570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26121R0066
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. SHIELDS AVE
E. CLINTON AVE
N
B L A
C K
S T
O N
E A
V E
E. SHIELDS AVE
E. MCKINLEY AVE
E. OLIVE AVE
N
F R
E S
N O
S T
N
F
IR
S T
S T
N
C E
D A
R A
V E
N
M A
P L E
A V
E
VACCHCS
PROJECT REVIEW
DATE: APPROVED: DIRECTOR
DATE: APPROVED: CHIEF OF STAFF
DATE: APPROVED: CHIEF, SAFETY SERVICE
DATE: APPROVED: CHIEF ENGINEER
DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES
DATE: APPROVED: CONTRACTING OFFICER
DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ELECTRICAL: MECHANICAL:
P2S ENGINEERING, INC.
5000 E. SPRING STREET, 8TH FLOOR
LONG BEACH, CA 90815-5218
562.497.2999
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
M O
D U
LA
R
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
G-000
GENERAL COVER SHEET
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
ISSUED FOR CONSTRUCTION
06/18/2021
570-17-210 REMODEL ED BEDS FOR OBSERVATION BEDS - OPC
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
VICINITY MAP
NOT TO SCALE
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________SIGNATURE ________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY
INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL
DIVISIONS ARE PAID BY THE GENERAL CONTRACTOR.
CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION
CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS
CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY
REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY
INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS
SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS
CONTRACT. ALL INSPECTIONS, TESTING CERTIFICATIONS, AND
PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.
THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED
INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN
PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON
THE CONTRACTOR.
SCOPE OF WORK
Section 01 00 00
1. STATEMENT OF BID ITEM(S)
A. CLIN 0001 - ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes rental Temporary emergency department modular building, temporary rental hospital elevators, general construction, alterations, and necessary removal of existing systems and structures and construction or and certain other items. Project includes modifications to existing HVAC, electrical, and IT.
A new variable air volume air handling unit (AHU-3) will be installed in the basement mechanical room of Building OPC. The unit will be approximately 13,000 CFM and it will consist of an energy recovery wheel, an exhaust fan, a variable frequency drive, return air inlet plenum, a return air sound attenuator, a return/relief fan with fan wall technology and a variable frequency drive, a mixing box with an air side economizer, a MERV 7 pre-filter #1 , a MERV 11 pre-filter #2, a hot water reheat coil, a clean steam humidifier, a chilled water cooling coil, a heating hot water heating coil, a supply fan with fan wall technology and a variable frequency drive, a sound attenuator, final filters MERV 14, and a discharge plenum. Variable frequency drives will be provided for the supply, return, and exhaust air fans. The fixed minimum outside air will be pre-conditioned by the energy recovery ventilation section of the air handling unit. General exhaust will be provided for the toilet rooms, the soiled utility room, the soiled linen room, and the housekeeping closet as required and discharged to atmosphere via the energy recovery ventilation section exhaust air fan. The exhaust air discharge will be terminated a minimum of 25’-0” away from any outside air intakes and/or building opening and a minimum 10’ above the roof level. All spaces will be provided with outdoor air ventilation as required to maintain minimum design air changes per hour in compliance with ASHRAE, IMC, VA, and FGI medical facility design recommendations.
Provide new single duct terminal units with hospital grade liner, hot water reheat coil, valve actuator, airflow sensor, duct probe temperature sensor, and factory mounted Metasys controller shall be provided at each location identified on the mechanical plans and schedules. Additional items include a thermostat, a valve set, control wiring and conduit, and power wiring and conduit to provide a complete and operational system at each installation. Each valve set includes a stainless-steel hose with a Belimo or equal pressure independent control valve, strainer, and isolation valves on the HWS and HWR valve set. A network controller panel shall be provided to serve a maximum of 60 terminal units. Electrical 120V feeders shall be extended to each terminal unit with all associated conduit, mounting hardware, junction boxes and fittings. Each terminal unit shall be provided with a 120V/24V power supply to actuate the damper and valve controllers. New electrical feeders shall be supplied by new emergency power panels and circuit breakers as shown on the drawings.
