This document outlines a federal contract opportunity for infrastructure upgrades construction. The solicitation number is 36C77622R0069 from the Department of Veterans Affairs Technology Acquisition Center Austin. The contractor will be required to provide all labor, project management, materials, tools, supplies, and equipment as drawn in the specifications for the EHRM Infrastructure Upgrades Construction project located in Columbia, Missouri. The name of the opportunity is Y1DZ--589A4-21-700 EHRM Infrastructure Upgrades Construction Columbia, MO. The type of opportunity listed is a solicitation.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
EHRM INFRASTRUCTURE UPGRADES - COLUMBIA, MO
PROJECT # 589A4-21-700
GI-000
COVER SHEET
IAR
PROJECT MANAGEMENT,
ARCHITECTURE, & TECHNOLOGY
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
SECURITY & MEP
6 S. Old Orchard Ave.
Webster Groves, MO 63119
Phone: 314-918-8383 www.rossbar.com
IAR, JFB
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O S
EP
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
GI-010
INDEX OF DRAWINGS
RACIAR, JFB
ARCHITECTURAL
GI-000 COVER
GI-010 INDEX OF DRAWINGS
GI-020 GENERAL INFORMATION, SYMBOLS & LOCATION MAP
GI-030 ABBREVIATIONS
GI-040 ACCESSIBILITY STANDARDS
GI-041 ACCESSIBILITY STANDARDS
GI-042 ACCESSIBILITY STANDARDS
GI-043 ACCESSIBILITY STANDARDS
GI-044 ACCESSIBILITY STANDARDS
AS-100-1.B FLOOR PLAN - BASEMENT - AREA 1
AS-101-1.B FLOOR PLAN - BASEMENT - AREA 2
AS-102-1.B FLOOR PLAN - BASEMENT - AREA 3 & 4
AS-103-1.B FLOOR PLAN - BASEMENT - AREA 3A & 4A
AS-104-1.B FLOOR PLAN - BASEMENT - AREA 5
AS-105-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1
AS-106-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1A
AS-107-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2
AS-108-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2A
AS-109-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3 & 4
AS-110-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3A & 4A
AS-111-1.1 FLOOR PLAN - FIRST FLOOR - AREA 5
AS-112-1.2 FLOOR PLAN - SECOND FLOOR - AREA 1
AS-113-1.2 FLOOR PLAN - SECOND FLOOR - AREA 2 & 3
AS-114-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4
AS-115-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4A
AS-116-1.2 FLOOR PLAN - SECOND FLOOR - AREA 5
AS-117-1.3 FLOOR PLAN - THIRD FLOOR - AREA 0
AS-118-1.3 FLOOR PLAN - THIRD FLOOR - AREA 1
AS-119-1.3 FLOOR PLAN - THIRD FLOOR - AREA 2 & 3
AS-120-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4
AS-121-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4A
AS-122-1.3 FLOOR PLAN - THIRD FLOOR - AREA 5
AS-125-1.4 FLOOR PLAN - FOURTH FLOOR - AREA 4
AS-126-1.5 FLOOR PLAN - FIFTH FLOOR
AS-127-1.6 FLOOR PLAN - SIXTH FLOOR
AS-128-14.0 FLOOR PLAN - BASEMENT
AS-129-22.0 FLOOR PLAN
AS-130 INFECTION CONTROL PLANS
AS-131 INFECTION CONTROL PLANS
AS-132 INFECTION CONTROL PLANS
AS-200-1.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM E006
AS-201-1.B ENLARGED FLOOR PLAN - BASEMENT - ROOM A060
AS-202-1.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM G050
AS-210-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM B144A
AS-211-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM E139
AS-212-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM C105
AS-213-1.1 ENLARGED FLOOR PLAN - FIRST FLOOR - TELECOM G141
AS-220-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - TELECOM A217
AS-221-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - TELECOM E203
AS-222-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - DATA CENTER D216 - DEMO
AS-223-1.2 ENLARGED FLOOR PLAN - SECOND FLOOR - DATA CENTER D216 - RENO
AS-230-1.3 ENLARGED FLOOR PLAN - THIRD FLOOR - TELECOM A306A
AS-250-1.5 ENLARGED FLOOR PLAN - FIFTH FLOOR - TELECOM 551
AS-260-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT
AS-261-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT
AS-262-1 ENLARGED FLOOR PLAN - DUMBWAITER SHAFT
AS-270-1-6 ENLARGED FLOOR PLAN - SIXTH FLOOR - TELECOM 650
AS-300-14.B ENLARGED FLOOR PLAN - BASEMENT - TELECOM W05B
AS-310 ROOF PLAN
AS-400 INTERIOR ELEVATIONS
AS-500 DOOR SCHEDULE, DOOR & FRAME TYPES
AS-700 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE
AS-710 DOOR & MISCELLANEOUS DETAILS
AS-720 PARTITION TYPES
TECHNOLOGY
T-001 TELECOMMUNICATIONS GENERAL INFORMATION
T-002 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX
TD-100-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 1
TD-101-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 2
TD-102-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 3 & 4
TD-103-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 3A & 4A
TD-104-1.B BASEMENT - TECHNOLOGY DEMO PLAN - AREA 5
TD-105-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 1
TD-106-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 1A
TD-107-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 2
TD-108-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 2A
TD-109-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 3 & 4
TD-110-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 3A & 4A
TD-111-1.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN - AREA 5
TD-112-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 1
TD-113-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 2 & 3
TD-114-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 4
TD-115-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 4A
TD-116-1.2 SECOND FLOOR - TECHNOLOGY DEMO PLAN - AREA 5
TD-118-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 1
TD-119-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 2 & 3
TD-120-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 4
TD-121-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 4A
TD-122-1.3 THIRD FLOOR - TECHNOLOGY DEMO PLAN - AREA 5
TD-125-1.4 FOURTH FLOOR - TECHNOLOGY DEMO PLAN - AREA 4
TD-126-1.5 FIFTH FLOOR - TECHNOLOGY DEMO PLAN
TD-127-1.6 SIXTH FLOOR - TECHNOLOGY DEMO PLAN
TD-128-14.B BASEMENT FLOOR - TECHNOLOGY DEMO PLAN
TD-129-22.1 FIRST FLOOR - TECHNOLOGY DEMO PLAN
TECHNOLOGY (CONTINUED)
TN-200-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 1
TN-201-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 2
TN-202-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 3 & 4
TN-203-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 3A & 4A
TN-204-1.B BASEMENT - TECHNOLOGY FLOOR PLAN - AREA 5
TN-205-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1
TN-206-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1A
TN-207-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2
TN-208-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2A
TN-209-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 3 & 4
TN-210-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 3A & 4A
TN-211-1.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5
TN-212-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1
TN-213-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2 & 3
TN-214-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4
TN-215-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4A
TN-216-1.2 SECOND FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5
TN-218-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 1
TN-219-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 2 & 3
TN-220-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4
TN-221-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4A
TN-222-1.3 THIRD FLOOR - TECHNOLOGY FLOOR PLAN - AREA 5
TN-225-1.4 FOURTH FLOOR - TECHNOLOGY FLOOR PLAN - AREA 4
TN-226-1.5 FIFTH FLOOR - TECHNOLOGY FLOOR PLAN
TN-227-1.6 SIXTH FLOOR - TECHNOLOGY FLOOR PLAN
TN-228-14.B BASEMENT FLOOR - TECHNOLOGY FLOOR PLAN
TN-229-22.1 FIRST FLOOR - TECHNOLOGY FLOOR PLAN
TN-300-1.B BASEMENT FLOOR PLAN - FIBER OPTIC PATHWAY
TN-301-1.1 FIRST FLOOR PLAN - FIBER OPTIC PATHWAY
TN-302-1.2 SECOND FLOOR PLAN - FIBER OPTIC PATHWAY
TN-303-1.3 THIRD FLOOR PLAN - FIBER OPTIC PATHWAY
TN-304-1.4 FOURTH FLOOR PLAN - FIBER OPTIC PATHWAY
TN-305-1.5 FIFTH FLOOR PLAN - FIBER OPTIC PATHWAY
TN-306-1.6 SIXTH FLOOR PLAN - FIBER OPTIC PATHWAY
TN-307-2 FLOOR PLAN - FIBER OPTIC PATHWAY - ROOMS K007 & K136
TN-310-1.B BASEMENT FLOOR PLAN - GROUNDING PATHWAY
TN-311-1.1 FIRST FLOOR PLAN - GROUNDING PATHWAY
TN-312-1.2 SECOND FLOOR PLAN - GROUNDING PATHWAY
TN-313-1.3 THIRD FLOOR PLAN - GROUNDING PATHWAY
TN-314-1.4 FOURTH FLOOR PLAN - GROUNDING PATHWAY
TN-315-1.5 FIFTH FLOOR PLAN - GROUNDING PATHWAY
TN-316-1.6 SIXTH FLOOR PLAN - GROUNDING PATHWAY
TN-400-1.B BASEMENT FLOOR - TR ZONE PLAN
TN-401-1.B BASEMENT FLOOR - TR LAYOUT - ROOM A060A
TN-402-1.B BASEMENT FLOOR - TR LAYOUT - ROOM E006
TN-403-1.B BASEMENT - TR LAYOUT - ROOM G050
TN-404-14.B BASEMENT FLOOR - TR LAYOUT - ROOM W05B
TN-405-1.1 FIRST FLOOR - TR ZONE PLAN
TN-406-1.1 FIRST FLOOR - TR LAYOUT - ROOM A153A
TN-407-1.1 FIRST FLOOR - TR LAYOUT - ROOM E139
TN-408-1.1 FIRST FLOOR - TR LAYOUT - ROOM B144A
TN-409-1.1 FIRST FLOOR - TR LAYOUT - ROOM G141
TN-410-1.1 FIRST FLOOR - TR LAYOUT - ROOM C105
TN-411-1.2 SECOND FLOOR - TR ZONE PLAN
TN-412-1.2 SECOND FLOOR - TR LAYOUT - ROOM A217
TN-413-1.2 SECOND FLOOR - TR LAYOUT - ROOM E203
TN-414-1.3 THIRD FLOOR - TR ZONE PLAN
TN-415-1.3 THIRD FLOOR - TR LAYOUT - ROOM C358C
TN-416-1.3 THIRD FLOOR - TR LAYOUT - ROOM C316
TN-417-1.3 THIRD FLOOR - TR LAYOUT - ROOM E326
TN-418-1.3 THIRD FLOOR - TR LAYOUT - ROOM A306A
TN-419-1.4 FOURTH FLOOR - TR ZONE PLAN
TN-420-1.5 FIFTH FLOOR - TR ZONE PLAN
TN-421-1.5 FIFTH FLOOR - TR LAYOUT - ROOM 551
TN-422-1.6 SIXTH FLOOR - TR ZONE PLAN
TN-423-1.6 SIXTH FLOOR - TR LAYOUT - ROOM 650
TN-424-22.1 FIRST FLOOR - TR ZONE PLAN
TN-425-1.2 BLDG. 1 - SECOND FLOOR - DATA CENTER - D216 - LAYOUT
TN-425-1.2.1 POWER ELEVATION AND SCHEMATIC - LEVEL REDUNDANCY
TN-425-1.2.2 BLDG. 1 - SECOND FLOOR - DATA CENTER - SENSOR LAYOUT
TN-426-2.B BASEMENT - ER LAYOUT - ROOM K007
TN-430 ENLARGED PLANS - VERTICAL RISER CLOSET
TN-431 ENLARGED PLANS - VERTICAL RISER CLOSET
TN-500 TECHNOLOGY - TYPICAL DETAILS
TN-501 TECHNOLOGY - TYPICAL DETAILS
TN-600 FIBER OPTIC CABLE RISER DIAGRAM
TN-601 GROUNDING AND BONDING - RISER DIAGRAM
TN-602 METERED ENERGY DIAGRAM
TS-200-1.B BASEMENT FLOOR - SECURITY PLAN
TS-201-1.1 FIRST FLOOR - SECURITY PLAN
TS-202-1.2 SECOND FLOOR - SECURITY PLAN
TS-203-1.3 THIRD FLOOR - SECURITY PLAN
TS-204-1.4 FOURTH FLOOR - SECURITY PLAN
TS-205-1.5 FIFTH FLOOR - SECURITY PLAN
TS-206-1.6 SIXTH FLOOR - SECURITY PLAN
TS-207-2.B BASEMENT FLOOR - SECURITY PLAN
TS-400 BLDG. 1 - SECURITY TELECOM ROOM - ENLARGED PLANS
TS-401 BLDG. 1 - SECURITY TELECOM ROOM - ENLARGED PLANS
TS-500 SECURITY PLAN - TYPICAL DETAILS
MECHANICAL
MH-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MH-100-1.PB FLOOR PLAN - PARTIAL - PIPE BASEMENT - AREA 3 & 4
MH-101-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1
MH-102-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2
MH-103-1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3 & 4
MH-104-14.B FLOOR PLAN - PARTIAL - BASEMENT - WAREHOUSE
MH-105-22.B FLOOR PLAN - PARTIAL - BASEMENT - CLC
MH-110-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 1
MH-111-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 2
MH-112-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 3 & 4
MH-113-1.1 FLOOR PLAN - PARTIAL - FIRST FLOOR - AREA 3A & 4A
MH-120-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 1
MH-121-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 4
MH-122-1.2 FLOOR PLAN - PARTIAL - SECOND FLOOR - AREA 4A
MH-130-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 1
MH-131-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 2
MH-132-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 4
MH-133-1.3 FLOOR PLAN - PARTIAL - THIRD FLOOR - AREA 4A
MH-140-1.4 FLOOR PLAN - FOURTH FLOOR
MH-150-1.5 FLOOR PLAN - FIFTH FLOOR
MH-160-1.6 FLOOR PLAN - SIXTH FLOOR
MH-170-1.R ROOF PLAN
MH-300 MECHANICAL SECTIONS
MH-400-1.PB ENLARGED PLANS - PIPE BASEMENT
MH-401-1.B ENLARGED PLANS - BASEMENT
MH-410-1.1 ENLARGED PLANS - FIRST FLOOR
MH-420-1.2 ENLARGED PLANS - SECOND FLOOR 1 OF 2
MH-421-1.2 ENLARGED PLANS - SECOND FLOOR 2 OF 2
MH-430-1.3 ENLARGED PLANS - THIRD FLOOR
MH-440-1.4 ENLARGED PLANS - FOURTH FLOOR
MH-450-1.5 ENLARGED PLANS - FIFTH FLOOR
MH-460-1.6 ENLARGED PLANS - SIXTH FLOOR
MH-500 MECHANICAL DETAILS
MH-600 MECHANICAL SCHEDULES
MH-700 MECHANICAL CONTROLS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EG-100-1.PB PIPE BASEMENT - OVERALL
EG-101-1.B BASEMENT - OVERALL
EG-102-1.1 FIRST FLOOR - OVERALL
EG-103-1.2 SECOND FLOOR - OVERALL
EG-104-1.3 THIRD FLOOR - OVERALL
EG-105-1.4 FOURTH FLOOR - OVERALL
EG-106-1.5 FIFTH FLOOR - OVERALL
EG-107-1.6 SIXTH FLOOR - OVERALL
EG-108-1.R ROOF PLAN - OVERALL
EG-109-2.B COMMUNITY LIVING CENTER - OVERALL
EG-110-22.B FLOOR PLAN - BUILDING 22 - OVERALL
EP-100-1.B FLOOR PLAN - BASEMENT - AREA 1
EP-101-1.B FLOOR PLAN - BASEMENT - AREA 2
EP-102-1.B FLOOR PLAN - BASEMENT - AREA 3 & 4
EP-103-1.B FLOOR PLAN - BASEMENT - AREA 3A & 4A
EP-104-1.B FLOOR PLAN - BASEMENT - AREA 5
EP-105-14.B FLOOR PLAN - BASEMENT - WAREHOUSE
EP-110-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1
EP-111-1.1 FLOOR PLAN - FIRST FLOOR - AREA 1A
EP-112-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2
EP-113-1.1 FLOOR PLAN - FIRST FLOOR - AREA 2A
EP-114-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3 & 4
EP-115-1.1 FLOOR PLAN - FIRST FLOOR - AREA 3A & 4A
EP-116-1.1 FLOOR PLAN - FIRST FLOOR - AREA 5
EP-120-1.2 FLOOR PLAN - SECOND FLOOR - AREA 1
EP-121-1.2 FLOOR PLAN - SECOND FLOOR - AREA 2 & 3
EP-122-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4
EP-123-1.2 FLOOR PLAN - SECOND FLOOR - AREA 4A
EP-124-1.2 FLOOR PLAN - SECOND FLOOR - AREA 5
EP-130-1.3 FLOOR PLAN - THIRD FLOOR - AREA 1
EP-131-1.3 FLOOR PLAN - THIRD FLOOR - AREA 2 & 3
EP-132-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4
EP-133-1.3 FLOOR PLAN - THIRD FLOOR - AREA 4A
EP-134-1.3 FLOOR PLAN - THIRD FLOOR - AREA 5
E-400-1.B ENLARGED PLANS - ELEC ROOM E003A AND HOISTWAY
E-401-1.B ENLARGED PLANS - BASEMENT 1 OF 3
E-402-1.B ENLARGED PLANS - BASEMENT 2 OF 3
E-403-1.B ENLARGED PLANS - BASEMENT 3 OF 3
E-410-1.1 ENLARGED PLANS - FIRST FLOOR 1 OF 2
E-411-1.1 ENLARGED PLANS - FIRST FLOOR 2 OF 2
E-420-1.2 ENLARGED PLANS - SECOND FLOOR 1 OF 2
E-421-1.2 ENLARGED PLANS - SECOND FLOOR 2 OF 2
E-422-1.2 WALL ELEVATION - D216
E-430-1.3 ENLARGED PLANS - THIRD FLOOR 1 OF 2
E-431-1.3 ENLARGED PLANS - THIRD FLOOR 2 OF 2
E-440-1.4 ENLARGED PLANS - FOURTH FLOOR
E-450-1.5 ENLARGED PLANS - FIFTH FLOOR
E-460-1.6 ENLARGED PLANS - SIXTH FLOOR
E-470-2.B ENLARGED PLANS - CLC - BASEMENT
EL-500 LIGHT FIXTURE DESCRIPTIONS
EP-500 ELECTRICAL ONE-LINES AND DIAGRAMS
EP-501 ELECTRICAL ONE-LINE AND DIAGRAMS - ACA
EP-502 ELECTRICAL ONE-LINE AND DIAGRAMS - ROOM A060 & TYP EPO
EP-503 ELECTRICAL ONE-LINE AND DIAGRAMS - ATS METERING
EP-504 ELECTRICAL ONE-LINES - COMMUNITY LIVING CENTER
EP-505 ELECTRICAL ONE-LINES - D217 AND D216 DEMO
EP-506 ELECTRICAL ONE-LINES - D217 AND D216 TEMP
EP-507 ELECTRICAL ONE-LINES - D217 AND D216 NEW
EP-510 CABLE TRAY DETAILS
EP-600-1.B PANEL SCHEDULES - BASEMENT 1 OF 2
EP-601-1.B PANEL SCHEDULES - BASEMENT 2 OF 2
EP-602-1.1 PANEL SCHEDULES - FIRST FLOOR 1 OF 2
EP-603-1.1 PANEL SCHEDULES - FIRST FLOOR 2 OF 2
EP-604-1.2 PANEL SCHEDULES - SECOND FLOOR
EP-605-1.3 PANEL SCHEDULES - THIRD FLOOR 1 OF 2
EP-606-1.3 PANEL SCHEDULES - THIRD FLOOR 2 OF 2
EP-607-1.4 PANEL SCHEDULES - FOURTH FLOOR
EP-608-1.5 PANEL SCHEDULES - FIFTH FLOOR
EP-609-1.6 PANEL SCHEDULES - SIXTH FLOOR
EP-610-2.B PANEL SCHEDULES - COMMUNITY LIVING CENTER
EP-611-1.2 PANEL SCHEDULES - D216
MEP0000 EQUIPMENT DATA SCHEDULE
PLUMBING
PL-000 PLUMBING LEGENDS, SYMBOLS, AND ABBREVIATIONS
PL-101-C-1.1 PLUMBING FIRST FLOOR OVERALL
PL-102-C-1.1 PLUMBING FIRST FLOOR PLAN
PL-103-C-1.1 PLUMBING FIRST FLOOR PLAN
PL-104-C-1.2 PLUMBING SECOND FLOOR OVERALL
PL-105-C-1.2 PLUMBING SECOND FLOOR PLAN
PL-106-C-1.3 PLUMBING THIRD FLOOR OVERALL
PL-107-C-1.3 PLUMBING THIRD FLOOR PLAN
PL-401-C-1.1,2,3 PLUMBING ENLARGED PLANS
FIRE PROTECTION
FX-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FX-101-C-1.PM FIRE PROTECTION PIPE BASEMENT FLOOR PLAN
FX-102-C-1.B FIRE PROTECTION BASEMENT OVERALL
FX-103-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN
FX-104-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN
FX-105-C-1.B FIRE PROTECTION BASEMENT FLOOR PLAN
FX-106-C-1.1 FIRE PROTECTION FIRST FLOOR OVERALL
FX-107-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN
FX-108-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN
FX-109-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN
FX-110-C-1.1 FIRE PROTECTION FIRST FLOOR PLAN
FX-111-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN OVERALL
FX-112-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN
FX-113-C-1.2 FIRE PROTECTION SECOND FLOOR PLAN
FX-114-C-1.3 FIRE PROTECTION THIRD FLOOR OVERALL
FX-115-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN
FX-116-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN
FX-117-C-1.3 FIRE PROTECTION THIRD FLOOR PLAN
FX-118-C-1.5 FIRE PROTECTION FIFTH FLOOR PLAN
FX-119-C-1.6 FIRE PROTECTION SIXTH FLOOR PLAN
FX-120-C-2.B FIRE PROTECTION BASEMENT FLOOR PLAN
FX-121-C-14.B FIRE PROTECTION BASEMENT FLOOR PLAN
FX-401-C-1.B FIRE PROTECTION ENLARGED PLANS
FX-402-C-1.1 FIRE PROTECTION ENLARGED PLANS
FX-403-C-1.2 FIRE PROTECTION ENLARGED PLANS
FX-404-C-1.2 FIRE PROTECTION ENLARGED PLANS
FX-405-C-1.2 FIRE PROTECTION ENLARGED PLANS
FX-406-C-1.3 FIRE PROTECTION ENLARGED PLANS
FX-407-C-1.5,6 FIRE PROTECTION ENLARGED PLANS
FX-408-C-14.B FIRE PROTECTION ENLARGED PLANS
FX-500 FIRE PROTECTION DETAILS
INDEX OF DRAWINGS
UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED
ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.
1.
UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO
REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE
TO CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AT NO ADDITIONAL COST TO THE OWNER..
2.
NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL
INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.
3.
ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED
AND PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS
PRIOR TO THE APPLICATION OF PRIMER AND PAINT.
4.
THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE
TECHNOLOGY, ETC. WORK SCOPE AND SATISFY THAT ALL REQUIREMENTS
FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS AND CURBS,
ETC. ARE IMPLEMENTED. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS
OR DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
5.
CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING SIGNAGE
AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE PARTITIONS
6.
THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD
CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND
OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT
DOCUMENTS.
7.
THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD
CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT
ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR
SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION
BEFORE PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK
OR ANY PORTION RELATED THERE TO.
8.
ALL WORK SHALL CONFORM TO MOST CURRENT VERSION OF ALL APPLICABLE
CODES AND STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE, VA
MASTER SPECIFICATIONS, AND LATEST ADOPTED NFPA.
9.
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,
CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD
CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST
CLARIFICATION IN WRITING.
10.
WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL ,MECHANICAL, ELECTRICAL,
PLUMBING, TECHNOLOGY, ETC. ELEMENTS THAT CONFLICT WITH THE INTENDED
FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE
AND EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE
CONTRACT OFFICER.
11.
WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS
USING MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS
DO NOT EXIST, NOTIFY THE ARCHITECT FOR CLARIFICATION.
12.
CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR
FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROCESS.
PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE
ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT
ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION
CONTROL GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.
13.
14.
ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE TO BE REMOVED
PRIOR TO DEMOLITION WORK, FULLY REFURBISHED, AND REINSTALLED IN
THE NEW WALL ASSEMBLY. LOCATION TO BE VERIFIED BY COR. ITEMS MAY
INCLUDE: DOOR STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,
SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL BOXES, ELECTRIC
OUTLETS, SIGNAGE, BULLETIN BOARDS, MILLWORK, CARD READERS,
CLOCK, DATA OUTLET, PUSH BUTTON, FIRE CONTROL BOX, PHONE AND
ROOM SIGNAGE, ETC.
15.
ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING,
16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LEGAL DISPOSAL OF ALL
DEBRIS.
17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ITEMES INDICATED TO
BE SALVAGED.
18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE MAINTAINED THROUGH THE
DURATION OF CONSTRUCTION ACTIVITIES AND THE CONTRACTOR SHALL REPAIR
ANY COMPROMISE OF EXISTING FIREPROOFING.
19. ALL BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH THE DURATION OF
CONSTRUCTION.
INTERIOR ELEVATION
ELEVATION PAGE NUMBER
WALL TYPE TAGF
PATIENT ROOM
ROOM NAME
ROOM NUMBER
ROOM TITLE
1/AS-101
ELEVATION DETAIL NUMBER
DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS
INCORPORATED INTO THE SHEET TITLE.
EACH DRAWING IS NUMBERED ACCORDING TO IT'S
LOCATION ON THE SHEET. THE DRAWING TITLE
APPEARS ABOVE THE DEMARCATION LINE AND,
APPROPRIATE THE SCALE IS LOCATED BELOW THE
DEMARCATION LINE IN THE LOWER LEFT-HAND
QUADRANT OF THE KEY. THE DRAWING CAN BE
REFERENCED BACK TO IT'S ORIGINAL SHEET AND
DRAWING BY THE DRAWING REFERENCE LOCATION
IN
THE LOWER RIGHT-HAND QUADRANT.
SHEET NUMBER
DRAWING NUMBER ON SHEET BY
LOCATION
REFERENCE
DISCIPLINE REFERENCES
DRAWING NUMBERING
DRAWING REFERENCE
GENERAL NOTES
REF. 1/1-A1
BUILDING SECTION
RE: 1/AS-101
SHEET NUMBER
DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS
A
1 COLUMN GRID
NORTH ARROW
REVISION NUMBER AND EXTENT
KEYED NOTE MARK
-SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET
WHERE REFERENCE OCCURS
REVISION NUMBER - SEE
REVISION HISTORY ON THE
TITLE BLOCK OF EACH SHEET
EXTENT OF CURRENT REVISION
EXISTING TO
REMAIN
CONCRETE
EXISTING
MASONRY
BUILDING
INTERIOR
MATERIAL GRAPHICS
GYP BD
CL
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION
INDICATORS,
BUILDING, WITH BREAK
STANDARDS)
DIMENSION LINE
CENTER LINE
LOCATION MAP
GI GENERAL INFORMATION
A ARCHITECTURAL
P PLUMBING
M MECHANICAL
E ELECTRICAL
T TECHNOLOGY
PROJECT INFORMATION
2018 NFPA 101 LIFE SAFETY CODE
OCCUPANCY: Group 'I-2' Condition 2
TYPE OF CONSTRUCTION: II-A
PROJECT AREA:
HEALTHCARE, CHAPTER 19
PROTECTED, TYPE II-A, FULLY SPRINKLERED
EHRM INFRASTRUCTURE UPGRADES - HARRY S. TRUMAN MEMORIAL VETERANS' HOSPITAL
CONSTRUCTION LIMITS
CODES: 2018 IBC or later version
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR
DIMENSIONAL INFORMATION
1.
ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.
ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE
SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,
SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE
THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED
ON THIS PROJECT.
2.
EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS
SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING
CONVENTIONS.
3.
DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:
· CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH
WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO
"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH
PARTITION TYPE.
· CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.
· CENTERLINE OF OTHER FEATURES AS INDICATED.
A.
ALL DIMENSIONS ARE MEASURED FROM FACE OF PARTITION ASSEMBLY:
· FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)
AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A
"FACE OF FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT
MEASURED TO THE FACE OF APPLIED FINISH BUT RATHER TO THE
FACE OF THE CORE STRUCURE (STUD, CMU, ETC...). REFER TO THE
"PARTITION SCHEDULE" TO DETERMINE THE THICKNESS OF EACH
PARTITION TYPE.
A.
WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO
LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:
· EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT
APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.
· CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -
THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND
IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR
"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE
CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN
DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE
OF THE CEILING.
C.
WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,
ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.
ALIGN
DIMENSION, WHEN OCCURS
WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE
NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL
SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.
5.
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF MISSOURI AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR
FEDERAL FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ADA ACCESSIBILITY STANDARDS
- NFPA 101, "LIFE SAFETY CODE"
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"
- NFPA 72, "NATIONAL FIRE ALARM CODE"
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"
- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"
- INTERNATIONAL BUILDING CODE (IBC)
- INTERNATIONAL MECHANICAL CODE (IMC)
- INTERNATIONAL PLUMBING CODE (IPC)
- INTERNATIONAL ENERGY CONSERVATION CODE
NTS
N
AD-100-1.B
DISCIPLINE BUILDING FLOOR
SHEET NUMBER BUILDING NUMBER
2 HR. WALL (NEW OR EXISTING)
1 HR. WALL (NEW OR EXISTING)
GI-020
GENERAL INFORMATION,
SYMBOLS, & LOCATION MAP
IARIAR, JFB
N
PHASING PLAN
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJO
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACM ASBESTOS CONTAINING
MATERIAL
ACP ACRYLIC GLAZING
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING
JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZED
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
ARCHITECTURAL ABBREVIATIONS
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR
FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER
GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING
ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MOMOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE
OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR
FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRAME
ASSEMBLY
IWH INSTANTANEOUS WATER
HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED
DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT
HEAT RATION
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKERWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATION
CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER
FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER
INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSH BUTTON
PBD PARTICLE BOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING
WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN
DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN
DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR
SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL
BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL
PANEL TEMPERATURE OR
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSOR
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR
TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD
FINISH
TRTD TREATED
TS TENSILE STRENGTH OR
TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER
COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS
LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL
TILE
VIC VICINTY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC
COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER
CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WPR WALL PROTECTION/RAILING
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE
BOARD (INSULATION)
YD YARD
YR YEAR
GI-030
ABBREVIATIONS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784
60" MINIMUM 60" MINIMUM
A. MINIMUM CLEAR WIDTH
FOR TWO WHEELCHAIRS
B. MINIMUM CLEAR WIDTH FOR
SINGLE WHEELCHAIR
1 MINIMUM CORRIDOR WIDTH
48" MINIMUM DOOR WIDTH
" M
IN
IM
U M
W
IT
H
PA
R
TI
TI
O
N S
" M
IN
IM
U M
2 TWO HINGED DOORS IN A SERIES
A
DOOR WIDTH
" M
IN
IM
U M
W
IT
H
PA
R
TI
TI
O
N S
" M
IN
IM
U M
DOOR WIDTH
" M
IN
IM
U M
48" MINIMUM
B C
60" MINIMUM
" M
IN
IM
U M
60" MINIMUM 60" MINIMUM
A. MINIMUM TURNING SPACE B. MINIMUM CLEAR WIDTH
3 MINIMUM TURNING SPACE/CLEAR WIDTH
" M
IN
IM
U M
" M
AX
IM
U M
36" MINIMUM
A. FORWARD APPROACH B. PARALLEL APPROACH
4 MANEUVERING CLEARANCE IN AN ALCOVE
X>
X>15"
" M
IN
IM
U M
32" MINIMUM
" M
IN
IM
U M
A. FRONT APPROACH
32" MINIMUM
" M
IN
IM
U M
B. POCKET OR HINGE APPROACH
22"
MINIMUM
32" MINIMUM
C. STOP OR LATCH APPROACH
" M
IN
IM
U M
24"
MINIMUM
5 SLIDING DOOR APPROACH
6 WHEELCHAIR TURNING RADIUS
60" MINIMUM
" M
IN
IM
U M
7 CLEAR FLOOR GROUND SPACE
30" MINIMUM
" M
IN
IM
U M
SPACE NEEDED TO
TURN A WHEELCHAIR
8 T-SHAPED TURNING SPACE
60" MINIMUM
" M
IN
IM
U M
M
IN
IM
U
M 60 " M
IN
IM
U M
60" MINIMUM12"
MIN.
12"
MIN.
BASE
AR
M
AR
M
42" MINIMUM 36" MINIMUM
" M
IN
IM
U M
ACCESSIBLE PATH OF TRAVEL
A. CLEARANCES FOR SEATING
9 MINIMUM CLEARANCES FOR SEATING & TABLES
60" MINIMUM 19"
MINIMUM
B. CLEARANCES FOR TABLES
ACCESSIBLE PATH OF TRAVEL
" M
IN
IM
U M
30" MINIMUM
" M
IN
IM
U M
GI-040
ACCESSIBILITY STANDARDS
RAC, JFB
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784
11" MINIMUM
" M
IN
IM
U M
8" MINIMUM
25" MAXIMUM
9" M
IN
IM
U M
" M
IN
IM
U M
1 KNEE CLEARANCE
A. ELEVATION B. PLAN
2 TOE CLEARANCE
6"
MINIMUM
17"-25"
9"
" M
IN
IM
U M
A. ELEVATION B. PLAN
" M
AX
IM
U M
10"
MAXIMUM
" M
AX
IM
U M
3 OBSTRUCTED HIGH SIDE REACH
A
" M
AX
IM
U M
X>10"-24" MAXIMUM
" M
AX
IM
U M
B
4 UNOBSTRUCTED SIDE REACH
10"
MAXIMUM
" M
AX
IM
U M
" M
IN
IM
U M
" M
IN
IM
U M
M
IN
IM
U
M
" M
IN
IM
U M
M
IN
IM
U
M
48" MINIMUM 24" MAXIMUM24" MAXIMUM
5 CLEAR WIDTH OF AN ACCESSIBLE ROUTE
6 OBSTRUCTED HIGH FORWARD REACH
" M
AX
IM
U M
20" MAXIMUM
A
" M
AX
IM
U M
20"-25" MAXIMUM
7 UNOBSTRUCTED FORWARD REACH
" M
AX
IM
U M
" M
IN
IM
U M
A. PULL SIDE C. PUSH SIDE, DOOR PROVIDED
WITH BOTH CLOSER AND LATCHB. PUSH SIDE
8 MANEUVERING CLEARANCES AT RECESSED DOORS AND GATES
32" MINIMUM
" M
IN
IM
U M
X> 8"
32" MINIMUM
" M
IN
IM
U M
X> 8"
12" MINIMUM
32" MINIMUM
" M
IN
IM
U M
X> 8"
18" MINIMUM
GI-041
ACCESSIBILITY STANDARDS
RAC, JFB
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784
5 MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS
1 PASS THRU COUNTER AREAS
40" MINIMUM
2 DINING AND WORK SURFACES
36" MINIMUM
" M
IN
IM
U M
" M
AX
IM
U M
17"-25"
" M
IN
IM
U M
" M
AX
IM
U M
3 DEPTH OF WHEELCHAIR SPACES
" M
IN
IM
U M
A. FRONT OR REAR ENTRY B. SIDE ENTRY
" M
IN
IM
U M
4 WIDTH OF WHEELCHAIR SPACES
A. SINGLE SPACE B. TWO SPACES
36" MINIMUM 33" MINIMUM 33" MINIMUM
C. FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
K. LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
F. HINGE APPROACH, PUSH SIDE
" M
IN
IM
U M
12" MINIMUM
" M
IN
IM
U M
22"
MINIMUM
" M
IN
IM
U M
24"
MINIMUM
J. LATCH APPROACH, PUSH SIDE
" M
IN
IM
U M
24"
MINIMUM
B. FRONT APPROACH, PUSH SIDE
" M
IN
IM
U M
A. FRONT APPROACH, PULL SIDE
" M
IN
IM
U M
18" MINIMUM
D. HINGE APPROACH, PULL SIDE
" M
IN
IM
U M
36" MINIMUM
H. LATCH APPROACH, PULL SIDE
" M
IN
IM
U M
24"
MINIMUM
G. HINGE APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
" M
IN
IM
U M
22"
MINIMUM
I. LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN
IM
U M
24"
MINIMUM
E. HINGE APPROACH, PULL SIDE
" M
IN
IM
U M
42" MINIMUM
GI-042
ACCESSIBILITY STANDARDS
RAC, JFB
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
589A4-21-700
1/25/2022
100% CONSTRUCTION
DOCUMENT
EHRM Infrastructure Upgrades - Columbia, MO
800 HOSPITAL DRIVE
COLUMBIA, MO 65201
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
1/25/2022 8718 Botts Lane Phone: (210) 816-4784
1 1/4" MINIMUM
2" MAXIMUM
2 1 /4"
2 1/4"
4 HANDRAILS
A) CIRCULAR CROSS SECTION B) NON-CIRCULAR CROSS SECTION
PERIMETER
DIMENSION
4" MINIMUM
6 1/4" MAXIMUM
1/
2" M
IN
IM
U M
1 1/2" MINIMUM
C) HANDRAIL CLEARANCES
7 CHANGES IN LEVEL
1/ 4"
M
AX
IM
U
M
A) VERTICAL CHANGE IN LEVEL
B) BEVELED CHANGE IN LEVEL
1/4" MAXIMUM
1/4" MAXIMUM
1/ 2"
M
AX
IM
U
M
11" MIN.
4"
7"
1/2" RADIUS
A) RADIUS OF TREAD EDGE
(TYPICAL FOR ALL DETAILS)
B) ANGLED RISER
4"
7"
C) CURVED NOSING
1 1/2" MAX.11"
11"
4"
7"
D) BEVELED NOSING
1 1/2" MAX.11"
4"
7"
3 STAIR NOSINGS1 TOP AND BOTTOM HANDRAIL EXTENSIONS AT RAMPS
8"
12" MIN.
8"
X X
2 HANDRAIL EXTENSIONS AT STAIRS
A. BOTTOM HANDRAIL
EXTENSION
B. TOP HANDRAIL
EXTENSION
X = TREAD DEPTH
12" MIN. 12" MIN.
" M
AX
IM
U M
" M
AX
IM
U M
8"
X
4"
8"
8"
5 VERTICAL CLEARANCE
M
AX
IM
U
M X
PROVIDE GUARD OR BARRIER WHERE
VERTICAL CLEARANCE IS LESS…