570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf

PDF 10 MB Posted

Attached to
Z2DA--REMODEL EMERGENCY DEPARTMENT FOR OBSERVATION BEDS | 570-17-210
Solicitation number
36C26121R0066
Issued by

View the file

Other files

File Type Posted
36C26121R0066 0005.docx DOCX document
36C26121R0066 0004.docx DOCX document
Site Visit Sign-in Sheet--12.1.2021.pdf PDF
Site Visit Sign-in Sheet--11.10.2021.pdf PDF
36C26121R0066--Responses to Pre-Proposal RFIs (1-17)--Complete--12.6.2021.pdf PDF
Specification 11 73 00-rev01-12.03.2021.pdf PDF
36C26121R0066 0003.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-17).pdf PDF
36C26121R0066 0002.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-10).pdf PDF
ACM Report.pdf PDF
36C26121R0066 0001.docx DOCX document
570-17-210.OPC.IFC.DWG.20210618Part-7of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-10of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-2of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-5of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-9of10.pdf PDF
Factor 6 - Divisional Construction Costs.pdf PDF
REQUEST FOR INFORMATION (RFI) FORM--36C26121R0066.docx DOCX document
Factor 4 - Past Performance (Questionnaire).docx DOCX document
570-17-210.OPC.IFC.Specification.R2.20210618Part-4.pdf PDF
570-17-210.OPC.IFC.Specification.R2.20210618Part-2.pdf PDF
Factor 2 - Key Personnel Qualifications Resumes.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-3.pdf PDF
VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf PDF
General Decision Number CA20210018 10.08.2021.pdf PDF
Responsibility - Contractor Certification Regarding Safety and Environmental.pdf PDF
Site_Visit_MAP.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-1.pdf PDF
36C26121R0066_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E. SHIELDS AVE

E. CLINTON AVE

N

B L A

C K

S T

O N

E A

V E

E. SHIELDS AVE

E. MCKINLEY AVE

E. OLIVE AVE

N

F R

E S

N O

S T

N

F

IR

S T

S T

N

C E

D A

R A

V E

N

M A

P L E

A V

E

VACCHCS

PROJECT REVIEW

DATE: APPROVED: DIRECTOR

DATE: APPROVED: CHIEF OF STAFF

DATE: APPROVED: CHIEF, SAFETY SERVICE

DATE: APPROVED: CHIEF ENGINEER

DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES

DATE: APPROVED: CONTRACTING OFFICER

DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ELECTRICAL: MECHANICAL:

P2S ENGINEERING, INC.

5000 E. SPRING STREET, 8TH FLOOR

LONG BEACH, CA 90815-5218

562.497.2999

B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

M O

D U

LA

R

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

G-000

GENERAL COVER SHEET

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

06/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

ISSUED FOR CONSTRUCTION

06/18/2021

570-17-210 REMODEL ED BEDS FOR OBSERVATION BEDS - OPC

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

VICINITY MAP

NOT TO SCALE

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

_____________________________SIGNATURE ________________DATE

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY

INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL

DIVISIONS ARE PAID BY THE GENERAL CONTRACTOR.

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY

INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS

SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING CERTIFICATIONS, AND

PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.

THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED

INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN

PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON

THE CONTRACTOR.

SCOPE OF WORK

Section 01 00 00

1. STATEMENT OF BID ITEM(S)

A. CLIN 0001 - ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes rental Temporary emergency department modular building, temporary rental hospital elevators, general construction, alterations, and necessary removal of existing systems and structures and construction or and certain other items. Project includes modifications to existing HVAC, electrical, and IT.

A new variable air volume air handling unit (AHU-3) will be installed in the basement mechanical room of Building OPC. The unit will be approximately 13,000 CFM and it will consist of an energy recovery wheel, an exhaust fan, a variable frequency drive, return air inlet plenum, a return air sound attenuator, a return/relief fan with fan wall technology and a variable frequency drive, a mixing box with an air side economizer, a MERV 7 pre-filter #1 , a MERV 11 pre-filter #2, a hot water reheat coil, a clean steam humidifier, a chilled water cooling coil, a heating hot water heating coil, a supply fan with fan wall technology and a variable frequency drive, a sound attenuator, final filters MERV 14, and a discharge plenum. Variable frequency drives will be provided for the supply, return, and exhaust air fans. The fixed minimum outside air will be pre-conditioned by the energy recovery ventilation section of the air handling unit. General exhaust will be provided for the toilet rooms, the soiled utility room, the soiled linen room, and the housekeeping closet as required and discharged to atmosphere via the energy recovery ventilation section exhaust air fan. The exhaust air discharge will be terminated a minimum of 25’-0” away from any outside air intakes and/or building opening and a minimum 10’ above the roof level. All spaces will be provided with outdoor air ventilation as required to maintain minimum design air changes per hour in compliance with ASHRAE, IMC, VA, and FGI medical facility design recommendations.

Provide new single duct terminal units with hospital grade liner, hot water reheat coil, valve actuator, airflow sensor, duct probe temperature sensor, and factory mounted Metasys controller shall be provided at each location identified on the mechanical plans and schedules. Additional items include a thermostat, a valve set, control wiring and conduit, and power wiring and conduit to provide a complete and operational system at each installation. Each valve set includes a stainless-steel hose with a Belimo or equal pressure independent control valve, strainer, and isolation valves on the HWS and HWR valve set. A network controller panel shall be provided to serve a maximum of 60 terminal units. Electrical 120V feeders shall be extended to each terminal unit with all associated conduit, mounting hardware, junction boxes and fittings. Each terminal unit shall be provided with a 120V/24V power supply to actuate the damper and valve controllers. New electrical feeders shall be supplied by new emergency power panels and circuit breakers as shown on the drawings.

In addition to sealing all new penetrations, Contractor is responsible for providing fire stopping for all existing, unprotected penetrations in the Area of Work. Contractor shall bid (100 penetrations and a deductive change order will be issued if the actual number is less than the estimated number.

All systems are to be commissioned as new with re-commissioning after one year from Government Acceptance.

A. CLIN 0002 - ITEM II: Deductive alternate no.1 remove all architectural renovation work associated with the interior emergency department bed observation area, this includes demolition work and all construction work outlined within the "area of work". Exterior Work shown on A-200, A-350, & A-351 REMAIN. Omit Sheets G-101, AD100, AD100B, AD150, AD150B, A-101, A-101B, A-101B-1, AC101, AC101B, A-402, A-403, A-601, A-901, A-902, AW101, AW601, IN101, IN601, IN701, Q-100, Q-600.

B. CLIN 0003 - ITEM III: Deductive alternate no.2: remove ERV (energy recovery ventilator) from ahu (air handler unit) selection.

C. CLIN 0004 – ITEM IV: Deductive alternate no. 3: remove signage from trailer completely. Omit Sheets

AW100 & AW600.

NO ACM (ASBESTOS CONTAINING MATERIAL) IS ALLOWED ON THIS PROJECT. NO

DUCT ADHESIVE OR ROOF ADHESIVE SHALL CONTAIN ACM. CONTRACTOR IS TO

SUBMIT ALL PRODUCT FOR REVIEW WITH A CERTIFICATE FROM THE PRODUCT

MANUFACTURER THAT NO ACM IS PRESENT IN THE PRODUCT.

Revisions: Date:

06/18/2021

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:3

P

M

G-001

GENERAL DRAWING INDEX

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

- DRAWING INDEX -

SHEET NUMBER SHEET NAME 35% SUBMITTAL 65% SUBMITTAL 95% SUBMITTAL

100% PRE-FINAL

SUBMITTAL

100% FINAL

SUBMITTAL

GENERAL

G-000 GENERAL COVER SHEET Yes Yes Yes Yes Yes

G-001 GENERAL DRAWING INDEX Yes Yes Yes Yes Yes

G-002 GENERAL VA PROJECT NOTES Yes Yes Yes Yes Yes

G-003 GENERAL PRECONSTRUCTION INFECTION CONTROL RISK ASSESSMENT No No No Yes Yes

G-050 GENERAL TYPICAL FIXTURE MOUNTING HEIGHTS Yes Yes Yes Yes Yes

G-100 GENERAL LIFE SAFETY PLAN AND CODE DATA - MODULAR BUILDING No No No No Yes

G-101 GENERAL LIFE SAFETY PLAN AND CODE DATA Yes Yes Yes Yes Yes

G-101-1 GENERAL LIFE SAFETY PLAN AND CODE DATA - DEDUCT ALT NO.1 No No No No Yes

GI200 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY MEASURES Yes Yes Yes Yes Yes