In addition to sealing all new penetrations, Contractor is responsible for providing fire stopping for all existing, unprotected penetrations in the Area of Work. Contractor shall bid (100 penetrations and a deductive change order will be issued if the actual number is less than the estimated number.
All systems are to be commissioned as new with re-commissioning after one year from Government Acceptance.
A. CLIN 0002 - ITEM II: Deductive alternate no.1 remove all architectural renovation work associated with the interior emergency department bed observation area, this includes demolition work and all construction work outlined within the "area of work". Exterior Work shown on A-200, A-350, & A-351 REMAIN. Omit Sheets G-101, AD100, AD100B, AD150, AD150B, A-101, A-101B, A-101B-1, AC101, AC101B, A-402, A-403, A-601, A-901, A-902, AW101, AW601, IN101, IN601, IN701, Q-100, Q-600.
B. CLIN 0003 - ITEM III: Deductive alternate no.2: remove ERV (energy recovery ventilator) from ahu (air handler unit) selection.
C. CLIN 0004 – ITEM IV: Deductive alternate no. 3: remove signage from trailer completely. Omit Sheets
AW100 & AW600.
NO ACM (ASBESTOS CONTAINING MATERIAL) IS ALLOWED ON THIS PROJECT. NO
DUCT ADHESIVE OR ROOF ADHESIVE SHALL CONTAIN ACM. CONTRACTOR IS TO
SUBMIT ALL PRODUCT FOR REVIEW WITH A CERTIFICATE FROM THE PRODUCT
MANUFACTURER THAT NO ACM IS PRESENT IN THE PRODUCT.
Revisions: Date:
06/18/2021
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:3
P
M
G-001
GENERAL DRAWING INDEX
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
- DRAWING INDEX -
SHEET NUMBER SHEET NAME 35% SUBMITTAL 65% SUBMITTAL 95% SUBMITTAL
100% PRE-FINAL
SUBMITTAL
100% FINAL
SUBMITTAL
GENERAL
G-000 GENERAL COVER SHEET Yes Yes Yes Yes Yes
G-001 GENERAL DRAWING INDEX Yes Yes Yes Yes Yes
G-002 GENERAL VA PROJECT NOTES Yes Yes Yes Yes Yes
G-003 GENERAL PRECONSTRUCTION INFECTION CONTROL RISK ASSESSMENT No No No Yes Yes
G-050 GENERAL TYPICAL FIXTURE MOUNTING HEIGHTS Yes Yes Yes Yes Yes
G-100 GENERAL LIFE SAFETY PLAN AND CODE DATA - MODULAR BUILDING No No No No Yes
G-101 GENERAL LIFE SAFETY PLAN AND CODE DATA Yes Yes Yes Yes Yes
G-101-1 GENERAL LIFE SAFETY PLAN AND CODE DATA - DEDUCT ALT NO.1 No No No No Yes
GI200 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY MEASURES Yes Yes Yes Yes Yes
GC300 PROJECT PHASING PLAN No No No No Yes
CIVIL
CD101 CIVIL DEMO PLAN Yes
CS101 CIVIL SITE PLAN Yes Yes Yes Yes Yes
CS501 CIVIL DETAIL SHEET 1 No No Yes Yes Yes
CS502 CIVIL DETAIL SHEET 2 Yes
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES Yes
S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes
S-350 FRAMING SECTION AND ENLARGED PLANS Yes
S-520 FRAMING DETAILS Yes
ARCHITECTURE - MODULAR
A-101M ARCHITECTURAL MODULAR BUILDING - REQUIRED ADJACENCY PLAN No Yes Yes Yes Yes
AC101M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - REFLECTED CEILING PLAN No No Yes Yes Yes
A-400M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - ENLARGED VIEWS No No Yes No Yes
A-401M ARCHITECTURAL MODULAR BUILDING - OVERALL PLAN - ENLARGED VIEWS No No Yes Yes Yes
A-512M ARCHITECTURAL MODULAR BUILDING CASEWORK DETAILS No Yes No Yes Yes
AW101M ARCHITECTURAL MODULAR BUILDING SIGNAGE PLAN - DEDUCT ALT NO.3 No No Yes Yes Yes
AW600M ARCHITECTURAL MODULAR BUILDING SIGNAGE DETAILS AND LEGEND - DEDUCT ALT NO.3 No No Yes Yes Yes
IN100M INTERIOR FINISH MODULAR BUILDING - PLAN No No Yes Yes Yes
ES101 ELECTRICAL SITE PLAN No No No No Yes
ARCHITECTURE
A-002 ARCHITECTURAL ABBREVIATIONS & SYMBOLS Yes Yes Yes Yes Yes
AD100 ARCHITECTURAL DEMO PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
AD100B ARCHITECTURAL DEMO PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
AD150 ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
AD150B ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
A-100 ARCHITECTURAL FLOOR PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes
A-100B ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
A-100B-1 ARCHITECTURAL DIMENSION PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
A-100B-3 ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B, DEDUCT ALT. NO. 1 No No No Yes Yes
AC100 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
AC100B ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
AC100B-3 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 No No Yes Yes Yes
A-200 PROPOSED BUILDING ELEVATIONS Yes Yes Yes Yes Yes
A-350 EXTERIOR WALL SECTIONS & DETAILS No No Yes Yes Yes
A-351 EXTERIOR ENLARGED PLANS & DETAILS No No No No Yes
A-401 ARCHITECTURAL ENLARGED VIEWS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED VIEWS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
A-511 ARCHITECTURAL CEILING DETAILS - DEDUCT ALT NO.1 No Yes Yes Yes Yes
A-512 ARCHITECTURAL DETAILS - DEDUCT ALT NO.1 No Yes Yes Yes Yes
A-601 ARCHITECTURAL DOOR SCHEDULE - DEDUCT ALT NO.3 Yes Yes Yes Yes Yes
A-701 INTERIOR WALL TYPES - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
A-721 HEAD-OF-WALL DETAILS Yes Yes Yes Yes Yes
A-722 PARTITION FRAMING DETAILS Yes Yes Yes Yes Yes
A-901 ARCHITECTURAL INTERIOR RENDERINGS - DEDUCT ALT NO.1 No Yes Yes Yes Yes
A-902 ARCHITECTURAL CUTSHEETS - DEDUCT ALT NO.1 No No Yes Yes Yes
SIGNAGE
AW100B ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT NO.3 No No Yes Yes Yes
AW601 ARCHITECTURAL SIGNAGE NOTES AND SCHEDULE - DEDUCT ALT NO.3 No No Yes Yes Yes
INTERIOR DESIGN
IN100B INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
IN601 INTERIOR FINISH LEGEND & ROOM FINISH SCHEDULE - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
IN701 INTERIOR FINISH COLOR BOARDS - DEDUCT ALT NO.1 Yes Yes Yes Yes Yes
EQUIPMENT
Q-100B EQUIPMENT PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1 No Yes Yes Yes Yes
Q-600 EQUIPMENT SCHEDULE - DEDUCT ALT NO.1 No Yes Yes Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION LEGEND No No Yes Yes Yes
FXD100B FIRE PROTECTION DEMOLITION PLAN - LEVEL B - AREA B No No Yes Yes Yes
FX100B FIRE PROTECTION PLAN - LEVEL B - AREA B No No Yes Yes Yes
PLUMBING
P-001 PLUMBING LEGEND No No Yes Yes Yes
PD100B PLUMBING DEMOLITION PLAN - LEVEL B AREA B No No Yes Yes Yes
PD100D PLUMBING DEMOLITION PLAN - LEVEL B AREA D No No Yes Yes Yes
PP100B PLUMBING PLAN - LEVEL B AREA B No No Yes Yes Yes
PP100D PLUMBING PLAN - LEVEL B AREA D No No Yes Yes Yes
PG100B PLUMBING MEDICAL GAS PLAN - LEVEL B - AREA B No No Yes Yes Yes
P-701 PLUMBING SCHEDULES No No Yes Yes Yes
MECHANICAL
M-001 MECHANICAL LEGEND Yes Yes Yes Yes Yes
MS101 MECHANICAL TEMPORARY SITE PLAN Yes Yes Yes Yes Yes
MD100A MECHANICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes
MD100B MECHANICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
MD100C MECHANICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
MD100D MECHANICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
MD102 MECHANICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
MH100A MECHANICAL DUCT PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes
MH100B MECHANICAL DUCT PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
MH100B.1 MECHANICAL DUCT PLAN - LEVEL B - AREA B - DEDUCT ALTERNATE 1 No No Yes Yes Yes
MH100C MECHANICAL DUCT PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
MH100D MECHANICAL DUCT PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
MH102 MECHANICAL PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
MP100A MECHANICAL PIPING PLAN - LEVEL B - AREA A No No Yes Yes Yes
MP100B MECHANICAL PIPING PLAN - LEVEL B - AREA B No No Yes Yes Yes
MP100C MECHANICAL PIPING PLAN - LEVEL B - AREA C No No Yes Yes Yes
MP100D MECHANICAL PIPING PLAN - LEVEL B - AREA D No No Yes Yes Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes Yes
M-601 MECHANICAL AIR FLOW DIAGRAM - SUPPLY AIR Yes Yes Yes Yes Yes
M-602 MECHANICAL AIR FLOW DIAGRAM - RETURN & EXHAUST AIR Yes Yes Yes Yes Yes
M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-703 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes
M-704 MECHANICAL CUT SHEETS No Yes Yes Yes Yes
M-705 MECHANICAL CUT SHEETS No Yes Yes Yes Yes
M-801 MECHANICAL CONTROLS LEGEND Yes Yes Yes Yes Yes
M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes
M-805 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes Yes
M-901 MECHANICAL REFERENCES No No Yes Yes Yes
M-902 MECHANICAL REFERENCES No No Yes Yes Yes
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes Yes
ED100A ELECTRICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes
ED100B ELECTRICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
ED100C ELECTRICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
ED100D ELECTRICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
ED102 ELECTRICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
EL100B ELECTRICAL LIGHTING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
EP100A ELECTRICAL POWER PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes
EP100B ELECTRICAL POWER PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
EP100C ELECTRICAL POWER PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes
EP100D ELECTRICAL POWER PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes
EP102 ELECTRICAL POWER PLAN - ROOF LEVEL Yes Yes Yes Yes Yes
ET100B ELECTRICAL SYSTEMS PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes
E-601 PARTIAL ONE LINE DIAGRAM Yes Yes Yes Yes Yes
E-602 PARTIAL ONE LINE DIAGRAM No No No Yes Yes
E-701 ELECTRICAL SCHEDULES AND DETAILS Yes Yes Yes Yes Yes
E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes Yes
Grand total: 119
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:5
:5
P
M
G-002
GENERAL VA PROJECT NOTES
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR
TO FABRICATION AND CONSTRUCTION. IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS
ARE DISCOVERED FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR
INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES
AND LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER
AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL
VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.
REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK
RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE
CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,
PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. VV: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS VV IS NOT IN THE CONTRACT.
HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS VV.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH COR, INCLUDING STAGING
AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,
INTERRUPTION OF UTILITIES. SEE SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S
WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION
IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH
FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN DISSIMILAR METALS. SEE
SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE
SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR
MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,
MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL
AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS TO BE COORDINATED WITH
COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES ARE DISCOVERED AFTER THE BID FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION, SHOP DRAWINGS, AND COORDINATION DRAWINGS; CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS
REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION
RELATED TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
FLOOR PLAN DIMENSIONS
1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO OUTSIDE
GRIDLINE) AS SHOWN.
2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF MASONRY
WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE
PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.
5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2"
(1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.
6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE PLUS
1" -WALL STOP PLUS 1/2" GB=4.0")
7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF
FINISHES.
8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.
ROOF PLAN DIMENSIONS
1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND
LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.
