570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf
PDF 7 MB Posted
- Solicitation number
- 36C26121R0066
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
A
4 5 65.A
A.1
B
B.1
C
D
E
INTERVENTION
(SECLUSION)
ROOM
B1C28
119 SF
LINEN
CLOSET
B1C41
18 SF
LINEN
CLOSET
B1C42
19 SF
STAIR
NO.4
B1C43
168 SF
ELEVATOR
EQUIP
RM
B1C40
113 SF
LINEN
CLOSET
B1C39
11 SF
CHIEF
OF ER
B1C35
127 SF
HEAD
NURSE
B1C37
97 SF
EMS
CLOSET
B1C36
10 SF
MALE
RR
B1C33
121 SF
FEMALE
RR
B1C32
120 SF
ELEVATOR
S-5
82 SF
OBSERVATION/
TREATMENT
RM
B1C14
130 SF
CORRIDOR
B1C-2
618 SF
CORRIDOR
B1C-4B1C-4
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
WAITING
B1C-1B1C-1
ELEVATOR
S-6S-6
PATIENT
COMFORT
ROOM
BC127BC127
CORRIDOR
B1C-2B1C-2NURSE
STATION
B1C29AB1C29A
CORRIDOR
B1C-7B1C-7
CRASH
CART
ALCOVE
AREA OF WORK
AREA OF WORK
'-3
3 3
A3
AD100B
B3
AD100B
C3
AD100B
E3
AD100B
D3
AD100B
D1
AD100B C1
AD100B
B1
AD100B
A1
AD100B
WALL TYPE LEGEND
TEMPORARY WALL
DEMOLISHED WALL, FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE OR FURNISHING
NEW WALL
AREA NOT IN SCOPE
CONTRACT LIMIT
DEMOLISHED FURNITURE OR EQUIPMENT, SALVAGE TO OWNER
CLOSET
B1C34DB1C34D
OBS
BEDS
ROOM
B1C-6AB1C-6A
CORRIDOR
B1C-6B1C-6
HEAD
NURSE
B1C53B1C53
CLOSET
SPD
B1C51B1C51
TOILET
B1C24B1C24
OBSERVATION/
TREATMENT
RM
B1C23B1C23
NURSE
B1C34AB1C34A
CORRIDOR
B1C-8B1C-8
OBSERVATION/
TREATMENT
RM
B1C26B1C26
EXISTING FINISH ABBREVIATIONS
ACOUSTICAL CEILING TILE
PAINT
PORCELAIN TILE
RESILIENT BASE
RIGID WALL COVERING
CARPET
RESILIENT SHEET FLOORING
VINYL COMPOSITE TILE
AT
P
PT
RB
RWC
CPT
RSF
VT
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:0
P
M
AD100B
ARCHITECTURAL DEMO PLAN - LEVEL B - AREA
B - DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS E. DANIELS
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN OPERATIONAL DURING ALL
PHASES OF CONSTRUCTION. ENSURE ADEQUATE EGRESS CLEARANCES ARE
MAINTAINED AND NOT IMPEDED DURING PHASED CONSTRUCTION.
2. SEE GENERAL SHEETS FOR VA PROJECT NOTES, INFECTION CONTROL AND LIFE
SAFETY / CODE DATA FOR ADDITIONAL INTERIM LIFE SAFETY MEASURES AND
INFORMATION.
3. SEE A-701 FOR INTERIOR WALL TYPES.
4. SEE 'IN' SERIES DRAWINGS FOR INTERIOR DESIGN AND FINISHES.
5. SEE 'AW' SERIES DRAWINGS FOR ARCHITECTURAL SIGNAGE.
6. SEE 'Q-' SERIES DRAWINGS FOR HOSPITAL EQUIPMENT AND FURNISHINGS.
7. NO DRILLING OR JACK HAMMERING ACTIVITIES ALLOWED DURING BUSINESS
HOURS.
1/4" = 1'-0" F4
ARCHITECTURAL DEMOLITION PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1
NTS
A3
OB BEDS ROOM - NORTH
NTS
B3
OB BEDS ROOM - NORTHEAST
NTS
C3
POLICE SERVICE
NTS
D3
OB BEDS ROOM - SINK AREA
NTS
E3
OB BEDS ROOM - SOUTH
NTS
D1
SMALL TOILET - SOUTHEAST
NTS
A1
SMALL TOILET
NTS
C1
SMALL TOILET - NORTH
NTS
B1
SMALL TOILET - EAST
1 REMOVE EXISTING DOOR AND FRAME.
2 TEMPORARY PARTITIONS
3 REMOVE ALL PARTITIONS, WALL FINISHES, FLOOR FINISHES, CAP
ALL PLUMBING FIXTURES. REMOVE ALL FURNITURE, EQUIPMENT,
CORNER GUARDS AND SALVAGE TO OWNER. PREPARE SUB FLOOR
FOR NEW CONSTRUCTION AND FINISHES.
4 REMOVE EXISTING DOOR AND PARTITION
5 SALVAGE ALL BED BUMPERS FOR REUSE IN NEW LAYOUT
6 SALVAGE ALL WALL PROTECTION, HANDRAILS AND CRASHRAILS
FOR REUSE IN NEW LAYOUT
7 PORTION OF WALL TO REMAIN FOR FIRE EXTINGUISHER CABINET
8 MUST MAINTAIN EGRESS PATH TO CT SCAN AREA DURING
CONSTRUCTION
EXISTING ROOM FINISH SCHEDULE
ROOM
NUMBER NAME
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
2 CLOSET RSF RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C22 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C23 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C24 TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C25 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C26 OBSERVATION/ TREATMENT RM VT RB GWB RWC/ P GWB RWC/ P GWB RWC/ P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C34A NURSE RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C34C SMALL TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C34D CLOSET RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C51 SPD VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C52 CHIEF OF ER CPT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C53 HEAD NURSE CPT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C54 TOILET PT PT GWB PT GWB PT GWB PT GWB PT GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C55 SOILED UTILITY RM VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C-6 CORRIDOR VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
B1C-6A OBS BEDS ROOM RSF RB GWB P GWB P GWB P GWB P GWB P SEE KEYNOTE 3 ON THIS SHEET
B1C-8 CORRIDOR VT RB GWB P GWB P GWB P GWB P AT - SEE KEYNOTE 3 ON THIS SHEET
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
KEYNOTES
Revisions: Date:
File details come from the government source that posted it. Updated .