This is an instruction document for the Cross Reference Matrix submission template for the FARM III RFP (FA9101-26-R-B011), a competitive multiple-award IDIQ contract for the Arnold Engineering Development Complex. The matrix serves as a tool for offerors to document and cross-reference up to 20 work samples against evaluation criteria, with each work sample limited to a single PDF submission with appropriate cover sheets.

The Cross Reference Matrix requires offerors to populate specific columns documenting work sample qualifications, including project completion status or percentage complete as of April 2026, prime or subcontractor designation, and detailed references to supporting documentation in Volume II. Offerors must map each work sample against scoring criteria categories: Mechanical Systems (M1-M10), Electrical Systems (E1-E8), and Facility Renovations (FR). For facility renovation work, offerors must demonstrate that at least five of seven facility elements (HVAC, fire protection, electrical systems, exterior components, plumbing systems, communication systems, and interior finishes) were addressed across 20,000 square feet of facility space to earn scoring points. Additional scoring criteria include DoD installation project value (1 point for $100K-$11M, 2 points for >$11M-$31M, and 3 points for >$31M), design/build contract designation, and submission of CPARS or CPARS equivalent performance data. All work samples must be completed within the last five years or at least 75 percent complete as of April 2026, with prime contractor work samples or subcontractor work samples accompanied by completed Attachment L-6 documentation.

View the file

Other files

File Type Posted
FARM III RFP SF1442 Atch 6_L-5 Past Performance Rating Form_Amend 2.pdf PDF
FARM III RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_Amend 2.xlsx XLSX spreadsheet
FARM III RFP SF30 Amendment 2.pdf PDF
FARM III RFP QandA_Amend 2.pdf PDF
FARM III RFP SF30 Amendment 1.pdf PDF
FARM III RFP SF1442 Atch 6 Section L_Amend 1.pdf PDF
FARM III RFP SF1442 Atch 6_L-3 Cross Reference Matrix_Amend 1.xlsx XLSX spreadsheet
FARM III RFP Questions and Answers.pdf PDF
FARM III RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_Amend1.xlsx XLSX spreadsheet
FARM III Atch B RFP Questions Template.xlsx XLSX spreadsheet
FARM III RFP SF1442 Atch 1 SOW.pdf PDF
FARM III RFP SF1442.pdf PDF
FARM III RFP SF1442 Atch 4 OCI Mitigation Plan.pdf PDF
FARM III RFP SF1442 Atch 6_L-2b Work Sample Cover Sheet - Subcontract.pdf PDF
FARM III RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix.xlsx XLSX spreadsheet
FARM III RFP SF1442 Atch 6_L-7 SBP Proposal.pdf PDF
FARM III RFP SF1442 Atch 7 Section M.pdf PDF
FARM III RFP SF1442 Atch 1 SOW.pdf PDF
FARM III RFP SF1442 Atch 2 Scheduled GFP.pdf PDF
FARM III RFP SF1442 Atch 3 Wage Determinations.pdf PDF
FARM III RFP SF1442 Atch 6_L-5 Past Performance Rating Form.pdf PDF
FA9101-26-R-B011 FARM III RFP Cover Letter.pdf PDF
FARM III RFP SF1442 Atch 5 SBSP.pdf PDF
FARM III RFP SF1442 Atch 6 Section L.pdf PDF
FARM III RFP SF1442 Atch 6_L-2a Work Sample Cover Sheet - Prime.pdf PDF
FARM III RFP SF1442 Atch 6_L-1 Offeror Company Information Form.pdf PDF
FARM III RFP SF1442 Atch 6_L-6 Teaming Agreement.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
General GuidanceThere should be no more than 20 Work Samples (WS) submitted, all in a single PDF (Volume II-Work Sample Evaluation Documentation) and each WS starting with the appropriate cover sheet. The Cross Reference Matrix will be used to highlight which Subcategories/Elements a WS is being applied to. Ensure the Offeror's name is entered on Row 4 of the Cross Reference Matrix.
ReferenceDocument Type (Examples include but not limited to: Award document, Statement of Work (SOW), Performance Work Statement (PWS), Contract Data Requirements List (CDRL), etc.), Page number, Paragraph, Table Number (if applicable), Block (if applicable), Contractor Performance Assessment Reporting System (CPARS) and Contracting Officer (CO) statement for subs, or Statements of Fact (SoF)). *Document information only, no additional narratives.
Columns B - C
1WS Qualification Criteria Column B: Note the status of the WS by listing project completion date or percentage complete as of April 2026.
2WS Qualification Criteria Column C: Note whether the WS is a Prime or Subcontractor WS
3Reference: Include the Volume II PDF page number(s) where it shows that qualification criteria is clearly met, along with other pertinent information to help reviewers confirm that the WS meets the given criteria.
4Reference Examples: Vol II pg(s) X-XX, Final Billing Statement; Vol II pg(s) X-XX, March 2026 invoice; Vol II pg XXX, Atch L-6
Columns E - AC
1Scoring Criteria: Note, with an "X", each column where the WS is being submitted for that particular criteria (i.e. M1-M10, E1-E8, Facility Renovation (FR) Elements).
2Reference: Include the Volume II PDF page number(s) where it shows that criteria is clearly met, along with other pertinent information to help reviewers confirm that the WS meets the given criteria.
3Reference Examples: Vol II pg(s) X-XX, SOW, para Y / Pg X; Vol II pg(s) X-XX, SoF; Vol II pg XX, Drawing YY.Y, See details and measurements
4Column AD is an automated formula, Offerors must show that they have addressed five out of the seven Facility Renovation Elements for 20,000 square feet of facility space to earn a point for that work, this column will show "N" or "Y" to confirm whether at least five of the Elements have been marked.
Column AE
1Scoring Criteria: Please note the Dollar Amount of the contract, the points earned for that dollar amount, and the Subcategories (M1-10, E1-E8, FR) the WS scored on. This section is only applicable to WS where construction services were performed on a Department of Defense (DoD) Installation.
2Scoring Criteria Example: $75M, 3pts, M2/M7/FR, Total Points=9pts
3Reference: Please include the Volume II PDF page number(s) where it shows the WS contract amount.
4Reference Example: Vol II pg X, Contract Award Document
5Scoring Criteria values found below.

