CLIN 001 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$
2 01 00 10 Contractor Quality Control
(CQC)
3 01 32 16.15 Project Schedules (Small
Projects)
4 01 33 23 Shop Drawings, Product Data, and Samples
5 01 35 26 Safety Requirements -$ -$ -$ -$ -$
6 01 42 19 Reference Standards -$ -$ -$ -$ -$
7 01 45 00 Quality Control -$ -$ -$ -$ -$
8 01 45 29 Testing Laboratory Services -$ -$ -$ -$ -$
9 01 45 35 Special Inspections -$ -$ -$ -$ -$
10 01 57 19 Temporary Environmental
Controls
11 01 74 19 Construction Waste
Management
12 01 91 00 General Commissioning
Requirements
DIVISION 02 - EXISTING CONDITIONS
13 02 21 13 Site Surveys -$ -$ -$ -$ -$
14 02 41 00 Demolition -$ -$ -$ -$ -$
DIVISION 03 - CONCRETE
15 03 30 00 Cast-in-Place Concrete -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
DIVISION 05 - METALS
17 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$
18 05 21 00 Steel Joist Framing -$ -$ -$ -$ -$
19 05 31 00 Steel Decking -$ -$ -$ -$ -$
20 05 40 00 Cold-Formed Metal Framing -$ -$ -$ -$ -$
21 05 50 00 Metal Fabrications -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
22 07 01 50.19 Preparation for Re-Roofing -$ -$ -$ -$ -$
23 07 21 13 Thermal Insulation -$ -$ -$ -$ -$
24 07 22 00 Roof and Deck Insulation -$ -$ -$ -$ -$
25 07 24 00 Exterior Insulation and Finish
Systems
26 07 27 26 Fluid-Applied Membrane Air
Barrier, Vapor Permeable
27 07 40 00 Roofing and Siding Panels -$ -$ -$ -$ -$
28 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$
29 07 84 00 Firestopping -$ -$ -$ -$ -$
30 07 92 00 Joint Sealants -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
31 08 11 13 Hollow Metal Doors and
Frames
32 08 14 00 Interior Wood Doors -$ -$ -$ -$ -$
33 08 17 10 Integrated Door Assemblies -$ -$ -$ -$ -$
34 08 31 13 Access Doors and Frames -$ -$ -$ -$ -$
35 08 41 13 Aluminum-Framed Entrances and Storefronts
36 08 71 00 Door Hardware -$ -$ -$ -$ -$
37 08 71 13 Automatic Door Operators -$ -$ -$ -$ -$
38 08 80 00 Glazing -$ -$ -$ -$ -$
39 08 90 00 Louvers and Vents -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
40 09 05 16 Subsurface Preparation for
Floor Finishes
41 09 22 16 Non-Structural Metal Framing -$ -$ -$ -$ -$
42 09 29 00 Gypsum Board -$ -$ -$ -$ -$
43 09 30 13 Ceramic/Porcelain Tiling -$ -$ -$ -$ -$
44 09 51 00 Acoustical Ceilings -$ -$ -$ -$ -$
45 09 65 13 Resilient Base and Accessories -$ -$ -$ -$ -$
46 09 65 19 Resilient Tile Flooring -$ -$ -$ -$ -$
47 09 91 00 Painting -$ -$ -$ -$ -$
TOTAL
(5)
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
TOTAL
(5)
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
DIVISION 10 - SPECIALTIES
48 10 14 00 Signage -$ -$ -$ -$ -$
49 10 21 23 Cubicle Curtain Tracks -$ -$ -$ -$ -$
50 10 25 13 Patient Bed Service Walls -$ -$ -$ -$ -$
51 10 26 00 Wall and Door Protection -$ -$ -$ -$ -$
52 10 28 00 Toilet, Bath, and Laundry
Accessories
53 10 44 13 Fire Extinguisher Cabinets -$ -$ -$ -$ -$
DIVISION 12 - FURNISHINGS -$ -$ -$ -$ -$
54 12 22 16 Drapery Track and Accessories -$ -$ -$ -$ -$
55 12 34 00 Manufactured Plastic Casework -$ -$ -$ -$ -$
56 12 36 00 Countertops -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION
57 13 05 41 Seismic Restraint Requirements for Non-Structural Components
58 13 34 41 Portable and Modular Buildings -$ -$ -$ -$ -$
DIVISION 14 - CONVEYING EQUIPMENT
59 14 21 20 Temporary Elevators -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
60 21 08 00 Commissioning of Fire
Suppression System
61 21 13 13 Wet-Pipe Sprinkler Systems -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING
62 22 05 11 Common Work Results for
Plumbing
63 22 07 11 Plumbing Insulation -$ -$ -$ -$ -$
64 22 08 00 Commissioning of Plumbing
Systems
65 22 11 00 Facility Water Distribution
66 22 13 00 Facility Sanitary and Vent
Piping
67 22 40 00 Plumbing Fixtures -$ -$ -$ -$ -$
68 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
69 22 63 00 Gas Systems for Laboratory and
Healthcare Facilities
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
TOTAL
(5)
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
70 23 05 10
Common Work Results for
Boiler Plant and Steam
Generation
71 23 05 11 Common Work Results for
HVAC
72 23 05 12
General Motor Requirements for HVAC and Steam
Generation Equipment
73 23 05 41 Noise and Vibration Control for
HVAC Piping and Equipment
74 23 05 50 Variable Frequency Drives -$ -$ -$ -$ -$
75 23 05 51 Noise and Vibration Control for
Boiler Plant
76 23 05 93 Testing, Adjusting, and
Balancing for HVAC
77 23 07 11 HVAC and Boiler Plant
Insulation
78 23 08 00 Commissioning of HVAC
Systems
79 23 09 23 Direct-Digital Control System for HVAC
80 23 21 13 Hydronic Piping
81 23 22 13 Steam and Condensate Heating
Piping
82 23 25 00 HVAC Water Treatment
83 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL
84 26 05 11 Requirements for Electrical
Installations
85 26 05 13 Medium Voltage Cables -$ -$ -$ -$ -$
86 26 05 19 Low-Voltage Electrical Power
Conductors and Cables
87 26 05 26 Grounding and Bonding for
Electrical Systems
88 26 05 29 Hangers and Supports for
Electrical Systems
89 26 05 41 Underground Electrical
Construction
90 26 05 48 Vibration and Seismic Controls for Electrical Systems
91 26 05 53 Identification for Electrical
Systems
92 26 05 73 Overcurrent Protective Device
Coordination Study
93 26 05 74 Overcurrent Protective Device
Arc-Flash Study
94 26 08 00 Commissioning of Electrical
Systems
95 26 27 26 Wiring Devices -$ -$ -$ -$ -$
96 26 29 11 Motor Controllers -$ -$ -$ -$ -$
97 26 29 21 Enclosed Switches and Circuit
Breakers
98 26 56 00 Exterior Lighting -$ -$ -$ -$ -$
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
TOTAL
(5)
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
DIVISION 31 - EARTHWORK
99 -$ -$ -$ -$ -$
DIVISION 32 - EXTERIOR IMPROVEMENTS
100 32 31 13 Chain Link Fences and Gates -$ -$ -$ -$
DIVISION 33 - UTILITIES
101 33 10 00 Water Utilities -$ -$ -$ -$
DIVISION 34 - TRANSPORTATION
102 34 71 13 Passive Vehicle Barriers -$ 0 -$ -$ -$
Design 103 Direct Design LS -$ 0 -$ -$ -$
104 Design Support LS -$ -$ -$ -$
CLOSE-OUT DOCUMENTS
105 As-Built Drawings LS -$ -$ -$ -$
106 O&M Manuals LS -$ -$ -$ -$