2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE ARCHITECT AND COR
PRIOR TO CONSTRUCTION.
VERTICAL DIMENSIONS
1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.
ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING OR
SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES
SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION
4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.
5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a"
PROTECTION OF NFPA 101 LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES; AND SECTION 28
31 00 FIRE DETECTION AND ALARM FOR APPROVAL PRIOR TO THE INSTALLATION.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE
EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH
EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL
EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
EXIT AND EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH
LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND
CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.
EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL.
EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW
THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC
GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED.
CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS TO BE INSTALLED IN ACCORDANCE
WITH 2016 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE
PERMISSIBLE.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE BUILDING IS EQUIPPED WITH A FIRE
SPRINKLER AND FIRE ALARM SYSTEM.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED
MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A
FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50
WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES
AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING
ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE
DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44"
ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR
CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF
70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
8. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE
SEALED WITH A UL APPROVED METHOD AND MATERIAL.
1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE REMOVAL, INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE
WALL, FLOOR, AND/OR ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND PUBLIC
ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY & DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH COR.
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL
FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE
TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF
PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY
PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS
(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,
UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS
MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL NOTES.
THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR
EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL
SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN
ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE
PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED
IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED
OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER
THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE ENTIRE
SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE- FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, FOLLOW
PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER, BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED
AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF
PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE
EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.
PROPER PRIMING MUST BE USED WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, FOLLOW PROCEDURES
LISTED IN SECTION 01 33 23.
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND
VERTICAL CONCRETE JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL
BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE
PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT
UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED
EQUIPMENT FRAMES AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS
(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE
ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.
Revisions: Date:
PHASE 1:
PHASING NOTES:
1. SUBMIT AND OBTAIN APPROVALS FOR ALL
PRECONSTRUCTION SUBMITTALS.
2. SUBMIT AND OBTAIN APPROVALS ALL SUBMITTALS AND
COORDINATION DRAWINGS.
3. END OF PHASE 1.
PHASE 2:
TEMPORARY EMERGENCY DEPARTMENT MODULAR BUILDING.
1. CONTRACTOR SHALL ACQUIRE THE RENTAL OF A
TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING PER THE PROVIDED DIAGRAMS IN THE CONTRACT
DOCUMENTS.
2. PREPARE SITE TO RECEIVE TEMPORARY EMERGENCY
DEPARTMENT MODULAR BUILDING.
3. INSTALL TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING.
4. COMMISSION TEMPORARY EMERGENCY DEPARTMENT
MODULAR BUILDING.
5. TURN OVER TEMPORARY EMERGENCY DEPARTMENT
MODULAR TO VA FOR INSTALLATION OF FFE.
6. ALLOW 21 DAYS BETWEEN PHASE 2 & PHASE 3.
7. DO NOT MOVE ON TO PHASE 3 WITHOUT WRITTEN
PERMISSION FROM CO AND COR.
PRECONSTRUCTION PHASE
PHASE 3:
OBSERVATION BED RENOVATION & AHU REPLACEMENT.
1. RENOVATE OBSERVATION BED AREA.
2. INSTALL TEMPORARY AHU AND DUCTS.
3. REMOVE EXISTING AHU & TERMINAL UNITS.
4. INSTALL NEW AHU & NEW TERMINAL UNITS.
5. COMMISSION EXISTING AND NEW SYSTEMS.
6. TURN OVER RENOVATED AREA BACK TO VA FOR
INSTALLATION OF FFE.
7. ALLOW 21 DAYS BETWEEN PHASE 3 & PHASE 4.
8. DO NOT MOVE ON TO PHASE 4 WITHOUT WRITTEN
PERMISSION FROM CO AND COR.
PHASE 4:
SITE RESTORATION.
1. DISCONNECT UTILITIES FROM TEMPORARY EMERGENCY
DEPARTMENT MODULAR BUILDING & TEMPORARY
ELEVATORS.
2. REMOVE MODULAR BUILDING AND TEMPORARY ELEVATORS
FROM SITE.
3. REMOVE UTILITIES BACK TO SOURCES.
4. RESTORE SITE, PARKING LOT, RAILINGS, PLANTING AREAS
BACK TO ORIGINAL STATES.
4 MONTH WARRANTY WALK-THRU
9 MONTH WARRANTY WALK-THRU
PROJECT COMPLETE
TEMPORARY EMERGENCY DEPARTMENT MODULAR BUILDING &
ELEVATORS.
1. CONTRACTOR SHALL ACQUIRE THE RENTAL OF A TEMPORARY
EMERGENCY DEPARTMENT MODULAR BUILDING & TEMPORARY
ELEVATORS PER THE PROVIDED DIAGRAMS IN THE CONTRACT
DOCUMENTS.
2. PREPARE SITE TO RECEIVE TEMPORARY EMERGENCY
DEPARTMENT MODULAR BUILDING & ELEVATORS.
3. INSTALL TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING & ELEVATORS.
4. COMMISSION TEMPORARY EMERGENCY DEPARTMENT MODULAR
BUILDING& ELEVATORS .
5. TURN OVER TEMPORARY EMERGENCY DEPARTMENT MODULAR
& ELEVATORS TO VA FOR INSTALLATION OF FFE.
6. ALLOW 21 DAYS BETWEEN PHASE 2 & PHASE 3.
7. DO NOT MOVE ON TO PHASE 3 WITHOUT WRITTEN PERMISSION
FROM CO AND COR.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:3
P
M
G-003
GENERAL PRECONSTRUCTION INFECTION
CONTROL RISK ASSESSMENT
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS E. DANIELS
ISSUED FOR
CONSTRUCTION
EXAMPLE OF TEMPORARY INFECTION CONTROL PARTITION AND HEPA EXHAUST
SYSTEM
EMERGENCY
EYEWASH
M A
X
3' -0
M
IN
6'
-8
M
IN
2'
-3
DIMENSION TO BOTTOM OF
KNEE SPACE
DIMENSION TO SPRAY HEAD
M A
X
3' -0
" M A
X 4'
-0
EMERGENCY
EYEWASH / SHOWER
DIMENSION TO
SPRAY HEAD
RECESSED OR SURFACE
MOUNTED F.E. CABINET
M A
X R
E A
C H
4' -0
" M A
X 5'
-0
ACCESSIBLE
ROBE HOOK
TOILET PAPER
HOLDER
TOILET
SANITARY
NAPKIN
DISPOSAL
N C
GRAB BARS
WALL
LAVATORY PAPER TOWEL
DISPENSER
SOAP DISPENSER
MIRROR, CENTER
OVER LAV
DIMENSION TO
COIN OPERATOR
SANITARY
NAPKIN
VENDOR
DIMENSION TO
BOTTOM OF
KNEE SPACE
DIMENSION
TO SPOUT
ELECTRIC
WATER
COOLER
TOWEL BAR
MIN
4'-0"
2' -1
2' -4
2' -9
M
IN
3' -0
M
A X
4" 1'
-6
C L
C L
1' -6
3'-6" 1'-0"
2' -1
0"
MIN.
1'-6"
3' -3
3' -5
3' -1
1"
C L
3' -7
M
IN
2'
-4
M A
X
3' -1
M A
X 4'
-0
CL CL
CL
C L
9" MAX
7" MIN
NOTE:
VERIFY ACCESORIES WITH TOILET SIZE
CL
5' -5
C L
ROBE HOOK
3'-4"
8"
1'-0"
GRAB BARS
3'-0" @ STF TLT
2'-0"
1' -6
2' -9
M
IN
3' -0
M
A X
C L
16" MIN, 18" MAX
CL
1'-0" MIN.
CL
3'-0" CL
CLCL
SWING UP GRAB BAR,
OMIT AT STF TLT
2' -1
1"
C L
MIN.
1'-6"
MARKER BOARD OR TACK
BOARD, 36" HIGH OR
HIGHER
TEMPERED GLASS MIRROR
WITH FRAME
MARKER BOARD OR TACK
BOARD, LESS THAN 36"
HIGH
7' -0
6' -0
M
IN
6' -2
1'-6"
(2) COAT HOOKS
ON PLAM STRIP
4' -6
C L
M A
X 4'
-0
C L
1'' BETWEEN CRASH RAILS
AND CORNER GUARD OR
DOOR FRAME
CRASH RAIL
CORNER GUARD
CRASH RAIL
PROTECTIVE WALL
COVERING
VERIFY W/
OWNER'S
FURNITURE 1'' BETWEEN HAND RAILS
AND CORNER GUARD OR
DOOR FRAME
CHAIR RAIL
CHAIRS (NIC)
HAND RAIL
CORNER GUARD
1' -0
3' -0
2' -6
2' -1
0"
C L
ADA AUTOMATIC DOOR
PUSH PAD
ROOM SIGNAGE MOUNT ON
LATCH SIDE OF DOOR
5' -0
2"
3' -4
C L
C L
COORDINATE LOW VOLTAGE AND HIGH VOLTAGE INSTALLATION WITH HARDWARE REQUIREMENTS. HARDWARE
INSTALLER TO CERTIFY POWER SOURCE IS SIZED FOR LEAF SIZE AND WEIGHT.
ENSURE ACCESSIBLE OPERATION IS ON UPS AND EMERGENCY POWER
1' -3
HEADWALL LEGEND
N POWER RECEPTACLE (NORMAL POWER)
C RED POWER RECEPTACLE (EMERGENCY POWER)
O OXYGEN
A MEDICAL AIR
V VACUUM
B BLANK
PH PHONE JACK
NC NURSE CALL
O
CB
AV
OAV
PH
C
B
C
C
CB
N
N
NC
O
CB
AV
OAV
PH
C
B
C
C
CB
N
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:3
P
M
G-050
GENERAL TYPICAL FIXTURE MOUNTING
HEIGHTS
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS E. DANIELS
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" D6
TYPICAL EMERGENCY FIXTURES MOUNTING HEIGHTS
1/4" = 1'-0" B4
TYPICAL FIXTURE MOUNTING HEIGHTS
1/4" = 1'-0" C6
TYPICAL WALL MOUNT EQUIPMENT MOUNTING HEIGHTS
*NOTE NOT ALL ITEMS ARE USED. SEE FLOOR
PLANS AND ELEVATIONS FOR EQUIPTMENT .
1/4" = 1'-0" B2
TYPICAL WALL PROTECTION MOUNTING HEIGHTS
1/4" = 1'-0" D4
TYPICAL SIGNAGE MOUNTING HEIGHTS
3/8" = 1'-0"
D9
TYPICAL HEADWALL DETAIL
DN
UP
DN
APPLICABLE BUILDING CODES
• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72 NATIONAL FIRE
ALARM AND SIGNALING CODE & 2016 NFPA 13 STANDARD FOR
INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF NFPA 5000
AND NFPA 900
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2017 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE
(PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR
DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS,
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR
NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01 00 00 AND 01 35 26 OF
THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE
STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE 170-2013, NON-
MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA
STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE STANDARD
OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)
BUILDING CODE DATA
CONSTRUCTION TYPE:
TYPE V (111) PER NFPA 220, Chapter 4
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
STRUCTURAL FRAME 1 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 1 HOURS
FLOORS 1 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 1 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE 1 HOURS
CLASSIFICATION OF OCCUPANCY:
NEW: AMBULATORY HEALTHCARE Occupancy per Chapter 20.
EXISTING: NONE
EXIT ACCESS TRAVEL DISTANCE:
20.2.6.2.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
AMBULATORY HEALTHCARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
20.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
CALCULATED OCCUPANT LOADS
PROJECT AREA = 154 TOTAL OCCUPANTS
MEANS OF EGRESS:
20.2.3 Capacity of Means of Egress.
20.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
20.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 96 in. (2438 mm).
20.2.4 Number of Means of Egress.
20.2.4.3 Not les than two exits of the types described in 20.2.2 shall be accessible from each smoke compartment.
20.2.4.4 Egress from smoke compartments addressed in 20.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.
LEGEND
PROTECTION OF VERTICAL OPENINGS:
20.3.1 Protection of Vertical Openings.
20.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PATH OF TRAVEL (DISTANCE)
EXIT LIGHTING
XXX
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
DIRECTION OF EGRESS &
AGGREGATE DISTANCE
WIDTH PROVIDEDP: XX"
R: XX"
WIDTH REQUIRED
50'-0"
50'-0"
PROTECTION FROM HAZARDS:
20.3.2 Protection from Hazards.
20.3.2.1 Hazardous Areas
20.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.
20.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
20.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.
20.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
20.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED.
OPAQUE THERMAL ENVELOPE MINIMUM REQUIREMENTS: CLIMATE ZONE 3C
Roofs
Insulation Entirely Above Deck: R-25CI Attic and Other: R-38
Walls, Above Grade Wood Framed: R-13 + R-3.8CI OR R-20
Floors Joist: R-30
FENESTRATION MINIMUM REQUIREMENTS: CLIMATE ZONE 3C
Fixed Fenestration: U-0.46 Entrance Doors: U-0.77
SHGC SEW N
PF < 0.2 0.25 0.33
0.2 ≤ PF < 0.5 0.30 0.37
PF ≥ 0.50.40 0.40
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
Occupancy Classification
HEALTH CARE
WAITING
211211
POLICE
152152
ED
DIRECTOR
168168
NURSE
MANAGER
169169
TREATMENT
RM 1
188188
TREATMENT
RM 2
167167
TREATMENT
RM 3
166166
TREATMENT
RM 4
165165
TREATMENT
RM 5
155155
EXAM
NEG
PRESSURE
161161
ANTEROOM
NEG
PRESSURE
162162
ANTEROOM
NEG
PRESSURE
159159
EXAM
NEG
PRESSURE
157157
LIFE
SUPPORT
UNIT
170170
SMALL
TRAUMA
172172
FAST
TRACK
180180
FAST
TRACK
181181
TRIAGE
194194
TRIAGE
182182
TRIAGE
183183
MENS
RESTROOM
191191
WOMENS
RESTROOM
190190
CHECK
IN
178178
TRIAGE
192192
DOCTOR
CHARTING
149149
NURSE
STATION
212212
NOURISHMENT
186186
CLEAN
UTLITY
147147
SOILDED
UTLITY
146146
BREAK
ROOM
148148
STAFF
RESTROOM
185185
HAC
193193
MEDICATION
RM
196196
PATIENT
RESTROOM/
SHOWER
151151
BARIATRIC
EXAM
NEG
PRESSURE
175175
RESTROOM
150150
CHARTING
187187
TREATMENT
RM 6
195195
NURSE
STATION
154154
INTERVENTION
SECLUSION
RM,
MENTAL
HEALTH
173173
P : 3
8"
R : 6
1/ 2"
P: 3' - 8 1/2" R: 3' - 8"
R : 3
8"
CORRIDOR
198198
B A
R
IA
T R
IC
R
E S
T R
O O
M
CORRIDOR
199199
RESTROOM
NEG
PRESSURE
160160
RESTROOM
NEG
PRESSURE
163163
CORRIDOR
201201
C O
R R
ID
O
R
FEC
FEC
SMOKE COMPARTMENT 1,943 SQ FT SMOKE COMPARTMENT 8,048 SQ FT
IPC TABLE 403.1
CLASSIFICATION
DESCRIPTION
Water Closets Lavatories BathTubs/Showers Drinking Fountain
Other
Male Female Male Female
HEALTHCARE
1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50
1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80
- 1 per 100 1 service sink
154 Occupants -
Required 5 3 -
Providing 2 2 2 2 1 SHOWER
1 service sink
2 1 service sink
Unisex
Unisex
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.M
O D
U L
A R
.r v t
/1
/2
:5
:4
P
M
G-100
GENERAL LIFE SAFETY PLAN AND CODE DATA
- MODULAR BUILDING
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
CONTACT: MAT PERKINS
PHONE: 562.452.7175
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .