570-17-210.OPC.IFC.DWG.20210618Part-7of10.pdf

PDF 9 MB Posted

Attached to
Z2DA--REMODEL EMERGENCY DEPARTMENT FOR OBSERVATION BEDS | 570-17-210
Solicitation number
36C26121R0066
Issued by

View the file

Other files

File Type Posted
36C26121R0066 0005.docx DOCX document
36C26121R0066 0004.docx DOCX document
Site Visit Sign-in Sheet--12.1.2021.pdf PDF
Site Visit Sign-in Sheet--11.10.2021.pdf PDF
36C26121R0066--Responses to Pre-Proposal RFIs (1-17)--Complete--12.6.2021.pdf PDF
Specification 11 73 00-rev01-12.03.2021.pdf PDF
36C26121R0066 0003.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-17).pdf PDF
36C26121R0066 0002.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-10).pdf PDF
ACM Report.pdf PDF
36C26121R0066 0001.docx DOCX document
570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-10of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-2of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-5of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-9of10.pdf PDF
Factor 6 - Divisional Construction Costs.pdf PDF
REQUEST FOR INFORMATION (RFI) FORM--36C26121R0066.docx DOCX document
Factor 4 - Past Performance (Questionnaire).docx DOCX document
570-17-210.OPC.IFC.Specification.R2.20210618Part-4.pdf PDF
570-17-210.OPC.IFC.Specification.R2.20210618Part-2.pdf PDF
Factor 2 - Key Personnel Qualifications Resumes.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-3.pdf PDF
VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf PDF
General Decision Number CA20210018 10.08.2021.pdf PDF
Responsibility - Contractor Certification Regarding Safety and Environmental.pdf PDF
Site_Visit_MAP.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-1.pdf PDF
36C26121R0066_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

4 5 65.A

A.1

B

B.1

C

D

E

INTERVENTION

(SECLUSION)

ROOM

B1C28B1C28

NEW

OBSERVATION

ROOM

B1C23B1C23

CLEAN

UTILITY

B1C52B1C52

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR

NO.4

B1C43B1C43

ELEVATOR

EQUIP

RM

B1C40B1C40

LINEN

CLOSET

B1C39B1C39

CHIEF

OF ER

B1C35B1C35

HEAD

NURSE

B1C37B1C37

EMS

CLOSET

B1C36B1C36

CORRIDOR

B1C-1B1C-1

MALE

RR

B1C33B1C33

FEMALE

RR

B1C32B1C32

NEW

OBSERVATION

ROOM

B1C34KB1C34K

NEW

NURSES

STATION

B1C34FB1C34F

ELEVATOR

S-5S-5

ELEVATOR

S-6S-6

HALL

B1C-6AB1C-6A

NEW

OBSERVATION

ROOM

B1C21B1C21

PATIENT

COMFORT

ROOM

BC127BC127

NEW

OBSERVATION

ROOM

B1C34CB1C34C

OBSERVATION/

TREATMENT

RM

B1C14B1C14

SOILED

UTILITY

B1C53B1C53

CORRIDOR

B1C-2B1C-2

HAC

BC50BC50

CORRIDOR

B1C-9B1C-9

CRASH

CART

ALCOVE

PAT TLT

B1C34JB1C34J

NEW

OBSERVATION

ROOM

B1C34EB1C34E

NEW

OBSERVATION

ROOM

B1C34GB1C34G

CORRIDOR

B1C-6B1C-6

PAT TLT

B1C25AB1C25A

NEW

NURSES

STATION

B1C34BB1C34B

NEW

STORAGE

B1C34DB1C34D

NEW

STORAGE

B1C34HB1C34H

STF TLT

BC51BC51

NEW

OBSERVATION

ROOM

BC24BC24

PAT

SHWR

B1C25BB1C25B

CLEAN

UTILITY

BC26BC26

M3155

M3155

M3155 M3155 M3155

NEW

OBSERVATION

ROOM

B1C34AB1C34A

CORRIDOR

B1C-4

635 SF

F0725M M7845

M7040

M4655

F2000

P9050

A5075 A1067 P3100

A5082 F2017M

A5109

A5109 A5200 A5090

A4995 A5140A5140 F2010M0013 A5108

A1110

M4200

M4655

A1165

F0725M M7845

A5107

M4100 A1132

M7040

A1110

A5180

P3100

A5075

A5082 F2017M

F2540 M1840 M1801 F0300

M1801 F0300

A5082

F2017M

P3100

A5075 M3150

M3150

F0300

M1840

M7845

F0725M A1110

A5107 M4100

M4200

M4655

A1165

M7040

A1110

A5180

M7845 F0725M

A1110

M7040

M4655

A1165

A5107 M4100

M4200

A1110

A5180

A1165

A5107 M4100

M4200

A1110

A5180

M7845 F0725M

M4100

A1110

M7040

M4655

A1165

A5180

M8000

A5109

P9050

A5109

A5090

A5075 P3100 A1067

A5077 F2017M

A5082

A4995

P3100 F0210M

A5075

A5082

F2010

M0013

A5108

A1110

M4200 M4100 A5107

F0725M M7845

M4655

A1165

A5180

P3100

F0725M M7845

A1110

F0210M

A5108

M0013 A1200

A5082 A5140

A5075 A1165

M4655

M7040M7040

A5180 P3100

A5075 A1165 M4655

M7040

F0725M M7845 A5107 M4100

M4200

A1110

A5108

M0013

F2010

A5140A5140

F0210M

F0500

F0505

A5075

A5082

P4700 P2000

F2000

A5075

A1067

P3100

A5082 F2017M

A5109 A5200 A5090

P9050 A5109CS200

CT050

A5082 A1012

A5075

P6350

F2020 M3072 M3070

P2000

P2451

A5075 P3100

A5082 A5107

A1132 A1132

A1132

A1132

A1132

A1200 A1200

A5030

A5077

A5077

A5082

A5140 F2010

A5200

M1801

U0001

U0001

U0001

FE

EQUIPMENT LEGEND

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:3

P

M

Q-100B

EQUIPMENT PLAN - LEVEL B - AREA B - DEDUCT

ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M PERKINS E DANIELS

ISSUED FOR

CONSTRUCTION

1/4" = 1'-0" F4

EQUIPMENT PLAN - LEVEL B - AREA B

GENERAL SHEET NOTES

1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN OPERATIONAL DURING ALL

PHASES OF CONSTRUCTION. ENSURE ADEQUATE EGRESS CLEARANCES ARE

MAINTAINED AND NOT IMPEDED DURING PHASED CONSTRUCTION.

