570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf

PDF 7 MB Posted

Attached to
Z2DA--REMODEL EMERGENCY DEPARTMENT FOR OBSERVATION BEDS | 570-17-210
Solicitation number
36C26121R0066
Issued by

View the file

Other files

File Type Posted
36C26121R0066 0005.docx DOCX document
36C26121R0066 0004.docx DOCX document
Site Visit Sign-in Sheet--12.1.2021.pdf PDF
Site Visit Sign-in Sheet--11.10.2021.pdf PDF
36C26121R0066--Responses to Pre-Proposal RFIs (1-17)--Complete--12.6.2021.pdf PDF
Specification 11 73 00-rev01-12.03.2021.pdf PDF
36C26121R0066 0003.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-17).pdf PDF
36C26121R0066 0002.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-10).pdf PDF
ACM Report.pdf PDF
36C26121R0066 0001.docx DOCX document
570-17-210.OPC.IFC.DWG.20210618Part-7of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-10of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-2of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-5of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-9of10.pdf PDF
Factor 6 - Divisional Construction Costs.pdf PDF
REQUEST FOR INFORMATION (RFI) FORM--36C26121R0066.docx DOCX document
Factor 4 - Past Performance (Questionnaire).docx DOCX document
570-17-210.OPC.IFC.Specification.R2.20210618Part-4.pdf PDF
570-17-210.OPC.IFC.Specification.R2.20210618Part-2.pdf PDF
Factor 2 - Key Personnel Qualifications Resumes.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-3.pdf PDF
VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf PDF
General Decision Number CA20210018 10.08.2021.pdf PDF
Responsibility - Contractor Certification Regarding Safety and Environmental.pdf PDF
Site_Visit_MAP.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-1.pdf PDF
36C26121R0066_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

A

4 5 65.A

A.1

B

B.1

C

D

E

INTERVENTION

(SECLUSION)

ROOM

B1C28

119 SF

LINEN

CLOSET

B1C41

18 SF

LINEN

CLOSET

B1C42

19 SF

STAIR

NO.4

B1C43

168 SF

ELEVATOR

EQUIP

RM

B1C40

113 SF

LINEN

CLOSET

B1C39

11 SF

CHIEF

OF ER

B1C35

127 SF

HEAD

NURSE

B1C37

97 SF

EMS

CLOSET

B1C36

10 SF

MALE

RR

B1C33

121 SF

FEMALE

RR

B1C32

120 SF

ELEVATOR

S-5

82 SF

OBSERVATION/

TREATMENT

RM

B1C14

130 SF

CORRIDOR

B1C-2

618 SF

CORRIDOR

B1C-4B1C-4

INTERVENTION

(SECLUSION)

ROOM

B1C28B1C28

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR

NO.4

B1C43B1C43

ELEVATOR

EQUIP

RM

B1C40B1C40

LINEN

CLOSET

B1C39B1C39

CHIEF

OF ER

B1C35B1C35

EMS

CLOSET

B1C36B1C36

CORRIDOR

B1C-1B1C-1

WAITING

B1C-1B1C-1

ELEVATOR

S-6S-6

PATIENT

COMFORT

ROOM

BC127BC127

CORRIDOR

B1C-2B1C-2NURSE

STATION

B1C29AB1C29A

CORRIDOR

B1C-7B1C-7

CRASH

CART

ALCOVE

AREA OF WORK

AREA OF WORK

'-3

3 3

A3

AD100B

B3

AD100B

C3

AD100B

E3

AD100B

D3

AD100B

D1

AD100B C1

AD100B

B1

AD100B

A1

AD100B

WALL TYPE LEGEND

TEMPORARY WALL

DEMOLISHED WALL, FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE OR FURNISHING

NEW WALL

AREA NOT IN SCOPE

CONTRACT LIMIT

DEMOLISHED FURNITURE OR EQUIPMENT, SALVAGE TO OWNER

CLOSET

B1C34DB1C34D

OBS

BEDS

ROOM

B1C-6AB1C-6A

CORRIDOR

B1C-6B1C-6

HEAD

NURSE

B1C53B1C53

CLOSET

SPD

B1C51B1C51

TOILET

B1C24B1C24

OBSERVATION/

TREATMENT

RM

B1C23B1C23

NURSE

B1C34AB1C34A

CORRIDOR

B1C-8B1C-8

OBSERVATION/

TREATMENT

RM

B1C26B1C26

EXISTING FINISH ABBREVIATIONS

ACOUSTICAL CEILING TILE

PAINT

PORCELAIN TILE

RESILIENT BASE

RIGID WALL COVERING

CARPET

RESILIENT SHEET FLOORING

VINYL COMPOSITE TILE

AT

P

PT

RB

RWC

CPT

RSF

VT

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:0

P

M

AD100B

ARCHITECTURAL DEMO PLAN - LEVEL B - AREA

B - DEDUCT ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS E. DANIELS

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN OPERATIONAL DURING ALL

PHASES OF CONSTRUCTION. ENSURE ADEQUATE EGRESS CLEARANCES ARE

MAINTAINED AND NOT IMPEDED DURING PHASED CONSTRUCTION.

2. SEE GENERAL SHEETS FOR VA PROJECT NOTES, INFECTION CONTROL AND LIFE

SAFETY / CODE DATA FOR ADDITIONAL INTERIM LIFE SAFETY MEASURES AND

INFORMATION.

3. SEE A-701 FOR INTERIOR WALL TYPES.

4. SEE 'IN' SERIES DRAWINGS FOR INTERIOR DESIGN AND FINISHES.

5. SEE 'AW' SERIES DRAWINGS FOR ARCHITECTURAL SIGNAGE.

6. SEE 'Q-' SERIES DRAWINGS FOR HOSPITAL EQUIPMENT AND FURNISHINGS.

7. NO DRILLING OR JACK HAMMERING ACTIVITIES ALLOWED DURING BUSINESS

HOURS.

1/4" = 1'-0" F4

ARCHITECTURAL DEMOLITION PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1

NTS

A3

OB BEDS ROOM - NORTH

NTS

B3

OB BEDS ROOM - NORTHEAST

NTS

C3

POLICE SERVICE

NTS

D3

OB BEDS ROOM - SINK AREA

NTS

E3

OB BEDS ROOM - SOUTH

NTS

D1

SMALL TOILET - SOUTHEAST

NTS

A1

SMALL TOILET

NTS

C1

SMALL TOILET - NORTH

NTS

B1

SMALL TOILET - EAST

1 REMOVE EXISTING DOOR AND FRAME.

2 TEMPORARY PARTITIONS

3 REMOVE ALL PARTITIONS, WALL FINISHES, FLOOR FINISHES, CAP

ALL PLUMBING FIXTURES. REMOVE ALL FURNITURE, EQUIPMENT,

CORNER GUARDS AND SALVAGE TO OWNER. PREPARE SUB FLOOR

FOR NEW CONSTRUCTION AND FINISHES.

4 REMOVE EXISTING DOOR AND PARTITION

5 SALVAGE ALL BED BUMPERS FOR REUSE IN NEW LAYOUT

6 SALVAGE ALL WALL PROTECTION, HANDRAILS AND CRASHRAILS

FOR REUSE IN NEW LAYOUT

7 PORTION OF WALL TO REMAIN FOR FIRE EXTINGUISHER CABINET

8 MUST MAINTAIN EGRESS PATH TO CT SCAN AREA DURING

CONSTRUCTION

EXISTING ROOM FINISH SCHEDULE

ROOM

NUMBER NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

2 CLOSET RSF RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C22 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C23 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C24 TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C25 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C26 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C34A NURSE RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C34C SMALL TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C34D CLOSET RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C51 SPD VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C52 CHIEF OF ER CPT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C53 HEAD NURSE CPT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C54 TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C55 SOILED UTILITY RM VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C-6 CORRIDOR VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

B1C-6A OBS BEDS ROOM RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET

B1C-8 CORRIDOR VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.