570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26121R0066
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOPC.3BOPC.2
BOPC.1
BOPC.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
F /M
H B
VAV-1-6
VAV-1-2
CAV-1-7
CAV-1-2
CAV-1-5
CAV-1-4
EG
550 CFM
EG
550 CFM
EG
550 CFM
EG
460 CFM
EG
510 CFM
EG
80 CFM
SD
230 CFM
SD
230 CFM
SD
620 CFM
SD
600 CFM
SD
190 CFM
SD
280 CFM
SD
190 CFM
SD
200 CFM
SD
500 CFM
SD
530 CFM
SD
540 CFM
SD
180 CFM
SD
60 CFM
SD
160 CFM
SD
500 CFM
SD
175 CFM
RG
180 CFM
RG
470 CFM
RG
200 CFM
RG
620 CFM
SD
100 CFM
SD
260 CFM
SD
100 CFM
SD
330 CFM
RG
620 CFM
VAV-1-2
VAV-1-6
CAV-1-9
CAV-1-8
CAV-1-7
CAV-1-6
CAV-1-2
CAV-1-1
VAV-1-1 VAV-1-20
VAV-1-14
CAV-1-5
VAV-1-1
(E)8"ø SA
(E)8"ø SA
(E)16"ø SA(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E )1
"ø
S A
(E)12"ø RA
(E)8"ø RA
(E)14"ø RA
(E)14"ø RA
(E )1
"ø
R A
(E)14"x10" RA
(E )1
"x
R A
(E )8
"ø R
A
(E )1
"x
E X
H
(E)14"x8" EXH
(E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø EXH
(E)16"x12" EXH (E)14"x8" EXH
(E)14"x8" EXH
(E)6"ø EXH (E)6"ø EXH
(E)12"ø SA
(E)8"ø SA
(E)10"ø SA
(E)12"ø SA
(E)10"ø SA
(E)10"ø SA (E)8"ø SA
(E)10"ø SA(E )8
"ø S
A
(E)14"x8" RA
(E)14"x8" RA
(E)8"ø SA
(E)8"ø SA
(E)14"ø SA (E)12"ø SA
(E)12"ø SA
(E)12"ø SA
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
(E )1
"x
E X
H
12"ø SA
"ø
S A
12"ø SA
8"ø SA
8"x10" SA
8"ø SA
10"ø SA
(E)12"ø RA (E)12"ø RA
(E )4
"x
R A
(E)14"ø RA
(E )2
"x
R A
(E)8"ø SA
(E)18"x12" EXH
TRAUMA RM LARGE
B1C07
EXAM AREA
B1C04
ENTRANCE
ELEVATOR
B-19
ALCOVE,
WHEELCHAIR/
STRETCHER/ LIFT
B1D
SOCIAL WORK
OFFICE
B1C01
EXAM AREA
B1C03
VESTIBULE
VESTIBULE
LINEN CART ALCOVE
POLICE DISPATCH
B1C02
PROCEDURE RM
B1C05
CHARTING ALCOVE
WHEELCH. SCALE
---CORRIDOR
B1C-1A
TRAUMA RM SMALL
B1C06
TOILET
B1C08
CORRIDOR
B1C-8
CORRIDOR
B1C-5
NURSE STATION
B1C29A
CLINICAL CHARTING
RM
B1C29
CORRIDOR
B1C-7
AOD/ CHECK-IN
B1C30
INTERVENTION
(SECLUSION) ROOM
B1C28
WAITING
B1C-1
AC
10"ø SA 10"ø SA
8"ø SA
F4/MH100D
(E )1
"x
R A
8"ø SA
CAV-1-6
TRIAGE RM
B1C31
12"ø EXH
12"ø SA
12"ø SA
C A
V -1
-8
C A
V -1
-9
FPH-31
FPH-32
SD
160 CFM
8"ø SA
8"ø SA
8"ø SA
8"ø SA
10"x10" SA
RG
460 CFM
RG
75 CFM
RG
190 CFM
RG
100 CFM
8"ø RA
6"ø RA
6"ø RA
RG
190 CFM
C A
V -1
-1