2. SEE GENERAL SHEETS FOR VA PROJECT NOTES, INFECTION CONTROL AND LIFE

SAFETY / CODE DATA FOR ADDITIONAL INTERIM LIFE SAFETY MEASURES AND

INFORMATION.

3. SEE A-701 FOR INTERIOR WALL TYPES.

4. SEE 'IN' SERIES DRAWINGS FOR INTERIOR DESIGN AND FINISHES.

5. SEE 'AW' SERIES DRAWINGS FOR ARCHITECTURAL SIGNAGE.

6. SEE 'Q-' SERIES DRAWINGS FOR HOSPITAL EQUIPMENT AND FURNISHINGS.

7. NO DRILLING OR JACK HAMMERING ACTIVITIES ALLOWED DURING BUSINESS

HOURS.

NOT USED

JSN SCHEDULE

JSN NOMENCLATURE

FURNISHED BY /

INSTALLED BY

A1012 Telephone, Wall Mounted, 1 Line VV

A1067 Mirror, Float Glass, ADA Accessible CC

A1110 Headwall, Prefabricated, General, 1-2 bed CC

A1132 Rail, Accessory Mounting, Length As Required VC

A1165 Track, IV, Ceiling Mounted, 7 Foot CC

A1200 Lift System, Overhead, Patient Room VV

A4995 Table, Diaper Changing, Wall Mounted CC

A5030 Bench, Stall, Shower, Built In CC

A5075 Dispenser, Soap, Disposable VV

A5077 Dispenser, Hand Sanitizer, Hands-Free VV

A5082 Dispenser, Paper Towel, Sensor, Hands Free CC

A5090 Disposal, Sanitary Napkin, SS, Surface Mounted CC

A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd VV

A5108 Waste Disposal Unit, Sharps VV

A5109 Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible CC

A5110 Grab Bar, 1-1/4" Dia., SS, 2 Wall, Shower Use CC

A5140 Hook, Garment, Security CC

A5180 Track, Cubicle, Surface Mounted CC

A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd VV

CS200 Sink, SS, Single Compartment, 12x28x16 ID CC

CT050 Countertop, Stainless Steel CC

F0210M Chair, Side, Without Arms, VV

F0300 Chair, Task, Swivel, With Arms VV

F0500 Cart, Janitor's VV

F0505 Bucket, Mop, With Wringer, 26 Quart VV

F0725M Table, Occasional, Executive, Wood VV

F2000 Basket, Wastepaper, Fire Resistant VV

F2010 Basket, Wastepaper, Step-On VV

F2017M Waste Receptacle, 12 GAL CC

F2020 Can, Trash, 44 Gallon VV

F2540 Shredder, Paper, Security VV

M0013 Basket, Infectious Waste, Step-On VV

M1801 Computer, Microprocessing, w/Flat Panel Monitor VV

M1840 Printer/Copier/Fax Combination VV

M3070 Hamper, Linen, Mobile, w/Lid VV

M3072 Frame, Infectious Waste Bag w/Lid VV

M3150 Distribution System, Medication, Automatic VV

M3155 Cabinet, Inventory Management System VV

M4100 Sphygmomanometer, Aneroid, Wall Mounted VV

M4200 Otoscope/Ophthalmoscope, Wall Mounted VV

M4655 Stretcher, Mobile, CRS, 9 Position VV

M7040 Table, Overbed VV

M7415 Light, Exam, Wall Mounted CC

M7845 Monitor, Physiological, Bedside, 4 Channel VV

M8000 Shower Trolley System, Complete CC

P2000 Eyewash, Wall Mounted, Hands-Free CC

P2451 Valve, Mixing, Thermostatic, Eyewash CC

P3100 Lavatory, Vitreous China, Slab Type CC

P4700 Sink, Mop, Molded Stone CC

P6350 Sink, Flushing Rim, China CC

P8710 Utility Center, Plumbing Connection CC

P9050 Toilet, Wall Hung, Siphon Jet CC

U0001 Nurse Charting Station CC

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.

KEYNOTES

Revisions: Date:

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:3

P

M

Q-600

EQUIPMENT SCHEDULE - DEDUCT ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 E.DANIELS H.GARDINER

ISSUED FOR

CONSTRUCTION

EQUIPMENT LIST (MILSTD 1691) SHEET

JSN NAME

SECTION

NUMBER ACQ/INS DESCRIPTION P

L U

M B

IN

G

E L

E C

T R

IC

A

L

M E

D

IC

A L

G A

S

N F

P A

9)

M

IS

C E

L L

A N

E O

U S

G A

S

N O

N -M

E D

IC

A

L G

A S

M

IS

C E

L L

A N

E O

U S

A1012 Telephone, Wall Mounted, 1 Line VV Telephone, wall mounted, 1 line. N/A N/A N/A N/A N/A N/A

A1067 Mirror, Float Glass, ADA Accessible 10 28 00 CC A high quality 1/4" polished float glass mirror with a stainless steel frame. Frame holds mirror in a tilted position for accessibility and compliance with ADA requirements. Mirror has a galvanized steel back secured to frame with concealed screws with integral horizontal hanging brackets. Mirror shall be approximately 18" wide and 36" high. Other sizes are available.

N/A N/A N/A N/A N/A N/A

A1110 Headwall, Prefabricated, General, 1-2 bed 10 25 13 CC 1-2 bed, general, prefabricated headwall. Unit consists of a patient service module for general care, single or double bed type. It contains lighting, medical gases, electrical outlets, nurse call and bed bumper. Specify number and type of medical gas and electrical outlets. Size of module will vary by type and configuration of outlets.

N/A F G N/A N/A N/A

A1132 Rail, Accessory Mounting, Length As Required VC Horizontal equipment mounting rail with lock mounting devices capable of; supporting up to 75 pounds each, being repositioned, and mounting and dismounting of equipment without the use of tools (special tools may be required to unlock adapter that was previously locked to the rail). The rail must be capable of supporting medical equipment and accessories normally found in exam or patient rooms. The rail system must be capable of mounting and dismounting equipment without leaving or creating new holes in the finished surface of the wall. The rail system utilizes a series of mounting plates and adapters specific to the device being mounted to the rail. The plate and adapter rail mounting kit must be specified to match the equipment being mounted to the equipment rail.

N/A N/A N/A N/A N/A J

A1165 Track, IV, Ceiling Mounted, 7 Foot 10 21 23 CC 7 ft. ceiling mounted IV track. Unit consists of a straight thick anodized aluminum track. It includes a carrier with self locking hinge, hook for attaching bottle hanger, and an adjustable pendant. Designed for dispensing IV solutions.

N/A N/A N/A N/A N/A N/A

A1200 Lift System, Overhead, Patient Room 11 73 00 VV An overhead rail system specifically designed for patient lifting and movement for a single bed patient room. The system will consist of recessed or ceiling mounted primary and secondary rails, lift motor with rolling carriage, patient harness or seat, and a hand controller or control box with charger. System will facilitate lifting and movement of patient to and from bed to gurney, chair or other requirement. Custom design of track layout by manufacturer is essential to meet individual facility requirements.

N/A F N/A N/A N/A J

A4995 Table, Diaper Changing, Wall Mounted 10 28 00 CC Wall mounted diaper changing table for use in public restrooms. Unit is a fold down system that folds upward when not in use for minimal intrusion into the room. Changing surface is contoured and has safety belt to insure that an infant will not fall from the table. Table is designed to hold no less than 250 pounds static weight. Closed dimensions are approximately 21" H x 36" W x 5" D. Open dimensions vary according to style. One system's open dimensions are 15 " high, 32" wide and 19" deep.

N/A N/A N/A N/A N/A N/A

A5030 Bench, Stall, Shower, Built In 10 28 00 CC Shower bench; built-in. Eighteen (18) gauge stainless steel frame with anchors built-in into the wall. Size and shape as required. N/A N/A N/A N/A N/A N/A

A5075 Dispenser, Soap, Disposable 10 28 00 VV Disposable soap dispenser. One-handed dispensing operation. Designed to accommodate disposable soap cartridge and valve. N/A N/A N/A N/A N/A N/A

A5077 Dispenser, Hand Sanitizer, Hands-Free 10 28 00 VV A touch free wall-mounted hand sanitizer dispenser. For use throughout a healthcare facility. Unit does not include the sanitizing liquid. Units are battery operated.

N/A N/A N/A N/A N/A N/A

A5082 Dispenser, Paper Towel, Sensor, Hands Free 10 28 00 CC A surface mounted, sensor activated, automatic, roll paper towel dispenser. The unit dispenses a paper towel automatically only when hands are place in position below the dispenser for maximum sanitation and hygiene. May include adjustable settings for sheet length, time delay, and sensor range. Unit is battery operated or with optional AC power adapter.

N/A N/A N/A N/A N/A N/A

A5090 Disposal, Sanitary Napkin, SS, Surface Mounted 10 28 00 CC A surface mounted, satin finish stainless steel, sanitary napkin disposal. Disposal features a flip-up cover, secured to the container by a heavy duty stainless steel piano-hinge. Disposal may be secured to wall or toilet partition. For general purpose use in female toilet stalls or rooms and uni-sex toilet rooms.

N/A N/A N/A N/A N/A N/A

A5107 Dispenser, Glove, Surgical/Examination, Wall Mntd VV Examination glove dispenser box for wall mounting. Fabricated of either cold rolled steel with a white baked enamel finish, plastic or acrylic. Provided with wall bracket to facilitate mounting and demounting.

N/A N/A N/A N/A N/A N/A

A5108 Waste Disposal Unit, Sharps VV A container for collecting and transporting syringes and other sharps for decontamination and disposal. Available in 2 gallon and 8 gallon with locking rotor.

Complies with OSHA regulations for handling sharps.

N/A N/A N/A N/A N/A N/A

A5109 Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible 10 28 00 CC A 1-1/4" diameter, satin finish stainless steel, peened gripping surface, 2 wall shower, grab bar with concealed mounting flanges. Snap over flanges are provided to conceal mounting screws. A selection of mounting kits and concealed anchor devices are available from the manufacturers for different types of installations. Grab bar shall comply with barrier-free accessibility guidelines for structural strength. For typical applications in shower stalls where ADA (American's With Disabilities Act) requirements must be met.

N/A N/A N/A N/A N/A N/A

A5109 Grab Bar, 1-1/4" Dia., SS, 2 Wall, W/C Accessible 10 28 00 CC A 1-1/4" diameter, satin finish stainless steel, peened gripping surface, 2 wall toilet stall/ room, grab bar with concealed mounting flanges. Snap over flanges are provided to conceal mounting screws. A selection of mounting kits and concealed anchor devices are available from the manufacturers for different types of installations. Grab bar shall comply with barrier-free accessibility guidelines for structural strength. For typical water closet applications in toilet stalls and rooms where ADA (American's With Disabilities Act) requirements must be met.

N/A N/A N/A N/A N/A N/A

A5110 Grab Bar, 1-1/4" Dia., SS, 2 Wall, Shower Use 10 28 00 CC A 1-1/4" diameter, satin finish stainless steel, peened gripping surface, 2 wall shower, grab bar with concealed mounting flanges. Snap over flanges are provided to conceal mounting screws. A selection of mounting kits and concealed anchor devices are available from the manufacturers for different types of installations. Grab bar shall comply with barrier-free accessibility guidelines for structural strength. For typical applications in shower stalls where ADA (American's With Disabilities Act) requirements must be met.

N/A N/A N/A N/A N/A N/A

A5140 Hook, Garment, Security 10 28 00 CC Clothes hook used in patient rooms of psychiatric, drug abuse or alcohol rehab facilities. N/A N/A N/A N/A N/A N/A

A5180 Track, Cubicle, Surface Mounted 10 21 23 CC Surface mounted cubicle track, with curtain. Track constructed of thick extruded aluminum. Equipped with self lubricating carriers, beaded drop chain hooks, and flame resistant curtain. To include removable end caps. Designed to be suspended around patient areas where privacy is needed. Price listed is per foot of the track, curtains to be priced per quote.

N/A N/A N/A N/A N/A N/A

A5200 Dispenser, Toilet Tissue, SS, 2-Roll, Surface Mntd 10 21 23 VV A concealed surface mounted, double roll, satin finish stainless steel, toilet tissue dispenser. Unit accommodates two standard-core toilet tissue rolls through 5" in diameter. Spindles are chrome plated plastic with a heavy-duty internal spring and tur

N/A N/A N/A N/A N/A N/A

CS200 Sink, SS, Single Compartment, 12x28x16 ID 22 40 00 CC Single compartment stainless steel sink, drop-in, self-rimming, ledge-type, connected with a drain and provided with a mixing faucet. It shall also be provided with pre-punched fixture holes on 4" center, integral back ledge to accommodate deck-mounted fixtures, brushed/polished interior and top surfaces, and sound deadened. Recommended for use in suspended or U/C/B sink cabinets having a high plastic laminate or Chemsurf laminate countertop/work surface.

Coordinate actual outside sink dimensions with the actual clear dimension of cabinet specified to ensure that they are compatible. For general purpose use throughout the facility.

D N/A N/A N/A N/A N/A

CT050 Countertop, Stainless Steel 12 36 00 CC Stainless steel countertop (composition of heavy-gauge Type No. 304 stainless steel) having a smooth satin finish and integral 4" backsplash/curb. Also referred to as a corrosion-resistant steel work surface or work top. Available in various depths. Used in areas where excellent ease of cleaning, abrasion resistance, bacteria resistance, impact resistance, load capacity and moisture resistance, are of concern. Pricing based upon a 24" depth.

N/A N/A N/A N/A N/A N/A

F0210M Chair, Side, Without Arms, VV Upholstered side chair approximately 32" high X 19" wide X 23" deep with floor glides. Seat is non-tilting and without arms. N/A N/A N/A N/A N/A N/A

F0300 Chair, Task, Swivel, With Arms VV Task chair, approximately 34" H X 26" W X 22" D with adjustable arms and a five caster adjustable swivel base. Seat and back are foam padded and upholstered in woven fabric or vinyl

N/A N/A N/A N/A N/A N/A

F0500 Cart, Janitor's VV Janitors cart, 38" high X 66" wide X 20" deep with 25 gallon heavy duty collection bag. Accommodations for locking vault and janitorial support items (broom, dust pan, chemicals, mop and mop bucket; not included).

N/A N/A N/A N/A N/A N/A

F0505 Bucket, Mop, With Wringer, 26 Quart VV Bucket, Mop, With Wringer, 26 Quart N/A N/A N/A N/A N/A N/A

F0725M Table, Occasional, Executive, Wood VV Executive chairside table, approximately 21" high X 26" wide X 20" deep. Used as an occasional table in an executive suite. N/A N/A N/A N/A N/A N/A

F2000 Basket, Wastepaper, Fire Resistant VV Wastepaper basket, fire resistant, approximately 40 quart capacity. This unit is used to collect and temporarily store small quantities of paper refuse in patient rooms, administrative areas and nursing stations. Size and shape varies depending on the application and manufacturer selected.

N/A N/A N/A N/A N/A N/A

F2010 Basket, Wastepaper, Step-On VV Step-on wastepaper basket with inner liner and foot petal activated flip top. N/A N/A N/A N/A N/A N/A

F2017M Waste Receptacle, 12 GAL 10 28 00 CC Rectangular stainless steel waste receptacle surface mounted 12 gallon capacity. The receptacle is used to collect and temporarily store small quantities of paper refuse. Can be used in restrooms.

N/A N/A N/A N/A N/A N/A

F2020 Can, Trash, 44 Gallon VV Forty four (44) gallon trash can, 32" high X 24" diameter, with lid. Used to collect and transport refuse from a point of origin to point of disposal (example:

from soiled utility or a nursing unit to the trash compactor at housekeeping).

N/A N/A N/A N/A N/A N/A

F2540 Shredder, Paper, Security VV Paper shredder, approximately 21" high X 15" wide X 12" deep with shredding unit and waste receptacle. Security features will include cross-cut shredding. N/A A N/A N/A N/A N/A

M0013 Basket, Infectious Waste, Step-On VV Frame for an infectious waste collection bag. Made of heavy tubular stainless steel with heavy gauge welded steel platform. Adjust to hold 18" or 25" trash bags. Mounted on ball bearing casters and includes permanently mounted hinged lid. Provides means of bagging infectious waste at point of waste generation.

N/A N/A N/A N/A N/A N/A

M1801 Computer, Microprocessing, w/Flat Panel Monitor VV Desk top microprocessing computer. The unit shall consist of a central processing mini tower, flat panel monitor, keyboard, mouse and speakers. The system shall have the following minimum characteristics: a 2.8 GHz Pentium processor; 512 MB memory; 80GB hard drive; 32/48x CD-ROMDVD combo;

1.44MB network interface card; video 32 MB NVIDIA; a 18 inch flat panel monitor. The computer is used throughout the facility to input, manipulate and retrieve information.

N/A A N/A N/A N/A N/A

M1840 Printer/Copier/Fax Combination VV Multifunctional printer, fax, scanner and copier (PFC) all-in-one machine. N/A A N/A N/A N/A N/A

M3070 Hamper, Linen, Mobile, w/Lid VV Mobile linen hamper with hand or foot operated lid. Made of heavy tubular stainless steel with heavy gauge welded steel platform. Holds 25" hamper bags.

Mounted on ball bearing casters. For linen transport in hospitals and clinics.

N/A N/A N/A N/A N/A N/A

M3072 Frame, Infectious Waste Bag w/Lid VV Frame for an infectious waste collection bag. Made of heavy tubular stainless steel with heavy gauge welded steel platform. Adjust to hold 18" or 25" trash bags. Mounted on ball bearing casters and includes permanently mounted hinged lid. Provides means

N/A N/A N/A N/A N/A N/A

M3150 Distribution System, Medication, Automatic VV An automated dispensing system that provides controlled dispensing, inventory and security. Size and cost will vary dependent on number of modules selected.

B A N/A N/A N/A N/A

M3155 Cabinet, Inventory Management System VV Asset tracking of high-value consumables using RTLS. The system is customizable utilizing an assortment of cabinet options and, RTLS software. Combined with the RTLS software it creates a smart supply system with the ability to maintain an accurate view of inventory levels, usage, and status of high-value medical devices.

N/A A N/A N/A N/A T

M4100 Sphygmomanometer, Aneroid, Wall Mounted VV Aneroid sphygmomanometer. Unit is wall mounted and has large graphic dial display for easy reading from all angles. It has a 90 degree (angle) swivel and 10 degree (angle) forward tilt to reduce glare. Unit accuracy is within 1% of reading. Sturdy impact-resistant construction.

N/A N/A N/A N/A N/A N/A

M4200 Otoscope/Ophthalmoscope, Wall Mounted VV Wall mounted otoscope and ophthalmoscope. Includes 6 foot line cord and plug and accepts and includes two handles. Contains head turn-on/turn-off, built-in speculum tray and 8 foot coiled cords. Unit is designed for use in patient exam rooms.

N/A A N/A N/A N/A N/A

M4655 Stretcher, Mobile, CRS, 9 Position VV Mobile stretcher. All corrosion resistant stainless steel construction. It consists of a tubular frame with side rails, a 9-position hydraulic base with pneumatic fowler adjustment, and a 2" pad. Unit is mounted on 8" conductive casters. Designed for patient transport as well as for minor surgical procedures.

N/A N/A N/A N/A N/A N/A

M7040 Table, Overbed VV Overbed table. Adjustable height table constructed of heavy gauge steel. Mounted on 2" diameter twin swivel casters with bumper caps. Table top is constructed with a high pressure plastic laminated surface that resists chipping, scratching, and staining. It includes a vanity tray and a mirror. Table is designed for use over bed, wheelchair or large chair.

N/A N/A N/A N/A N/A N/A

M7415 Light, Exam, Wall Mounted 26 55 71 CC Wall mounted examination light. Unit features high intensity color-corrected lighting, a tungsten halogen lamp and a supporting arm with minimum reach of 45 inches. Physical dimensions refer to the retracted light; one length of the dual swing arm from the wall mount in width and depth and the combined height of the lamp head and folded arms. See manufacturer's requirements for screws and pull-out strengths for mounting. Unit may also have a center mount detachable and sterilizable control handle. The unit is used in clinical treatment rooms and hospital rooms.

N/A A N/A N/A N/A N/A

M7845 Monitor, Physiological, Bedside, 4 Channel VV 4 channel bedside physiological monitor. The unit consist of a four-channel non-fade monochrome display monitor, an alarm system and printer-recording capabilities. The monitor has color coded controls and automatic calibration. The unit displays up to four waveforms simultaneously. The parameters to be monitored are user selectable. The monitor may be connected to a central monitoring station. The unit monitors patients in most acute care areas, step-down units, procedure rooms and emergency rooms.

N/A A N/A N/A N/A D

M8000 Shower Trolley System, Complete 22 40 00 CC Shall be a hydraulically height-adjustable shower trolley for patient transfer and shower. It shall be approximately 77" long x 30" wide with minimum height adjustments range between 23 - 33". It shall have a minimum lift capacity of 330 pounds. Casters shall be a minimum of 4" with wheel locking brakes.

Shower Trolley may be configured to work manually or with a battery/electric height adjustment. The unit shall come complete with a wall panel that includes a patient shower and disinfection system, thermostatic mixer and temperature gauge and a stainless steel flush sink.

D N/A N/A N/A N/A N/A

P2000 Eyewash, Wall Mounted, Hands-Free 22 40 00 CC Wall mounted emergency eye wash station. The flow of water from the unit is activated by hand. Upon initiation of water flow the unit will operate hands free to provide streams of water to clear foreign particles or dilute caustic liquids from the eyes in emergency situations. Used in laboratories and areas of the hospital where employees are subject to foreign bodies or liquid material to the eyes.

B N/A N/A N/A N/A N/A

P2451 Valve, Mixing, Thermostatic, Eyewash 22 40 00 CC Emergency tempering valve thermostatically mixes hot and cold water to provide a safe fluid supply for a single emergency eye/face wash with a flow rate of 10 gpm (38.8L)

A N/A N/A N/A N/A N/A

P3100 Lavatory, Vitreous China, Slab Type 22 40 00 CC Wall mounted, slab type, vitreous china, lavatory (approximate bowl size 7"x15"x10") with: faucet holes on 4" centers; gooseneck spout; wrist blade handles;

and grid strainer. It shall be suitable for use in clinics, offices, washrooms or patient care area.

D N/A N/A N/A N/A N/A

P3100 Lavatory, Vitreous China, Slab Type 22 40 00 CC Wall mounted, slab type, vitreous china, lavatory (approximate bowl size 7"x15"x10") with: faucet holes on 4" centers; gooseneck spout; wrist blade handles;

and grid strainer. It shall be suitable for use in clinics, offices, washrooms or patient care area.

B N/A N/A N/A N/A N/A

P4700 Sink, Mop, Molded Stone 22 40 00 CC Mop service sink approximately 10"H x 36"W x 24"D. Also called a mop service basin and a mop receptor. Unit is made of molded stone and is a one piece item. It shall include a service faucet hose, hose bracket and mop hanger. Used in utility rooms for cleaning mops and floor cleaning equipment.

D N/A N/A N/A N/A N/A

P6350 Sink, Flushing Rim, China 22 40 00 CC Flushing rim sink approximately 18" H x 26" D x 22" W. Also called a clinic service sink. Unit is constructed of vitreous china with an integral flushing rim. It includes: faucet with a fork brace; 6 inch wrist control handles; plain end spout with bucket hook; stainless steel spring type front rim guard; and grid drain. If it is to be floor mounted, a base must be provided. Unit is used in utility rooms to clean equipment and materials.

D N/A N/A N/A N/A N/A

P8710 Utility Center, Plumbing Connection 22 40 00 CC Plumbing connection utility center, sometimes referred to as a 'GUY GRAY BOX'. This recessed utility center provides for hot and cold water connections and a drain connection at sink and other equipment locations. The utility center includes cutoff valves for the water connections, a plug seal for the drain and an outside cover to provide an aesthetic appearance when connections are no longer required. This center may be installed in locations where no plumbing fixtures are included in a design as a future flexibility device, saving many dollars for later facility modifications to incorporate sinks as functions change.

D N/A N/A N/A N/A N/A

P9050 Toilet, Wall Hung, Siphon Jet 22 40 00 CC Siphon jet water closet/ toilet. This unit is wall hung with an elongated bowl, top spud flushometer, seat with open front and check hinge, and carrier. Used in restrooms throughout the health care facility.

B N/A N/A N/A N/A N/A

U0001 Nurse Charting Station CC Modular furniture panel system; VA Interior designer to review final layout and selection of finishes N/A

Revisions: Date:

Acquisition Code Responsibility Description CC CFCI Contractor Furnished Contractor Installed.

Equipment purchased and installed by the contractor.

VC GFCI VA Furnished Contractor Installed. Equipment is provided by the Government and installed by the Contractor (used for major imaging and OR equipment).

VV GFGI VA Furnished VA Installed. Equipment purchased and installed by the Government.

L_RE Leased or Rented Other. Equipment leased or rented and installed by the Government.

R GFGI Reuse. These are existing equipment assets that will be transferred and reused and may be a relocation cost associated with them.

RESPONSIBILITY: PLUMBING:

Code Description A Hot and cold water B Cold water and drain C Hot water and drain D Cold and hot water and drain E Treated water and drain F Cold, hot and treated water and drain G Cold and treated water and drain H Hot and treated water and drain I Drain only J Cold water only

ELECTRICAL:

Code Description A 120 volt, conventional outlet B 120 volt, special outlet C 208/220 volt D 120 and 208/220 volt E 440 volt, 3 phase F Special electrical requirements

(includes, but is not limited to emergency power, multiple power connections, etc.)

G 208/220 volt, 3 phase

MEDICAL GAS:

Code Description A Oxygen B Vacuum C Air, low pressure D Air, high pressure E Oxygen and medical air H Oxygen, vacuum and medical air J Vacuum and HP air K Medical air

MISCELLANEOUS GAS:

Code Description A Steam B Nitrogen gas C Nitrous oxide D Nitrogen and nitrous oxide gas E Carbon dioxide gas F Liquid carbon dioxide G Liquid nitrogen H Instrument Air

NON-MEDICAL GAS:

Code Description A Natural gas B Liquid propane gas C Methane D Butane E Propane F Hydrogen gas G Reserved H Acetylene gas

MISCELLANEOUS:

Code Description A Earth ground B Lead lined walls C Remote alarm ground D Empty conduit with pull cord E Vent to atmosphere F Special gas requirements G Liquid gas requirements H RF/Magnetic shielding J Wall/ceiling support required K Empty conduit/pull cord & wall/ceiling support required M Earth ground and wall/ceiling support required P Lead lined walls and wall/ceiling support required T CAT 6 wire to nearest

Telecommunications Room

FIRE PROTECTION SYMBOL LEGEND

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

SECTION, ELEVATION, AND DETAIL TITLES

FX200

FX500

FX300

ELEVATION

DETAIL

SECTION

FX-100

A

FX500

A

C.P.

DISCHARGE NOZZLE

CONTROL PANEL

CLEAN AGENT FIRE SUPPRESSION

FIRE HOSE VALVE CABINET

FIRE HOSE CABINET

ALARM BELL

WATER MOTOR GONG

PENETRATION

TEST PLUG (PRESS/TEMP)

WH

PRESSURE GAUGE AND GAUGE COCK

NEW PIPE CONNECTION TO EXISTING PIPING

EXISTING PIPE TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

FLEXIBLE CONNECTION

ORIFICE UNION

FLANGED UNION

UNION

RISE IN PIPE

DROP IN PIPE

CAPPED OUTLET

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

ECCENTRIC REDUCER

REDUCER OR INCREASER

DIRECTION OF FLOW

MAV MANUAL AIR VENT (MAV)

AAV AUTOMATIC AIR VENT (AAV)

AG AIR GAP FITTING

WALL HYDRANT

POINT OF CONNECTION TO EXISTING

KEYED NOTE

SCHEMATIC SYMBOLS

ABBREVIATIONSYMBOL DESCRIPTION

XX

STANDPIPE VALVE

INSPECTOR'S TEST CONNECTION (VERTICAL)DFP

D

FP INSPECTOR'S TEST CONNECTION (HORIZONTAL)

FP WET PIPE FIRE RISERFP

(E)FDC

FDC

FLOW SWITCH

FDC (E) EXISTING FIRE DEPARTMENT INLET CONNECTION

FIRE DEPARTMENT INLET CONNECTIONFDC

FLOW CONTROL VALVE

ATMOSPHERIC VACUUM BREAKER

PRESSURE STYLE VACUUM BREAKER

DIAPHRAGM (PROCESS SYSTEMS)

OS&Y VALVE

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

WATER PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE

VALVE IN VERTICAL

REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)

DRAIN VALVE

FP ROOF MANIFOLD

AUTO BALL DRIP VALVE

DN DOWN

YH YARD HYDRANT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

BOTTOM OF PIPE

ELEVATION

FINISHED FLOOR ELEVATION

FEET

GALLONS PER MINUTE

HORSEPOWER

HEAD

INCHES

INVERT

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

NORMALLY CLOSED

NORMALLY OPEN

OUTSIDE SCREW AND YOKE

PHASE

POUNDS PER SQUARE INCH GAUGE

STATIC PRESSURE

TYPICAL

YARD BOX

AFF

AFG

BOP

EL

FFE

FT

GPM

HP

HD

IN

INV

NA

NIC

No. #

N.C.

N.O.

OS&Y

PSIG

SP

TYP

YB

PH

OR OR

OR

ABBREVIATION DESCRIPTIONSYMBOL

VALVE SYMBOLS

ABBREVIATIONS

SYMBOL DESCRIPTION

NEW PENDANT STYLE SPRINKLER HEAD

FP

SP STANDPIPE; WETSP

FP FIRE PROTECTION; WET PIPE

ABBREVIATIONSYMBOL DESCRIPTION

PIPING SYMBOLS

FIRE PROTECTION-INTERIOR

QUICK RESPONSE SPRINKLERQRS

ORDINARY GROUP 1 HAZARD

ORDINARY GROUP 2 HAZARD

OH1

OH2

DEMO PENDANT STYLE SPRINKLER HEAD

UPRIGHT STYLE SPRINKLER HEAD

DEMO UPRIGHT STYLE SPRINKLER HEAD

F.D.C.(E)FIRE DEPARTMENT INLET CONNECTION F.D.C.

REDUCED PRESSURE BACKFLOW PREVENTER

F.H.(E)F.H.

CONSTRUCTION

FIRE HYDRANT

VALVE WITH VALVE BOX

FIRE PROTECTION

POST INDICATOR VALVE

PIV PIV(E)

F F(E)

EXISTINGNEWDESCRIPTION

SITE UTILITY SYMBOLS

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

SECTION, ELEVATION, AND DETAIL SYMBOLS

FX-100

A

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

GENERAL NOTES:

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.

PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR

RATING SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.

COORDINATE THE LOCATION OF SPRINKLER HEADS AND ACCESS DOORS WITH THE ARCHITECTURAL REFLECTED

CEILING PLAN(S).

REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION PIPING WITH DUCTWORK, PIPING, PLUMBING, STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND

TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.

CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES FOR

INSTALLATION PIPING.

CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO ADEQUATELY SUPPORT FIRE PROTECTION PIPING AND EQUIPMENT IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING STRUCTURAL SYSTEM.

IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE.COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY

IDENTIFIED ON THE DRAWINGS.

1.

2.

3.

4.

5.

6.

7.

8.

THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION, ARRANGEMENT, AND SIZES OF PIPE LINES IN THE EXISTING BUILDING MAY BE DIFFERENT

FROM THAT SHOWN ON THESE DRAWINGS.

THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING SERVICES FOR REMOVALS WITH

OWNER AUTHORIZED REPRESENTATIVE AND SHALL CONFORM TO THEIR REQUIREMENTS.

DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY WHICH ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE FACILITY. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC.

FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST AND FUMES.

THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH ACCEPTABLE ROUTING AND

ACCESS FOR MATERIALS REQUIRED FOR THE NEW INSTALLATION.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED

IMMEDIATELY TO THE ARCHITECT PRIOR TO START OF WORK.

ALL NEW TO EXISTING PIPE CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO ORDERING AND FABRICATING NEW

PIPING OR FITTINGS.

1.

2.

3.

4.

5.

6.

GENERAL DEMO NOTES:

• EXISTING FIRE PROTECTION SYSTEM SHALL BE MODIFIED, AS REQUIRED, SO THAT SPRINKLER ZONES COINCIDE WITH SMOKE ZONE BOUNDARIES IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN

MANUAL CRITERIA.

• CONTRACTOR SHALL REPLACE EXISTING FIRE SPRINKLER HEAD DROPS TO SERVE THE NEW SPRINKLERS

AT THE NEW LOCATIONS.

• WHERE REQUIRED, CONTRACTOR SHALL REPLACE EXISTING FIRE PROTECTION BRANCH PIPING TO

SERVE THE NEW LOCATIONS.

• CONTRACTOR SHALL PROVIDE COMPLETE FIRE PROTECTION SYSTEM COORDINATION DRAWINGS TO ENSURE ALL REQUIRED CLEARANCES ARE MAINTAINED AND THAT NO CONFLICTS EXIST WITH ANY OTHER

MECHANICAL, PLUMBING, ELECTRICAL, COMMUNICATIONS, OR STRUCTURAL SYSTEMS.

• FIRE PROTECTION WORK SHALL BE OMITTED UNDER DEDUCT ALTERNATE 1.

FIRE PROTECTION SCOPE OF WORK:

NOT TO SCALENTS

FIRE FLOW DATA

TEST DATE:

WATER PRESSURE ZONE:

TEST ELEVATION:

TEST LOCATION:

REQUESTED LOADING:

(IF MODELED BY THE MUNICIPALITY)

XX/XX/XXXX

XX - XXXX

XXXX' MSL

XX INCH MAIN ON SITE

XXXX GPM

PEAK STATIC PRESSURE:

RESIDUAL PRESSURE:

FLOWING GPM:

(IF NOT MODELED BY THE MUNICIPALITY)

XXX.X PSI

XXX.X PSI

XXXX GPM

VA TO PROVIDE TESTING INFORMATION

PIPE RING HANGER

TOLCO FIG. 200

BAR JOIST OR

STEEL MEMBER BY

STRUCTURAL

1" MIN.

1" MIN.

SPRINKLER PIPE

PER PLAN

ALL THREAD ROD

TOLCO FIG. 100

REVERSIBLE BEAM CLAMP

(TYPICAL)

TOLCO FIG. 65

RESTRAINING STRAP

(TYPICAL)

TOLCO FIG. 69/69R

BASIS OF DESIGN IS TOLCO

FIGURE NUMBERS OR APPROVED

EQUAL.

PIPE PER PLAN PIPE RING

HANGER

TOLCO FIG. 200

ALL THREAD ROD

TOLCO FIG. 100

USE 3/8" CONCRETE INSERT

FOR UP TO 4" PIPE

USE 1/2" CONCRETE INSERT

FOR 6" AND 8" PIPE

INSERT SHALL BE PLACED

WITHIN THICKEST PORTION

OF CONCRETE DECKING,

TYPICAL

CONCRETE

DECKING

BASIS OF DESIGN IS TOLCO

FIGURE NUMBERS OR APPROVED

EQUAL.

INSERT IS NOT

PERMITTED

WITHIN DECKING

VALLEY, TYPICAL NO-THREAD

SWIVEL SWAY

BRACE

ATTACHMENT

TYP.

TOLCO FIG. 909

BASIS OF DESIGN IS TOLCO

FIGURE NUMBERS OR APPROVED

EQUAL.

"FAST CLAMP" BRANCH

LINE RESTRAINT

ATTACHMENT TYP.

TOLCO FIG. 909

BAR JOIST OR STEEL

MEMBER BY

STRUCTURAL

SPRINKLER PIPE PER

PLAN

STEEL PIPE

LATERAL

BRACE

BASIS OF DESIGN IS TOLCO

FIGURE NUMBERS OR APPROVED

EQUAL.

PIPE CLAMP

FOR SWAY

BRACING

TOLCO FIG.

4A

SPRINKLER PIPE PER

PLAN

STEEL PIPE

LATERAL

BRACE

NO-THREAD

SWIVEL SWAY

BRACE

ATTACHMENT

TYP.

TOLCO FIG. 909

SWAY BRACE

ATTACHMENT

TO STEEL

TOLCO FIG.

BAR JOIST OR STEEL

MEMBER BY

STRUCTURAL

BASIS OF DESIGN IS TOLCO

FIGURE NUMBERS OR APPROVED

EQUAL.

SWAY BRACE

ATTACHMEN

T

TOLCO FIG.

SPRINKLER PIPE PER

PLAN

STEEL PIPE

LATERAL

BRACE

NO-THREAD

SWIVEL SWAY

BRACE

ATTACHMENT

TOLCO FIG. 909

SWAY BRACE

ATTACHMENT

TO STEEL

TOLCO FIG.

BAR JOIST OR STEEL

MEMBER BY

STRUCTURAL

SPRINKLER

PIPE TO

SYSTEM PER

PLAN

O F F

D R A

IN

TEST

TEST DRAIN

VALVE

300 LB. PRESSURE

GAUGE

WATER FLOW

SWITCH

BUTTERFLY

VALVE WITH

TAMPER SWITCH

SPRINKLER

PIPE FROM

SUPPLY

PIPE UNION

TO EXISTING

DRAIN

SYSTEM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.P L

M B

.r v t

/1

/2

:2

:0

A

M

FX001

FIRE PROTECTION LEGEND

TRIPLE C The A/E Group

4401 Alantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

06/18/2021 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

NTS

F1

WIDE FLANG BEAM CLAMP

NTS

F3

DROP-IN ANCHOR

NTS

F8

4-WAY BRACE DETAIL

NTS

F5

LONGITUDINAL BRACE DETAIL

NTS

F7

LATERAL BRACE DETAIL

Revisions: Date:

NTS

E8

FLOOR CONTROL DETAIL

BOPC.6BOPC.5.ABOPC.5BOPC.4

BOPC.A

BOPC.A.1

BOPC.B

BOPC.B.1

BOPC.C

BOPC.D

BOPC.E

PATIENT COMFORT

ROOM

BC127

INTERVENTION

(SECLUSION) ROOM

B1C28

CORRIDOR

B1C-9

CORRIDOR

B1C-1

CHIEF OF ER

B1C35

HEAD NURSE

B1C37

ELEVATOR

S-6

ELEVATOR

S-5

ELEVATOR EQUIP RM

B1C40

CORRIDOR

B1C-2

STAIR NO.4

B1C43

1 11

22 2

2 2

2 1/2" FP

2 1/2" FP

2 1/2" FP

1" FP1" FP

1 1/4" FP

1" FP

1" FP

1 1/4" FP

1" FP

1" FP

1 1/4" FP

1" FP

1" FP

1" FP

1" FP

3" FP

2 1/2" FP

2 1/2" FP

1" FP

2 1/2" FP

1" FP

1" FP

1" FP

2 1/2" FP

2 1/2" FP

2 1/2" FP

1 1/4" FP

1 1/4" FP

2 1/2" FP

1" FP

1" FP

1" FP

1" FP

1" FP

1" FP

1" FP

1 1/4" FP1 1/4" FP

1 1/4" FP 1 1/4" FP 1" FP

1" FP

1" FP

1" FP 1" FP

1" FP

1" FP

1" FP

1" FP

1" FP

1 1/4" FP 1" FP

1" FP

2 1/2" FP

2 1/2" FP

2 1/2" FP

2 1/2" FP

1 1/4" FP

1 1/4" FP

1 1/4" FP 1" FP 1 1/4" FP

1" FP

1 1/4" FP 1 1/4" FP 1 1/4" FP

1 1/4" FP 1" FP

1" FP

1" FP

1" FP

1" FP

1 1/4" FP

1" FP

1" FP 1" FP

1" FP

1 1/4" FP

1" FP

1 1/4" FP

1 1/4" FP

1" FP

1" FP

1" FP

1" FP

1 1/4" FP

1" FP

1" FP 1 1/4" FP

1" FP

1 1/4" FP

1" FP

1" FP 1" FP

1 1/4" FP

1" FP

1 1/4" FP 1 1/4" FP 1 1/4" FP 1 1/4" FP 1" FP 1" FP

1" FP

1" FP

1" FP 1" FP 1" FP

1" FP

1 1

2 1/2" FP

1 1/4" FP

1" FP

1" FP

NURSE

B1C34A

OBS BEDS ROOM

B1C-6A

SMALL TOILET

B1C34C

OBSERVATION/

TREATMENT RM

B1C26

OBSERVATION/

TREATMENT RM

B1C25

TOILET

B1C24

OBSERVATION/

TREATMENT RM

B1C23

SPD

B1C51

MALE RR

B1C33

FEMALE RR

B1C32

SOILED UTILITY RM

B1C55

CORRIDOR

B1C-6

OBSERVATION/

TREATMENT RM

B1C22

HEAD NURSE

B1C53

CHIEF OF ER

B1C52

CORRIDOR

B1C-6

TOILET

B1C54

CORRIDOR

B1C-2

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.P L

M B

.r v t

/1

/2

:2

:1

A

M

FXD100B

FIRE PROTECTION DEMOLITION

PLAN - LEVEL B - AREA B

TRIPLE C The A/E Group

4401 Alantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

06/18/2021 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

1 EXISTING FIRE SPRINKLER HEAD TO REMAIN, PROTECT IN PLACE. CONTRACTOR IS

RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2016 NFPA 13.

2 REMOVE EXISTING PENDENT FIRE SPRINKLER HEAD.

3 EXISTING 4" FIRE SUPPLY RISER.

4 EXISTING FIRE RISER SHUT OF VALVE AND DRAIN VALVE LOCATED WITHIN STAIR

WELL NO. 4. COORDINATE WATER SHUT DOWN WITH COR PRIOR TO

COMMENCEMENT OF WORK. ALL OTHER FLOORS SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION.

5 CONTINUES TO EXISTING FIRE SPRINKLER PIPING SYSTEM.

SPRINKLER HEAD LEGEND

SYM. TYPE ORIFICE TEMP "K" FINISH COLOR

PENDANT

MAKE & MODEL

TYCO TY323 1/2" 155F 5.6

TOTAL DEMO QUANTITY

MATCH EXISTING

BUILDING STANDARDS

TOTAL NEW QUANTITY

33 36

1/4" = 1'-0" F4

FIRE PROTECTION DEMOLITION PLAN - LEVEL B - AREA B

GENERAL SHEET NOTES

KEYNOTES

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.

CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO

DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED

WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO

OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE

COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY

THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED

OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2016

NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO

MATCH EXISTING BUILDING STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY NFPA 13.

L. PENDENT SPRINKLER HEADS LOCATED IN ACOUSTICAL CEILING TILES SHALL BE

LOCATED IN THE CENTER OR QUARTER-PONT OF THE CEILING TILE WHENEVER

FEASIBLE.

M. NFPA 13 "SMALL ROOM RULE" HAS BEEN UTILIZED WHERE APPLICABLE.

N. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS. MAIN

PIPING 2" OR BIGGER SHALL HAVE GROOVED ENDS, GROOVED FITTINGS, AND

WELDED OUTLETS.

O. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

P. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

Q. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

R. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

S. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

T. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL

VALVES. ACCESS PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF

WALL AND CEILING FIRE RATING.

U. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL

SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT

AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND

RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT

SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE

ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE

SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES

ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS

DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR

SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS,

PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE

IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT

STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND

INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY

PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE SHALL BE

CLEARLY IDENTIFIED ON THE DRAWINGS.

V. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE

THAT CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE

PROJECT. THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE

PROTECTION SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH

THE VA PRIOR TO PERFORMING WORK.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.

FIRE PROTECTION WORK SHALL BE

OMITTED UNDER DEDUCT ALTERNATE 1.

BOPC.A.1

BOPC.B

BOPC.B.1

BOPC.C

BOPC.D

BOPC.E

NEW OBSERVATION

ROOM

B1C34C

LINEN CLOSET

B1C39

EMS CLOSET

B1C36

MALE RR

B1C33

FEMALE RR

B1C32

OBSERV…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .