BOPC.6BOPC.5.ABOPC.5BOPC.4BOPC.3BOPC.2BOPC.1
BOPC.A
BOPC.A.1
BOPC.B
BOPC.C
BOPC.D
BOPC.E
BOPC.F
BOPC.G
EF-1
1-EF-ED
(BELOW)
12"ø EXH
14"x10" SA
24"x18" SA
B1
MH102
D1
MH102
F1
MH102
(E)26"ø EXH26"ø EXH
1-GH-41-GH-3
(E )1
"x
E X
H
36"ø EXH
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A B
D C
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:3
A
M
MH102
MECHANICAL PLAN - ROOF LEVEL
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
1 PROVIDE NEW OUTSIDE AIR INTAKE LOUVERED PENTHOUSE, MINIMUM 3' ABOVE ROOF AND MINIMUM 25'
FROM EXHAUST AIR OUTLETS. SEE M-702 FOR SCHEDULE.
2 PROVIDE NEW GENERAL EXHAUST FAN SERVING BASEMENT FLOOR, MINIMUM 10' ABOVE ROOF AND
MINIMUM 25' FROM AIR INTAKES. SEE M-702 FOR SCHEDULE. (LOCATION OPTION #1)
3 25' MINIMUM CLEARANCE FROM NEAREST FRESH AIR INTAKE
4 PROVIDE NEW SPECIAL EXHAUST FAN SERVING NEGATIVE PRESSURE TREATMENT ROOMS ON
BASEMENT FLOOR, MINIMUM 10' ABOVE ROOF AND MINIMUM 25' FROM AIR INTAKES. SEE M-702 FOR
SCHEDULE.
5 EXISTING ROOFTOP MECHANICAL EQUIPMENT TO REMAIN, PROTECT IN-PLACE.
6 EXISTING PHOTOVOLTAIC PANEL ARRAY TO REMAIN, PROTECT IN-PLACE.
7 FUTURE ROOFTOP AIR HANDLING UNIT AND PIPING CONSTRUCTED UNDER SEPARATE RENOVATE
SPECIALTY CLINIC PROJECT.
8 PROVIDE NEW 36" DIAMETER EXHAUST DUCT AND STACK FROM NEW AHU-3 WITH OUTLET MINIMUM 10'
ABOVE ROOF LEVEL.
1/8" = 1'-0" F4
MECHANICAL PLAN - ROOF
NTS
B1
PROPOSED EXHAUST DUCT (OPC & B1 CHASE BELOW)
NTS
D1
PROPOSED ROOF LEVELTOP EXHAUST DUCT (OPC & B1 CHASE)
NTS
F1
NEW INTAKE HOOD AND EXHAUST FAN LOCATIONS
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
06/18/2021
BOPC.3BOPC.2
BOPC.1
BOPC.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
F4/MP100D
VAV-1-2
CAV-1-7
CAV-1-2
CAV-1-5
CAV-1-4
VAV-1-1
TRAUMA RM LARGE
B1C07
EXAM AREA
B1C04
ENTRANCE
ELEVATOR
B-19
ALCOVE,
WHEELCHAIR/
STRETCHER/ LIFT
B1D
SOCIAL WORK
OFFICE
B1C01
EXAM AREA
B1C03
VESTIBULE
VESTIBULE
LINEN CART ALCOVE
POLICE DISPATCH
B1C02
PROCEDURE RM
B1C05
CHARTING ALCOVE
WHEELCH. SCALE
CORRIDOR
B1C-1A
TRAUMA RM SMALL
B1C06
TOILET
B1C08
CORRIDOR
B1C-8
CORRIDOR
B1C-5
NURSE STATION
B1C29A
CLINICAL CHARTING
RM
B1C29
CORRIDOR
B1C-7
AOD/ CHECK-IN
B1C30
INTERVENTION
(SECLUSION) ROOM
B1C28
WAITING
B1C-1
CAV-1-6
3/4" HWS
3/4" HWR
2" HWS
2" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
V-53 V-54
V-40
V-39
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
2" HWR
2" HWS
2" HWR
2" HWS
V-49 V-50
V-52 V-51
V-48
V-47
V-46
V-45
V-41 V-42
3/4" HWS
3/4" HWR
V-38
V-37
2 3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
C A
V -1
-8
C A
V -1
-9
VAV-1-6
V-29 V-30
3/4" HWS
3/4" HWR
V-31
V-32
3/4" HWR
3/4" HWS
V-34 V-33
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
V-35
V-36
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
V-56 V-55
V-43
V-44
3/4" HWS
3/4" HWR
V-47
V-48
3/4" HWS
3/4" HWR
F /M
P B
C A
V -1
-1
C A
V -1
-3
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:4
A
M
MP100A
MECHANICAL PIPING PLAN - LEVEL
B - AREA A
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F1
MECHANICAL PIPING PLAN - BASEMENT - AREA A
1 CONTRACTOR SHALL INSTALL NEW HOSE AND VALVE KIT SERVING NEW TERMINAL
UNITS, REFER TO DETAILS ON SHEET M-501.