Points shall be assigned on the following basis within the following ranges:

- one (1) point for every construction services WS from $100K and up to $11M

- two (2) points for every construction services WS from greater than $11M and up to $31M

- three (3) points for every construction services WS greater than $31M

In order to receive the maximum points, each of the Offeror’s WSs and accompanying support documents shall demonstrate WS values greater than or equal to $31M and construction services performed on a DoD Installation.

Column AF
1Scoring Criteria: Please note whether this WS was a Design/Build Contract and the Subcategories this WS scored on.
2Scoring Criteria Example: Y, M2/E5/FR or N
3Reference: Please include the Volume II PDF page number(s) where it shows the WS contract type.
4Reference Example: Vol II pg X, SOW
Column AG
1Scoring Criteria: Please note whether CPARS/CPARS Equivalent data was submitted for this WS and the Subcategories it was submitted for.
2Scoring Criteria Example: Y, M2/E5/FR or N
3Reference: Please include the Volume II PDF page number(s) where it shows the CPARS/CPARS equivalent data
4Reference Example: Vol II pg X, SOW

Primary

FARM III
FA9101-26-R-B011
Attachment L-3 Cross Reference Matrix
OFFEROR NAME: [FILL IN OFFEROR NAME HERE]
CategoryMechanical SystemsElectrical SystemsFacility Renovations (FR)DoD Installation ProjectsDesign and Build EffortsCPARS/CPARS Equivalent
Does your Work Sample (WS) qualify IAW L-3.2.1.2?Section L Paragraph3.2.2.1
Does your WS meet the criteria for any of these Mechanical System Subcategories described on the HTRO Scoring Matrix (rows M1-M10)?3.2.2.2
Does your WS meet the criteria for any of these Electrical System Subcategories described on the HTRO Scoring Matrix (rows E1-E8)?3.2.2.3
Does your WS meet the criteria for at least five of the seven FR Elements described on the HTRO Scoring Matrix (3.2.2.3)?3.2.2.4
Total dollar value of the contract, the points earned for that dollar amount, and the Subcategories the WS scored on (only for WS where construction services were performed on a DoD Installation)3.2.2.5
Was this WS a Design/Build Contract?3.2.2.6

Was CPARS/CPARS Equivalent Data submitted for this WS?

Comp. w/in the last five years or at least 75% comp. as of Apr 2026?Prime WS or Sub WS with fully completed Atch L-6?SubcategoryM1M2M3M4M5M6M7M8M9M10E1E2E3E4E5E6E7E8Facility HVACFacility Fire ProtectionFacility Electrical SystemsFacility Exterior ComponentsFacility Plumbing SystemsFacility Communication SystemsInterior FinishesWere 5 out of 7 systems for 20K sf of facility space addressed?
WS 1Scoring CriteriaN
Reference
WS 2Scoring CriteriaN
Reference
WS 3Scoring CriteriaN
Reference
WS 4Scoring CriteriaN
Reference
WS 5Scoring CriteriaN
Reference
WS 6Scoring CriteriaN
Reference
WS 7Scoring CriteriaN
Reference
WS 8Scoring CriteriaN
Reference
WS 9Scoring CriteriaN
Reference
WS 10Scoring CriteriaN
Reference
WS 11Scoring CriteriaN
Reference
WS 12Scoring CriteriaN
Reference
WS 13Scoring CriteriaN
Reference
WS 14Scoring CriteriaN
Reference
WS 15Scoring CriteriaN
Reference
WS 16Scoring CriteriaN
Reference
WS 17Scoring CriteriaN
Reference
WS 18Scoring CriteriaN
Reference
WS 19Scoring CriteriaN
Reference
WS 20Scoring CriteriaN
Reference

&"-,Bold"&28DRAFT

FA8622-19-R-8133

FOPR #42

Atch 8