(E)6"ø SA
(E)6"ø SA
(E)8"ø SA
(E)8"ø SA (E)12"ø SA 12"ø SA
8"ø SA
(E)8"ø SA
(E )8
"ø S
A (E
)1 "ø
S A
(E )3
"x
S A
(E )2
"x
S A
(E )2
"x
S A
(E )8
"ø S
A C
A V
-1 -3
12"ø SA
(E)8"ø SA
(E)8"ø SA 8"ø SA
6"ø RA
SD
160 CFM
32"x12" RA 26"x12" RA
(E)6"ø RA
10"ø SA
8"ø SA 6"ø SA
6"ø SA
SMOKE COMPARTMENT 1
SMOKE COMPARTMENT 2
TYP
TYP
TYP
TYP
WAITING
B1C-1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:4
:5
A
M
MH100A
MECHANICAL DUCT PLAN - LEVEL
B - AREA A
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
1/4" = 1'-0" F1
MECHANICAL DUCT PLAN - BASEMENT - AREA A
KEYNOTES
1 PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING AUTOMATION SYSTEM.
PROVIDE NEW THERMOSTAT TO MATCH EXISTING BUILDING STANDARDS, COORDINATE FINAL
LOCATION WITH COR. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
2 CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS NECESSARY TO
MAKE CONNECTION AND SEAL AIRTIGHT.
3 NEW 12” ROUND EXHAUST DUCT UP TO NEW EXHAUST FAN EF-1, ROUT AND BRACE ALONG EXTERIOR
WALL. RESEAL PENETRATION AS REQUIRED.
4 SMOKE COMPARTMENT BOUNDARY LINE, SEE SHEET G-101 FOR ADDITIONAL INFORMATION.
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
06/18/2021
BOPC.6BOPC.5.ABOPC.5BOPC.4
BOPC.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
BOPC.E
F1/MH100A
VAV-1-12
VAV-1-17
VAV-1-18
VAV-1-6
SD
330 CFM
SD
160 CFM
SD
130 CFM
RG
130 CFM
RG
110 CFM
SD
110 CFM
SD
950 CFM
EG
950 CFM
EG
550 CFM
SD
230 CFM
SD
190 CFM
RG
620 CFM
RG
100 CFM
EG
95 CFM
SD
135 CFM
SD
150 CFM
SD
250 CFM
SD
150 CFM
EG
80 CFM
RG
150 CFM
SD
200 CFM
SD
80 CFM
SD
80 CFM
RG
150 CFM
SD
340 CFM
VAV-1-18
VAV-1-16
VAV-1-17
VAV-1-12
VAV-1-13
VAV-1-14
VAV-1-15
VAV-1-8
VAV-1-11
VAV-1-10
1 2 1 2
1 2
1 2
F D
EG
200 CFM
EG
210 CFM
CORRIDOR
B1C-1
WAITING
B1C-1
FEMALE RR
B1C32
MALE RR
B1C33
PAT TLT
B1C34J
NEW OBSERVATION
ROOM
B1C34G
PATIENT COMFORT
ROOM
BC127
CORRIDOR
B1C-9
NEW OBSERVATION
ROOM
B1C23
NEW OBSERVATION
ROOM
BC24
NEW OBSERVATION
ROOM
B1C21
HAC
BC50
CORRIDOR
B1C-6
PAT SHWR
B1C25B
CLEAN UTILITY
BC26
PAT TLT
B1C25A
HALL
B1C-6A
NEW NURSES
STATION
B1C34B
NEW NURSES
STATION
B1C34F
NEW OBSERVATION
ROOM
B1C34K
CORRIDOR
B1C-2
LINEN CLOSET
B1C41
ELEVATOR EQUIP RM
B1C40
ELEVATOR
S-5
ELEVATOR
S-6
HEAD NURSE
B1C37
CHIEF OF ER
B1C35
OBSERVATION/
TREATMENT RM
B1C14
CORRIDOR
B1C-4
SOILED UTILITY
B1C53
CLEAN UTILITY
B1C52
STF TLT
BC51
CORRIDOR
B1C-2
STAIR NO.4
B1C43
LINEN CLOSET
B1C42
NEW OBSERVATION
ROOM
B1C34A
NEW OBSERVATION
ROOM
B1C34C
NEW OBSERVATION
ROOM
B1C34E
NEW STORAGE
B1C34H
NEW STORAGE
B1C34D
EG
180 CFM
SD
150 CFM
SD
150 CFM
SD
250 CFM
SD
250 CFM
EG
80 CFM
VAV-1-9
F4/MH100D
F4/MH100Cx
(E)50"x12" SA
(E)54"x14" SA
(E)24"x12" SA
14"x12" SA
8"ø SA
(E)10"ø SA
(E)10"ø EXH
8"ø SA
(E)8"ø SA
12"x10" SA 8"ø SA
(E)6"ø SA
6"ø SA
(E)16"x12" SA
8"ø SA
8"ø RA
6"ø SA
(E)30"x12" SA
(E)24"x12" SA
(E)12"ø EXH(E)10"ø EXH
VAV-1-9(E)8"ø EXH
(E)8"ø EXH
"ø
E X
H
8"ø SA
8"ø SA
VAV-1-8
VAV-1-13
VAV-1-14
VAV-1-11
VAV-1-15
V A
V -1
-1
V A
V -1
-1
"ø
R A
8"ø EXH
EG
120 CFM
FSDFSDFSD
F S
D
8"ø RA 10"x12" SA
"ø
S A
8"ø SA
"x
S A
"x
S A
"x
S A
8"ø SA
8"ø SA 10"x10" SA
10"x10" SA
SD
175 CFM
"ø
S A
"ø
S A
8"ø SA
"ø
S A
8"ø SA
10"x10" SA
8"ø SA
8"ø SA
"x
R A
"ø
R A 8"ø RA
RG
485 CFM
SD
175 CFM
6"ø SA
8"ø SA
F S
D8 "ø
E X
H
8"ø SA
"ø
S A
RG
150 CFM RG
150 CFM
6"ø SA
10"ø SA
"ø
S A
8"ø SA
8"ø EXH
CD-19
135 CFM
1 2
1 2
RG
485 CFM
"ø
S A
"ø
E X
H
"ø
S A
"ø
E X
H
"ø
S A
(E)12"x8" SA
(E )2
"x
S A
(E)54"x14" SA
(E )1
"ø
R A
RG
240 CFM
(E )1
"x
S A
(E )1
"ø
S A
(E )1
"x
R A
(E )1
"ø
R A
(E)12"ø RA
(E)37"x12" SA(E)14"ø SA
FD
"ø
R A
8"ø RA
10"x10" SA
VAV-1-7
FD
RG
190 CFM
6"ø RA
CORRIDOR
B1C48
SD
160 CFM
(E)20"x12" SA
SD
150 CFM
26"x12" RA 22"x12" RA
"x
R A
RG
285 CFM
10"ø RA
10"ø RA
10"ø RA
RG
485 CFM
(E)6"ø RA
(E)6"ø RA
(E)8"ø RA(E)10"ø RA
(E)8"ø RA
"ø
S A
10"ø SA
FSD
FSD
FD
SMOKE COMPARTMENT 1
SMOKE COMPARTMENT 2
S M
O K
E C
O M
P A
R T
M E
N T
S M
O K
E C
O M
P A
R T
M E
N T
TYP
WAITING
B1C-1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:4
:5
A
M
MH100B
MECHANICAL DUCT PLAN - LEVEL
B - AREA B
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
1/4" = 1'-0" F4
MECHANICAL DUCT PLAN - BASEMENT - AREA B
1 PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH EXISTING BUILDING STANDARDS, COORDINATE FINAL LOCATION WITH
COR. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
2 CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS NECESSARY TO
MAKE CONNECTION AND SEAL AIRTIGHT.
3 PROVIDE NEW EXHAUST, RETURN AND SUPPLY GRILLES, TYP.
4 DEDUCT ALTERNATE 1 OMITS ARCHITECTURAL RENOVATION WORK WITHIN THIS AREA, SEE SHEET
MH100B.1 FOR DEDUCT ALTERNATE 1 MECHANICAL LAYOUT.
5 THE RELOCATION OF THIS RETURN AIR GRILLE SHALL BE OMITTED UNDER DEDUCT ALTERNATE 1.
6 AS-BUILTS DO NOT IDENTIFY THIS AIR TERMINALS CFM.
7 SMOKE COMPARTMENT BOUNDARY LINE, SEE SHEET G-101 FOR ADDITIONAL INFORMATION.
8 PROVIDE FIRE/FIRE SMOKE DAMPER AT LOCATION SHOWN.
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
BOPC.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
BOPC.E
1 2
1 2
1 2
VAV-1-6
VAV-1-13
VAV-1-10
EG
70 CFM
EG
80 CFM
SD
50 CFM
CR
0 CFM
SD
100 CFM
SD
50 CFM
SD
260 CFM
RG
100 CFM
RG
190 CFM
RG
90 CFM
SD
90 CFM
SD
330 CFM
SD
90 CFM
SD
160 CFM
SD
160 CFM
EG
80 CFM
RG
150 CFM
SD
160 CFM
RG
620 CFM
SD
160 CFM
EG
80 CFM
EG
80 CFM
SD
80 CFM
SD
100 CFM
RG
100 CFM
SD
100 CFM
SD
160 CFM
SD
130 CFM
RG
130 CFM
RG
110 CFM
SD
110 CFM
SD
950 CFM
EG
950 CFM
RG
240 CFM
EG
550 CFM
SD
230 CFM
SD
190 CFM
SD
160 CFM
RG
620 CFM
RG
100 CFM
RG
100 CFM
(E )1
"ø
E X
H
(E)12"ø EXH(E)10"ø EXH
(E)8"ø EXH
(E )1
"ø
S A
(E)6"ø EXH
(E)6"ø EXH
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø EXH
(E)10"ø SA (E)14"x12" SA
(E)8"ø SA
(E )1
"x
R A
(E)12"ø RA
(E)12"ø RA
(E)10"ø RA
(E)8"ø RA
(E)8"ø RA
(E)6"ø RA (E)6"ø RA
(E)6"ø RA
(E)10"ø EXH(E)6"ø EXH
(E)8"ø EXH
(E )6
"ø E
X H
(E)12"ø SA
(E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA (E)6"ø SA
(E)6"ø SA
(E)6"ø SA
(E)6"ø SA
(E)12"ø SA
(E )1
"ø
S A
(E )6
"ø S
A
(E)10"ø SA
(E )8
"ø S
A (E
)8 "ø
S A
(E)10"ø RA
(E)8"ø RA
(E)6"ø RA
(E )6
"ø S
A
(E)4"ø SA
(E)24"x12" SA
(E )1
"ø
S A
(E)54"x14" SA
(E)6"ø SA(E)6"ø SA
(E)4"ø SA
(E)4"ø SA
(E )6
"ø S
A(E)6"ø SA
(E)10"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E )2
"x
R A
(E)8"ø RA
(E)6"ø RA
(E )2
"x
S A
(E)30"x12" SA
(E)5"ø SA
(E)6"ø SA(E)12"ø SA
(E)8"ø SA
(E)8"ø RA
(E)5"ø SA
(E)16"x12" SA
(E)10"ø SA
(E)6"ø RA
(E)6"ø RA
(E)12"x8" SA
(E)12"ø
(E)6"ø RA
(E)50"x12" SA(E)37"x12" SA(E)14"ø SA
(E)10"ø RA
(E)14"x12" EXH
(E)24"x12" SA
(E )1
"x
S A
(E )1
"ø
S A
(E )2
"x
S A(E)18"x10"
VAV-1-7
VAV-1-14 VAV-1-15
VAV-1-16
VAV-1-17
VAV-1-18
VAV-1-9
VAV-1-8
VAV-1-11
VAV-1-12
VAV-1-15
VAV-1-14
VAV-1-13
VAV-1-11
VAV-1-17
VAV-1-16
VAV-1-9
VAV-1-10
VAV-1-8
VAV-1-12
VAV-1-18
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
(E )1
"ø
S A
EG
200 CFM
EG
210 CFM
(E)6"ø RA
F1/MH100A
F4/MH100D
F4/MH100Cx
NURSE
B1C34A
MALE RR
B1C33
FEMALE RR
B1C32
WAITING
B1C-1
CORRIDOR
B1C-1
TRIAGE RM
B1C28
PATIENT COMFORT
ROOM
B1C27
OBSERVATION/
TREATMENT RM
B1C25
OBSERVATION/
TREATMENT RM
B1C26
OBS BEDS ROOM
B1C-6ANURSE STATION
B1C29A
CORRIDOR
B1C-8
CORRIDOR
B1C-7
TOILET
B1C24
OBSERVATION/
TREATMENT RM
B1C23
OBSERVATION/
TREATMENT RM
B1C14
SOILED UTILITY RM
B1C55
MECHANICAL ROOM
B1C39
HEAD NURSE
B1C53
OBSERVATION/
TREATMENT RM
B1C22
CORRIDOR
B1C-8
STAIR NO.4
B1C43
EQUIP STOR
B1C60
HAC
B1C57
CHIEF OF ER
B1C52
SPD
B1C51
CORRIDOR
B1C-2
ELEVATOR EQUIP RM
B1C40
ELEVATOR
S-6
ELEVATOR
S-5
CORRIDOR
B1C-2
POLICE CHIEF
OFFICE
B1C35
OBS BEDS ROOM
B1C-6A
CLOSET
B1C34D
SMALL TOILET
B1C34C
CRASH CART
ALCOVE
PUBLIC AFFAIRS
B1C37
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:0
A
M
MH100B.1
MECHANICAL DUCT PLAN - LEVEL
B - AREA B - DEDUCT ALTERNATE 1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M.PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
1 PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH EXISTING BUILDING STANDARDS, COORDINATE FINAL LOCATION WITH
COR. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
2 CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS NECESSARY TO
MAKE CONNECTION AND SEAL AIRTIGHT.
3 EXISTING DUCTWORK TO REMAIN.
KEYNOTES
1/4" = 1'-0" F4
MECHANICAL DUCT PLAN - LEVEL B - AREA B - DEDUCT ALTERNATE 3
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
FD
BOPC.D
BOPC.E
BOPC.F
BOPC.G
F1/MH100A
F4/MH100D
(E )3
"x
E X
H
(E)18"x12" EXH
(E)72"x20" OA
(E)48"x24" RA
(E)26"ø RA
(E)30"ø RA
(E )2
"x
R A
(E)18"x12" EXH
(E)18"x10" EXH
(E)50"x12" SA
(E)54"x14" SA
(E)30"x12" EXH
(E)24"x12" SA
(E)6"ø SA
8"ø RA
6"ø SA
(E )3
"x
S A
(E)24"x12" SA
8"ø RA 10"x12" SA
"ø
S A
8"ø SA
"x
S A
"x
S A
"x
R A
8"ø SA
(E )2
"x
R A
"ø
E X
H
"ø
S A
"ø
E X
H
"ø
S A
(E)12"x8" SA
(E )2
"x
S A
(E)54"x14" SA
(E )1
"ø
R A
(E )1
"x
S A
(E )1
"x
R A
36"ø EXH
65"x18" EXH
36"x12" RA
66"x24" OA
66"x24" OA
50"x24" RA
"ø
S A
(E)37"x12" SA
(E)14"ø SA
"ø
R A
8"ø RA
1-AHU-4
1-AHU-3
VAV-1-14
VAV-1-15
VAV-1-15
VAV-1-19
VAV-1-7
V A
V -1
-1
1 2
F D
FSDFSDFSD
F S
D
FD
F D
FD
EG
120 CFM
SD
160 CFM
EG
95 CFM
SD
150 CFM
EG
80 CFM
RG
150 CFM
SD
80 CFM
SD
80 CFM
RG
150 CFM
SD
340 CFM
SD
150 CFM
SD
150 CFM
SD
150 CFM
EG
120 CFM
RG
150 CFM
RG
150 CFM
RG
240 CFM
RG
450 CFM
SD
275 CFM
SD
300 CFM
SD
275 CFM
RG
200 CFM
SD
200 CFM
EG
60 CFM
SD
100 CFM
(E)10"ø SA
(E)10"ø SA
(E)10"ø SA
(E )1
"x
S A
(E )1
"x
S A
(E )8
"ø E
X H
(E)6"ø EXH (E)8"ø SA
(E)8"ø SA (E)8"ø RA
(E)12"ø RA
EQUIP STOR
B1C44
CONTROL ROOM
B1C45PAT HOLDING
B1C47
HAC
B1C49
CT SCANNER
B1C46
MECHANICAL ROOM
B1C17
AREAWAY
NEW OBSERVATION
ROOM
BC24
NEW OBSERVATION
ROOM
B1C23
NEW OBSERVATION
ROOM
B1C21
SOILED UTILITY
B1C53
OBSERVATION/
TREATMENT RM
B1C14
CORRIDOR
B1C-4 CORRIDOR
B1C-2
STF TLT
BC51CLEAN UTILITY
B1C52
HAC
BC50
LINEN CLOSET
B1C42
STAIR NO.4
B1C43
LINEN CLOSET
B1C41
ELEVATOR EQUIP RM
B1C40
CORRIDOR
B1C48
RG
400 CFM
S M
O K
E C
O M
P A
R T
M E
N T
S M
O K
E C
O M
P A
R T
M E
N T
VAV-1-6
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
C
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:1
A
M
MH100C
MECHANICAL DUCT PLAN - LEVEL
B - AREA C
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M.PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/4" = 1'-0" F4
MECHANICAL DUCT PLAN - LEVEL B - AREA C - FUTURE
1 PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH EXISTING BUILDING STANDARDS, COORDINATE FINAL LOCATION WITH
COR. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
2 CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS NECESSARY TO
MAKE CONNECTION AND SEAL AIRTIGHT.
3 PROVIDE NEW EXHAUST, RETURN AND SUPPLY GRILLES, TYP.
4 DEDUCT ALTERNATE 1 OMITS ARCHITECTURAL RENOVATION WORK WITHIN THIS AREA, SEE SHEET
MH100B.1 FOR DEDUCT ALTERNATE 1 MECHANICAL LAYOUT.
5 NEW OUTSIDE AIR INTAKE FROM ROOF MOUNTED GRAVITY HOOD.
6 PROVIDE NEW AIR HANDLING UNIT WITH 100 PERCENT OUTSIDE AIR/EXHAUST EMERGENCY MODE, SEE
M-701 FOR SCHEDULE AND M-802 FOR CONTROLS.
7 VA REQUIRED FUTURE LAYOUT, COORDINATED WITH PROJECT 570-16-409. CONTRACTOR SHALL FIELD
VERIFY ALL DUCT ROUTING PRIOR TO CONSTRUCTION.
8 SMOKE COMPARTMENT BOUNDARY LINE, SEE SHEET G-101 FOR ADDITIONAL INFORMATION.
9 PROVIDE FIRE/FIRE SMOKE DAMPER AT LOCATION SHOWN. REFER TO DETAIL C1/M-502.
10 EXISTING THERMOSTAT LOCATION TO BE REUSED. COORDINATE FINAL ROUGH-IN LOCATION.
Revisions: Date:
BOPC.3BOPC.2BOPC.1
BOPC.D
BOPC.E
BOPC.F
BOPC.G
F4/MH100B
F1/MH100A
VAV-1-3
VAV-1-4
EG
180 CFM
RG
190 CFM
SD
340 CFM
EG
80 CFM
RG
130 CFM
SD
130 CFM
SD
170 CFM
SD
225 CFM
SD
75 CFM
EG
75 CFM
EG
225 CFM
SD
230 CFM
SD
230 CFM
SD
190 CFM
SD
160 CFM
RF-6
VAV-1-6
CAV-1-9
CAV-1-8
VAV-1-3
VAV-1-4
VAV-1-5
VAV-1-7
V A
V -1
-5
(E)24"x12" SA
(E)8"ø SA
(E)42"x12" RA
(E )1
"x
S A
(E)14"ø SA
(E )1
"x
E X
H
(E)10"ø RA
(E)8"ø RA
(E)10"ø EXH
(E)8"ø EXH
(E)8"ø EXH
(E)6"ø EXH
(E)6"ø SA
(E)6"ø EXH
(E)8"x8" EXH
(E )8
"x
E X
H
(E)6"x6" EXH(E)50"x24" RA
(E)48"x24" RA
(E)20"x12" RA
(E )1
"x
E X
H
(E)14"ø SA
(E )3
"x
S A
1 2
1 2
1 2
(E )1
"ø
E X
H
EF-1-11
EF-1-11 EF-1-10
STAIR
B1C21
OBSERVATION/
TREATMENT RM
B1C09
OBSERVATION/
TREATMENT RM
B1C10
OBSERVATION/
TREATMENT RM
B1C11
OBSERVATION/
TREATMENT RM
B1C12
OBSERVATION/
TREATMENT RM
B1C13
CORRIDOR
B1C-4
TELEPHONE CLOSET
B1C15
ELECTRIC CLOSET
B1C16
MECHANICAL ROOM
B1C17
AREAWAY
TRANSFORMER RM
B1C17A
ON-CALL RM
B1C18
TOILET
B1C19
STAFF LOUNGE
B1C20LOCKER RM
B1C20A
6"ø SA
8"ø SA
10"ø SA
6"ø SA
10"x6" SA
(E)24"x12" SA
(E)8"ø SA
(E)14"ø SA
8"ø SA
(E)8"ø RA
(E)18"x12" EXH
F1
MH100D
F4/MH100Cx
(E)24"x12" SA
8"ø SA
FPH-31
FPH-32
SD
160 CFM
EF-1-10
"ø
S A
"ø
S A
VAV-1-7
(E)14"ø SA
SD
160 CFM
(E)14"ø SA(E)14"ø SA
(E)14"ø SA
(E )2
"x
S A
(E)14"ø SA
16"x15" SA
6"ø SA
SMOKE COMPARTMENT 1
SMOKE COMPARTMENT 2
TYP
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
D
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:3
A
M
MH100D
MECHANICAL DUCT PLAN - LEVEL
B - AREA D
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
1/4" = 1'-0" F4
MECHANICAL DUCT PLAN - BASEMENT - AREA D
1 PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH EXISTING BUILDING STANDARDS, COORDINATE FINAL LOCATION WITH
COR. REFER TO SHEET M-501 FOR DETAILS AND M-803 FOR CONTROLS.
2 CONNECT EXISTING DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS NECESSARY TO
MAKE CONNECTION AND SEAL AIRTIGHT.
4 SMOKE COMPARTMENT BOUNDARY LINE, SEE SHEET G-101 FOR ADDITIONAL INFORMATION.
5 CONNECT NEW DUCTWORK TO EXISTING DUCT MAIN, IN CEILING SPACE. COORDINATE EXACT LOCATION
WITH CEILING PLANS AND OTHER TRADES.
KEYNOTES
NTS
F1
EXISTING AREAWAY 103
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
File details come from the government source that posted it. Updated .