2 PROVIDE NEW ISOLATION BALL VALVES, CONTRACTOR SHALL COORDINATE FINAL
VALVE NUMBERING WITH THE VA.
3 PROVIDE NEW HOT WATER SUPPLY AND RETURN PIPING TO NEW TERMINAL UNITS,
INSULATE PIPING PER SPECIFICATION SECTION 23 00 11. COORDINATE ALL ROUTING
WITH EXISTING TRADES PRIOR TO INSTALLATION.
4 PROVIDE NEW TERMINAL UNIT LOCATED IN CEILING SPACE. COORDINATE LOCATION
WITH MANUFACTURER'S MINIMUM REQUIRED SERVICE CLEARANCE AND OTHER
TRADES. TYPICAL FOR ALL UNITS.
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
BOPC.6BOPC.5.ABOPC.5BOPC.4
BOPC.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
BOPC.E
F1/MP100A
F4/MP100D
VAV-1-12
VAV-1-17
VAV-1-18
CORRIDOR
B1C-1
WAITING
B1C-1
FEMALE RR
B1C32
MALE RR
B1C33
PAT TLT
B1C34J
NEW OBSERVATION
ROOM
B1C34G
PATIENT COMFORT
ROOM
BC127
CORRIDOR
B1C-9
NEW OBSERVATION
ROOM
B1C23
NEW OBSERVATION
ROOM
BC24
NEW OBSERVATION
ROOM
B1C21
HAC
BC50
CORRIDOR
B1C-6
PAT SHWR
B1C25B
CLEAN UTILITY
BC26
PAT TLT
B1C25A
HALL
B1C-6A
NEW NURSES
STATION
B1C34B
NEW NURSES
STATION
B1C34F
NEW OBSERVATION
ROOM
B1C34K
CORRIDOR
B1C-2
LINEN CLOSET
B1C41
ELEVATOR EQUIP RM
B1C40
ELEVATOR
S-5
ELEVATOR
S-6
HEAD NURSE
B1C37
CHIEF OF ER
B1C35
OBSERVATION/
TREATMENT RM
B1C14
CORRIDOR
B1C-4
SOILED UTILITY
B1C53
CLEAN UTILITY
B1C52
STF TLT
BC51
CORRIDOR
B1C-2
STAIR NO.4
B1C43
LINEN CLOSET
B1C42
HAC
B1C49
NEW OBSERVATION
ROOM
B1C34A
NEW OBSERVATION
ROOM
B1C34C
NEW OBSERVATION
ROOM
B1C34E
NEW STORAGE
B1C34H
NEW STORAGE
B1C34D
2" HWS
2" HWR
3/4" HWR
3/4" HWS
2" HWR
2" HWS
V-05 V-06
V A
V -1
-1
V A
V -1
-1
VAV-1-15
VAV-1-14VAV-1-13
VAV-1-8
VAV-1-9
VAV-1-11
V-11 V-12
2" HWS
2" HWR
3/4" HWS
3/4" HWR
2" HWS
2" HWR
4" HWS
4" HWR
V-01 V-02
V-08
V-07
F4/MP100C
VAV-1-6
2" HWS
2" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
V-19 V-20V-22
V-21V-23 V-24
V-26 V-25
V-28 V-27
V-29 V-30
VAV-1-2
3/4" HWS
3/4" HWR
V-17 V-18
V-15 V-16
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
2" HWS
2" HWR
3/4" HWS
3/4" HWR
V-09
V-10
V-13 V-14
V-04
V-03 3/4" HWS
3/4" HWR
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:5
A
M
MP100B
MECHANICAL PIPING PLAN - LEVEL
B - AREA B
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F4
MECHANICAL PIPING PLAN - BASEMENT - AREA B
1 CONTRACTOR SHALL INSTALL NEW HOSE AND VALVE KIT SERVING NEW TERMINAL
UNITS, REFER TO DETAILS ON SHEET M-501.
2 PROVIDE NEW HOT WATER SUPPLY AND RETURN CONNECTIONS WITH ISOLATION
VALVES, MAIN BRANCH TO SERVE TERMINAL UNIT REHEAT COILS ON THE BASEMENT
LEVEL.
3 PROVIDE NEW ISOLATION BALL VALVES, CONTRACTOR SHALL COORDINATE FINAL
VALVE NUMBERING WITH THE VA.
4 PROVIDE NEW HOT WATER SUPPLY AND RETURN PIPING TO NEW TERMINAL UNITS,
INSULATE PIPING PER SPECIFICATION SECTION 23 00 11. COORDINATE ALL ROUTING
WITH EXISTING TRADES PRIOR TO INSTALLATION.
5 PROVIDE NEW TERMINAL UNIT LOCATED IN CEILING SPACE. COORDINATE LOCATION
WITH MANUFACTURER'S MINIMUM REQUIRED SERVICE CLEARANCE AND OTHER
TRADES. TYPICAL FOR ALL UNITS.
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
FD
BOPC.6BOPC.5.ABOPC.5BOPC.4
BOPC.D
BOPC.E
BOPC.F
BOPC.G
F1/MP100A
F4/MP100D
1-AHU-4
1-AHU-3
NEW OBSERVATION
ROOM
B1C23
NEW OBSERVATION
ROOM
BC24
LINEN CLOSET
B1C41
OBSERVATION/
TREATMENT RM
B1C14
CORRIDOR
B1C-4
SOILED UTILITY
B1C53
CLEAN UTILITY
B1C52
STF TLT
BC51
CORRIDOR
B1C-2
STAIR NO.4
B1C43
LINEN CLOSET
B1C42
MECHANICAL ROOM
B1C17
AREAWAY
HAC
B1C49
CT SCANNER
B1C46
EQUIP STOR
B1C44
3/4" HWR
3/4" HWS
V A
V -1
-1
VAV-1-15
VAV-1-6
4" CHS
4" CHR
4" HWS
4" HWR
3/4" HWR
3/4" HWS
4" HWR
4" HWS
4" CHS
4" CHR
1 1/2" HWR
1 1/2" HWS
3" CHS
3" CHR
1 1/4" CD
4" HWS
4" HWR
6" CHR
4" CHS
4" HWS
4" HWR
6" CHR
6" CHS
2" HWS
2" HWR
2" MPS
3/4" CD
4" HWS
4" HWR
4" CHR
4" CHS
F4/MP100B
1 1/2" MPS
3/4" CD
1-AHU-3
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
C
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:0
A
M
MP100C
MECHANICAL PIPING PLAN - LEVEL
B - AREA C
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F4
MECHANICAL PIPING PLAN - BASEMENT - AREA C OPTION 2
1 CONTRACTOR SHALL INSTALL NEW HOSE AND VALVE KIT SERVING NEW TERMINAL
UNITS, REFER TO DETAILS ON SHEET M-501.
2 PROVIDE NEW HOT WATER SUPPLY AND RETURN PIPING TO NEW TERMINAL UNITS,
INSULATE PIPING PER SPECIFICATION SECTION 23 00 11. COORDINATE ALL ROUTING
WITH EXISTING TRADES PRIOR TO INSTALLATION.
3 AHU CONDENSATE DRAIN PIPING, SLOPE PIPING 1/8”/FT MINIMUM. DROP DOWN TO
DISCHARGE OVER EXISTING FLOOR DRAIN BELOW WITH A MINIMUM OF TWO PIPE
DIAMETERS AIR GAP ABOVE FLOOR DRAIN RIM. SECURE PIPING TO FLOOR WITH
UNI-STRUT CHANNEL.
4 PROVIDE NEW TERMINAL UNIT LOCATED IN CEILING SPACE. COORDINATE LOCATION
WITH MANUFACTURER'S MINIMUM REQUIRED SERVICE CLEARANCE AND OTHER
TRADES. TYPICAL FOR ALL UNITS.
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
FD
BOPC.3BOPC.2BOPC.1
BOPC.D
BOPC.E
BOPC.F
BOPC.G
F4/MP100B
F4/MP100C
F1/MP100A
VAV-1-3
VAV-1-4
1-AHU-4
1 1
EF-1-11 EF-1-10
STAIR
B1C21
OBSERVATION/
TREATMENT RM
B1C09 OBSERVATION/
TREATMENT RM
B1C10
OBSERVATION/
TREATMENT RM
B1C11
OBSERVATION/
TREATMENT RM
B1C12
OBSERVATION/
TREATMENT RM
B1C13
CORRIDOR
B1C-4
TELEPHONE CLOSET
B1C15
ELECTRIC CLOSET
B1C16
MECHANICAL ROOM
B1C17
AREAWAY
TRANSFORMER RM
B1C17A
ON-CALL RM
B1C18
TOILET
B1C19
STAFF LOUNGE
B1C20
LOCKER RM
B1C20A
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
V A
V -1
-5
3/4" HWS
3/4" HWR
V-60 V-59
V-58 V-57
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
FPH-31 FPH-32
VAV-1-7
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
D
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:5
:1
A
M
MP100D
MECHANICAL PIPING PLAN - LEVEL
B - AREA D
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F4
MECHANICAL PIP PLAN - BASEMENT - AREA D
1 CONTRACTOR SHALL INSTALL NEW HOSE AND VALVE KIT SERVING NEW TERMINAL
UNITS, REFER TO DETAILS ON SHEET M-501.
2 PROVIDE NEW ISOLATION BALL VALVES, CONTRACTOR SHALL COORDINATE FINAL
VALVE NUMBERING WITH THE VA.
3 PROVIDE NEW HOT WATER SUPPLY AND RETURN PIPING TO NEW TERMINAL UNITS,
INSULATE PIPING PER SPECIFICATION SECTION 23 00 11. COORDINATE ALL
ROUTING WITH EXISTING TRADES PRIOR TO INSTALLATION.
4 PROVIDE NEW TERMINAL UNIT LOCATED IN CEILING SPACE. COORDINATE
LOCATION WITH MANUFACTURER'S MINIMUM REQUIRED SERVICE CLEARANCE AND
OTHER TRADES. TYPICAL FOR ALL UNITS.
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
KEYNOTES
Revisions: Date:
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
M
IN
IM
U
M
ROOF TOP UNIT
LAP VERTICAL
MEMBRANE
LAYERS OVER
CURB
OVERLAP
HORIZONTAL
MEMBRANE LAYERS
AT CANT OR CRICKET
SECURE LEVELED PRE-
FABRICATED ROOF CURB TO
FIRE TREATED NAILER
SECURED TO ROOF DECK.
REFER TO AHU SCHEDULE
NOTE 7 ON SHEET M-701.
OPENING FRAMING,
SEE STRUCTURAL
DRAWINGS
DUCTWORK, SEE
MECHANICAL
DRAWINGS
SEAL ALL FASTENERS
THROUGH CAP, SEAL
CAP TO CURB
20 30
RISE
PLAN
NOTES
1. ANGLE A=30 MAXIMUM WHEN AIR FLOWS IN
DIRECTION OF ARROS. (SUPPLY AIR)
2. ANGLE A=15 WHEN AIR FLOWS IN OPPOSITE
DIRECTION OF ARROS (R.A. OR EXHAUST)
20°
A°
A°
A°
A°
3.73xH
FBFT
FT FB
A°A°
A°
A°
PLAN VIEW PLAN VIEW PLAN VIEW
TRANSITION
w/ EQUIPMENT
ELEVATION
PLAN
DUCT OFFSET
FT FB
FBFT
A°
A° A°
A°
ELEVATION ELEVATION ELEVATION BRANCH DUCT
PLAN
45° W
1/2 W
(4"MIN.)
PLAN A
A
B
C
(1) NECK DIA. MIN.
PROVIDE QUADRANT
LOCKING HAND DAMPER
WITH ACCESS DOOR
WHERE SHOWN ON PLANS
BRANCH
DUCT
BRANCH MAIN
FIXED CEILINGS
SECTION A
FLEX DUCT. DIAMETER
EQUALTO DIFFUSER NECK
SIZE (MAX. LENGTH 4'-0")
SPIN IN FITTING
W/HAND DAMPER
SECTION B
LAY-IN CEILINGS
PLAN B
RIGID DUCT WHERE
RUN-OUT EXCEEDS 4'-0"
PROVIDE HAND DAMPER
WITH ACCESS DOOR
WHERE SHOWN
ON PLANS
SHEET METAL
PLENUM
RIGID DUCT WHERE
RUN-OUT EXCEEDS 4'-0"
FLEX. DUCT FOR LAY-IN
CEILING APPLICATION
EXHAUST / DUCTED RETURN
GRILLE. SEE FLOOR PLAN
FOR SIZE, TYPE, AND LOCATION
SECTION C
RETURN/EXHAUST REGISTER
FOR LAY-IN AND FIXED CEILINGS
PLAN C
(E) WALL OR
CEILING
10 GAUGE STEEL PIPE
SLEEVE THROUGH
WALL
CONDUIT OR STEEL
PIPE, INSULATED WHERE
OCCURS
SEAL SLEEVE WITH UL RATED
SEALANT TO MATCH RATING OF
WALL OR CEILING. MAINTAIN
REQUIRED MINIMUM CONTACT OF
SEALANT AND CLEARANCES OF
PIPE IN PENETRATION
PROVIDE ESCUTCHEON PLATE AT
ALL EXPOSED PENETRATIONS
UL Listed System No. C-AJ-2001
AIR FLOW
HWS
7 14
1 2
METAL STRAP SUPPORT FROM STRUCTURE (TYPICAL)
MANUAL AIR VENT ON COIL OR HWR PIPING
FACTORY FABRICATED SOUND ATTENUATOR
HOT WATER COIL
VALVE ACTUATOR
HIGH VELOCITY FLEXIBLE SUPPLY DUCT 12" MIN., 24" MAX.
DRAIN
TEMPERATURE-PRESSURE FITTING (TYP.)
LOW VELOCITY DUCTWORK TO DISTRIBUTION
REFER TO PLANS FOR PIPE SIZES
2-WAY CONTROL VALVE, NORMALLY CLOSED. FAIL TO COOL
BALL VALVE (TYP)
UNION (TYP)
REDUCER (TYP)
HIGH VELOCITY RIGID SUPPLY DUCT, 3 FT. MINIMUM STRAIGHT RUN PRIOR
TO TERMINAL UNIT CONNECTION. SEE SCHEDULE FOR VALVE AND DUCT SIZES
FLOW BALANCING VALVE, OR FLOW LIMITING VALVE, SEE SPECIFICATIONS
TRANSITION FROM 2" LARGER DUCT DIAMETER THAN VALVE CONNECTION SIZE
HWR
METAL STRAP SUPPORT FROM STRUCTURE. (TYPICAL)
MANUAL AIR VENT ON COIL OR HWR PIPING
FACTORY FABRICATED SOUND ATTENUATOR
HOT WATER COIL
VALVE ACTUATOR
HIGH VELOCITY FLEXIBLE SUPPLY DUCT 12" MIN., 24" MAX.
DRAIN
TEMPERATURE-PRESSURE FITTING (TYP.)
LOW VELOCITY DUCTWORK TO DISTRIBUTION
REFER TO PLANS FOR PIPE SIZES
3-WAY CONTROL VALVE
BALL VALVE (TYP)
UNION (TYP)
REDUCER (TYP)
HIGH VELOCITY RIGID SUPPLY DUCT, 3 FT. MINIMUM STRAIGHT RUN PRIOR TO
TERMINAL UNIT CONNECTION. SEE SCHEDULE FOR VALVE AND DUCT SIZE
FLOW BALANCING VALVE, SEE SPEC. SECTION 15080
STRAINER
TRANSITION FROM 2" LARGER DUCT DIAMETER THAN VALVE CONNECTION
AIR FLOW
C
HWR
NC
NO
HWS
1 2
22-1/2 2-PIECE
ELBOW
A
R R R
A A
30 2-PIECE
ELBOW
45 ELBOW
(3" THRU 8")
45 3-PIECE
ELBOW
60 3-PIECE
ELBOW
90 ELBOW
(3" THRU 8")
90 5-PIECE
ELBOW
CONCENTRIC REDUCER
RL=A-B (MIN)
ECCENTRIC REDUCER
RL=2(AB)
LATERAL TEE LATERAL CROSS REDUCING
LATERAL TEE
RL=A-B (MIN)
REDUCING
LATERAL CROSS
A
R
A
R
A
RL
B A
RL
B
A A
R R
A
L
C C
A L
D
A
C
RL B
L
A L
C
RL B
D
A
C
L L RL
A
C
B
C
A
L
A
C
B
L RL
COMBINATION TEE REDUCING
COMBINATION TEE
SPUN TEE REDUCING
SPUN TEE
CONICAL LATERAL REDUCING
CONICAL LATERAL
TANGENTIAL TEE
TYPE: ONE TAP
L=C+2"
TYPE: TWO TAPS
L=C+D+4"
CONICAL TEE
L=C+4"
REDUCING
CONICAL TEE
L=C+4" X=(C/2)+2"
5"MIN.
5"MIN.
L=LARGER OF
(C OR D)+4"
CONICAL CROSS
L=1.414 C+5"
(MAX)
Q=(A/2)+.707C+3"
(MAX)
H=.707A+.5C+3"
(MAX)
5"MIN.5"MIN.
NOTE: SEE SPECIFICATIONS FOR DUCT MATERIALS AND CONSTRUCTION
L
Q
A 1"
1" 4"
H C
L
Q
A 1"
4" H
C 1"
RL
B
1"
A
1" 1"
L
1"
C D
C
A
L
5"MIN.
C
A
L RL
B
C
A L
D
NTS
E8
ROOF LEVEL CURB DETAIL
NTS
F8
LOW PRESSURE DUCT FITTINGS
NTS
C8
DIFFUSER AND REGISTER CONNECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:4
:3
A
M
M-501
MECHANICAL DETAILS
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS K. LUKE
ISSUED FOR
CONSTRUCTION
NTS
F4
MECHANICAL EQUIPMENT - DRAIN CONNECTION
NTS
F1
STEAM HUMIDIFIER - PIPING CONNECTIONS
NTS
D1
PIPE PENETRATION AT EXTERIOR WALL
NTS
C1
SINGLE DUCT VAV TERMINAL UNIT WITH REHEAT COIL - 2 WAY VALVE
NTS
C4
SINGLE DUCT VAV TERMINAL UNIT WITH REHEAT COIL - 3 WAY VALVE
NTS
F6
MEDIUM PRESSURE AND ROUND DUCT FITTINGS
Revisions: Date:
FILL OPENING WITH
GROUTOR SEALANT
DEPENDING UPON
BUILDING MATERIALS
PENETRATED
PIPE SLEEVE OR
SHEET METAL SLEEVE
SEAL ALL AROUND
WITH RESILIENT
NON-HARDENING
SEALER-TYP BUILDING WALL OR FLOOR
1/2" TO 5/8" ANNULAR
SPACE-PACK SPACE
WITH FIBERGLASS
MATERIAL
PIPE OR ELECTRICAL CONDUIT
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
M A
X
PROVIDE INSULATION
SHIELD & INSERT FOR
ALL PIPING (8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR
2"x2"x1/4"
ANGLE
1/2" DIA. HANGER
RODS WITH
36" MAX. SPACING
ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECIFER FOR
DETAILED HANGER
REQUIREMENTS
NOTE:
USE KINETIC, OR EQUIVALENT FOR
ALL SEISMIC RESTRAINTS. SEE
SPECIFICATIONS SECTION 15200.
CABLE ALIGNMENT (MAX ALLOWABLE)
PLAN VIEW
SEE CALCULATIONS FOR MAXIMUM ROD
LENGTH BEFORE REINFORCING IS REQUIRED
ANCHOR BOLTS NOT
SUPPLIED BY KNC
OPTIONAL 2 OR
4 BOLT BRACKET
MIN1
FLOW
1 MAX
CABLE CHIPS
BY KNC
THIMBLE
SUPPLIED BY KNC
3/8 (1/4 CABLE) DIAMETER ROD
UP TO 7/8 (3/8-1/2 CABLE)
NUTS FOR ATTACHMENT, NOT
SUPPLIED BY KNC
GR 8 CABLE
HARDWARE BY
KNC
1/2" TO 1" BOLT WITH
WASHERNOT SUPPLIED
BY KNC
NO RESTRAINT
REQUIRED
IF DUCT AREA < 6 SQ. FT HVAC DUCT
ATTACHMENT HARDWARE BY KNC
CABLE ANCHOR
BRACKET BY
KNC
ISOLATED OR
NON-ISOLATED
ISOLATED OR
NON-ISOLATED
12" MAX
12" MAX
NO RESTRAINT REQUIRED
IF ROD UNDER 12" LONG
NO RESTRAINT REQUIRED
IF ROD UNDER 12" LONG
SWIVEL REQ
FOR 2000 IBC SWIVEL REQ
FOR 2000 IBC
FLOW FLOW
F L O
W
NOTE:
USE KINETIC, OR EQUIVALENT FOR ALL SEISMIC
RESTRAINTS. SEE SPECIFICATIONS SECTION 15200.
PERPENDICULAR ALIGNMENT
(MAX ALLOWABLE)
PLAN VIEW
MIN1
SEE CALCULATIONS FOR MAXIMUM ROD LENGTH
BEFORE REINFORCING IS REQUIRED
ANCHOR BOLTS NOT SUPPLIED BY KNC
OPTIONAL 2 OR
4 BOLT BRACKET
3/8 (1/4 CABLE) DIA ROD UP TO 7/8
(3/8-1/2 CABLE) NUTS FOR
ATTACHMENT - NOT SUPPLIED BY KNC
GR 8 HARDWARE
CABLE
1/2" TO 1" BOLT
WITH WASHER NOT
SUPPLIED BY KNC
SUPPLIED BY KNC
AND CLIPS BY KNC
NO RESTRAINT
REQUIRED
IF PIPE SIZE < 2-1/2"
(1-1/2" IN MECH ROOMS)
HVAC DUCT
ISOLATED OR
NON-ISOLATED
ISOLATED OR
NON-ISOLATED
SYMMETRICAL
ABOUT CENTER
LINE
SYMMETRICAL
ABOUT CENTER
LINENO RESTRAINT
REQUIRED IF
ROD UNDER
12' LONG
NO RESTRAINT
REQUIRED IF
ROD UNDER
12' LONG
SWIVEL
REQUIRED
FOR 2000 IBC
SWIVEL
REQUIRED
FOR 2000 IBC
12" MAX
12" MAX
1 MAX
SUPPLY WATER SHALL BE CONNECTED
TO AIR LEAVING SIDE OF COIL
COLLECT ALL DRAINS, INSTALL HOSE
CONNECTION AND CAP
TEMP. AND PRESS. FITTING TYP.
PRESSURE GAUGE
THERMOMETER
UNION
AUTOMATIC TWO-WAY CONTROL VALVE
BUTTERFLY VALVE
MANUAL AIR VENT
1/2" GATE VALVE AND DRAIN
DASHED PIPING AND COILS INDICATE
TYPICAL PIPING REQUIREMENTS FOR
MULTIPLE COILS
FLOW CONTROL VALVE, SEE
SPECIFICATIONS SECT. 15080
CONNECTION
STRAINER WITH HOSE BIBB
GENERAL NOTES
1 PROVIDE MANUAL AIR VENTS AT ALL
HIGH POINTS IN SYSTEM.
2 SEE PLANS AND/OR PIPING
SCHEMATIC FOR PIPE SIZES.
3 TEMP./PRESS. FITTINGS INSTALLED
IN PIPING 2" AND SMALLER SHALL
BE INSTALLED IN ELBOW OR IN THE
BRANCH SIDE OF A 2" TEE.
COIL
COIL
AIR FLOW
HWS
HWR
6 12
SUPPLY WATER SHALL BE CONNECTED
TO AIR LEAVING SIDE OF COIL
COLLECT ALL DRAINS, INSTALL HOSE
CONNECTION AND CAP
TEMP. AND PRESS. FITTING TYP.
PRESSURE GAUGE
THERMOMETER
UNION
AUTOMATIC TWO-WAY CONTROL VALVE
BUTTERFLY VALVE
MANUAL AIR VENT
1/2" GATE VALVE AND DRAIN
DASHED PIPING AND COILS INDICATE
TYPICAL PIPING REQUIREMENTS FOR
MULTIPLE COILS
FLOW CONTROL VALVE, SEE SPECIFICATIONS
GENERAL NOTES
1. PROVIDE MANUAL AIR VENTS AT ALL HIGH
POINTS IN SYSTEM.
2. SEE PLANS AND/OR PIPING SCHEMATIC FOR
PIPE SIZES.
3. TEMP./PRESS. FITTINGS INSTALLED IN PIPING
2" AND SMALLER SHALL BE INSTALLED IN ELBOW
OR IN THE BRANCH SIDE OF A 2" TEE.
CHS
CHR
COIL
AIR FLOW
COIL
1" OVERLAP
ON ALL SIDES
OF DAMPER
AIRFLOW
1" OVERLAP
ON ALL SIDES
OF DAMPER
AIRFLOW
MULTIBLADE NON-AIRFOIL
(LOW VELOCITY APPLICATIONS
1500 FPM & LESS)
MULTIBLADE AIRFOIL
(HIGH VELOCITY APPLICATIONS
IN EXCESS OF 1500 FPM)
WALL OR FLOOR
SLEEVE - SEE MANUFACTURE'S INSTALLATION NOTES
MOUNTING ANGLES CONTINUOUS AROUND SLEEVE WITH MINIMUM 1" OVERLAP
SQUARE OR RECTANGULAR DAMPER FRAME FOR ROUND OR OVAL DUCTS,
PROVIDE DUCT TRANSITION
BREAKAWAY DUCT CONNECTION - SEE INSTALLATION NOTES
INSTALL DAMPER ASSEMBLY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS
1/4" MINIMUM EXPANSION CLEARANCE - SEE MANUFACTURE'S INSTALLATION NOTES
APPROVED SEALING MATERIAL IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS
U.L. APPROVED DAMPER ACTUATOR ASSEMBLY WITH MOUNTING BRACKET,
ELECTRIC FUSE LINK, AND OPERATING JACK SHAFT LINKAGE. DAMPER
ACTUATOR SHALL BE MOUNTED ON DUCT OUTSIDE AIR STREAM\
INTEGRAL FACTORY WIRED FOR SINGLE POINT POWER CONNECTION, NO FLOW
SMOKE DETECTOR WITH BUILT-IN TEST SWITCH RATED FOR 0-3000 FPM, MOUNTED
INTERNALLY TO THE DAMPER SLEEVE
* FUSIBLE ROD IS NOT REQUIRED FOR SMOKE DAMPER APPLICATION
6" 6"6"6"
10 10
V A
R
IE
S
VARIES
LOWER BRACING
MAY RE REUIRED ON
TALLER FRAMES,
FOLLOW
MANUFACTURER’S
RECOMMENDATION
D11
D1+12"
STORM COLLAR
D+4"
ROOF FLASHING
D1=D+2"
D
/2
D
D+6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:4
:3
A
M
M-502
MECHANICAL DETAILS
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS K. LUKE
ISSUED FOR
CONSTRUCTION
NTS
C6
PIPE PENTRATION DETAIL
NTS
C8
PIPE SUPPORTS
NTS
F8
MISCELLANEOUS VALID RESTRAINT ARRANGEMENTS
NTS
F6
MISCELLANEOUS VALID RESTRAINT ARRANGEMENTS
NTS
F4
HOT WATER COIL PIPING SCHEMATIC WITH 2-WAY VALVE
NTS
C4
CHILLED WATER COIL PIPING SCHEMATIC
Revisions: Date:
NTS
F1
SMOKE DAMPER AND COMBINATION FIRE SMOKE DAMPER DETAIL
NTS
C1
TEMPORARY DUCT SUPPORT
NTS
A1
EXHAUST DUCT WEATHER HOOD
M
IN
B C
B C
V E
S T
IB
U
L E
C A
V -1
-1
E N
T R
A N
C E
C A
V -1
-3
C A
V -1
-4 B
C
-1
B C
-1
V A
V -1
-1 B
C
B C
B C
B C
-1 A
C A
V -1
-2
B C
B C
B C
C A
V -1
-5
B C
C A
V -1
-6
B C
C A
V -1
-7
B C
C A
V -1
-9
B C
C A
V -1
-8
B C
V A
V -1
-5
EXH
B C
B C
B C
-4
V A
V -1
-7
B C
B C
-9
B C
A
V A
V -1
-2
B C
V A
V -1
-1
B C
-5
B C
V A
V -1
-1
B C
V A
V -1
-6
B C
B C
-2 V
A V
-1 -1
V A
V -1
-1
B C
B C
B C
-1 V
A V
-1 -1
B C
B C
-3
B C
B C
V A
V -1
-1
AREA
WEL
L
SA
SA
SA
HWR
HWS
T
T
TT
T
T T TT T TTT
B C
V A
V -1
-4
T
B C
V A
V -1
-3
T T T T TT
BASEMENT FLOOR
BASEMENT FLOOR
STEEL
GRATING
STREET
CONCRETE
CURB
ROAD
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
ROOF
15 14 13 12 11
EXH
RA
R A
E X
H
O S
A
O S
A
E X
H
HWR
HWS
RA
EXH
3 45
NOTE: THIS SHEET IDENTIFIES THE HVAC MODIFICATION AND UPGRADES PROPOSED FOR THE BASEMENT LEVEL OF BUILDING OPC. THIS INCLUDES PROVIDING A NEW AIR HANDLING UNIT 3, NEW SPECIAL EXHAUST FAN EF-1 AND NEW GENERAL EXHAUST FAN EF-ED. THE NEW AIR HANDLING UNIT SHALL BE CAPABLE OF OPERATING IN EMERGENCY/100% OUTSIDE AIR MODE. THIS CONFIGURATION REQUIRES A NEW EXHAUST STACK ON THE SOUTH SIDE OF THE BUILDING
EXTERIOR TO MEET VA SAFETY REQUIREMENTS.
CHR
CHS
T
B C
T
B C
V A
V -1
-1
T
B C
T
B C
B
V A
V -1
-1
T
B C
H
V A
V -1
-1
B C
D
B C
K
T
V A
V -1
-9 B
C
G
B C
E
T
B C
A
V A
V -1
-8
B C
C
B C
-6
T
V A
V -1
-1
B C
-4
B C
T
CD
MPS
C D
M P
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O P
C .M
E .r v t
/1
/2
:4
:4
A
M
M-601
MECHANICAL AIR FLOW DIAGRAM -
SUPPLY AIR
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
06/18/2021 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F1
MECHANICAL AIR FLOW DIAGRAM - SUPPLY AIR
GENERAL SHEET NOTES
KEYNOTES
1 (E) PENTHOUSE MECHANICAL ROOM S0-401, PROTECT IN PLACE AND
MAINTAIN OPERATIONS THROUGHOUT CONSTRUCTION.
2 (E) RETURN AND EXHAUST AIR SHAFT
3 (N) EXHAUST FAN, EF-1
4 (N) EXHAUST FAN, EF-ED
5 (N) GRAVITY HOOD, GH-1
6 (N) AIR HANLING UNIT, 1-AHU-3
7 RETURN FAN
8 ECONOMIZER BOX
9 MIXING BOX
10 FILTER PF-1
11 FILTER PF-2
12 HEATING COIL
13 COOLING COIL
14 SUPPLY FAN
15 FINAL FILTER FF-1
16 SUPPLY PLENUM
17 ACCESS DOOR
18 STEAM HUMIDIFIER
19 FROM BUILDING ONE SUB-BASEMENT
20 CONTINUES TO AIR HANDLING UNIT 4
21 SEE SHEET M-602 FOR CONTINUATION
22 PROVIDE NEW HOT WATER SUPPLY AND RETURN PIPING TO NEW
TERMINAL UNITS, INSULATE PIPING PER SPECIFICATION SECTION 23 00
11. COORDINATE ALL ROUTING WITH EXISTING TRADES PRIOR TO
INSTALLATION.
23 (N) 36" DIAMETER EXHAUST DUCT AND STACK FROM NEW AHU-3 WITH
OUTLET MINIMUM 10' ABOVE ROOF LEVEL.
A. THIS SHEET IDENTIFIES THE NEW EXTERIOR DUCT SHAFT
REQUIRED FOR EXHAUST AIR COMPLIANCE, RESPECTIVELY.
B. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND
ASSOCIATED SYSTEMS SHOWN ON THE CONSTRUCTION
DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT
DRAWINGS FROM THE OWNER. TEST AND BALANCE
CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING
DRAWINGS SHOWING EQUIPMENT LOCATIONS, AIR
DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF
THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT
REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW AND
WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER
TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
C. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE
UTILIZED TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE
AND BALANCE DATA FOR THE RENOVATION. DATA SHALL BE
FORWARDED TO THE PROJECT ENGINEER FOR REVIEW AND
COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR
NEW WORK ASSOCIATED WITH THE FACILITY RENOVATION.
D. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
E. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION
WARRANTY REQUIREMENTS FOR ANY MODIFICATIONS TO
ROOFING TO ENSURE NO VIOLATIONS OCCUR OF THE
WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE
REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT. ROOFS
AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
F. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED
AND/OR SMOKE RATED WALLS AND ASSEMBLIES INDICATED
ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE
BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL.
G. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING,
AND CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY
OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
H. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND
FIELD VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS
MAY DIFFER FROM THOSE INDICATED. CONTRACTOR TO
FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR
REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
I. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT
LOCATIONS WITH ALL TRADES PRIOR TO INSTALLATION.
J. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS
REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR
METALS.
K. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR
SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING
CONDITIONS AND FINISHES.
L. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW
EXPOSED EXTERIOR PIPE PENETRATIONS AND SEAL
COMPLETELY.
M. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE
MODIFYING SUBFLOORING.
N. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
O. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES
AND M-802 AND M-803 FOR CONTROL SEQUENCE.
P. PROVIDE PRECONSTRUCTION…