Final Drawings_Part1.pdf

PDF 17 MB Posted

Attached to
Y1DZ--589A4-21-700 EHRM Infrastructure Upgrades Construction Columbia, MO
Solicitation number
36C77622R0069
Issued by

About this file

This document outlines a federal contract opportunity for infrastructure upgrades construction. The solicitation number is 36C77622R0069 from the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as drawn in the specifications for the EHRM Infrastructure Upgrades Construction project located in Columbia, Missouri. The name of the opportunity is Y1DZ--589A4-21-700 EHRM Infrastructure Upgrades Construction Columbia, MO. The type of opportunity listed is a solicitation.

View the file

Other files

File Type Posted
Answers to Technical Questions 7-15-22.pdf PDF
36C77622R0069 0007 Amendment 0007 7-15-22.pdf PDF
TERRACON ASBESTOS SURVEY Final Report-NESHAP Survey Report_updated as removed.pdf PDF
36C77622R0069 0006 Amendment 0006 7-7-2022.pdf PDF
Answers_Clarifications to Technical Questions 7-7-22.pdf PDF
Attachment A _Roof Plans_Site Layout.pdf PDF
Answers to Technical Questions 6-29-22.pdf PDF
36C77622R0069 0005 Amendment 0005 6-29-2022.pdf PDF
36C77622R0069 0004 Amendment 0004 6-27-2022.pdf PDF
36C77622R0069 0003 - Amendment 0003 - 6-22-2022.pdf PDF
36C77622R0069 0002 - Amendment 0002 - 6-16-2022.pdf PDF
Construction Wage Rates - Boone County - 5-27-22.pdf PDF
Site Visit Sign-In-Sheet 6-9-22.pdf PDF
36C77622R0069 0001 - Amendment 0001 - 6-9-22.pdf PDF
Attachment C - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Final Drawings_Part3.pdf PDF
Construction Wage Rates - Boone County - 4-22-22.pdf PDF
Attachment A - PPQ.docx DOCX document
Final Specifications-Vol 1_Rev2 - 3-28-22.pdf PDF
Attachment D - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment B - VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Final Specifications-Vol 2_Rev2 - 3-28-22.pdf PDF
Final Drawings_Part6.pdf PDF
Final Drawings_Part7.pdf PDF
Final Drawings_Part2.pdf PDF
36C77622R0069 Columbia EHRM Infra - 5-19-22.pdf PDF
Final Drawings_Part9.pdf PDF
Final Drawings_Part8.pdf PDF
Final Narrative.pdf PDF
Final Drawings_Part4.pdf PDF
Final Drawings_Part5.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

EHRM INFRASTRUCTURE UPGRADES - COLUMBIA, MO

PROJECT # 589A4-21-700

GI-000

COVER SHEET

IAR

PROJECT MANAGEMENT,

ARCHITECTURE, & TECHNOLOGY

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

SECURITY & MEP

6 S. Old Orchard Ave.

Webster Groves, MO 63119

Phone: 314-918-8383 www.rossbar.com

IAR, JFB

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O S

EP

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

GI-010

INDEX OF DRAWINGS

RACIAR, JFB

ARCHITECTURAL

GI-000 COVER

GI-010 INDEX OF DRAWINGS

GI-020 GENERAL INFORMATION, SYMBOLS & LOCATION MAP

GI-030 ABBREVIATIONS

GI-040 ACCESSIBILITY STANDARDS

GI-041 ACCESSIBILITY STANDARDS

GI-042 ACCESSIBILITY STANDARDS

GI-043 ACCESSIBILITY STANDARDS

GI-044 ACCESSIBILITY STANDARDS

AS-100-1.B FLOOR PLAN - BASEMENT - AREA 1

AS-101-1.B FLOOR PLAN - BASEMENT - AREA 2

AS-102-1.B FLOOR PLAN - BASEMENT - AREA 3 & 4

AS-103-1.B FLOOR PLAN - BASEMENT - AREA 3A & 4A

AS-104-1.B FLOOR PLAN - BASEMENT - AREA 5

AS-105-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1

AS-106-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1A

AS-107-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2

AS-108-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2A

AS-109-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3 & 4

AS-110-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3A & 4A

AS-111-1.1 FLOOR PLAN - FIRST FLOOR - AREA 5

AS-112-1.2 FLOOR PLAN - SECOND FLOOR - AREA 1

AS-113-1.2 FLOOR PLAN - SECOND FLOOR - AREA 2 & 3

AS-114-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4

AS-115-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4A

AS-116-1.2 FLOOR PLAN - SECOND FLOOR - AREA 5

AS-117-1.3 FLOOR PLAN - THIRD FLOOR - AREA 0

AS-118-1.3 FLOOR PLAN - THIRD FLOOR - AREA 1

AS-119-1.3 FLOOR PLAN - THIRD FLOOR - AREA 2 & 3

AS-120-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4

AS-121-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4A

AS-122-1.3 FLOOR PLAN - THIRD FLOOR - AREA 5

AS-125-1.4 FLOOR PLAN - FOURTH FLOOR - AREA 4

AS-126-1.5 FLOOR PLAN - FIFTH FLOOR

AS-127-1.6 FLOOR PLAN - SIXTH FLOOR

AS-128-14.0 FLOOR PLAN - BASEMENT

AS-129-22.0 FLOOR PLAN

AS-130 INFECTION CONTROL PLANS

AS-131 INFECTION CONTROL PLANS

AS-132 INFECTION CONTROL PLANS

AS-200-1.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM E006

AS-201-1.B ENLARGED FLOOR PLAN - BASEMENT - ROOM A060

AS-202-1.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM G050

AS-210-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM B144A

AS-211-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM E139

AS-212-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM C105

AS-213-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM G141

AS-220-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - TELECOM A217

AS-221-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - TELECOM E203

AS-222-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - DATA CENTER D216 - DEMO

AS-223-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - DATA CENTER D216 - RENO

AS-230-1.3 ENLARGED FLOOR PLAN - THIRD FLOOR - TELECOM A306A

AS-250-1.5 ENLARGED FLOOR PLAN - FIFTH FLOOR - TELECOM 551

AS-260-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT

AS-261-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT

AS-262-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT

AS-270-1-6 ENLARGED FLOOR PLAN - SIXTH FLOOR - TELECOM 650

AS-300-14.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM W05B

AS-310 ROOF PLAN

AS-400 INTERIOR ELEVATIONS

AS-500 DOOR SCHEDULE, DOOR & FRAME TYPES

AS-700 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE

AS-710 DOOR & MISCELLANEOUS DETAILS

AS-720 PARTITION TYPES

TECHNOLOGY

T-001 TELECOMMUNICATIONS GENERAL INFORMATION

T-002 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX

TD-100-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 1

TD-101-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 2

TD-102-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 3 & 4

TD-103-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 3A & 4A

TD-104-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 5

TD-105-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 1

TD-106-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 1A

TD-107-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 2

TD-108-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 2A

TD-109-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 3 & 4

TD-110-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 3A & 4A

TD-111-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 5

TD-112-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 1

TD-113-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 2 & 3

TD-114-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 4

TD-115-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 4A

TD-116-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 5

TD-118-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 1

TD-119-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 2 & 3

TD-120-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 4

TD-121-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 4A

TD-122-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 5

TD-125-1.4 FOURTH FLOOR - TECHNOLOGY DEMO PLAN - AREA 4

TD-126-1.5 FIFTH FLOOR - TECHNOLOGY DEMO PLAN

TD-127-1.6 SIXTH FLOOR - TECHNOLOGY DEMO PLAN

TD-128-14.B BASEMENT FLOOR - TECHNOLOGY DEMO PLAN

TD-129-22.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN

TECHNOLOGY (CONTINUED)

TN-200-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 1

TN-201-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 2

TN-202-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 3 & 4

TN-203-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 3A & 4A

TN-204-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 5

TN-205-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1

TN-206-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1A

TN-207-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2

TN-208-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2A

TN-209-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 3 & 4

TN-210-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 3A & 4A

TN-211-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5

TN-212-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1

TN-213-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2 & 3

TN-214-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4

TN-215-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4A

TN-216-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5

TN-218-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1

TN-219-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2 & 3

TN-220-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4

TN-221-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4A

TN-222-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5

TN-225-1.4 FOURTH FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4

TN-226-1.5 FIFTH FLOOR - TECHNOLOGY FLOOR PLAN

TN-227-1.6 SIXTH FLOOR - TECHNOLOGY FLOOR PLAN

TN-228-14.B BASEMENT FLOOR - TECHNOLOGY FLOOR PLAN

TN-229-22.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN

TN-300-1.B BASEMENT FLOOR PLAN - FIBER OPTIC PATHWAY

TN-301-1.1 FIRST FLOOR PLAN - FIBER OPTIC PATHWAY

TN-302-1.2 SECOND FLOOR PLAN - FIBER OPTIC PATHWAY

TN-303-1.3 THIRD FLOOR PLAN - FIBER OPTIC PATHWAY

TN-304-1.4 FOURTH FLOOR PLAN - FIBER OPTIC PATHWAY

TN-305-1.5 FIFTH FLOOR PLAN - FIBER OPTIC PATHWAY

TN-306-1.6 SIXTH FLOOR PLAN - FIBER OPTIC PATHWAY

TN-307-2 FLOOR PLAN - FIBER OPTIC PATHWAY - ROOMS K007 & K136

TN-310-1.B BASEMENT FLOOR PLAN - GROUNDING PATHWAY

TN-311-1.1 FIRST FLOOR PLAN - GROUNDING PATHWAY

TN-312-1.2 SECOND FLOOR PLAN - GROUNDING PATHWAY

TN-313-1.3 THIRD FLOOR PLAN - GROUNDING PATHWAY

TN-314-1.4 FOURTH FLOOR PLAN - GROUNDING PATHWAY

TN-315-1.5 FIFTH FLOOR PLAN - GROUNDING PATHWAY

TN-316-1.6 SIXTH FLOOR PLAN - GROUNDING PATHWAY

TN-400-1.B BASEMENT FLOOR - TR ZONE PLAN

TN-401-1.B BASEMENT FLOOR - TR LAYOUT - ROOM A060A

TN-402-1.B BASEMENT FLOOR - TR LAYOUT - ROOM E006

TN-403-1.B BASEMENT - TR LAYOUT - ROOM G050

TN-404-14.B BASEMENT FLOOR - TR LAYOUT - ROOM W05B

TN-405-1.1 FIRST FLOOR - TR ZONE PLAN

TN-406-1.1 FIRST FLOOR - TR LAYOUT - ROOM A153A

TN-407-1.1 FIRST FLOOR - TR LAYOUT - ROOM E139

TN-408-1.1 FIRST FLOOR - TR LAYOUT - ROOM B144A

TN-409-1.1 FIRST FLOOR - TR LAYOUT - ROOM G141

TN-410-1.1 FIRST FLOOR - TR LAYOUT - ROOM C105

TN-411-1.2 SECOND FLOOR - TR ZONE PLAN

TN-412-1.2 SECOND FLOOR - TR LAYOUT - ROOM A217

TN-413-1.2 SECOND FLOOR - TR LAYOUT - ROOM E203

TN-414-1.3 THIRD FLOOR - TR ZONE PLAN

TN-415-1.3 THIRD FLOOR - TR LAYOUT - ROOM C358C

TN-416-1.3 THIRD FLOOR - TR LAYOUT - ROOM C316

TN-417-1.3 THIRD FLOOR - TR LAYOUT - ROOM E326

TN-418-1.3 THIRD FLOOR - TR LAYOUT - ROOM A306A

TN-419-1.4 FOURTH FLOOR - TR ZONE PLAN

TN-420-1.5 FIFTH FLOOR - TR ZONE PLAN

TN-421-1.5 FIFTH FLOOR - TR LAYOUT - ROOM 551

TN-422-1.6 SIXTH FLOOR - TR ZONE PLAN

TN-423-1.6 SIXTH FLOOR - TR LAYOUT - ROOM 650

TN-424-22.1 FIRST FLOOR - TR ZONE PLAN

TN-425-1.2 BLDG. 1 - SECOND FLOOR - DATA CENTER - D216 - LAYOUT

TN-425-1.2.1 POWER ELEVATION AND SCHEMATIC - LEVEL REDUNDANCY

TN-425-1.2.2 BLDG. 1 - SECOND FLOOR - DATA CENTER - SENSOR LAYOUT

TN-426-2.B BASEMENT - ER LAYOUT - ROOM K007

TN-430 ENLARGED PLANS - VERTICAL RISER CLOSET

TN-431 ENLARGED PLANS - VERTICAL RISER CLOSET

TN-500 TECHNOLOGY - TYPICAL DETAILS

TN-501 TECHNOLOGY - TYPICAL DETAILS

TN-600 FIBER OPTIC CABLE RISER DIAGRAM

TN-601 GROUNDING AND BONDING - RISER DIAGRAM

TN-602 METERED ENERGY DIAGRAM

TS-200-1.B BASEMENT FLOOR - SECURITY PLAN

TS-201-1.1 FIRST FLOOR - SECURITY PLAN

TS-202-1.2 SECOND FLOOR - SECURITY PLAN

TS-203-1.3 THIRD FLOOR - SECURITY PLAN

TS-204-1.4 FOURTH FLOOR - SECURITY PLAN

TS-205-1.5 FIFTH FLOOR - SECURITY PLAN

TS-206-1.6 SIXTH FLOOR - SECURITY PLAN

TS-207-2.B BASEMENT FLOOR - SECURITY PLAN

TS-400 BLDG. 1 - SECURITY TELECOM ROOM - ENLARGED PLANS

TS-401 BLDG. 1 - SECURITY TELECOM ROOM - ENLARGED PLANS

TS-500 SECURITY PLAN - TYPICAL DETAILS

MECHANICAL

MH-000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MH-100-1.PB FLOOR PLAN - PARTIAL - PIPE BASEMENT - AREA 3 & 4

MH-101-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1

MH-102-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2

MH-103-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3 & 4

MH-104-14.B FLOOR PLAN - PARTIAL - BASEMENT - WAREHOUSE

MH-105-22.B FLOOR PLAN - PARTIAL - BASEMENT - CLC

MH-110-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 1

MH-111-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 2

MH-112-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 3 & 4

MH-113-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 3A & 4A

MH-120-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 1

MH-121-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 4

MH-122-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 4A

MH-130-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 1

MH-131-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 2

MH-132-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 4

MH-133-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 4A

MH-140-1.4 FLOOR PLAN - FOURTH FLOOR

MH-150-1.5 FLOOR PLAN - FIFTH FLOOR

MH-160-1.6 FLOOR PLAN - SIXTH FLOOR

MH-170-1.R ROOF PLAN

MH-300 MECHANICAL SECTIONS

MH-400-1.PB ENLARGED PLANS - PIPE BASEMENT

MH-401-1.B ENLARGED PLANS - BASEMENT

MH-410-1.1 ENLARGED PLANS - FIRST FLOOR

MH-420-1.2 ENLARGED PLANS - SECOND FLOOR 1 OF 2

MH-421-1.2 ENLARGED PLANS - SECOND FLOOR 2 OF 2

MH-430-1.3 ENLARGED PLANS - THIRD FLOOR

MH-440-1.4 ENLARGED PLANS - FOURTH FLOOR

MH-450-1.5 ENLARGED PLANS - FIFTH FLOOR

MH-460-1.6 ENLARGED PLANS - SIXTH FLOOR

MH-500 MECHANICAL DETAILS

MH-600 MECHANICAL SCHEDULES

MH-700 MECHANICAL CONTROLS

ELECTRICAL

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

EG-100-1.PB PIPE BASEMENT - OVERALL

EG-101-1.B BASEMENT - OVERALL

EG-102-1.1 FIRST FLOOR - OVERALL

EG-103-1.2 SECOND FLOOR - OVERALL

EG-104-1.3 THIRD FLOOR - OVERALL

EG-105-1.4 FOURTH FLOOR - OVERALL

EG-106-1.5 FIFTH FLOOR - OVERALL

EG-107-1.6 SIXTH FLOOR - OVERALL

EG-108-1.R ROOF PLAN - OVERALL

EG-109-2.B COMMUNITY LIVING CENTER - OVERALL

EG-110-22.B FLOOR PLAN - BUILDING 22 - OVERALL

EP-100-1.B FLOOR PLAN - BASEMENT - AREA 1

EP-101-1.B FLOOR PLAN - BASEMENT - AREA 2

EP-102-1.B FLOOR PLAN - BASEMENT - AREA 3 & 4

EP-103-1.B FLOOR PLAN - BASEMENT - AREA 3A & 4A

EP-104-1.B FLOOR PLAN - BASEMENT - AREA 5

EP-105-14.B FLOOR PLAN - BASEMENT - WAREHOUSE

EP-110-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1

EP-111-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1A

EP-112-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2

EP-113-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2A

EP-114-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3 & 4

EP-115-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3A & 4A

EP-116-1.1 FLOOR PLAN - FIRST FLOOR - AREA 5

EP-120-1.2 FLOOR PLAN - SECOND FLOOR - AREA 1

EP-121-1.2 FLOOR PLAN - SECOND FLOOR - AREA 2 & 3

EP-122-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4

EP-123-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4A

EP-124-1.2 FLOOR PLAN - SECOND FLOOR - AREA 5

EP-130-1.3 FLOOR PLAN - THIRD FLOOR - AREA 1

EP-131-1.3 FLOOR PLAN - THIRD FLOOR - AREA 2 & 3

EP-132-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4

EP-133-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4A

EP-134-1.3 FLOOR PLAN - THIRD FLOOR - AREA 5

E-400-1.B ENLARGED PLANS - ELEC ROOM E003A AND HOISTWAY

E-401-1.B ENLARGED PLANS - BASEMENT 1 OF 3

E-402-1.B ENLARGED PLANS - BASEMENT 2 OF 3

E-403-1.B ENLARGED PLANS - BASEMENT 3 OF 3

E-410-1.1 ENLARGED PLANS - FIRST FLOOR 1 OF 2

E-411-1.1 ENLARGED PLANS - FIRST FLOOR 2 OF 2

E-420-1.2 ENLARGED PLANS - SECOND FLOOR 1 OF 2

E-421-1.2 ENLARGED PLANS - SECOND FLOOR 2 OF 2

E-422-1.2 WALL ELEVATION - D216

E-430-1.3 ENLARGED PLANS - THIRD FLOOR 1 OF 2

E-431-1.3 ENLARGED PLANS - THIRD FLOOR 2 OF 2

E-440-1.4 ENLARGED PLANS - FOURTH FLOOR

E-450-1.5 ENLARGED PLANS - FIFTH FLOOR

E-460-1.6 ENLARGED PLANS - SIXTH FLOOR

E-470-2.B ENLARGED PLANS - CLC - BASEMENT

EL-500 LIGHT FIXTURE DESCRIPTIONS

EP-500 ELECTRICAL ONE-LINES AND DIAGRAMS

EP-501 ELECTRICAL ONE-LINE AND DIAGRAMS - ACA

EP-502 ELECTRICAL ONE-LINE AND DIAGRAMS - ROOM A060 & TYP EPO

EP-503 ELECTRICAL ONE-LINE AND DIAGRAMS - ATS METERING

EP-504 ELECTRICAL ONE-LINES - COMMUNITY LIVING CENTER

EP-505 ELECTRICAL ONE-LINES - D217 AND D216 DEMO

EP-506 ELECTRICAL ONE-LINES - D217 AND D216 TEMP

EP-507 ELECTRICAL ONE-LINES - D217 AND D216 NEW

EP-510 CABLE TRAY DETAILS

EP-600-1.B PANEL SCHEDULES - BASEMENT 1 OF 2

EP-601-1.B PANEL SCHEDULES - BASEMENT 2 OF 2

EP-602-1.1 PANEL SCHEDULES - FIRST FLOOR 1 OF 2

EP-603-1.1 PANEL SCHEDULES - FIRST FLOOR 2 OF 2

EP-604-1.2 PANEL SCHEDULES - SECOND FLOOR

EP-605-1.3 PANEL SCHEDULES - THIRD FLOOR 1 OF 2

EP-606-1.3 PANEL SCHEDULES - THIRD FLOOR 2 OF 2

EP-607-1.4 PANEL SCHEDULES - FOURTH FLOOR

EP-608-1.5 PANEL SCHEDULES - FIFTH FLOOR

EP-609-1.6 PANEL SCHEDULES - SIXTH FLOOR

EP-610-2.B PANEL SCHEDULES - COMMUNITY LIVING CENTER

EP-611-1.2 PANEL SCHEDULES - D216

MEP0000 EQUIPMENT DATA SCHEDULE

PLUMBING

PL-000 PLUMBING LEGENDS, SYMBOLS, AND ABBREVIATIONS

PL-101-C-1.1 PLUMBING FIRST FLOOR OVERALL

PL-102-C-1.1 PLUMBING FIRST FLOOR PLAN

PL-103-C-1.1 PLUMBING FIRST FLOOR PLAN

PL-104-C-1.2 PLUMBING SECOND FLOOR OVERALL

PL-105-C-1.2 PLUMBING SECOND FLOOR PLAN

PL-106-C-1.3 PLUMBING THIRD FLOOR OVERALL

PL-107-C-1.3 PLUMBING THIRD FLOOR PLAN

PL-401-C-1.1,2,3 PLUMBING ENLARGED PLANS

FIRE PROTECTION

FX-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

FX-101-C-1.PM FIRE PROTECTION PIPE BASEMENT FLOOR PLAN

FX-102-C-1.B FIRE PROTECTION BASEMENT OVERALL

FX-103-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN

FX-104-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN

FX-105-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN

FX-106-C-1.1 FIRE PROTECTION FIRST FLOOR OVERALL

FX-107-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN

FX-108-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN

FX-109-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN

FX-110-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN

FX-111-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN OVERALL

FX-112-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN

FX-113-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN

FX-114-C-1.3 FIRE PROTECTION THIRD FLOOR OVERALL

FX-115-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN

FX-116-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN

FX-117-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN

FX-118-C-1.5 FIRE PROTECTION FIFTH FLOOR PLAN

FX-119-C-1.6 FIRE PROTECTION SIXTH FLOOR PLAN

FX-120-C-2.B FIRE PROTECTION BASEMENT FLOOR PLAN

FX-121-C-14.B FIRE PROTECTION BASEMENT FLOOR PLAN

FX-401-C-1.B FIRE PROTECTION ENLARGED PLANS

FX-402-C-1.1 FIRE PROTECTION ENLARGED PLANS

FX-403-C-1.2 FIRE PROTECTION ENLARGED PLANS

FX-404-C-1.2 FIRE PROTECTION ENLARGED PLANS

FX-405-C-1.2 FIRE PROTECTION ENLARGED PLANS

FX-406-C-1.3 FIRE PROTECTION ENLARGED PLANS

FX-407-C-1.5,6 FIRE PROTECTION ENLARGED PLANS

FX-408-C-14.B FIRE PROTECTION ENLARGED PLANS

FX-500 FIRE PROTECTION DETAILS

INDEX OF DRAWINGS

UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED

ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.

1.

UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO

REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION

ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE

TO CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH

EXISTING AT NO ADDITIONAL COST TO THE OWNER..

2.

NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL

INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.

3.

ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED

AND PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS

PRIOR TO THE APPLICATION OF PRIMER AND PAINT.

4.

THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE

TECHNOLOGY, ETC. WORK SCOPE AND SATISFY THAT ALL REQUIREMENTS

FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS AND CURBS,

ETC. ARE IMPLEMENTED. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS

OR DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.

5.

CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING SIGNAGE

AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE PARTITIONS

6.

THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND

OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT

DOCUMENTS.

7.

THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD

CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT

ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR

SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION

BEFORE PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK

OR ANY PORTION RELATED THERE TO.

8.

ALL WORK SHALL CONFORM TO MOST CURRENT VERSION OF ALL APPLICABLE

CODES AND STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE, VA

MASTER SPECIFICATIONS, AND LATEST ADOPTED NFPA.

9.

THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,

CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY

DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD

CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST

CLARIFICATION IN WRITING.

10.

WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL ,MECHANICAL, ELECTRICAL,

PLUMBING, TECHNOLOGY, ETC. ELEMENTS THAT CONFLICT WITH THE INTENDED

FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE

AND EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE

CONTRACT OFFICER.

11.

WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS

USING MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS

DO NOT EXIST, NOTIFY THE ARCHITECT FOR CLARIFICATION.

12.

CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR

FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING

THE WORK PROCESS.

PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT

ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION

CONTROL GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.

13.

14.

ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE TO BE REMOVED

PRIOR TO DEMOLITION WORK, FULLY REFURBISHED, AND REINSTALLED IN

THE NEW WALL ASSEMBLY. LOCATION TO BE VERIFIED BY COR. ITEMS MAY

INCLUDE: DOOR STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,

SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL BOXES, ELECTRIC

OUTLETS, SIGNAGE, BULLETIN BOARDS, MILLWORK, CARD READERS,

CLOCK, DATA OUTLET, PUSH BUTTON, FIRE CONTROL BOX, PHONE AND

ROOM SIGNAGE, ETC.

15.

ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING,

16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LEGAL DISPOSAL OF ALL

DEBRIS.

17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ITEMES INDICATED TO

BE SALVAGED.

18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE MAINTAINED THROUGH THE

DURATION OF CONSTRUCTION ACTIVITIES AND THE CONTRACTOR SHALL REPAIR

ANY COMPROMISE OF EXISTING FIREPROOFING.

19. ALL BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH THE DURATION OF

CONSTRUCTION.

INTERIOR ELEVATION

ELEVATION PAGE NUMBER

WALL TYPE TAGF

PATIENT ROOM

ROOM NAME

ROOM NUMBER

ROOM TITLE

1/AS-101

ELEVATION DETAIL NUMBER

DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS

INCORPORATED INTO THE SHEET TITLE.

EACH DRAWING IS NUMBERED ACCORDING TO IT'S

LOCATION ON THE SHEET. THE DRAWING TITLE

APPEARS ABOVE THE DEMARCATION LINE AND,

APPROPRIATE THE SCALE IS LOCATED BELOW THE

DEMARCATION LINE IN THE LOWER LEFT-HAND

QUADRANT OF THE KEY. THE DRAWING CAN BE

REFERENCED BACK TO IT'S ORIGINAL SHEET AND

DRAWING BY THE DRAWING REFERENCE LOCATION

IN

THE LOWER RIGHT-HAND QUADRANT.

SHEET NUMBER

DRAWING NUMBER ON SHEET BY

LOCATION

REFERENCE

DISCIPLINE REFERENCES

DRAWING NUMBERING

DRAWING REFERENCE

GENERAL NOTES

REF. 1/1-A1

BUILDING SECTION

RE: 1/AS-101

SHEET NUMBER

DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS

A

1 COLUMN GRID

NORTH ARROW

REVISION NUMBER AND EXTENT

KEYED NOTE MARK

-SEE CORRESPONDING

NUMBERED KEY NOTE ON SHEET

WHERE REFERENCE OCCURS

REVISION NUMBER - SEE

REVISION HISTORY ON THE

TITLE BLOCK OF EACH SHEET

EXTENT OF CURRENT REVISION

EXISTING TO

REMAIN

CONCRETE

EXISTING

MASONRY

BUILDING

INTERIOR

MATERIAL GRAPHICS

GYP BD

CL

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION

INDICATORS,

BUILDING, WITH BREAK

STANDARDS)

DIMENSION LINE

CENTER LINE

LOCATION MAP

GI GENERAL INFORMATION

A ARCHITECTURAL

P PLUMBING

M MECHANICAL

E ELECTRICAL

T TECHNOLOGY

PROJECT INFORMATION

2018 NFPA 101 LIFE SAFETY CODE

OCCUPANCY: Group 'I-2' Condition 2

TYPE OF CONSTRUCTION: II-A

PROJECT AREA:

HEALTHCARE, CHAPTER 19

PROTECTED, TYPE II-A, FULLY SPRINKLERED

EHRM INFRASTRUCTURE UPGRADES - HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL

CONSTRUCTION LIMITS

CODES: 2018 IBC or later version

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE

"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR

DIMENSIONAL INFORMATION

1.

ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.

ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE

SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,

SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE

THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED

ON THIS PROJECT.

2.

EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS

SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING

CONVENTIONS.

3.

DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:

· CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH

WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO

"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

· CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.

· CENTERLINE OF OTHER FEATURES AS INDICATED.

A.

ALL DIMENSIONS ARE MEASURED FROM FACE OF PARTITION ASSEMBLY:

· FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)

AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A

"FACE OF FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH BUT RATHER TO THE

FACE OF THE CORE STRUCURE (STUD, CMU, ETC...). REFER TO THE

"PARTITION SCHEDULE" TO DETERMINE THE THICKNESS OF EACH

PARTITION TYPE.

A.

WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO

LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:

· EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT

APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.

· CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -

THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND

IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR

"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE

CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN

DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE

OF THE CEILING.

C.

WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,

ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.

ALIGN

DIMENSION, WHEN OCCURS

WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE

NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.

5.

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-5 EQUIPMENT LIST GUIDES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-18-10 DESIGN MANUALS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF MISSOURI AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR

FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ADA ACCESSIBILITY STANDARDS

- NFPA 101, "LIFE SAFETY CODE"

- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"

- NFPA 72, "NATIONAL FIRE ALARM CODE"

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"

- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- INTERNATIONAL MECHANICAL CODE (IMC)

- INTERNATIONAL PLUMBING CODE (IPC)

- INTERNATIONAL ENERGY CONSERVATION CODE

NTS

N

AD-100-1.B

DISCIPLINE BUILDING FLOOR

SHEET NUMBER BUILDING NUMBER

2 HR. WALL (NEW OR EXISTING)

1 HR. WALL (NEW OR EXISTING)

GI-020

GENERAL INFORMATION,

SYMBOLS, & LOCATION MAP

IARIAR, JFB

N

PHASING PLAN

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJO

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACM ASBESTOS CONTAINING

MATERIAL

ACP ACRYLIC GLAZING

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZED

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

ARCHITECTURAL ABBREVIATIONS

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING

ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MOMOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE

OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR

FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRAME

ASSEMBLY

IWH INSTANTANEOUS WATER

HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED

DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT

HEAT RATION

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKERWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATION

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER

FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSH BUTTON

PBD PARTICLE BOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING

WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN

DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR

SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL

BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL

PANEL TEMPERATURE OR

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSOR

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR

TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD

FINISH

TRTD TREATED

TS TENSILE STRENGTH OR

TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER

COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS

LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL

TILE

VIC VICINTY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC

COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER

CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WPR WALL PROTECTION/RAILING

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE

BOARD (INSULATION)

YD YARD

YR YEAR

GI-030

ABBREVIATIONS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784

60" MINIMUM 60" MINIMUM

A. MINIMUM CLEAR WIDTH

FOR TWO WHEELCHAIRS

B. MINIMUM CLEAR WIDTH FOR

SINGLE WHEELCHAIR

1 MINIMUM CORRIDOR WIDTH

48" MINIMUM DOOR WIDTH

" M

IN

IM

U M

W

IT

H

PA

R

TI

TI

O

N S

" M

IN

IM

U M

2 TWO HINGED DOORS IN A SERIES

A

DOOR WIDTH

" M

IN

IM

U M

W

IT

H

PA

R

TI

TI

O

N S

" M

IN

IM

U M

DOOR WIDTH

" M

IN

IM

U M

48" MINIMUM

B C

60" MINIMUM

" M

IN

IM

U M

60" MINIMUM 60" MINIMUM

A. MINIMUM TURNING SPACE B. MINIMUM CLEAR WIDTH

3 MINIMUM TURNING SPACE/CLEAR WIDTH

" M

IN

IM

U M

" M

AX

IM

U M

36" MINIMUM

A. FORWARD APPROACH B. PARALLEL APPROACH

4 MANEUVERING CLEARANCE IN AN ALCOVE

X>

X>15"

" M

IN

IM

U M

32" MINIMUM

" M

IN

IM

U M

A. FRONT APPROACH

32" MINIMUM

" M

IN

IM

U M

B. POCKET OR HINGE APPROACH

22"

MINIMUM

32" MINIMUM

C. STOP OR LATCH APPROACH

" M

IN

IM

U M

24"

MINIMUM

5 SLIDING DOOR APPROACH

6 WHEELCHAIR TURNING RADIUS

60" MINIMUM

" M

IN

IM

U M

7 CLEAR FLOOR GROUND SPACE

30" MINIMUM

" M

IN

IM

U M

SPACE NEEDED TO

TURN A WHEELCHAIR

8 T-SHAPED TURNING SPACE

60" MINIMUM

" M

IN

IM

U M

M

IN

IM

U

M 60 " M

IN

IM

U M

60" MINIMUM12"

MIN.

12"

MIN.

BASE

AR

M

AR

M

42" MINIMUM 36" MINIMUM

" M

IN

IM

U M

ACCESSIBLE PATH OF TRAVEL

A. CLEARANCES FOR SEATING

9 MINIMUM CLEARANCES FOR SEATING & TABLES

60" MINIMUM 19"

MINIMUM

B. CLEARANCES FOR TABLES

ACCESSIBLE PATH OF TRAVEL

" M

IN

IM

U M

30" MINIMUM

" M

IN

IM

U M

GI-040

ACCESSIBILITY STANDARDS

RAC, JFB

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784

11" MINIMUM

" M

IN

IM

U M

8" MINIMUM

25" MAXIMUM

9" M

IN

IM

U M

" M

IN

IM

U M

1 KNEE CLEARANCE

A. ELEVATION B. PLAN

2 TOE CLEARANCE

6"

MINIMUM

17"-25"

9"

" M

IN

IM

U M

A. ELEVATION B. PLAN

" M

AX

IM

U M

10"

MAXIMUM

" M

AX

IM

U M

3 OBSTRUCTED HIGH SIDE REACH

A

" M

AX

IM

U M

X>10"-24" MAXIMUM

" M

AX

IM

U M

B

4 UNOBSTRUCTED SIDE REACH

10"

MAXIMUM

" M

AX

IM

U M

" M

IN

IM

U M

" M

IN

IM

U M

M

IN

IM

U

M

" M

IN

IM

U M

M

IN

IM

U

M

48" MINIMUM 24" MAXIMUM24" MAXIMUM

5 CLEAR WIDTH OF AN ACCESSIBLE ROUTE

6 OBSTRUCTED HIGH FORWARD REACH

" M

AX

IM

U M

20" MAXIMUM

A

" M

AX

IM

U M

20"-25" MAXIMUM

7 UNOBSTRUCTED FORWARD REACH

" M

AX

IM

U M

" M

IN

IM

U M

A. PULL SIDE C. PUSH SIDE, DOOR PROVIDED

WITH BOTH CLOSER AND LATCHB. PUSH SIDE

8 MANEUVERING CLEARANCES AT RECESSED DOORS AND GATES

32" MINIMUM

" M

IN

IM

U M

X> 8"

32" MINIMUM

" M

IN

IM

U M

X> 8"

12" MINIMUM

32" MINIMUM

" M

IN

IM

U M

X> 8"

18" MINIMUM

GI-041

ACCESSIBILITY STANDARDS

RAC, JFB

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784

5 MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS

1 PASS THRU COUNTER AREAS

40" MINIMUM

2 DINING AND WORK SURFACES

36" MINIMUM

" M

IN

IM

U M

" M

AX

IM

U M

17"-25"

" M

IN

IM

U M

" M

AX

IM

U M

3 DEPTH OF WHEELCHAIR SPACES

" M

IN

IM

U M

A. FRONT OR REAR ENTRY B. SIDE ENTRY

" M

IN

IM

U M

4 WIDTH OF WHEELCHAIR SPACES

A. SINGLE SPACE B. TWO SPACES

36" MINIMUM 33" MINIMUM 33" MINIMUM

C. FRONT APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

K. LATCH APPROACH, PUSH SIDE,

DOOR PROVIDED WITH CLOSER

F. HINGE APPROACH, PUSH SIDE

" M

IN

IM

U M

12" MINIMUM

" M

IN

IM

U M

22"

MINIMUM

" M

IN

IM

U M

24"

MINIMUM

J. LATCH APPROACH, PUSH SIDE

" M

IN

IM

U M

24"

MINIMUM

B. FRONT APPROACH, PUSH SIDE

" M

IN

IM

U M

A. FRONT APPROACH, PULL SIDE

" M

IN

IM

U M

18" MINIMUM

D. HINGE APPROACH, PULL SIDE

" M

IN

IM

U M

36" MINIMUM

H. LATCH APPROACH, PULL SIDE

" M

IN

IM

U M

24"

MINIMUM

G. HINGE APPROACH, PUSH SIDE,

DOOR PROVIDED WITH BOTH

CLOSER AND LATCH

" M

IN

IM

U M

22"

MINIMUM

I. LATCH APPROACH, PULL SIDE,

DOOR PROVIDED WITH CLOSER

" M

IN

IM

U M

24"

MINIMUM

E. HINGE APPROACH, PULL SIDE

" M

IN

IM

U M

42" MINIMUM

GI-042

ACCESSIBILITY STANDARDS

RAC, JFB

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

589A4-21-700

1/25/2022

100% CONSTRUCTION

DOCUMENT

EHRM Infrastructure Upgrades - Columbia, MO

800 HOSPITAL DRIVE

COLUMBIA, MO 65201

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

1/25/2022 8718 Botts Lane Phone: (210) 816-4784

1 1/4" MINIMUM

2" MAXIMUM

2 1 /4"

2 1/4"

4 HANDRAILS

A) CIRCULAR CROSS SECTION B) NON-CIRCULAR CROSS SECTION

PERIMETER

DIMENSION

4" MINIMUM

6 1/4" MAXIMUM

1/

2" M

IN

IM

U M

1 1/2" MINIMUM

C) HANDRAIL CLEARANCES

7 CHANGES IN LEVEL

1/ 4"

M

AX

IM

U

M

A) VERTICAL CHANGE IN LEVEL

B) BEVELED CHANGE IN LEVEL

1/4" MAXIMUM

1/4" MAXIMUM

1/ 2"

M

AX

IM

U

M

11" MIN.

4"

7"

1/2" RADIUS

A) RADIUS OF TREAD EDGE

(TYPICAL FOR ALL DETAILS)

B) ANGLED RISER

4"

7"

C) CURVED NOSING

1 1/2" MAX.11"

11"

4"

7"

D) BEVELED NOSING

1 1/2" MAX.11"

4"

7"

3 STAIR NOSINGS1 TOP AND BOTTOM HANDRAIL EXTENSIONS AT RAMPS

8"

12" MIN.

8"

X X

2 HANDRAIL EXTENSIONS AT STAIRS

A. BOTTOM HANDRAIL

EXTENSION

B. TOP HANDRAIL

EXTENSION

X = TREAD DEPTH

12" MIN. 12" MIN.

" M

AX

IM

U M

" M

AX

IM

U M

8"

X

4"

8"

8"

5 VERTICAL CLEARANCE

M

AX

IM

U

M X

PROVIDE GUARD OR BARRIER WHERE

VERTICAL CLEARANCE IS LESS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .