This is a self-scoring matrix template for offerors responding to the FARM III RFP (FA9101-26-R-B011), an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for the Arnold Engineering Development Complex. The scoring matrix evaluates offeror qualifications across six technical categories with a maximum total score of 60 points before bonuses. Offerors must demonstrate experience in Mechanical Systems (10 subcategories including high-pressure piping, large vessels, pumps, boilers, and chillers up to 300 refrigeration tons), Electrical Systems (8 subcategories including medium and high-voltage switchgear, transformers, circuit breakers, and lightning protection), and Facility Renovations (7 elements across HVAC, fire protection, electrical, exterior, plumbing, communications, and interior finishes). Work samples must be submitted for each subcategory, with a maximum of four points per subcategory and a combined cap of 20 points across the first three categories. Offerors designate work performed by prime contractors versus teaming subcontractors, with subcontractor work samples capped at the prime's total.

The matrix includes additional scoring for Project Management and Development (up to 60 points for DoD installation construction services value) and Design (up to 20 points for single-contract design and construction services). Offerors may submit up to five CPARS/CPARS Equivalent project performance evaluations as bonus scoring, with potential double bonus multipliers if at least one CPAR submission is provided for each of the first three technical categories. All scoring is self-assessed by offerors in designated yellow cells, with calculated weighted scores applied based on multiplication factors and weight factors. The template is designed for use with the broader FARM III RFP evaluation, which addresses design-build and construction services for mechanical, electrical, instrumentation, data, control systems, and utilities supporting military testing facilities.

View the file

Other files

File Type Posted
FARM III RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_Amend 2.xlsx XLSX spreadsheet
FARM III RFP SF30 Amendment 2.pdf PDF
FARM III RFP QandA_Amend 2.pdf PDF
FARM III RFP SF1442 Atch 6_L-5 Past Performance Rating Form_Amend 2.pdf PDF
FARM III RFP SF1442 Atch 6 Section L_Amend 1.pdf PDF
FARM III RFP SF1442 Atch 6_L-3 Cross Reference Matrix_Amend 1.xlsx XLSX spreadsheet
FARM III RFP Questions and Answers.pdf PDF
FARM III RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_Amend1.xlsx XLSX spreadsheet
FARM III RFP SF30 Amendment 1.pdf PDF
FARM III Atch B RFP Questions Template.xlsx XLSX spreadsheet
FARM III RFP SF1442 Atch 1 SOW.pdf PDF
FARM III RFP SF1442 Atch 1 SOW.pdf PDF
FARM III RFP SF1442 Atch 2 Scheduled GFP.pdf PDF
FARM III RFP SF1442 Atch 3 Wage Determinations.pdf PDF
FARM III RFP SF1442 Atch 6_L-3 Cross Reference Matrix.xlsx XLSX spreadsheet
FARM III RFP SF1442 Atch 6_L-5 Past Performance Rating Form.pdf PDF
FA9101-26-R-B011 FARM III RFP Cover Letter.pdf PDF
FARM III RFP SF1442 Atch 5 SBSP.pdf PDF
FARM III RFP SF1442 Atch 6 Section L.pdf PDF
FARM III RFP SF1442 Atch 6_L-2a Work Sample Cover Sheet - Prime.pdf PDF
FARM III RFP SF1442 Atch 6_L-1 Offeror Company Information Form.pdf PDF
FARM III RFP SF1442 Atch 6_L-6 Teaming Agreement.pdf PDF
FARM III RFP SF1442.pdf PDF
FARM III RFP SF1442 Atch 4 OCI Mitigation Plan.pdf PDF
FARM III RFP SF1442 Atch 6_L-2b Work Sample Cover Sheet - Subcontract.pdf PDF
FARM III RFP SF1442 Atch 6_L-7 SBP Proposal.pdf PDF
FARM III RFP SF1442 Atch 7 Section M.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
1. Only input data into the yellow cells of the Self Score Sheet tab.
2. Please insert Offeror's name on Row 4.
3. Offeror shall fill in Column D "Offeror Self-Score Points: Work performed by Prime" and Column E "Offeror Self-Score Points: Work performed by Teaming Subcontractor" for the first 5 Categories, 3.2.2.1-3.2.2.5.
4. Sum of Work Samples submitted for each Subcategory cannot break the max allowable points (Column F must be less than or equal to Column C for each subcategory).
5. An Offeror may account for a sum of 20 points across the first three Categories: 3.2.2.1 Mechanical Systems, 3.2.2.2 Electrical Systems, and 3.2.2.3 Facility Renovations. Please note that points are referencing the value placed by the Offeror in columns D&E, not the score calculated from those entries.
6. The total number of Work Samples submitted on behalf of a Teaming Subcontractor must be less than or equal to the number of Work Samples submitted for work performed by the Prime (Cell E31 must be less than or equal to Cell D31).
7. All Offerors are to fill in the Project Management, Development, and Design Category (3.2.2.4 and 3.2.2.5) based off the projects/work samples submitted for sections 3.2.2.1-3.2.2.3.
8. All Offerors are encouraged to fill out the CPARS/CPARS Equivalent Data Submission Category (3.2.2.6), columns A-I, based off the projects/work samples submitted from Categories 3.2.2.1-3.2.2.3.
9. Offerors are allotted a maximum of five CPARS/CPARS Equivalent submissions (3.2.2.6). It is up to the Offeror to determine best score feasible with the available five submissions. Note that the number of subcontractor CPAR submissions must be less than or equal to the number of CPARs submitted for the Prime.
10. Points allotted from CPARS/CPARS Equivalent data are considered a bonus score; each entry will produce a calculated percentage bonus based off of the specific Subcategory it is associated with and the Offeror's ratings.
11. If an Offeror is able to submit at least one CPARS/CPARS Equivalent response for each of the first three Categories (3.2.2.1 Mechanical Systems, 3.2.2.2 Electrical Systems, 3.2.2.3 Facility Renovations), then the Offeror will receive a double bonus, doubling the points received for all CPAR submissions.

&"Times New Roman,Regular"FA8903-24-R-0023 Appendix L-05

Self Score Sheet

FARM III
FA9101-26-R-B011
Attachment L-4 HTRO Scoring Matrix
OFFEROR NAME: [FILL IN OFFEROR NAME HERE]
Section L ParagraphCategoryMaximum Self-Score PointsOfferor Self-Score Points: Work performed by Prime (1-4, 1-5)Offeror Self-Score Points: Work performed by Teaming Subcontractor (1-4, 1-5)Offeror Proposed Total Self-Score PointsSelf-Score Point Multiplication FactorOfferor's Initial Unweighted ScoreWeight FactorSingle Project Weighted ScoreMax Weighted ScoreOfferor's Weighted Score before Bonus
Mechanical Systems
3.2.2.1Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems:
M1Air Duct, expansion joints and control/process valves (≥ 36" Ø and 150psig)40250.0004100040000
M2High pressure duct/piping and valves (≥ 4" Ø, ≥ 4,000psig)40250.0007175070000
M3Large pressure vessels (≥ 2000psig; ≥ 10K gallons)40250.0009225090000
M4Desiccant bed air dryers (≤ 300psia and ≥ 200lb/s)40250.000375030000
M5Turning vanes for large air ducting (≥ 30ft Ø, 0.5-160psia)40250.0005125050000
M6Cooling water/raw water pumps (10,000-50,000gpm)40250.0008200080000
M7Cooling water/raw water filters/strainers, valves (control/process) and distribution lines (≥ 36” Ø)40250.0007175070000
M8Hydraulic Systems with high flow and pressure requirements (≥ 100gpm, ≥2000psig)40250.0004100040000
M9Large Steam Boilers (≥50kpph)40250.0005125050000
M10Chillers and Refrigeration equipment, project sum (≥300 refrigeration tons)40250.0006150060000
Electrical Systems
3.2.2.2Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems:
E1Medium Voltage gas insulated switchgear (≥ 1kV and ≤ 35kV)40250.0006150060000
E2Medium Voltage unit substations (≥ 1kV and ≤ 35kV)40250.0006150060000
E3Medium Voltage ducting/vaults/cables (≥ 1kV and ≤ 35kV), more than 500 linear feet40250.0006150060000
E4High Voltage ducting/vaults/cables (>35kV), more than 500 linear feet40250.0008200080000
E5High Voltage transformers (> 35kV)40250.0008200080000
E6Oil or gas circuit breakers (≥ 1000 amp and ≥ 500kV)40250.0008200080000
E7Variable frequency drives for motors (≥ 1000V)40250.0005125050000
E8Facility Wide Lightning Protection Systems (Facility ≥ 5,000SF)40250.0004100040000
Facility Renovations
3.2.2.3Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to execute a construction service contract by repairing, repair by replacing, or installing at least 5 of 7 Elements listed below:

-Facility HVAC will include at least 4 of the following items: chillers, Air Handler Units, ducting, boilers, refrigerant/refrigerant lines, condensers, and compressors -Facility Fire protection will include at least 3 of the following items: sprinkler systems, heat/smoke detectors, pull stations, fire alarm control panels, notification systems -Facility Electrical systems will include at least 4 of the following items: facility transformers, power panels, bus bars, circuit breakers/fuses, conduit/conductors, lights/wall plugs, and grounding systems -Facility Exterior components will include at least 2 of the following items: roofing systems, exterior cladding, windows/doors, and insulation -Facility Plumbing systems will include at least 2 of the following items: potable water piping/fittings, sewage piping/fittings, venting, and fixtures -Facility Communications Systems will include at least 2 of the following items: hardware replacement withing telecommunication rooms/closets, cabling within the facility, wireless network systems, public address systems, and uninterruptible power supplies (UPS) -Interior Finishes will include at least 3 of the following items: finished flooring, drywall (or other typical wall material) installation/repair, painting, wall paper/coverings, suspended ceiling systems, and systems furniture 5 0 250.00 0 7 1750 8750 0

Total Sum of Self-Score Points Selected for Mechanical Systems, Electrical Systems, and Facility Renovation cannot be greater than 20.
Total Sum of Teaming Subcontractor Points (Cell E31) cannot be greater than Total Sum of the Prime's Points (Cell D31).Total Self-Score Points000
Project Management, Development, and DesignAcceptable Input (1-60/1-20)
3.2.2.4Total dollar value of construction services projects supporting DoD Installations.60016.67035030000
3.2.2.5Total number of design and construction services on a single contract/TO.20050.000315030000

Offeror is only to input data into the yellow cells.

Offeror's Weighted Score Before CPARS Bonus (Column J Sum)0
Offeror's Bonus Score based off CPARS Data (CPARS Sections Below)0
Did Offeror Receive "CPAR For All Categories" Bonus, Points AwardedNo0
Offeror's Final Self Score0
Government-Validated Score
3.2.2.6CPARS/CPARS Equivalent Data Submission
Project 1Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
0Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%
Project 2Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
0Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%
Project 3Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
0Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%
Project 4Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
0Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%
Project 5Contract TitleSubsection Associated with ProjectQualityManagementCost ControlSmall Business SubcontractingRegulatory ComplianceScheduleTotal Score from Provided Ratings
YearWS Number/Project TitleSelect from Dropdown
0.00
0.00
0.00
0.00
0.00
0Average0.00
Project Details from Above SubsectionsUnweighted ScoreWeighted ScoreBonus Awarded0%

Sheet1

CPAR RatingsAssociated ScoreSubsectionsCPARS Criteria SelectedCPARS Potential CriteriaCheck
Exceptional50M100M1000
Very Good40M200M2000
Satisfactory20M300M3000
Marginal0M400M4000
Unsatisfactory-5M500M5000
N/A0M6M6000
""0M7M7000
M8M8000
M9M9000
M10M10000
E1E1000
E2E2000
E3E3000
E4E4000
E5E5000
E6E6000
E7E7000
E8E8000