

UP

UP

DN

F175

F174C

F174B

F174A

C1E33

C1E31

F181

A130

C

E6

E102L

C1E35

C1E29

F176

F174

E102C E102B E102A

E-1100

E102J E102K

F171

F171A F150

E102H

F151B

E102

F151A

E144

E140

F168 F169

E146

C1F19

C

F1

C1E8 E145

E143

F163

F179B

F177

F160 F177A

F178

F161

F164

F1 F2

C1E32

F166

F167

F165

F162

F179

C1F22

F170

F151

F180

156 F157 F158 F159

C1F17

A119A A121 A123 A125

C1E30

E100A

E142

E141

E100

E101

MATCH LINE 'A'

M

AT

C H

L

IN

E 'D

2 2 2

2 2 2 2

2 2 2

2 2

2 3

2 2

3 3

2 3

2 2 2 22

1 FLOOR PLAN - FIRST FLOOR - AREA 1A

SCALE: 1/8 = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-206-1.1

FIRST FLOOR - TECHNOLOGY

FLOOR PLAN - AREA 1A

VV

9*

N7

F

F

F

F F

F

F

F

#14

#13 #12

#15

C133C

C133B

C111

C112

C1

B176C

B176B

B176

C

G

G176

G100

G101

G102

G102A

G160

G103

G

G105

G106

G

G105A

G108

G114A

G

G116

G114

G115

G113G112

G156

G173G

G111

G110

G110A

G

G148 G147 G146 G171

G145 G143A

G144

G142A G168

G142

G170

G169 G143

G107

G136 G139

G155

G155B

G137

G138

G163 G162

G120

G121

G123

G122

G133

G127 G128

G159

G

G

G129

G130

G131

G132

G119

G124 G

5 G118 G161

G164A C104

G164

C110

G135 G140

G

A

G193

G149

G150

G150A

G151 G153

B176D

G152

G196E

G196H G196G G196F

G192

M

AT

C H

L

IN

E 'B

MATCH LINE 'F'

EXIST.

TELECOM

G141

EXIST.

CORRIDOR

G191

2 2

1 41 4

4 1 3

4 1

2 21

22 22

2 2

2 2

2 2

TN-409-1.1

1 FLOOR PLAN - FIRST FLOOR - AREA 2

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-207-1.1

FIRST FLOOR - TECHNOLOGY

FLOOR PLAN - AREA 2

VV

9*

F

#13 #12

B107

B104 B105

G150A

B176D

G196E

G194B

G195G196DG196CG196BG196AG181

G196H G196G G196F

G182

G184B

G

AG184G183

G185E G185

G185CG185D G185B

G185A

G188 G190

G189 G190A

G191

G194G197AG197G197B

MATCH LINE 'F'

M

AT

C H

L

IN

E 'B

4 3 3 4

2 2

2 2 2

2 2

4 2

3 4 4

2 2

1 FLOOR PLAN - FIRST FLOOR - AREA 2A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-208-1.1

FIRST FLOOR TECHNOLOGY

FLOOR PLAN - AREA 2A

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

O2

MV

MA

O2

MA

MV

NG O2

MA

MV

NG

O2

MA

MV

NG

O2

MA

MV

MV

MA

O2

NG MA NG MA NG MA MA

MANGNGMAMANGMA

O2

MA

MV

MV

EX

T1

EX

T1

FE

UPDN

UP

DN

UP

#4

#5

#1#2#3

A158A160A161 A159

C168 C170 C171

C174

C175

C173 C172C167C146

C182 C103 C102C1C2

C137C125C126C127C128

C136 C124

C123

C133

C134

C113

C111

C112

C114

C115

C116

C117

C118 C119

C132

C120 C121 C122

B168 B172

B176

B176C

B176B

B176A B152

B148

B154B167B

B160

B164

B166

B167AB167B129

B128

B165

B136B

B136B132

B136A

B175A

B112AB108

B108A

B107A

B107

B104 B105 B109 B110 B112

B135

B133

A103

B150

C1A8

A153

A152A

A191

A149

A148A187A188

C1A9

A167

A162

A165

A166

A168

A

6D

C135

6E

94B

B106

B131A

B131B

B1

B179

B126 B129

B174

C 1B

B119

B170

C169

C168 B121 B120 B122

C1B4

B127

B128

B130 B131 B164

B165

C

B

B123

C176

D149

D101

C1C1 D101B

A189

A147

A106A107

A194

A110 A117G

A117F

A117E

A117A

A117BA116

A115

C

B

A116A

A153C

A117C

C1A7 A117D

A156C

A156B

A156A

A157

A101

A102A108A109A111A112A113A114

A153B

B149

A186

C1A2

A193 A192

D102H D102K

D104

D10

D

D

A

1D

D

D102A

D102B

D102C

D102D

D102F

D102E

D102G D103

E102G

A163

B139

C1E14

E102J E102K

B146

C1E13

E108B

E105

C1A1

E102H

E104

E107

E108

B139A

E102

E103

E106

E108C

B145

B116 B116A

B138

C1E15

B134

C1E16

B137 C1E17

B132A

B166A

C1C2

C

B

B152A B173

B134A

A172 A171 A169

B175 B160A

MATCH LINE 'A'

MATCH LINE 'C'

EXIST.

TELECOM

A153A

BREAK

ROOM

B144

EXIST.

TELECOM

B144A

LOCKERS

B143

EXIST.

TOILET

B144B

2 2 2 2 2 2

1 1

2 23

3 2 22

2 2 2 2 2 2 2 2

2 2

3 2

2 2

2 2

2 2

2 2 2

2 2

2 2 2

2 2

2 2

2 2

2 2 2 22

2 2 2 2

2 4

TN-408-1.1

TN-406-1.1

1 FLOOR PLAN - FIRST FLOOR - AREA 3 & 4

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-209-1.1

FIRST FLOOR - TECHNOLOGY

FLOOR PLAN - AREA 3 & 4

VV

N7

UP

DNUP UPDN

UP

DN

#5

#6

D125

D10

D124

D124A

D126

D127

D128

D129D129B

D100A

C173 C172C167C146

C182 C103 C102C1C2

C137C125C126C127C128

C192

C191

C189 C184

C188

C185

C187

C186

C193 C180

C181

D194

C107

C142AC142C140AC140C139C138

C137A

C135

C134B

C136

C

A

C133B C1C10

C132

C106

C109

C113

C111

C114

C179

D198

D199C

D199B

D193A

D193

D

E

D199

D183 D182 D155

D181

D180

C1C23

D

A

D

C

C

D179

D

B

C

C

D194A D189D D185

D

C

D186

D187

D194

D199A

D195A

C152

D195

C1D23

D191 D190 D189 D170

D134

D152

D159A

D159B

D159 D160

D161 D158

D157 C

D

D162

D156

D154 D153

D153A

D163D175A

D175

D173 D174

D164

D165

D173A

D166D167D168

C1D21

D169

D172A

D172D171

D171A

C133

C104

C110

C176

D149

D101

C1C1 D101B

D150

D151B

C143

C101

C

C

0 C101C

D129C

D151

D151C C101D

C1D5

C198

C1C9

D

D

C 1D

D

D102A

D102B

D102C

D102D

D102F

D102E

C1D4

C137

C144

C1C2

C

B

MATCH LINE 'C'

EXISTING

U/C WAITING

C178

EXIST.

TELECOM

C105

2 2

2 2

2 3

2 2

2 2

2 2 2 3 2 2 2 2

2 2

2 2 2

2 2

2 2

2 2

2 22

2 2 2

2 2

2 2

2 2

2 2

2 2 2

2 2 2 2

6 3

2 2 2 2

2 4

TN-410-1.1

1 FLOOR PLAN - FIRST FLOOR - AREA 3A & 4A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-210-1.1

FIRST FLOOR TECHNOLOGY

FLOOR PLAN - AREA 3A & 4A

VV

MA

MA

F

F

DN

UP

DN

DN

SLOPE

DN

A128A

A128B

C1E33

C1E31

A144G

C

A

A136

A184

A183

A179 C

A

A144B A177

A144C

A174 A176

D

D115D118BD118AD122

A103

A130

D117

D118C

D118

D105 C1A10A8

A149

A148

C

A 6A168

A147

C

E6

A145

D102L

D106

D130D102D D120

D102E

C 1D

E102L

A

A139

A138 A146

A142

C

A

A141

A140

A141BA141A

A133

A131

C1E29

E102K

C

A

A126A124A122 A1

A

A

A119A A121 A123 A125

C1A3 A129A129B

A118

A

A

A129A

A128

C1E30

A143

A142A

A144

A137

A144A

MATCH LINE 'A'

MATCH LINE 'C'

M

AT

C H

L

IN

E 'D

2 2 2 2 2

2 2

2 2

2 2

2 2 4

24 4

2 2

1 FLOOR PLAN - FIRST FLOOR - AREA 5

SCALE: 1/8 = 1'-0"

UP

DN

108A1

D115D118BD118AD122

D123

D125

D119A

D108

D119

D115A

D114

D113D112D111D110D109D107

4A

C1D3D160

D121

D102E

C 1D

1D4

MATCH LINE 'C'

M

AT

C H

L

IN

E 'D

22 222

2 2

2 2 2 2 2

2 2

24 4

2 2

2 FLOOR PLAN - FIRST FLOOR - AREA 5

SCALE: 1/8 = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-211-1.1

FIRST FLOOR TECHNOLOGY

FLOOR PLAN - AREA 5

VV

PATIENT ED

F

FE

FE

F

F

F

F

F

DN

UP

DN

#10

#9

#11

C2E7

C2E12

F210 F211 F212 F214 F215 F217 F235 F236 F239 F240 F267 F266 F265

F269

C2F23

F268 F264 F263

F210A C2F3

F204

C2F1 F201

F202

F206DF206C

C2F7

F203

E202

F224

C2F8

F206AF206B

F205

F242

F237

F206

F207

C2F20

E201

C2F20

F256

F245

F241

C2 F1

F231

F223

C2F14 F257

F230

F232

F219

F238

F233

C2F16

F234

F243

F246

C2 F1

E207

E204A

F209

C2F4

C2F6

F216

F208

C2 F2

F209A

E204

C2E6

F247

F244

C2F17

F225

F228

E209

E205A C2E3

E222E223E225E226

F218

C2F12

F222

C2 E2

E212A

E224A E214

E213

E205

F221

C2F19

F227

F222A

E208

E217

E212E211

E2

C2 E4

C2 F5

F250

F255

C2 F1

F226

E216E255

C2E1E253

E220

F211A

F248

F249

C2 F1

F220

E211A

E254 E210

F256

C2 F2

F213A

F213

E221

E219

E218

C2 F2

E215

F252

F257

F260F271

F261F270

F262

C2 F2

F258F273

F259F272

F229

F200

F274

E209A

F275

F213B

E241

E239

E237

E236

C2E9

C2E11

E227E229

E230E232E233E234E235

E238 C2E16 C2E14

C2 E1

E244

E240

E242 E243 E249

C2E18

E245

C2 E1

E246 E247

E248 E250

E231

E228

C2E13

E251 E252

F251

F253

EXIST.

ELEV. LOBBY

C2E10

EXIST.

TELECOM

E203

2 2 2222222 4 8

22 2

2 2

2222222

2 2 2

1 2

22 2

2 2

22222 2

2 2 2

2 2 2

2 2 2

2 2 2 2

2 2

2 2 2 2 2 2

TN-413-1.2

1 FLOOR PLAN - SECOND FLOOR - AREA 1

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

TN-212-1.2

SECOND FLOOR TECHNOLOGY

FLOOR PLAN - AREA 1

VV

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

N2

OPEN TO

ROOF

ACCESS

DN UP

1-2

STOR

G200

G202

G201

G203

#13 #12

UP

DN

C219

C220

ST

R

C218

C216

C217

C215

C214

C213

C211

C209 C209A

C210 C208 C207 C206 C205 C204 C203

C207A C2B2 C203A

B211

B212

B209

B208 B207

B210

B212A B227 B228 B230 B232

B206

B235

B205

B236

B204

C2B4

B237B234B233B231B229B226B223 B225

B224

B213

B215

B214

B216

B217

B218

C2 B3

C212

C2 C1

MATCH LINE 'A' MATCH LINE 'A'

M

AT

C H

L

IN

E 'B

M

AT

C

H L

IN

E

'B

4 4

2 22

22 2

2 22

22 2

2 22

22 2

2 22

22 2

2 22

22 2

2 2 2 2

22 2

22 2

22 2

22 2

2 22

1111 1

22 222

2 2 2 2

1 FLOOR PLAN - SECOND FLOOR - AREA 2 & 3

SCALE: 1/8" = 1'-0"

DN

UP

B216

B217

B218

C2 B3

B221B

B219

B220

B221A

B221

B245

ST

R

B222 B222A

B221D

MATCH LINE 'A' MATCH LINE 'A'

22 2

22 2

22 2

2 FLOOR PLAN - SECOND FLOOR - AREA 3

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-213-1.2

SECOND FLOOR TECHNOLOGY

FLOOR PLAN - AREA 2 & 3

VV

3 2 1 6 5 4

* 0 #

3 2 1 6 5 4

* 0 #

BMS

BMS

N7

N2

OPEN TO

ROOF ACCESS

OPEN TO

ROOF ACCESS

UPDN

UP

DN

#7

#8

#2#3 #1

#4

#5

C2A6

D206A

C201C

C201B

D202

D202B

D212

D201

D206 D205A

D201A

C2 D1

D203

D204 D219C

D219B

D219 D220

D219H

D219G

D219F

D221 D222 D223

A223

A223A A223C

A258 A257

A228 A230

A256

D224

A2

A2

A229A227A225A222A

A220

A226A205A207

A204

C206 C205 C204 C203

C2B2 C203A

B207

B230 B232

B206

B235

B205

B236

B204

B238

B203 B239A

B239

B241

A212

B200

C2B4

B242A201

A200

B237B234B233B231

D209A

D219E

D221A

C201

C201D

C202

C201F C201E

C201A

B201B A214 A215

A209

C2A05

C2 A0

A202 A203 A218

D219D

A200A

A219

C2A4

C2A03

A208

A216

A212

STR #1

C2 A0

8A222

A200

C2B4A

M

AT

C H

L

IN

E 'B

M

AT

C

H L

IN

E

'B

MATCH LINE 'C' MATCH LINE 'C'

M

AT

C H

L

IN

E 'D

M

AT

C

H L

IN

E

'D

EXIST.

TELECOM

A217

A201B C2A02

A200A

A206A

C2A01

A211 A213

A210

A223B

A223D

A221

C2A09

2 2

2 2

3 3 22

22 2 2

2 2 2 4

AREA NOT IN SCOPE

PROJECT: 589A4-19-103

RELOCATE BEHAVIOR HEALTH CLINIC

TN-412-1.2

1 FLOOR PLAN - SECOND FLOOR - AREA 4

SCALE: 1/8 = 1'-0"

KEYED NOTES

1. CONTRACTOR SHALL MOVE AND CONNECT THE

TELEPHONE BACKBOARD COORDINATING WITH

THE COR.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE NOTED.

7. CONTRACTOR SHALL TERMINATE

COMMUNICATIONS CABLES WITH NEW

CATEGORY MODULAR JACKS TO MATCH THE

COMMUNICATION CABLE PERFORMANCE

SPECIFICATIONS. NEW MODULAR JACKS SHALL

BE OF THE SAME MANUFACTURER AS THE FACE

PLATES, PATCH PANELS, AND PATCH CABLES.

8. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A CABLES AND CONNECTIVITY COMPONENTS

THAT ARE OF THE SAME MANUFACTURER,

INCLUDING CABLE, MODULAR JACKS, PATCH

PANELS, FACEPLATES, AND PATCH CABLES.

9. CONTRACTOR SHALL TEST ALL NEW AND

EXISTING RE-TERMINATED CABLES IN

ACCORDANCE WITH THE SPECIFICATION 27 08

00.

TN-214-1.2

SECOND FLOOR TECHNOLOGY

FLOOR PLAN - AREA 4

VV

DP-CRITICAL-1

OPEN TO

OF ACCESS

UPDNDNUP

UP

DN

#5

#6

C235BC235AC234C233C232

C227

C252

C249E

C251 C257 C237A

C237

C235

C256 C236

C255 C238 C239

C241C240C254

C253 C242 C243

C250

C249C

C249

C227B

C227A C249D

C247

C2 C2

C225

C224

C223

C222

C246

C2C3

C248

C249B C249A

C221

C2 D2

D212A D212D

D212B D212E

D212C D212F D205C

D205B

D200A

D205

D206A

D207C D207B

C201C

C201B D202B

D212 D206 D205A

D201A

C2 D1

D204 D219C

D219F

D209A

D219E

D221A

D213A

C2D3 D210 D214 D215

C2 D4

D213C

D213E

D218 D218C D218B D218A

D217

D213G

D218

C2C1

C2 C4

C2 C6

C226

D213D D213J

D213K

D213H

D213F

D213B

D213L

C201

D219D

D207

D216D

C230

C228

C231

C226A

C226B

C227C

C229

M

AT

C H

L

IN

E

MATCH LINE 'C' MATCH LINE 'C'

M

AT

C H

L

IN

E

D208

EXIST.

DATA CENTER

D216

3 3

3 3

3 3

3 3

1 2

2 4

3 4

TN-425-1.2

1 FLOOR PLAN - SECOND FLOOR - AREA 4A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

KEY PLAN

N

GENERAL NOTES

1. CONTRACTOR SHALL INSTALL NEW CABLE

TRAYS AS INDICATED ON ELECTRICAL PLANS.

2. CONTRACTOR SHALL INSTALL NEW J-HOOKS

WHERE THERE IS NO CABLE TRAY OR

COMMUNICATIONS CONDUIT UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A PATCH PANELS IN THE TELECOMMUNICATION

ROOM AS INDICATED ON RACK ELEVATIONS.

4. CONTRACTOR SHALL RE-TERMINATE AND TEST

CABLING REMOVED FROM ANY WALL MOUNT

EQUIPMENT UNLESS OTHERWISE NOTED.

TESTING SHALL BE PERFORMED BY THE

CONTRACTOR DURING COMMISSIONING.

5. CONTRACTOR SHALL INSTALL NEW CATEGORY

6A TELECOMMUNICATIONS/DATA OUTLET AS

INDICATED. EXISTING COMMUNICATION OUTLET

BOXES AND CONDUITS TO BE REUSED.

6. CONTRACTOR SHALL REPLACE ALL DATA CABLE

WITH NEW CATEGORY 6A CABLE UNLESS

OTHERWISE…