570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26121R0066
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOPC.1
A
BOPC.2 BOPC.3 4 5 65.A
A.1
B
B.1
C
D
E
BOPC.F
BOPC.G
CLINICAL
CHARTING
RM
B1C29B1C29
LOCKER
RM
B1C20AB1C20A
AREAWAY
103103
ELEVATOR
B-19B-19
VESTIBULE
106106
SOCIAL
WORK
OFFICE
B1C01B1C01
LINEN
CART
ALCOVE
TRANSFORMER
RM
B1C17AB1C17A
ON-CALL
RM
B1C18B1C18
TOILET
B1C19B1C19
STAFF
LOUNGE
B1C20B1C20
STAIR
B1C21B1C21
TOILET
B1C08B1C08
TRAUMA
RM
SMALL
B1C06B1C06
TRAUMA
RM
LARGE
B1C07B1C07
X-RAY
ALCOVE
118118
ELECTRIC
CLOSET
B1C16B1C16
TELEPHONE
CLOSET
B1C15B1C15
ENTRANCE
123123
TRIAGE
RM
B1C31B1C31
AOD/
CHECK-IN
B1C30B1C30
MECHANICAL
ROOM
B1C17B1C17
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42 STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
WAITING
B1C-1B1C-1
ELEVATOR
S-5S-5
ELEVATOR
S-5S-5
PATIENT
COMFORT
ROOM
BC127BC127
CHARTING
ALCOVE
POLICE
DISPATCH
B1C02B1C02
CORRIDOR
B1C-5B1C-5
ELEV.
EQUIP/
SUMP
178178
OBSERVATION/
TREATMENT
RM
B1C13B1C13
OBSERVATION/
TREATMENT
RM
B1C09B1C09
CORRIDOR
B1C-2B1C-2
PROCEDURE
RM
B1C05B1C05
WHEELCH.
SCALE
EXAM
AREA
B1C04B1C04
EXAM
AREA
B1C03B1C03
NURSE
STATION
B1C29AB1C29A
CORRIDOR
B1C-1AB1C-1A
CORRIDOR
B1C-7B1C-7
CLINICAL
CHARTING
RM
B1C29B1C29
LOCKER
RM
B1C20AB1C20A
AREAWAY
103103
ELEVATOR
B-19B-19
VESTIBULE
106106
SOCIAL
WORK
OFFICE
B1C01B1C01
LINEN
CART
ALCOVE
TRANSFORMER
RM
B1C17AB1C17A
ON-CALL
RM
B1C18B1C18
TOILET
B1C19B1C19
STAFF
LOUNGE
B1C20B1C20
STAIR
B1C21B1C21
TOILET
B1C08B1C08
TRAUMA
RM
SMALL
B1C06B1C06
TRAUMA
RM
LARGE
B1C07B1C07
X-RAY
ALCOVE
118118
CORRIDOR
B1C-4B1C-4
ELECTRIC
CLOSET
B1C16B1C16
TELEPHONE
CLOSET
B1C15B1C15
OBSERVATION/
TREATMENT
RM
B1C11B1C11
ENTRANCE
123123
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
TRIAGE
RM
B1C31B1C31
AOD/
CHECK-IN
B1C30B1C30
MECHANICAL
ROOM
B1C17B1C17
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42 STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
WAITING
B1C-1B1C-1
MALE
RR
B1C33B1C33
FEMALE
RR
B1C32B1C32
ELEVATOR
S-5S-5
ELEVATOR
S-5S-5
CORRIDOR
B1C-9B1C-9
CHARTING
ALCOVE
POLICE
DISPATCH
B1C02B1C02
CORRIDOR
B1C-5B1C-5
OBSERVATION/
TREATMENT
RM
B1C10B1C10
OBSERVATION/
TREATMENT
RM
B1C12B1C12
OBSERVATION/
TREATMENT
RM
B1C13B1C13
OBSERVATION/
TREATMENT
RM
B1C09B1C09
OBSERVATION/
TREATMENT
RM
B1C14B1C14
CORRIDOR
B1C-2B1C-2
PROCEDURE
RM
B1C05B1C05
WHEELCH.
