This is an instruction document for the Cross Reference Matrix submission template for the FARM III RFP (FA9101-26-R-B011), a competitive multiple-award IDIQ contract for the Arnold Engineering Development Complex. The matrix serves as a tool for offerors to document and cross-reference up to 20 work samples against evaluation criteria, with each work sample limited to a single PDF submission with appropriate cover sheets.
The Cross Reference Matrix requires offerors to populate specific columns documenting work sample qualifications, including project completion status or percentage complete as of April 2026, prime or subcontractor designation, and detailed references to supporting documentation in Volume II. Offerors must map each work sample against scoring criteria categories: Mechanical Systems (M1-M10), Electrical Systems (E1-E8), and Facility Renovations (FR). For facility renovation work, offerors must demonstrate that at least five of seven facility elements (HVAC, fire protection, electrical systems, exterior components, plumbing systems, communication systems, and interior finishes) were addressed across 20,000 square feet of facility space to earn scoring points. Additional scoring criteria include DoD installation project value (1 point for $100K-$11M, 2 points for >$11M-$31M, and 3 points for >$31M), design/build contract designation, and submission of CPARS or CPARS equivalent performance data. All work samples must be completed within the last five years or at least 75 percent complete as of April 2026, with prime contractor work samples or subcontractor work samples accompanied by completed Attachment L-6 documentation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| General Guidance | There should be no more than 20 Work Samples (WS) submitted, all in a single PDF (Volume II-Work Sample Evaluation Documentation) and each WS starting with the appropriate cover sheet. The Cross Reference Matrix will be used to highlight which Subcategories/Elements a WS is being applied to. Ensure the Offeror's name is entered on Row 4 of the Cross Reference Matrix. |
| Reference | Document Type (Examples include but not limited to: Award document, Statement of Work (SOW), Performance Work Statement (PWS), Contract Data Requirements List (CDRL), etc.), Page number, Paragraph, Table Number (if applicable), Block (if applicable), Contractor Performance Assessment Reporting System (CPARS) and Contracting Officer (CO) statement for subs, or Statements of Fact (SoF)). *Document information only, no additional narratives. |
| Columns B - C | |
| 1 | WS Qualification Criteria Column B: Note the status of the WS by listing project completion date or percentage complete as of April 2026. |
| 2 | WS Qualification Criteria Column C: Note whether the WS is a Prime or Subcontractor WS |
| 3 | Reference: Include the Volume II PDF page number(s) where it shows that qualification criteria is clearly met, along with other pertinent information to help reviewers confirm that the WS meets the given criteria. |
| 4 | Reference Examples: Vol II pg(s) X-XX, Final Billing Statement; Vol II pg(s) X-XX, March 2026 invoice; Vol II pg XXX, Atch L-6 |
| Columns E - AC | |
| 1 | Scoring Criteria: Note, with an "X", each column where the WS is being submitted for that particular criteria (i.e. M1-M10, E1-E8, Facility Renovation (FR) Elements). |
| 2 | Reference: Include the Volume II PDF page number(s) where it shows that criteria is clearly met, along with other pertinent information to help reviewers confirm that the WS meets the given criteria. |
| 3 | Reference Examples: Vol II pg(s) X-XX, SOW, para Y / Pg X; Vol II pg(s) X-XX, SoF; Vol II pg XX, Drawing YY.Y, See details and measurements |
| 4 | Column AD is an automated formula, Offerors must show that they have addressed five out of the seven Facility Renovation Elements for 20,000 square feet of facility space to earn a point for that work, this column will show "N" or "Y" to confirm whether at least five of the Elements have been marked. |
| Column AE | |
| 1 | Scoring Criteria: Please note the Dollar Amount of the contract, the points earned for that dollar amount, and the Subcategories (M1-10, E1-E8, FR) the WS scored on. This section is only applicable to WS where construction services were performed on a Department of Defense (DoD) Installation. |
| 2 | Scoring Criteria Example: $75M, 3pts, M2/M7/FR, Total Points=9pts |
| 3 | Reference: Please include the Volume II PDF page number(s) where it shows the WS contract amount. |
| 4 | Reference Example: Vol II pg X, Contract Award Document |
| 5 | Scoring Criteria values found below. |
Points shall be assigned on the following basis within the following ranges:
- one (1) point for every construction services WS from $100K and up to $11M
- two (2) points for every construction services WS from greater than $11M and up to $31M
- three (3) points for every construction services WS greater than $31M
In order to receive the maximum points, each of the Offeror’s WSs and accompanying support documents shall demonstrate WS values greater than or equal to $31M and construction services performed on a DoD Installation.
| Column AF | |
| 1 | Scoring Criteria: Please note whether this WS was a Design/Build Contract and the Subcategories this WS scored on. |
| 2 | Scoring Criteria Example: Y, M2/E5/FR or N |
| 3 | Reference: Please include the Volume II PDF page number(s) where it shows the WS contract type. |
| 4 | Reference Example: Vol II pg X, SOW |
| Column AG | |
| 1 | Scoring Criteria: Please note whether CPARS/CPARS Equivalent data was submitted for this WS and the Subcategories it was submitted for. |
| 2 | Scoring Criteria Example: Y, M2/E5/FR or N |
| 3 | Reference: Please include the Volume II PDF page number(s) where it shows the CPARS/CPARS equivalent data |
| 4 | Reference Example: Vol II pg X, SOW |
Primary
| FARM III |
| FA9101-26-R-B011 |
| Attachment L-3 Cross Reference Matrix |
| OFFEROR NAME: [FILL IN OFFEROR NAME HERE] |
| Category | Mechanical Systems | Electrical Systems | Facility Renovations (FR) | DoD Installation Projects | Design and Build Efforts | CPARS/CPARS Equivalent | |||||
| Does your Work Sample (WS) qualify IAW L-3.2.1.2? | Section L Paragraph | 3.2.2.1 | |||||||||
| Does your WS meet the criteria for any of these Mechanical System Subcategories described on the HTRO Scoring Matrix (rows M1-M10)? | 3.2.2.2 | ||||||||||
| Does your WS meet the criteria for any of these Electrical System Subcategories described on the HTRO Scoring Matrix (rows E1-E8)? | 3.2.2.3 | ||||||||||
| Does your WS meet the criteria for at least five of the seven FR Elements described on the HTRO Scoring Matrix (3.2.2.3)? | 3.2.2.4 | ||||||||||
| Total dollar value of the contract, the points earned for that dollar amount, and the Subcategories the WS scored on (only for WS where construction services were performed on a DoD Installation) | 3.2.2.5 | ||||||||||
| Was this WS a Design/Build Contract? | 3.2.2.6 |
Was CPARS/CPARS Equivalent Data submitted for this WS?
| Comp. w/in the last five years or at least 75% comp. as of Apr 2026? | Prime WS or Sub WS with fully completed Atch L-6? | Subcategory | M1 | M2 | M3 | M4 | M5 | M6 | M7 | M8 | M9 | M10 | E1 | E2 | E3 | E4 | E5 | E6 | E7 | E8 | Facility HVAC | Facility Fire Protection | Facility Electrical Systems | Facility Exterior Components | Facility Plumbing Systems | Facility Communication Systems | Interior Finishes | Were 5 out of 7 systems for 20K sf of facility space addressed? | |
| WS 1 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 2 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 3 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 4 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 5 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 6 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 7 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 8 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 9 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 10 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 11 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 12 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 13 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 14 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 15 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 16 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 17 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 18 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 19 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference | |||||||||||||||||||||||||||||
| WS 20 | Scoring Criteria | N | |||||||||||||||||||||||||||
| Reference |
&"-,Bold"&28DRAFT
FA8622-19-R-8133
FOPR #42
Atch 8