Factor 6 - Divisional Construction Costs.pdf

PDF 97 KB Posted

Attached to
Z2DA--REMODEL EMERGENCY DEPARTMENT FOR OBSERVATION BEDS | 570-17-210
Solicitation number
36C26121R0066
Issued by

View the file

Other files

File Type Posted
36C26121R0066 0005.docx DOCX document
36C26121R0066 0004.docx DOCX document
Site Visit Sign-in Sheet--12.1.2021.pdf PDF
Site Visit Sign-in Sheet--11.10.2021.pdf PDF
36C26121R0066--Responses to Pre-Proposal RFIs (1-17)--Complete--12.6.2021.pdf PDF
Specification 11 73 00-rev01-12.03.2021.pdf PDF
36C26121R0066 0003.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-17).pdf PDF
36C26121R0066 0002.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-10).pdf PDF
ACM Report.pdf PDF
36C26121R0066 0001.docx DOCX document
570-17-210.OPC.IFC.DWG.20210618Part-7of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-10of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-2of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-5of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-9of10.pdf PDF
REQUEST FOR INFORMATION (RFI) FORM--36C26121R0066.docx DOCX document
Factor 4 - Past Performance (Questionnaire).docx DOCX document
570-17-210.OPC.IFC.Specification.R2.20210618Part-4.pdf PDF
570-17-210.OPC.IFC.Specification.R2.20210618Part-2.pdf PDF
Factor 2 - Key Personnel Qualifications Resumes.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-3.pdf PDF
VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf PDF
General Decision Number CA20210018 10.08.2021.pdf PDF
Responsibility - Contractor Certification Regarding Safety and Environmental.pdf PDF
Site_Visit_MAP.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-1.pdf PDF
36C26121R0066_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 001 - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LABOR COSTS

MANHOURS

MANDAYS

(6)

AVERAGE

RATE

(7)

TOTAL

(8)

OTHER

DIRECT

COSTS

(9)

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$

2 01 00 10 Contractor Quality Control

(CQC)

3 01 32 16.15 Project Schedules (Small

Projects)

4 01 33 23 Shop Drawings, Product Data, and Samples

5 01 35 26 Safety Requirements -$ -$ -$ -$ -$

6 01 42 19 Reference Standards -$ -$ -$ -$ -$

7 01 45 00 Quality Control -$ -$ -$ -$ -$

8 01 45 29 Testing Laboratory Services -$ -$ -$ -$ -$

9 01 45 35 Special Inspections -$ -$ -$ -$ -$

10 01 57 19 Temporary Environmental

Controls

11 01 74 19 Construction Waste

Management

12 01 91 00 General Commissioning

Requirements

DIVISION 02 - EXISTING CONDITIONS

13 02 21 13 Site Surveys -$ -$ -$ -$ -$

14 02 41 00 Demolition -$ -$ -$ -$ -$

DIVISION 03 - CONCRETE

15 03 30 00 Cast-in-Place Concrete -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

DIVISION 05 - METALS

17 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$

18 05 21 00 Steel Joist Framing -$ -$ -$ -$ -$

19 05 31 00 Steel Decking -$ -$ -$ -$ -$

20 05 40 00 Cold-Formed Metal Framing -$ -$ -$ -$ -$

21 05 50 00 Metal Fabrications -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

22 07 01 50.19 Preparation for Re-Roofing -$ -$ -$ -$ -$

23 07 21 13 Thermal Insulation -$ -$ -$ -$ -$

24 07 22 00 Roof and Deck Insulation -$ -$ -$ -$ -$

25 07 24 00 Exterior Insulation and Finish

Systems

26 07 27 26 Fluid-Applied Membrane Air

Barrier, Vapor Permeable

27 07 40 00 Roofing and Siding Panels -$ -$ -$ -$ -$

28 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$

29 07 84 00 Firestopping -$ -$ -$ -$ -$

30 07 92 00 Joint Sealants -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

31 08 11 13 Hollow Metal Doors and

Frames

32 08 14 00 Interior Wood Doors -$ -$ -$ -$ -$

33 08 17 10 Integrated Door Assemblies -$ -$ -$ -$ -$

34 08 31 13 Access Doors and Frames -$ -$ -$ -$ -$

35 08 41 13 Aluminum-Framed Entrances and Storefronts

36 08 71 00 Door Hardware -$ -$ -$ -$ -$

37 08 71 13 Automatic Door Operators -$ -$ -$ -$ -$

38 08 80 00 Glazing -$ -$ -$ -$ -$

39 08 90 00 Louvers and Vents -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

40 09 05 16 Subsurface Preparation for

Floor Finishes

41 09 22 16 Non-Structural Metal Framing -$ -$ -$ -$ -$

42 09 29 00 Gypsum Board -$ -$ -$ -$ -$

43 09 30 13 Ceramic/Porcelain Tiling -$ -$ -$ -$ -$

44 09 51 00 Acoustical Ceilings -$ -$ -$ -$ -$

45 09 65 13 Resilient Base and Accessories -$ -$ -$ -$ -$

46 09 65 19 Resilient Tile Flooring -$ -$ -$ -$ -$

47 09 91 00 Painting -$ -$ -$ -$ -$

TOTAL

(5)

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LABOR COSTS

MANHOURS

MANDAYS

(6)

AVERAGE

RATE

(7)

TOTAL

(8)

OTHER

DIRECT

COSTS

(9)

LINE TOTAL

(10)

TOTAL

(5)

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

DIVISION 10 - SPECIALTIES

48 10 14 00 Signage -$ -$ -$ -$ -$

49 10 21 23 Cubicle Curtain Tracks -$ -$ -$ -$ -$

50 10 25 13 Patient Bed Service Walls -$ -$ -$ -$ -$

51 10 26 00 Wall and Door Protection -$ -$ -$ -$ -$

52 10 28 00 Toilet, Bath, and Laundry

Accessories

53 10 44 13 Fire Extinguisher Cabinets -$ -$ -$ -$ -$

DIVISION 12 - FURNISHINGS -$ -$ -$ -$ -$

54 12 22 16 Drapery Track and Accessories -$ -$ -$ -$ -$

55 12 34 00 Manufactured Plastic Casework -$ -$ -$ -$ -$

56 12 36 00 Countertops -$ -$ -$ -$ -$

DIVISION 13 - SPECIAL CONSTRUCTION

57 13 05 41 Seismic Restraint Requirements for Non-Structural Components

58 13 34 41 Portable and Modular Buildings -$ -$ -$ -$ -$

DIVISION 14 - CONVEYING EQUIPMENT

59 14 21 20 Temporary Elevators -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

60 21 08 00 Commissioning of Fire

Suppression System

61 21 13 13 Wet-Pipe Sprinkler Systems -$ -$ -$ -$ -$

DIVISION 22 - PLUMBING

62 22 05 11 Common Work Results for

Plumbing

63 22 07 11 Plumbing Insulation -$ -$ -$ -$ -$

64 22 08 00 Commissioning of Plumbing

Systems

65 22 11 00 Facility Water Distribution

66 22 13 00 Facility Sanitary and Vent

Piping

67 22 40 00 Plumbing Fixtures -$ -$ -$ -$ -$

68 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities

69 22 63 00 Gas Systems for Laboratory and

Healthcare Facilities

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LABOR COSTS

MANHOURS

MANDAYS

(6)

AVERAGE

RATE

(7)

TOTAL

(8)

OTHER

DIRECT

COSTS

(9)

LINE TOTAL

(10)

TOTAL

(5)

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

70 23 05 10

Common Work Results for

Boiler Plant and Steam

Generation

71 23 05 11 Common Work Results for

HVAC

72 23 05 12

General Motor Requirements for HVAC and Steam

Generation Equipment

73 23 05 41 Noise and Vibration Control for

HVAC Piping and Equipment

74 23 05 50 Variable Frequency Drives -$ -$ -$ -$ -$

75 23 05 51 Noise and Vibration Control for

Boiler Plant

76 23 05 93 Testing, Adjusting, and

Balancing for HVAC

77 23 07 11 HVAC and Boiler Plant

Insulation

78 23 08 00 Commissioning of HVAC

Systems

79 23 09 23 Direct-Digital Control System for HVAC

80 23 21 13 Hydronic Piping

81 23 22 13 Steam and Condensate Heating

Piping

82 23 25 00 HVAC Water Treatment

83 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$

DIVISION 26 - ELECTRICAL

84 26 05 11 Requirements for Electrical

Installations

85 26 05 13 Medium Voltage Cables -$ -$ -$ -$ -$

86 26 05 19 Low-Voltage Electrical Power

Conductors and Cables

87 26 05 26 Grounding and Bonding for

Electrical Systems

88 26 05 29 Hangers and Supports for

Electrical Systems

89 26 05 41 Underground Electrical

Construction

90 26 05 48 Vibration and Seismic Controls for Electrical Systems

91 26 05 53 Identification for Electrical

Systems

92 26 05 73 Overcurrent Protective Device

Coordination Study

93 26 05 74 Overcurrent Protective Device

Arc-Flash Study

94 26 08 00 Commissioning of Electrical

Systems

95 26 27 26 Wiring Devices -$ -$ -$ -$ -$

96 26 29 11 Motor Controllers -$ -$ -$ -$ -$

97 26 29 21 Enclosed Switches and Circuit

Breakers

98 26 56 00 Exterior Lighting -$ -$ -$ -$ -$

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LABOR COSTS

MANHOURS

MANDAYS

(6)

AVERAGE

RATE

(7)

TOTAL

(8)

OTHER

DIRECT

COSTS

(9)

LINE TOTAL

(10)

TOTAL

(5)

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

DIVISION 31 - EARTHWORK

99 -$ -$ -$ -$ -$

DIVISION 32 - EXTERIOR IMPROVEMENTS

100 32 31 13 Chain Link Fences and Gates -$ -$ -$ -$

DIVISION 33 - UTILITIES

101 33 10 00 Water Utilities -$ -$ -$ -$

DIVISION 34 - TRANSPORTATION

102 34 71 13 Passive Vehicle Barriers -$ 0 -$ -$ -$

Design 103 Direct Design LS -$ 0 -$ -$ -$

104 Design Support LS -$ -$ -$ -$

CLOSE-OUT DOCUMENTS

105 As-Built Drawings LS -$ -$ -$ -$

106 O&M Manuals LS -$ -$ -$ -$