SCALE
EXAM
AREA
B1C04B1C04
EXAM
AREA
B1C03B1C03
CORRIDOR
B1C-8B1C-8
CORRIDOR
B1C-7B1C-7
NURSE
STATION
B1C29AB1C29A
VESTIBULE
CORRIDOR
B1C-1AB1C-1A
CRASH
CART
ALCOVE
AD150B
F4
DEDUCT ALTERNATE NO. 1:
REMOVING TERMINAL UNIT
REPLACEMENTS OUTSIDE OF
THE RENOVATION AREA
ALCOVE,
WHEELCHAIR/
STRETCHER/
LIFT
B1DB1D
RCP SYMBOL LEGEND
DEMOLISHED HVAC SUPPLY DIFFUSER
DEMOLISHED HVAC RETURN
DIFFUSER
EXIT LIGHT
DEMOLISHED LIGHT FIXTURE
DEMOLISHED GYPSUM CEILING
DEMOLISHED CEILING TILE (24X48)
DEMOLISHED CEILING TILE (24X24)
DEMOLISHED CUBICAL CURTAIN
CLOSET
B1C34DB1C34D
OBS
BEDS
ROOM
B1C-6AB1C-6A
CORRIDOR
B1C-6B1C-6
HEAD
NURSE
B1C53B1C53
CLOSET
SPD
B1C51B1C51
TOILET
B1C24B1C24
OBSERVATION/
TREATMENT
RM
B1C23B1C23
NURSE
B1C34AB1C34A
CORRIDOR
B1C-8B1C-8
OBSERVATION/
TREATMENT
RM
B1C26B1C26
AREA OF WORK
AREA OF WORK
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A B
D C
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:0
P
M
AD150
ARCHITECTURAL DEMO REFLECTED CEILING
PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS E. DANIELS
ISSUED FOR
CONSTRUCTION
1/8" = 1'-0" F3
ARCHITECTURAL REFLECTED CEILING DEMOLITION PLAN - LEVEL B - OVERALL - DEDUCT ALT NO.1
GENERAL SHEET NOTES
1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN OPERATIONAL DURING ALL
PHASES OF CONSTRUCTION. ENSURE ADEQUATE EGRESS CLEARANCES ARE
MAINTAINED AND NOT IMPEDED DURING PHASED CONSTRUCTION.
2. SEE GENERAL SHEETS FOR VA PROJECT NOTES, INFECTION CONTROL AND LIFE
SAFETY / CODE DATA FOR ADDITIONAL INTERIM LIFE SAFETY MEASURES AND
INFORMATION.
3. SEE A-701 FOR INTERIOR WALL TYPES.
4. SEE 'IN' SERIES DRAWINGS FOR INTERIOR DESIGN AND FINISHES.
5. SEE 'AW' SERIES DRAWINGS FOR ARCHITECTURAL SIGNAGE.
6. SEE 'Q-' SERIES DRAWINGS FOR HOSPITAL EQUIPMENT AND FURNISHINGS.
7. NO DRILLING OR JACK HAMMERING ACTIVITIES ALLOWED DURING BUSINESS
HOURS.
1 REMOVE ACOUSTICAL CEILING, LIGHT FIXTURES AND MECHANICAL
DIFFUSERS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
2 REMOVE GYPSUM CEILING, LIGHT FIXTURES AND MECHANICAL
DIFFUSERS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
3 EXISTING 2X2 ACOUSTICAL CEILING TO REMAIN
4 EXISTING 2X4 ACOUSTICAL CEILING TO REMAIN
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
KEYNOTES
Revisions: Date:
A
4 5 65.A
A.1
B
B.1
C
D
E
MECHANICAL
ROOM
B1C17B1C17
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
MALE
RR
B1C33B1C33
FEMALE
RR
B1C32B1C32
ELEVATOR
S-5S-5
PATIENT
COMFORT
ROOM
BC127BC127
OBSERVATION/
TREATMENT
RM
B1C14B1C14
CORRIDOR
B1C-2B1C-2
CRASH
CART
ALCOVE
CORRIDOR
B1C-4B1C-4
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
MECHANICAL
ROOM
B1C17B1C17
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
WAITING
B1C-1B1C-1
ELEVATOR
S-6S-6
PATIENT
COMFORT
ROOM
BC127BC127
OBSERVATION/
TREATMENT
RM
B1C14B1C14
CORRIDOR
B1C-2B1C-2
CORRIDOR
B1C-7B1C-7
CRASH
CART
ALCOVE
AREA OF WORK
AREA OF WORK
5 5
B3
AD150B
C3
AD150B
F3
AD150B E3
AD150B
D3
AD150B
TO BUILDING 1
RCP SYMBOL LEGEND
DEMOLISHED HVAC SUPPLY DIFFUSER
DEMOLISHED HVAC RETURN
DIFFUSER
EXIT LIGHT
DEMOLISHED LIGHT FIXTURE
DEMOLISHED GYPSUM CEILING
DEMOLISHED CEILING TILE (24X48)
DEMOLISHED CEILING TILE (24X24)
DEMOLISHED CUBICAL CURTAIN
CLOSET
B1C34DB1C34D
OBS
BEDS
ROOM
B1C-6AB1C-6A
CORRIDOR
B1C-6B1C-6
HEAD
NURSE
B1C53B1C53
CLOSET
SPD
B1C51B1C51
TOILET
B1C24B1C24
OBSERVATION/
TREATMENT
RM
B1C23B1C23
NURSE
B1C34AB1C34A
CORRIDOR
B1C-8B1C-8
OBSERVATION/
TREATMENT
RM
B1C26B1C26
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:1
P
M
AD150B
ARCHITECTURAL DEMO REFLECTED CEILING
PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS E. DANIELS
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
1. ACCESS TO EXISTING FIRE EXIT SHALL REMAIN OPERATIONAL DURING ALL
PHASES OF CONSTRUCTION. ENSURE ADEQUATE EGRESS CLEARANCES ARE
MAINTAINED AND NOT IMPEDED DURING PHASED CONSTRUCTION.
2. SEE GENERAL SHEETS FOR VA PROJECT NOTES, INFECTION CONTROL AND LIFE
SAFETY / CODE DATA FOR ADDITIONAL INTERIM LIFE SAFETY MEASURES AND
INFORMATION.
3. SEE A-701 FOR INTERIOR WALL TYPES.
4. SEE 'IN' SERIES DRAWINGS FOR INTERIOR DESIGN AND FINISHES.
5. SEE 'AW' SERIES DRAWINGS FOR ARCHITECTURAL SIGNAGE.
6. SEE 'Q-' SERIES DRAWINGS FOR HOSPITAL EQUIPMENT AND FURNISHINGS.
7. NO DRILLING OR JACK HAMMERING ACTIVITIES ALLOWED DURING BUSINESS
HOURS.
1/4" = 1'-0" F4
ARCHITECTURAL REFLECTED CEILING DEMOLITION PLAN - LEVEL B - AREA B - DEDUCT ALT NO.1
NTS
B3
POLICE SERVICE EXISTING CEILING
NTS
C3
OB BEDS ROOM - SOUTH - EXISTING
CEILING
NTS
D3
OB BEDS ROOM - NORTH - EXISTING
CEILING
NTS
E3
SMALL TOILET - SOUTH - EXISTING
CEILING
NTS
F3
SMALL TOILET - NORTHWEST -
EXISTING CEILING
1 REMOVE ACOUSTICAL CEILING TILES AND GRID FOR NEW
PARTITION IN CORRIDOR
2 REMOVE EXISTING GYPSUM SOFFIT
3 REMOVE EXISTING DOOR AND PARTITION
4 REMOVE EXISTING GYPSUM CEILING AND ALL FIXTURES
5 REMOVE EXISTING ACOUSTICAL CEILING TILES, GRID AND ALL
FIXTURES
6 REMOVE AND SALVAGE CUBICLE CURTAIN TRACKS FOR REUSE IN
NEW SPACE
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
KEYNOTES
Revisions: Date:
File details come from the government source that posted it. Updated .