GC300 PROJECT PHASING PLAN No No No No Yes

CIVIL

CD101 CIVIL DEMO PLAN Yes

CS101 CIVIL SITE PLAN Yes Yes Yes Yes Yes

CS501 CIVIL DETAIL SHEET 1 No No Yes Yes Yes

CS502 CIVIL DETAIL SHEET 2 Yes

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES Yes

S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes

S-350 FRAMING SECTION AND ENLARGED PLANS Yes

S-520 FRAMING DETAILS Yes

ARCHITECTURE - MODULAR

A-101M ARCHITECTURAL MODULAR BUILDING - REQUIRED ADJACENCY PLAN No Yes Yes Yes Yes

AC101M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - REFLECTED CEILING PLAN No No Yes Yes Yes

A-400M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - ENLARGED VIEWS No No Yes No Yes

A-401M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - ENLARGED VIEWS No No Yes Yes Yes

A-512M ARCHITECTURAL MODULAR BUILDING CASEWORK DETAILS No Yes No Yes Yes

AW101M ARCHITECTURAL MODULAR BUILDING SIGNAGE PLAN - DEDUCT ALT NO.3 No No Yes Yes Yes

AW600M ARCHITECTURAL MODULAR BUILDING SIGNAGE DETAILS AND LEGEND - DEDUCT ALT NO.3 No No Yes Yes Yes

IN100M INTERIOR FINISH MODULAR BUILDING - PLAN No No Yes Yes Yes

ES101 ELECTRICAL SITE PLAN No No No No Yes

ARCHITECTURE

A-002 ARCHITECTURAL ABBREVIATIONS & SYMBOLS Yes Yes Yes Yes Yes

AD100 ARCHITECTURAL DEMO PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

AD100B ARCHITECTURAL DEMO PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

AD150 ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

AD150B ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

A-100 ARCHITECTURAL FLOOR PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes

A-100B ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

A-100B-1 ARCHITECTURAL DIMENSION PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

A-100B-3 ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B, DEDUCT ALT. NO. 1 No No No Yes Yes

AC100 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

AC100B ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

AC100B-3 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 No No Yes Yes Yes

A-200 PROPOSED BUILDING ELEVATIONS Yes Yes Yes Yes Yes

A-350 EXTERIOR WALL SECTIONS & DETAILS No No Yes Yes Yes

A-351 EXTERIOR ENLARGED PLANS & DETAILS No No No No Yes

A-401 ARCHITECTURAL ENLARGED VIEWS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

A-402 ARCHITECTURAL ENLARGED VIEWS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

A-511 ARCHITECTURAL CEILING DETAILS - DEDUCT ALT NO.1 No Yes Yes Yes Yes

A-512 ARCHITECTURAL DETAILS - DEDUCT ALT NO.1 No Yes Yes Yes Yes

A-601 ARCHITECTURAL DOOR SCHEDULE - DEDUCT ALT NO.3 Yes Yes Yes Yes Yes

A-701 INTERIOR WALL TYPES - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

A-721 HEAD-OF-WALL DETAILS Yes Yes Yes Yes Yes

A-722 PARTITION FRAMING DETAILS Yes Yes Yes Yes Yes

A-901 ARCHITECTURAL INTERIOR RENDERINGS - DEDUCT ALT NO.1 No Yes Yes Yes Yes

A-902 ARCHITECTURAL CUTSHEETS - DEDUCT ALT NO.1 No No Yes Yes Yes

SIGNAGE

AW100B ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT NO.3 No No Yes Yes Yes

AW601 ARCHITECTURAL SIGNAGE NOTES AND SCHEDULE - DEDUCT ALT NO.3 No No Yes Yes Yes

INTERIOR DESIGN

IN100B INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND & ROOM FINISH SCHEDULE - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

IN701 INTERIOR FINISH COLOR BOARDS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes

EQUIPMENT

Q-100B EQUIPMENT PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 No Yes Yes Yes Yes

Q-600 EQUIPMENT SCHEDULE - DEDUCT ALT NO.1 No Yes Yes Yes Yes

FIRE PROTECTION

FX001 FIRE PROTECTION LEGEND No No Yes Yes Yes

FXD100B FIRE PROTECTION DEMOLITION PLAN - LEVEL B - AREA B No No Yes Yes Yes

FX100B FIRE PROTECTION PLAN - LEVEL B - AREA B No No Yes Yes Yes

PLUMBING

P-001 PLUMBING LEGEND No No Yes Yes Yes

PD100B PLUMBING DEMOLITION PLAN - LEVEL B AREA B No No Yes Yes Yes

PD100D PLUMBING DEMOLITION PLAN - LEVEL B AREA D No No Yes Yes Yes

PP100B PLUMBING PLAN - LEVEL B AREA B No No Yes Yes Yes

PP100D PLUMBING PLAN - LEVEL B AREA D No No Yes Yes Yes

PG100B PLUMBING MEDICAL GAS PLAN - LEVEL B - AREA B No No Yes Yes Yes

P-701 PLUMBING SCHEDULES No No Yes Yes Yes

MECHANICAL

M-001 MECHANICAL LEGEND Yes Yes Yes Yes Yes

MS101 MECHANICAL TEMPORARY SITE PLAN Yes Yes Yes Yes Yes

MD100A MECHANICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes

MD100B MECHANICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

MD100C MECHANICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

MD100D MECHANICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

MD102 MECHANICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

MH100A MECHANICAL DUCT PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes

MH100B MECHANICAL DUCT PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

MH100B.1 MECHANICAL DUCT PLAN - LEVEL B - AREA B - DEDUCT ALTERNATE 1 No No Yes Yes Yes

MH100C MECHANICAL DUCT PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

MH100D MECHANICAL DUCT PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

MH102 MECHANICAL PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

MP100A MECHANICAL PIPING PLAN - LEVEL B - AREA A No No Yes Yes Yes

MP100B MECHANICAL PIPING PLAN - LEVEL B - AREA B No No Yes Yes Yes

MP100C MECHANICAL PIPING PLAN - LEVEL B - AREA C No No Yes Yes Yes

MP100D MECHANICAL PIPING PLAN - LEVEL B - AREA D No No Yes Yes Yes

M-501 MECHANICAL DETAILS Yes Yes Yes Yes Yes

M-502 MECHANICAL DETAILS Yes Yes Yes Yes Yes

M-601 MECHANICAL AIR FLOW DIAGRAM - SUPPLY AIR Yes Yes Yes Yes Yes

M-602 MECHANICAL AIR FLOW DIAGRAM - RETURN & EXHAUST AIR Yes Yes Yes Yes Yes

M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-703 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-704 MECHANICAL CUT SHEETS No Yes Yes Yes Yes

M-705 MECHANICAL CUT SHEETS No Yes Yes Yes Yes

M-801 MECHANICAL CONTROLS LEGEND Yes Yes Yes Yes Yes

M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-805 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes Yes

M-901 MECHANICAL REFERENCES No No Yes Yes Yes

M-902 MECHANICAL REFERENCES No No Yes Yes Yes

ELECTRICAL

E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes Yes

ED100A ELECTRICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes

ED100B ELECTRICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

ED100C ELECTRICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

ED100D ELECTRICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

ED102 ELECTRICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

EL100B ELECTRICAL LIGHTING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

EP100A ELECTRICAL POWER PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes

EP100B ELECTRICAL POWER PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

EP100C ELECTRICAL POWER PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

EP100D ELECTRICAL POWER PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

EP102 ELECTRICAL POWER PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

ET100B ELECTRICAL SYSTEMS PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

E-601 PARTIAL ONE LINE DIAGRAM Yes Yes Yes Yes Yes

E-602 PARTIAL ONE LINE DIAGRAM No No No Yes Yes

E-701 ELECTRICAL SCHEDULES AND DETAILS Yes Yes Yes Yes Yes

E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes Yes

Grand total: 119

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:5

:5

P

M

G-002

GENERAL VA PROJECT NOTES

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS

ARE DISCOVERED FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR

INFORMATION (RFI).

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13

REQUESTS FOR INFORMATION (RFI).

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. VV: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS VV IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS VV.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH COR, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S

WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION

IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH

FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN DISSIMILAR METALS. SEE

SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL

AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL

AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS TO BE COORDINATED WITH

COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES ARE DISCOVERED AFTER THE BID FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION, SHOP DRAWINGS, AND COORDINATION DRAWINGS; CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS

REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION

RELATED TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO OUTSIDE

GRIDLINE) AS SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF MASONRY

WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE

PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2"

(1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE PLUS

1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF

FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND

LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE ARCHITECT AND COR

PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.

ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING OR

SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES

SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.

FIRE ALARM

1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a"

PROTECTION OF NFPA 101 LIFE SAFETY CODE.

2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES; AND SECTION 28

31 00 FIRE DETECTION AND ALARM FOR APPROVAL PRIOR TO THE INSTALLATION.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE

EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH

EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL

EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.

EXIT AND EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH

LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND

CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A

SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.

EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL.

EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW

THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC

GUIDELINES.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED.

CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.

2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS TO BE INSTALLED IN ACCORDANCE

WITH 2016 NFPA 13.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE

PERMISSIBLE.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE BUILDING IS EQUIPPED WITH A FIRE

SPRINKLER AND FIRE ALARM SYSTEM.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE STOPPING.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED

MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A

FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50

WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES

AND ADHESIVES NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING

ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE

DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.

4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44"

ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING

HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR

CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF

70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE

LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.

5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

8. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE

SEALED WITH A UL APPROVED METHOD AND MATERIAL.

1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE REMOVAL, INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE

WALL, FLOOR, AND/OR ROOF ASSEMBLY.

5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND PUBLIC

ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY & DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH COR.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL

FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE

TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF

OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF

PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY

PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS

(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,

UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS

MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL NOTES.

THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR

EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL

SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN

ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE

PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED

IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED

OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER

THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE ENTIRE

SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE- FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, FOLLOW

PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER, BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED

AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF

PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE

EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.

PROPER PRIMING MUST BE USED WITH SEALANTS.

2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, FOLLOW PROCEDURES

LISTED IN SECTION 01 33 23.

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL

BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT

UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED

EQUIPMENT FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS

(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

Revisions: Date:

PHASE 1:

PHASING NOTES:

1. SUBMIT AND OBTAIN APPROVALS FOR ALL

PRECONSTRUCTION SUBMITTALS.

2. SUBMIT AND OBTAIN APPROVALS ALL SUBMITTALS AND

COORDINATION DRAWINGS.

3. END OF PHASE 1.

PHASE 2:

TEMPORARY EMERGENCY DEPARTMENT MODULAR BUILDING.

1. CONTRACTOR SHALL ACQUIRE THE RENTAL OF A

TEMPORARY EMERGENCY DEPARTMENT MODULAR

BUILDING PER THE PROVIDED DIAGRAMS IN THE CONTRACT

DOCUMENTS.

2. PREPARE SITE TO RECEIVE TEMPORARY EMERGENCY

DEPARTMENT MODULAR BUILDING.

3. INSTALL TEMPORARY EMERGENCY DEPARTMENT MODULAR

BUILDING.

4. COMMISSION TEMPORARY EMERGENCY DEPARTMENT

MODULAR BUILDING.

5. TURN OVER TEMPORARY EMERGENCY DEPARTMENT

MODULAR TO VA FOR INSTALLATION OF FFE.

6. ALLOW 21 DAYS BETWEEN PHASE 2 & PHASE 3.

7. DO NOT MOVE ON TO PHASE 3 WITHOUT WRITTEN

PERMISSION FROM CO AND COR.

PRECONSTRUCTION PHASE

PHASE 3:

OBSERVATION BED RENOVATION & AHU REPLACEMENT.

1. RENOVATE OBSERVATION BED AREA.

2. INSTALL TEMPORARY AHU AND DUCTS.

3. REMOVE EXISTING AHU & TERMINAL UNITS.

4. INSTALL NEW AHU & NEW TERMINAL UNITS.

5. COMMISSION EXISTING AND NEW SYSTEMS.

6. TURN OVER RENOVATED AREA BACK TO VA FOR

INSTALLATION OF FFE.

7. ALLOW 21 DAYS BETWEEN PHASE 3 & PHASE 4.

8. DO NOT MOVE ON TO PHASE 4 WITHOUT WRITTEN

PERMISSION FROM CO AND COR.

PHASE 4:

SITE RESTORATION.

1. DISCONNECT UTILITIES FROM TEMPORARY EMERGENCY

DEPARTMENT MODULAR BUILDING & TEMPORARY

ELEVATORS.

2. REMOVE MODULAR BUILDING AND TEMPORARY ELEVATORS

FROM SITE.

3. REMOVE UTILITIES BACK TO SOURCES.

4. RESTORE SITE, PARKING LOT, RAILINGS, PLANTING AREAS

BACK TO ORIGINAL STATES.

4 MONTH WARRANTY WALK-THRU

9 MONTH WARRANTY WALK-THRU

PROJECT COMPLETE

TEMPORARY EMERGENCY DEPARTMENT MODULAR BUILDING &

ELEVATORS.

1. CONTRACTOR SHALL ACQUIRE THE RENTAL OF A TEMPORARY

EMERGENCY DEPARTMENT MODULAR BUILDING & TEMPORARY

ELEVATORS PER THE PROVIDED DIAGRAMS IN THE CONTRACT

DOCUMENTS.

2. PREPARE SITE TO RECEIVE TEMPORARY EMERGENCY

DEPARTMENT MODULAR BUILDING & ELEVATORS.

3. INSTALL TEMPORARY EMERGENCY DEPARTMENT MODULAR

BUILDING & ELEVATORS.

4. COMMISSION TEMPORARY EMERGENCY DEPARTMENT MODULAR

BUILDING& ELEVATORS .

5. TURN OVER TEMPORARY EMERGENCY DEPARTMENT MODULAR

& ELEVATORS TO VA FOR INSTALLATION OF FFE.

6. ALLOW 21 DAYS BETWEEN PHASE 2 & PHASE 3.

7. DO NOT MOVE ON TO PHASE 3 WITHOUT WRITTEN PERMISSION

FROM CO AND COR.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:3

P

M

G-003

GENERAL PRECONSTRUCTION INFECTION

CONTROL RISK ASSESSMENT

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS E. DANIELS

ISSUED FOR

CONSTRUCTION

EXAMPLE OF TEMPORARY INFECTION CONTROL PARTITION AND HEPA EXHAUST

SYSTEM

EMERGENCY

EYEWASH

M A

X

3' -0

M

IN

6'

-8

M

IN

2'

-3

DIMENSION TO BOTTOM OF

KNEE SPACE

DIMENSION TO SPRAY HEAD

M A

X

3' -0

" M A

X 4'

-0

EMERGENCY

EYEWASH / SHOWER

DIMENSION TO

SPRAY HEAD

RECESSED OR SURFACE

MOUNTED F.E. CABINET

M A

X R

E A

C H

4' -0

" M A

X 5'

-0

ACCESSIBLE

ROBE HOOK

TOILET PAPER

HOLDER

TOILET

SANITARY

NAPKIN

DISPOSAL

N C

GRAB BARS

WALL

LAVATORY PAPER TOWEL

DISPENSER

SOAP DISPENSER

MIRROR, CENTER

OVER LAV

DIMENSION TO

COIN OPERATOR

SANITARY

NAPKIN

VENDOR

DIMENSION TO

BOTTOM OF

KNEE SPACE

DIMENSION

TO SPOUT

ELECTRIC

WATER

COOLER

TOWEL BAR

MIN

4'-0"

2' -1

2' -4

2' -9

M

IN

3' -0

M

A X

4" 1'

-6

C L

C L

1' -6

3'-6" 1'-0"

2' -1

0"

MIN.

1'-6"

3' -3

3' -5

3' -1

1"

C L

3' -7

M

IN

2'

-4

M A

X

3' -1

M A

X 4'

-0

CL CL

CL

C L

9" MAX

7" MIN

NOTE:

VERIFY ACCESORIES WITH TOILET SIZE

CL

5' -5

C L

ROBE HOOK

3'-4"

8"

1'-0"

GRAB BARS

3'-0" @ STF TLT

2'-0"

1' -6

2' -9

M

IN

3' -0

M

A X

C L

16" MIN, 18" MAX

CL

1'-0" MIN.

CL

3'-0" CL

CLCL

SWING UP GRAB BAR,

OMIT AT STF TLT

2' -1

1"

C L

MIN.

1'-6"

MARKER BOARD OR TACK

BOARD, 36" HIGH OR

HIGHER

TEMPERED GLASS MIRROR

WITH FRAME

MARKER BOARD OR TACK

BOARD, LESS THAN 36"

HIGH

7' -0

6' -0

M

IN

6' -2

1'-6"

(2) COAT HOOKS

ON PLAM STRIP

4' -6

C L

M A

X 4'

-0

C L

1'' BETWEEN CRASH RAILS

AND CORNER GUARD OR

DOOR FRAME

CRASH RAIL

CORNER GUARD

CRASH RAIL

PROTECTIVE WALL

COVERING

VERIFY W/

OWNER'S

FURNITURE 1'' BETWEEN HAND RAILS

AND CORNER GUARD OR

DOOR FRAME

CHAIR RAIL

CHAIRS (NIC)

HAND RAIL

CORNER GUARD

1' -0

3' -0

2' -6

2' -1

0"

C L

ADA AUTOMATIC DOOR

PUSH PAD

ROOM SIGNAGE MOUNT ON

LATCH SIDE OF DOOR

5' -0

2"

3' -4

C L

C L

COORDINATE LOW VOLTAGE AND HIGH VOLTAGE INSTALLATION WITH HARDWARE REQUIREMENTS. HARDWARE

INSTALLER TO CERTIFY POWER SOURCE IS SIZED FOR LEAF SIZE AND WEIGHT.

ENSURE ACCESSIBLE OPERATION IS ON UPS AND EMERGENCY POWER

1' -3

HEADWALL LEGEND

N POWER RECEPTACLE (NORMAL POWER)

C RED POWER RECEPTACLE (EMERGENCY POWER)

O OXYGEN

A MEDICAL AIR

V VACUUM

B BLANK

PH PHONE JACK

NC NURSE CALL

O

CB

AV

OAV

PH

C

B

C

C

CB

N

N

NC

O

CB

AV

OAV

PH

C

B

C

C

CB

N

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:3

P

M

G-050

GENERAL TYPICAL FIXTURE MOUNTING

HEIGHTS

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS E. DANIELS

ISSUED FOR

CONSTRUCTION

1/4" = 1'-0" D6

TYPICAL EMERGENCY FIXTURES MOUNTING HEIGHTS

1/4" = 1'-0" B4

TYPICAL FIXTURE MOUNTING HEIGHTS

1/4" = 1'-0" C6

TYPICAL WALL MOUNT EQUIPMENT MOUNTING HEIGHTS

*NOTE NOT ALL ITEMS ARE USED. SEE FLOOR

PLANS AND ELEVATIONS FOR EQUIPTMENT .

1/4" = 1'-0" B2

TYPICAL WALL PROTECTION MOUNTING HEIGHTS

1/4" = 1'-0" D4

TYPICAL SIGNAGE MOUNTING HEIGHTS

3/8" = 1'-0"

D9

TYPICAL HEADWALL DETAIL

DN

UP

DN

APPLICABLE BUILDING CODES

• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72 NATIONAL FIRE

ALARM AND SIGNALING CODE & 2016 NFPA 13 STANDARD FOR

INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF NFPA 5000

AND NFPA 900

• 2018 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)

STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2017 NATIONAL ELECTRICAL CODE (NEC)

• 2018 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE

(PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR

DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS,

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR

NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433, 434 AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01 00 00 AND 01 35 26 OF

THE VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE

STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE 170-2013, NON-

MEDICAL SPACES - ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2013

• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA

STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE STANDARD

OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)

BUILDING CODE DATA

CONSTRUCTION TYPE:

TYPE V (111) PER NFPA 220, Chapter 4

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:

STRUCTURAL FRAME 1 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 1 HOURS

FLOORS 1 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 1 HOURS

MEDICAL GAS / HAZARDOUS

STORAGE 1 HOURS

CLASSIFICATION OF OCCUPANCY:

NEW: AMBULATORY HEALTHCARE Occupancy per Chapter 20.

EXISTING: NONE

EXIT ACCESS TRAVEL DISTANCE:

20.2.6.2.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

AMBULATORY HEALTHCARE OCCUPANCY; PROTECTED = 200'-0"

OCCUPANT LOAD:

20.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

CALCULATED OCCUPANT LOADS

PROJECT AREA = 154 TOTAL OCCUPANTS

MEANS OF EGRESS:

20.2.3 Capacity of Means of Egress.

20.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

20.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 96 in. (2438 mm).

20.2.4 Number of Means of Egress.

20.2.4.3 Not les than two exits of the types described in 20.2.2 shall be accessible from each smoke compartment.

20.2.4.4 Egress from smoke compartments addressed in 20.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.

LEGEND

PROTECTION OF VERTICAL OPENINGS:

20.3.1 Protection of Vertical Openings.

20.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PATH OF TRAVEL (DISTANCE)

EXIT LIGHTING

XXX

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

DIRECTION OF EGRESS &

AGGREGATE DISTANCE

WIDTH PROVIDEDP: XX"

R: XX"

WIDTH REQUIRED

50'-0"

50'-0"

PROTECTION FROM HAZARDS:

20.3.2 Protection from Hazards.

20.3.2.1 Hazardous Areas

20.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.

20.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

20.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.

20.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

20.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED.

OPAQUE THERMAL ENVELOPE MINIMUM REQUIREMENTS: CLIMATE ZONE 3C

Roofs

Insulation Entirely Above Deck: R-25CI Attic and Other: R-38

Walls, Above Grade Wood Framed: R-13 + R-3.8CI OR R-20

Floors Joist: R-30

FENESTRATION MINIMUM REQUIREMENTS: CLIMATE ZONE 3C

Fixed Fenestration: U-0.46 Entrance Doors: U-0.77

SHGC SEW N

PF < 0.2 0.25 0.33

0.2 ≤ PF < 0.5 0.30 0.37

PF ≥ 0.50.40 0.40

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.

Occupancy Classification

HEALTH CARE

WAITING

211211

POLICE

152152

ED

DIRECTOR

168168

NURSE

MANAGER

169169

TREATMENT

RM 1

188188

TREATMENT

RM 2

167167

TREATMENT

RM 3

166166

TREATMENT

RM 4

165165

TREATMENT

RM 5

155155

EXAM

NEG

PRESSURE

161161

ANTEROOM

NEG

PRESSURE

162162

ANTEROOM

NEG

PRESSURE

159159

EXAM

NEG

PRESSURE

157157

LIFE

SUPPORT

UNIT

170170

SMALL

TRAUMA

172172

FAST

TRACK

180180

FAST

TRACK

181181

TRIAGE

194194

TRIAGE

182182

TRIAGE

183183

MENS

RESTROOM

191191

WOMENS

RESTROOM

190190

CHECK

IN

178178

TRIAGE

192192

DOCTOR

CHARTING

149149

NURSE

STATION

212212

NOURISHMENT

186186

CLEAN

UTLITY

147147

SOILDED

UTLITY

146146

BREAK

ROOM

148148

STAFF

RESTROOM

185185

HAC

193193

MEDICATION

RM

196196

PATIENT

RESTROOM/

SHOWER

151151

BARIATRIC

EXAM

NEG

PRESSURE

175175

RESTROOM

150150

CHARTING

187187

TREATMENT

RM 6

195195

NURSE

STATION

154154

INTERVENTION

SECLUSION

RM,

MENTAL

HEALTH

173173

P : 3

8"

R : 6

1/ 2"

P: 3' - 8 1/2" R: 3' - 8"

R : 3

8"

CORRIDOR

198198

B A

R

IA

T R

IC

R

E S

T R

O O

M

CORRIDOR

199199

RESTROOM

NEG

PRESSURE

160160

RESTROOM

NEG

PRESSURE

163163

CORRIDOR

201201

C O

R R

ID

O

R

FEC

FEC

SMOKE COMPARTMENT 1,943 SQ FT SMOKE COMPARTMENT 8,048 SQ FT

IPC TABLE 403.1

CLASSIFICATION

DESCRIPTION

Water Closets Lavatories BathTubs/Showers Drinking Fountain

Other

Male Female Male Female

HEALTHCARE

1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50

1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80

- 1 per 100 1 service sink

154 Occupants -

Required 5 3 -

Providing 2 2 2 2 1 SHOWER

1 service sink

2 1 service sink

Unisex

Unisex

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.M

O D

U L

A R

.r v t

/1

/2

:5

:4

P

M

G-100

GENERAL LIFE SAFETY PLAN AND CODE DATA

- MODULAR BUILDING

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

CONTACT: MAT PERKINS

PHONE: 562.452.7175

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA…