570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26121R0066
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
4 5 65.A
A.1
B
B.1
C
D
E
D4
A-901
B4
A-901
B7
A-901
D7
A-901
F4
A-901
F7
A-901
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:1
P
M
A-901
ARCHITECTURAL INTERIOR RENDERINGS -
DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS H.
GARDINER
ISSUED FOR
CONSTRUCTION
NTS
B7
VIEW B
NTS
D4
VIEW C
NTS
D7
VIEW D
NTS
B4
VIEW A
NTS
F4
VIEW E
NTS
F7
VIEW F
1/8" = 1'-0" F1
ARCHITECTURAL BASEMENT - PROPOSED PLAN AREA B - KEY PLAN
Revisions: Date:
RENDERINGS ARE PROVIDED TO
ILLUSTRATE DESIGN INTENT ONLY
AND SHALL BE CONSIDERED
REFERENCE MATERIAL.
DESIGN DRAWINGS AND
SPECIFICATIONS SHALL BE
FOLLOWED FOR ALL
CONSTRUCTION
RELATED ITEMS PERTAINING TO
THIS
SCOPE OF WORK.
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:1
P
M
A-902
ARCHITECTURAL CUTSHEETS - DEDUCT ALT
NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
Revisions: Date:
4 5 65.A
A.1
B
B.1
C
D
E
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
NEW
OBSERVATION
ROOM
B1C23B1C23
CLEAN
UTILITY
B1C52B1C52
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
ELEVATOR
EQUIP
RM
B1C40B1C40
LINEN
CLOSET
B1C39B1C39
CHIEF
OF ER
B1C35B1C35
HEAD
NURSE
B1C37B1C37
EMS
CLOSET
B1C36B1C36
CORRIDOR
B1C-1B1C-1
MALE
RR
B1C33B1C33
FEMALE
RR
B1C32B1C32
NEW
OBSERVATION
ROOM
B1C34KB1C34K
NEW
NURSES
STATION
B1C34FB1C34F
ELEVATOR
S-5S-5
ELEVATOR
S-6S-6
HALL
B1C-6AB1C-6A
NEW
OBSERVATION
ROOM
B1C21B1C21
PATIENT
COMFORT
ROOM
BC127BC127
NEW
OBSERVATION
ROOM
B1C34CB1C34C
OBSERVATION/
TREATMENT
RM
B1C14B1C14
SOILED
UTILITY
B1C53B1C53
CORRIDOR
B1C-2B1C-2
HAC
BC50BC50
CORRIDOR
B1C-9B1C-9
CRASH
CART
ALCOVE
PAT TLT
B1C34JB1C34J
NEW
OBSERVATION
ROOM
B1C34EB1C34E
NEW
OBSERVATION
ROOM
B1C34GB1C34G
CORRIDOR
B1C-6B1C-6
PAT TLT
B1C25AB1C25A
NEW
NURSES
STATION
B1C34BB1C34B
NEW
STORAGE
B1C34DB1C34D
NEW
STORAGE
B1C34HB1C34H
STF TLT
BC51BC51
NEW
OBSERVATION
ROOM
BC24BC24
PAT
SHWR
B1C25BB1C25B
CLEAN
UTILITY
BC26BC26
NEW
OBSERVATION
ROOM
B1C34AB1C34A
CORRIDOR
B1C-4
635 SF
IN-03.01
IN-09.03
IN-03.01 IN-03.01 IN-09.03
IN-03.01
IN-04.04B
IN-04.04B
IN-04.03D IN-04.03DIN-04.03D
IN-09.03
IN-04.03DB1C-6
B 1C
B 1C
B 1C
-4 A
B 1C
B 1C
B C
B1C-4
BC50
B1C25A
BC26
B1C34J
IN-01.07.01
IN-01.07.01
IN-01.07.01
IN-01.01
IN-18.04
IN-18.04
IN-18.04
IN-18.04
IN-18.04
IN-18.04 IN-18.04 IN-18.04
IN-01.02
ARCHITECTURAL SHEET NOTES
1. REFER TO PLAN SHEETS FOR SIGNAGE LOCATION
INFORMATION, REFER TO SPECIFICATIONS FOR
ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS
/ EQUIPMENT LABELING REQUIREMENTS.
2. REFER TO AW600 FOR SIGNAGE MESSAGE SCHEDULE.
3. REFER TO AW600 FOR SIGNAGE MOUNTING DETAILS.
4. REFER TO IN SERIES SHEETS FOR ARCHITECTURAL
INTERIOR FINISHES AND PAINTS.
SIGN TYPE, SEE SCHEDULEXXX
PRIMARY SIGN
SECONDARY SIGN
RESTROOM - ALL
EXIT
ARCHITECTURAL SIGNAGE LEGEND
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
AW100B
ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT
NO.3
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F4
ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT NO.3
Revisions: Date:
DEDUCTIVE ALTERNATE #3
REMOVE SIGNAGE FROM ED BED
OBSERVATION SCOPE AND TRAILER
COMPLETELY.
SIGNAGE GENERAL NOTES
1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION
STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL
DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED.
HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.
PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING
SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION,
DETAILING, MATERIALS AND COLORS.
2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO
INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING
SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.
3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.
4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L
DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.
5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE
STRUCTURE, UNLESS NOTED.
6. DO NOT SCALE DRAWINGS.
7. BACKS AND EDGES OF ALL ALUMINUM SIGNS MOUNTED DIRECTLY TO
STRUCTURE SHALL BE PAINTED WHITE TO PREVENT CATHODIC
REACTION.
8. ILLUMINATED SIGNS TO BE U.L. LISTED OR APPROVED EQUIVALENT.
9. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-
REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.
10. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE,
PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE,
COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.
11. HANG SIGN FROM OUTSIDE FACE OF BEAM.
12. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.
13. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND
TACTILE SURFACING REQUIREMENTS WITH CAMPUS STANDARDS AND
PG-18-12.
14. ALL SIGNS INDICATED TO BE RELOCATED SHALL BE REMOVED IN THEIR
ENTIRETY (INCLUDING CONCRETE FOUNDATIONS), REFURBISHED OFF
SITE TO LIKE NEW CONDITION, HAVE NEW MESSAGE INSTALLED AS
SCHEDULED, AND BE INSTALLED IN THEIR FINAL LOCATION BEFORE
COMPLETION OF THE PROJECT. INCLUDE NEW FOUNDATION (TO MATCH
EXISTING) IN BID PRICE FOR ALL RELOCATED SIGNS.
15. FOR ALL SIGNS IN THIS PROJECT, PROVIDE ENGINEERING FOR
FOUNDATIONS AND ATTACHMENT CONNECTIONS TO MEET LOCAL
CODES AND ORDINANCES FOR WIND LOADING AND OTHER APPLICABLE
SAFETY AND SOILS REQUIREMENTS.
16. ALL SITE SIGN LOCATIONS SHALL BE COORDINATED ON SITE WITH THE
ARCHITECT AND OWNER PRIOR TO FINAL INSTALLATION.
17. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS
DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW ORIENTATION
IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO
FABRICATION.
18. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA
LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS
INCORPORATING THE VA LOGO.
19. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN".
IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH FINAL
PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE
SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES
CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE
REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS
ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE
THIS SCOPE OF WORK WITHIN THE BID PRICE.
20. BID PRICE SHALL INCLUDE REFURBISHMENT TO LIKE NEW CONDITION,
REMESSAGING AND RELOCATION FOR (2) ADDITIONAL 5'x4' POST &
PANEL SITE SIGNS (2 SIDED), BEYOND WHAT IS INDICATED WITHIN
THESE DOCUMENTS, INCLUDING INSTALLATION AND FOUNDATIONS.
21. BID PRICE SHALL INCLUDE (1) ADDITIONAL SIGN #6 BEYOND WHAT IS
INDICATED WITHIN THESE DOCUMENTS, INCLUDING INSTALLATION AND
FOUNDATIONS.
22. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED
MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY
CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF
ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL MUST BE
REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.
23. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE
SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.
24. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT
REPRESENT LINES SEPARATING TEXT.
25. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED
MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF MESSAGE
SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT
COORDINATION TO BE PERFORMED WITH ARCHITECT DURING THE SHOP
DRAWING PROCESS.
26. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO
MATCH THAT OF THE MESSAGE BEING REPLACED.
27. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA"
LOGO REPLACED.
28. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS
PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT
TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND
SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.
29. PROVIDE 60 SF ROCK MULCH BED, INCLUDING CONTINUOUS PERIMETER
STEEL EDGING, AT ALL PROPOSED AND RELOCATED SITE SIGN
LOCATIONS. EXCEPTIONS ARE WHERE SIGNS ARE LOCATED ON
HARDSCAPE OR COMPLETELY WITHIN LANDSCAPE MULCH BEDS.
30. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE
FITTING WITHIN SIGN LIMITS.
31. PRIMARY DIRECTIONAL POST & PANEL AND PRIMARY BUILDING
IDENTIFICATION SIGNS LETTERING TO BE NO SMALLER THAN 3" IN
HEIGHT. SECONDARY POST & PANEL AND SECONDARY BUILDING
IDENTIFICATION & INFORMATIONAL SIGNS LETTERING TO BE NO
SMALLER THAN 2" IN HEIGHT.
32. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE
ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS AS
THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL
MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND
PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF
DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY
BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION
REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL
SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.
33. FOR ANY SIGN NOTED TO BE RETURNED TO OWNER, CONTRACTOR
SHALL COMPLETELY REMOVE CONCRETE FOUNDATION PRIOR TO
TURNING OVER.
INTERIOR SIGN PLAQUE COLOR
REFERENCES
VA SIGNAGE DESIGN MANUAL
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE
SPECIFICATIONS
https://www.cfm.va.gov/til/spclRqmts.asp#SIGN
SIGN SYMBOL LEGEND
PRIMARY SIGN
SECONDARY SIGN
CONFERENCE/TRAINING ROOM SIGN
RESTROOM - ALL
RESTROOM - MEN
RESTROOM - WOMEN
EXIT
EXTERIOR SIGNAGE
SIGN SHALL MATCH THE CAMPUS STANDARD IN PLACE, VENDOR TO
COORDINATE WITH VA FACILITIES TO OBTAIN COLOR AND FORMAT
https://www.cfm.va.gov/til/signs/SignageSumm.p df
1'-1"
FACE: CLEAR NON-GLARE
ACRYLIC WITH SUBSURFACE
BACKGROUND COLOR CREATING
CLEAR WINDOW
CLEAR INSERT
MOUNTED WITH DOUBLE SIDED
FOAM TAPE OR SILASTIC ADHESIVE
9"
ADA TACTILE NUMERALS AND
GRADE II BRAILLE
INSERT WITH CLEAR PROTECTOR
COVER WITH SURFACE APPLIED VINYL
ON SUBSTRATE
MOUNTED WITH DOUBLE SIDED FOAM
TAPE, SILASTIC ADHESIVE OR
SCREW
BACKGROUND COLOR: MATCH
EXISTING CAMPUS STANDARD
9"
ADA TACTILE NUMERALS AND
GRADE II BRAILLE
INSERT WITH CLEAR PROTECTOR
COVER WITH SURFACE APPLIED VINYL
ON SUBSTRATE
MOUNTED WITH DOUBLE SIDED FOAM
TAPE, SILASTIC ADHESIVE OR
SCREW
BACKGROUND COLOR: MATCH
EXISTING CAMPUS STANDARD
9"
/4
ADA TACTILE NUMERALS AND
GRADE II BRAILLE
TACTILE SYMBOL AND TEXT
MOUNTED WITH DOUBLE SIDED FOAM
TAPE OR SILASTIC ADHESIVE
BACKGROUND COLOR: MATCH
EXISTING CAMPUS STANDARD
EXIT
1'-10"
IN-01.07.01
5' -0
2'
-1 1"
VINYL ADHESIVE SIGN
FONT: FUTURA MD
COLOR: TO BE
DETERMINED BY VA
DESIGNER, TYP.
2" 8" 2" 1'-10" 2"
2' -6
5'
-5
2'-9"
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
9"
" ADA TACTILE NUMERALS AND
GRADE II BRAILLE
MOUNTED WITH DOUBLE SIDED FOAM
TAPE, SILASTIC ADHESIVE OR
SCREW
BACKGROUND COLOR: MATCH
EXISTING CAMPUS STANDARD
9"
HELVETICA BOLD WHITE COPY
RED BACKGROUND ACRYLIC PLAQUE
MOUNTED WITH DOUBLE SIDED
FOAM TAPE OR SILASTIC
ADHESIVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
AW601
ARCHITECTURAL SIGNAGE NOTES AND
SCHEDULE - DEDUCT ALT NO.3
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
BUILDING SIGNAGE SCHEDULE
TYPE VERSION TYPE COUNT DESCRIPTION INSTALLATION PROPOSED MESSAGE
BRAILLE OR RAISED
LETTERS REQUIRED TEXT COLOR BACKGROUND COLOR
DIMENSIONS
COMMENTSSIGN_HEIGHT SIGN_WIDTH
MOUNTING
HEIGHT
IN-01.01 IN-01.01 1 EMERGENCY EXIT PLAN, DETAIL E1 / AW601 PUBLIC SPACES REFER TO PAGE 8-5-3 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 NO REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 1' - 1" 1' - 1" 5' - 0"
IN-01.02 IN-01.02 1 FIRE EQUIPMENT IDENTIFICATION SIGN, DETAIL E3 / AW601 PUBLIC SPACES REFER TO PAGE 8-5-5 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"
IN-01.07.01 IN-01.07.01 3 EXIT SIGN, DETAIL E5 / AW601 VARIES REFER TO PAGE 8-5-15 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 NO WHITE RED (OSHA) 0' - 9" 1' - 10" 6' - 8"
IN-03.01 IN-03.01 4 ROOM NUMBER IDENTIFICATION, DETAIL E3 / AW601 UTILITY SPACES REFER TO PAGE 9-5-1 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 3" 0' - 9" 5' - 0"
IN-04.03 IN-04.03D 4 PRIMARY ROOM IDENTIFICATION WITH INSERT, DETAIL F1 / AW601 PUBLIC SPACES REFER TO PAGE 9-5-7 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"
IN-04.04 IN-04.04B 2 SECONDARY ROOM IDENTIFICATION WITH INSERT, DETAIL F3 / AW601 STAFF SPACES REFER TO PAGE 9-5-9 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"
IN-09.03 IN-09.03 3 RESTROOM IDENTIFICATION, DETAIL F5 / AW601 RESTROOM REFER TO PAGE 9-5-27 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 1' - 0 1/4" 0' - 9" 5' - 0"
IN-18.04 IN-18.04 8 SURFACE APPLIED WHITE VINYL, DETAIL D5 / AW601 OBSERVATION BEDS REFER TO PAGE 9-5-101 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 NO REFERENCE EXISTING CAMPUS STANDARDS - 2' - 6" 2' - 9" 5' - 0"
Grand total: 26
3" = 1'-0" E1
IN-01.01 SIGN DETAIL - EMERGENCY EXIT PLAN
3" = 1'-0" F1
IN-04.03 SIGN DETAIL - PRIMARY ROOM IDENTIFICATION
3" = 1'-0"
F3
IN-04.04 SIGN DETAIL - SECONDARY ROOM IDENTIFICATION
3" = 1'-0" F5
IN-09.03 SIGN DETAIL - RESTROOM IDENTIFICATION
1 1/2" = 1'-0" E5
IN-01.07 INTERIOR - EXIT SIGN
1/2" = 1'-0" D5
IN-18.04 SIGN DETAIL - VINYL GRAPHICS
Revisions: Date:
DEDUCTIVE ALTERNATE #3
REMOVE SIGNAGE FROM ED BED
OBSERVATION SCOPE AND TRAILER
COMPLETELY.
3" = 1'-0" E3
IN-03.01 SIGN DETAIL - ROOM NUMBER IDENTIFICATION
3" = 1'-0" D1
IN-01.02 SIGN DETAIL - FIRE EXTINGUISHER
UP
4 5 65.A
A.1
B
B.1
C
D
E
INTERVENTION
(SECLUSION)
ROOM
B1C28
119 SF
ELEVATOR
EQUIP RM
B1C40
113 SF
LINEN
CLOSET
B1C39
11 SF
CHIEF OF ER
B1C35
127 SF
HEAD NURSE
B1C37
97 SF
EMS CLOSET
B1C36
10 SF
MALE RR
B1C33
121 SF
FEMALE RR
B1C32
120 SF
ELEVATOR
S-5
82 SF
PATIENT
COMFORT
ROOM
BC127
42 SF
CORRIDOR
B1C-4B1C-4
INTERVENTION
(SECLUSION)
ROOM
B1C28B1C28
NEW
OBSERVATION
ROOM
B1C23
83 SF
CLEAN
UTILITY
B1C52
66 SF
LINEN
CLOSET
B1C41B1C41
LINEN
CLOSET
B1C42B1C42
STAIR
NO.4
B1C43B1C43
CORRIDOR
B1C-1B1C-1
WAITING
B1C-1B1C-1
NEW
OBSERVATION
ROOM
B1C34K
105 SF
NEW
OBSERVATION
ROOM
B1C34A
70 SF
ELEVATOR
S-5S-5
ELEVATOR
S-6S-6
HALL
B1C-6A
255 SF
NEW
OBSERVATION
ROOM
B1C21
84 SF
NEW
OBSERVATION
ROOM
B1C34C
78 SF
OBSERVATION/
TREATMENT
RM
B1C14B1C14
SOILED
UTILITY
B1C53
62 SF
CORRIDOR
B1C-2B1C-2
HAC
BC50
51 SF
CORRIDOR
B1C-7B1C-7
NURSE
STATION
B1C29AB1C29A
CRASH
CART
ALCOVE
A6
A6
A5 A6
A
B1C-4
B C
B 1C
B 1C
NEW
OBSERVATION
ROOM
B1C34G
93 SF
NEW
OBSERVATION
ROOM
B1C34E
78 SF
PAT TLT
B1C25A
67 SF
PAT SHWR
B1C25B
16 SF
CLEAN
UTILITY
BC26
70 SF
NEW
OBSERVATION
ROOM
BC24
93 SF
STF TLT
BC51
53 SF
CORRIDOR
B1C-6
246 SF
NEW NURSES
STATION
B1C34B
36 SF
NEW
STORAGE
B1C34D
14 SF
NEW NURSES
STATION
B1C34F
67 SF
NEW
STORAGE
B1C34H
13 SF
PAT TLT
B1C34J
54 SF
CORRIDOR
B1C-4
635 SF
B1C-6
A5WFT-1
WFT-3 ALL
WALLS WFT-4 ALL
WALLS
WFT-3 ALL
WALLS
WFT-4 ALL
WALLS
P-1
RB-1
LVT-1
WFT-4
PT-2
PT-1
3'-4"
1'-8"
1'-8"
A
8'-4"
8'-4"
1' -8
1'
-8
2'-0" 6'-4"
'-0
6'
-2
P-1
RB-1
LVT-1
WFT-1
RB-1
LVT-1
P-1,WFT-2
RB-1
LVT-1
WFT-5
S-1
PT-1
P-1,WFT-2
RB-1
LVT-1,2
WFT-4
PT-2
PT-1 P-1,3,/WFT-2,3,7
RB-1
LVT-1, 2
P-3/WFT-2,3,7
RB-1
LVT-1,2
WFT-3,7
RB-1
LVT-1,2
WFT-3,7
RB-1
LVT-1,2
WFT-3,7
RB-1
LVT-1,2
P-1
RB-1
LVT-1
P-1,3/ WFT-1,3,7
RB-1
LVT-1
P-1/WFT-1,3,7
RB-1
LVT-1
P-1,3/ WFT-1,3,7
RB-1
LVT-1
WFT-3
RB-1
PT-1
P-1/WFT-3
RB-1
LVT-1
P-1,2,3/WFT-1,3
RB-1
LVT-1,2
P-1,2,3/WFT-3
RB-1
LVT-1,2
P-1/WFT-3
RB-1
LVT-1
WFT-6
S-1
PT-1
W F
T -2
5' -0
WFT-2
9'-2"
W F
T -2
2' -8
W F
T -2
4' -6
W F
T -2
'-0
CG-1
CG-1
CG-1CG-1
W F
T -2
'-2
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1 CG-1
CG-1
CG-1CG-1CG-1
CG-1
CG-1
CG-1
CG-1CG-1
G R
A
IN
GRAIN
GRAIN
G R
A
IN
G R
A
IN G
R A
IN
GRAIN
GRAIN GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
G R
AIN
A-401
B7
A-401
C7
A-401
D7
A-401
F7
A-402
C7
A-402
E7
A-402
F7
P-3
P-3 P-3
REFER TO
C7/A-402 FOR
PAINT LOCATIONS
ON THIS WALL
WFT-2
9'-7"
WFT-2
12'-9"
P-1
WFT-7
WFT-7
WFT-7
WFT-7
WFT-7
WFT-7
CORRIDOR
B1C-9B1C-9
5 5
CG-1
CG-1
CG-1
CG-1
WFT-2
3'-4"
GRAIN
G R
A
IN
GRAIN
W F
T -1
3' -4
W F
T -1
3' -4
WFT-2
3'-4"
WFT-7WFT-7
1'-6"
G R
A
IN
G R
A
IN
GRAIN
G R
A
IN
WFT-1
1'-8"
G R
A
IN
GRAIN
8"
W F
T -2
1' -3
W F
T -1
W F
T -1
3' -1
0"
5' -6
REFER TO
C7/A-402 FOR
PAINT LOCATIONS
ON THIS WALL
WFT-3 ALL
WALLS
WFT-3 ALL
WALLS
WFT-3 ALL
WALLS
WFT-2
13'-1"
W F
T -2
2' -2
CG-1
WFT-3
WFT-3
WFT-3
WFT-3
WFT-3
WFT-3
WFT-3
G R
AIN
G R
AIN
B1
IN601
A1
IN601
B1
IN601 FE
PATTERN CHANGE (REFER TO IF601 FOR
TRANSITION DETAILS)
MATERIAL FLOOR CHANGE (REFER TO IF601 FOR
TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
HANDRAIL LOCATION
ROOM FINISH TAG
Wall Finish
Base Finish Floor Finish
WALL GUARD LOCATION
WG
LVT- 1 (FIELD COLOR)
LVT- 2 (ACCENT COLOR)
TILE (PT)
INTERIOR FLOOR FINISH LEGEND
LVT- 1 (FIELD COLOR) INSTALLED ON 45° ANGLE
NOT IN SCOPE
MATCH EXISTING (VCT - REFER TO IMAGE E2/IN100B FOR
COLOR REFERENCE, FINAL COLOR APPROVAL BY OWNER )
EQUIPMENT LEGEND
V V ITEM - VA SUPPLIED & INSTALLED
V C ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
C C ITEM - CONTRACTOR SUPPLIED &
INSTALLED
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A1000
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
IN100B
INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA
B - DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
1/4" = 1'-0" F4
INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B
FINISH ABBREVIATIONS
REFER TO SHEET IN601 FOR FINISH LEGEND
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
CC CUBICLE CURTAIN TRACK
CG CORNER GUARD
HR HAND RAIL
LVT LUXURY VINYL TILE
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WFT WALL FINISH TYPE
WG WALL GUARD
INTERIOR SHEET NOTES
A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
B. REFER TO SHEET IF601/IF602 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY, REFER
TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.
F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS
G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,
TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE
CLOSED POSITION.
H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
I. REFER TO AJ SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /
EQUIPMENT LABELING REQUIREMENTS.
J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE
SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO
NOT TRANSMIT TO ADJACENT SPACES.
K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION
AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE SHALL
BE REQUESTED FROM THE COR.
O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH IBC
2009 TABLE 803.9
Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR
INSTALLER FINISHED ITEMS.
S. PAINT ALL WALLS (P-1) UNO.
T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-1) UNO.
U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-2) UNO.
KEYNOTES
1 INSTALL NEW HANDRAIL TO MATCH EXISTING
2 MATCH EXISTING FLOORING INSTALLED AT CORRIDOR.
CONTRACTOR TO VERIFY TYPE AND MATERIAL WITH OWNER.
3 ALIGN FLOORING WITH WALL EDGE
4 PAINT TO MATCH EXISTING CORRIDOR COLOR, COORDINATE WITH
OWNER FOR PAINT STANDARD
5 DISPOSABLE CUBICLE CURTAINS WILL BE PURCHASED BY
OWNERS FACILITIES DEPARTMENT; CUBICLE CURTAIN TRACK
PROVIDED AND INSTALLED BY CC
6 RECESS SLAB FOR LEVEL FLOOR TRANSITION
7 TEMPORARY PARTITIONS
8 REFER TO ENLARGED PLANS ON A-401 FOR WALL FINISH TYPES
9 COVER ALL SIDES OF THIS WALL WITH WFT-3 WITH THE EXCEPTION
OF THE WET WALL FACE, THAT WALL WILL BE FINISHED IN WFT-1
FLOOR FINISH AREA
LVT-1 1480 SF
LVT-1 INSTALLED ON 45 239 SF
LVT-2 191 SF
MATCH EXISTING 82 SF
PORCELAIN TILE 245 SF12" = 1'-0"
E2
EXISTING FLOORING TO BE MATCHED
AT CORRIDOR B1C-2
PATTERN CHANGE (REFER TO IF601 FOR
TRANSITION DETAILS)
MATERIAL FLOOR CHANGE (REFER TO IF601 FOR
TRANSITION DETAILS)
DIRECTION OF FINISH
INTERIOR FINISH SYMBOLS
P-_ PAINT COLOR / WALL FINISHES
EXTENT OF WALL FINISH TYPE
CORNER GUARD LOCATIONCG
GRAIN
HANDRAIL LOCATION
ROOM FINISH TAG
Wall Finish
Base Finish Floor Finish
WALL GUARD LOCATION
WG
3' -0
4' -0
6"
HR-1
RB-1
RWC-1
RB-1
RWC-1
P-1
UNLESS NOTED
OTHERWISE ON
FINISH PLAN
WFT-2: HAND RAIL WFT-3: SHEET WALL PROTECTION
MANUFACTURER'
S
STANDARD
TRIM PIECES AT
ALL SEAMS AND
EDGES
P-1 , UNLESS
NOTED
OTHERWISE ON
FINISH PLAN
TR-1
PT-2
WFT-4: WAINSCOT TILE
P-1
UNLESS NOTED
OTHERWISE ON
FINISH PLAN
TR-2
PT-3
3' -0
6"
1' -0
4' -6
6"
RB-1
S-1
WFT-1: SOLID SURFACE WALL PANEL
AT WALL MOUNTED LAVATORIES
P-1 , UNLESS NOTED
OTHERWISE ON
FINISH PLAN
EQ EQ
UNO ON FINISH PLAN
2'-6"
4' -6
"4' -0
WFT-5: PATIENT TOILET
4' -6
3'
-6
8' -0
8' -0
S-1
WFT-6: PATIENT SHOWER
8' -0
TR-2
S-1
P-1
UNLESS NOTED
OTHERWISE ON
FINISH PLAN
EASED EDGE
SCRIBE TO
CEILING
TR-2
WFT-7: WALL GUARDS AT
HEAD WALL
WG-1
RB-1
4' -6
2'-0"
SCRIBE
AND SEAL
INSIDE
SHOWER
CORNERS
WG-2
1' -0
D3
IN601
D5
IN601
6"
1' -6
P-1
UNLESS NOTED
OTHERWISE ON
FINISH PLAN
CENTER WALL
GUARDS IN
OBSERVATION BAY
SPACE.
COORDINATE WITH
HEADWALL
CONTROLS IN
FIELD.
RESILIENT BASE AS SCHEDULED
RESILIENT FLOOR AS SCHEDULED
WATER VAPOR CONTROL SYSTEM
PARTITION AS SCHEDULED
TOP OF SLAB
PORCELAIN TILE LUXURY VINYL TILE
ALIGN
CEMENTITIOUS SETTING BED
LVT TO PT-1
STAINLESS STEEL TRANSITION STRIP
(TR-3)
RECESSED SLAB
PORCELAIN TILE
CEMENTITIOUS SETTING BED
SHOWER TO PT-1
HIGH POINT
RECESSED SLABSLOPED CEMENTITIOUS
SETTING BED
SLOPE DIRECTLY TO DRAIN
GROUT
1 7/8" [48MM]
1 /
[1 0 3
M M
VINYL COVER
CONTINUOUS
ALUMINUM RETAINER
#10X 1 3/4" SHEET
METAL SCREW WITH
ALLIGATOR ANCHOR
WALL AS
SCHEDULED
SEE F1 ON THIS
SHEET FOR
MOUNTING HEIGHTS
CONTINUOUS IMPACT BUMPER
CONTINUOUS
ALUMINUM RETAINER
#10X 1 3/4" SHEET
METAL SCREW WITH
ALLIGATOR ANCHOR
WALL AS
SCHEDULED
VINYL COVER
1" [25MM]
1'-0" AFF
4" [1
M
M
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
IN601
INTERIOR FINISH LEGEND & ROOM FINISH
SCHEDULE - DEDUCT ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
FINISH LEGEND
SYMBOL FINISH TYPE
SPEC
SECTION MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE NOTES
AT-1 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * ULTIMA HEALTH ZONE TEGULAR 1937 FLAT WHITE 24"X24" 15/16" CEILING GRID SYSTEM
AT-2 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * ULTIMA HIGH NRC 1943 FLAT WHITE 24"X48" 15/16" CEILING GRID SYSTEM
AT-3 ACOUSTICAL CEILING TILE 09 51 00 SKYFACTORY * CLASSIC ECOSLIM LED ES22-CLA SKY IMAGE
CC-1 CUBICLE CURTAIN TRACK 10 21 23 IN PRO * FORMATRAC BENDABLE TRACK WHITE CURTAIN TO BE PROVIDED AND INSTALLED BY THE VA (VV); TRACK PROVIDED AND
INSTALLED BY GC (CC)
CG-1 CORNER GUARD 10 26 00 IN PRO * 150 BN SURFACE MOUNT SHARKSKIN 0350 3" LEGS, 4'H
HR-1 HAND RAIL 10 26 00 IN PRO * 1000 SHARKSKIN 0350
LVT-1 LUXURY VINYL TILE 09 65 19 INTERFACE * NATIVE FABRIC SEAGRASS A00802 50"CMX50CM" FIELD
LVT-2 LUXURY VINYL TILE 09 65 19 INTERFACE * NATIVE FABRIC FLAX A00801 50"CMX50CM" ACCENT
P-1 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DE6254- SATIN FINISH COLOR MATCH: LIGHT SPRINKLE LRV 71 MAIN FIELD
P-2 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DE6242- SATIN FINISH COLOR MATCH: WELLS GRAY LRV 43 TRIM
P-3 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DET604- SATIN FINISH COLOR MATCH: BROODING STORM LRV 15 ACCENT
PL-1 PLASTIC LAMINATE 06 20 00 WILSONART * Y0598 FAWN WALNUT CROSSGRAIN
PT-1 PORCELAIN TILE 09 30 13 DALTILE * FABRIC ART MOSAIC MODERN TEXTILE TAUPE MT52 1"x3" MOSAIC FLOOR TILE, GROUT COLOR: MAPEI 105 DRIFTWOOD
PT-2 PORCELAIN TILE 09 30 13 DALTILE * FABRIC ART MODERN TEXTILE TAUPE MT52 12"X24" WALL TILE, GROUT COLOR: MAPEI 15 BONE
PT-3 PORCELAIN TILE 09 30 13 DALTILE * COLOR WAVE COLOR WAVE SMOKED PEARL CW17 1"X6" WALL TILE ACCENT BAR STACKED, GROUT COLOR: MAPEI 15 BONE
RB-1 RESILIENT BASE 09 65 13 TARKETT * TRADITIONAL VINYL 1/8" TYPE TV TA3 CASTAWAY 6"
RWC-1 RIGID WALL COVERING 10 26 00 IN PRO * PALLADIUM G2 SHARKSKIN 0350
S-1 SOLID SURFACE 12 36 00 AVONITE * WET WALL 0936 SANDSTORM 1/4" THICK
SS-1 STAINLESS STEEL 06 20 00 - - - - COUNTERTOP AT SOILED UTILITY B1C53
TR-1 TILE TRIM 09 30 13 SCHLUTER * JOLLY SATIN NICKEL ANODIZED ALUMINUM TOP FINISH PIECE AT WALL TILE
TR-2 TILE TRIM 09 30 13 SCHLUTER * DILEX-AHK SATIN NICKEL ANODIZED ALUMINUM COVE FINISH PIECE AT RESTROOM/SHOWER; SIZE PER WALL MATERIAL
TR-3 TILE TRIM 09 30 13 SCHLUTER * DECO STAINLESS STEEL TRANSITION AT TILE
WFT-1 WALL FINISH TYPE - - - - - - SEE F1 THIS SHEET
WG-1 WALL GUARD 10 26 00 IN PRO * 1300 SHARKSKIN 0350 4-1/16" HEADWALL WALL PROTECTION; REFER TO F1 THIS SHEET FOR DETAILS
WG-2 WALL GUARD 10 26 00 IN PRO * 1400 SHARKSKIN 0350 4"H
ROOM FINISH SCHEDULE
NO. NAME
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
B1C21 NEW OBSERVATION ROOM LVT-1 RB-1 GWB P-1 GWB WFT-3 GWB P-3, WFT-3,7 GWB WFT-1,3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C23 NEW OBSERVATION ROOM LVT-1 RB-1 GWB P-1 GWB WFT-1,3 GWB WFT-7,3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C25A PAT TLT PT-1 S-1 GWB WFT-5 GWB WFT-5 GWB WFT-5 GWB WFT-5 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C25B PAT SHWR PT-1 S-1 GWB WFT-6 GWB WFT-6 - - GWB WFT-6 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34A NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34B NEW NURSES STATION LVT-1,2 RB-1 GWB P-1 GWB P-1,2,3/WFT-3 GWB P-1 - - GYB,AT-3, P-3
B1C34C NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34D NEW STORAGE LVT-1 RB-1 - - GWB P-1/WFT-3 - - GWB P-1 AT-1
B1C34E NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34F NEW NURSES STATION LVT-1,2 RB-1 GWB P-1 GWB P-1,2,3/WFT-1,3 GWB P-1 - - GWB, AT-1,3, P-3 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34G NEW OBSERVATION ROOM LVT-1,2 RB-1 GWB P3, WFT-2,3 - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34H NEW STORAGE LVT-1 RB-1 - - GWB WFT-3 - - GWB P-1 AT-1
B1C34J PAT TLT PT-1 PT-2 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C34K NEW OBSERVATION ROOM LVT-1, 2 RB-1 GWB P-1, WFT-2 GWB P-3, WFT-3,7 GWB P-1 - - AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C52 CLEAN UTILITY LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1
B1C53 SOILED UTILITY LVT-1 RB-1 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C-2 CORRIDOR EXISTING MATCH EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING GWB MATCH EXISTING GWB, EXISTING P-1, MATCH EXISTING REFER TO SHEET IN101 FOR PAINT BOUNDARY
B1C-4 CORRIDOR LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-2
B1C-6 CORRIDOR LVT-1 RB-1 GWB P-1, WFT-2 GWB P-1 GWB P-1, WFT-2 - - AT-1, GWB, P-3 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C-6A HALL LVT-1,2 RB-1 GWB P-1, WFT-2 - - - - - - AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION
B1C-9 CORRIDOR LVT-1 RB-1 EXISTING P-1 GWB P-1 GWB P-1 - -
BC24 NEW OBSERVATION ROOM LVT-1 RB-1 - - GWB WFT-3 GWB P-3, WFT-3,7 GWB P-1,WFT-1,3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
BC26 CLEAN UTILITY LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1
BC50 HAC PT-1 RB-1 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
BC51 STF TLT PT-1 PT-2 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION
INTERIOR SHEET NOTES
A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
B. REFER TO SHEET IF601/IF602 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY, REFER
TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.
F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS
G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,
TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE
CLOSED POSITION.
H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
I. REFER TO AJ SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /
EQUIPMENT LABELING REQUIREMENTS.
J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE
SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO
NOT TRANSMIT TO ADJACENT SPACES.
K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION
AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE SHALL
BE REQUESTED FROM THE COR.
O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH IBC
2009 TABLE 803.9
Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR
INSTALLER FINISHED ITEMS.
S. PAINT ALL WALLS (P-1) UNO.
T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-1) UNO.
U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-2) UNO.
FINISH ABBREVIATIONS
REFER TO SHEET IN601 FOR FINISH LEGEND
ABBREVIATION FINISH TYPE
AT ACOUSTICAL CEILING TILE
CC CUBICLE CURTAIN TRACK
CG CORNER GUARD
HR HAND RAIL
LVT LUXURY VINYL TILE
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RWC RIGID WALL COVERING
S SOLID SURFACE
SS STAINLESS STEEL
TR TILE TRIM
WFT WALL FINISH TYPE
WG WALL GUARD
1/2" = 1'-0" F1
WALL FINISH TYPES
6" = 1'-0" D1
RESILIENT TO RESILIENT BASE (TOE BASE)
12" = 1'-0" B1
LUXURY VINYL TILE TO RECESSED PORCELAIN TILE
NOTE:
MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN, ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS APPROVAL.
12" = 1'-0" A1
RECESSED PORCELAIN TILE TO SHOWER TILE
Revisions: Date:
1/2" = 1'-0" D3
WALL GUARD (WG-1)
1/2" = 1'-0"
D5
WALL GUARD (WG-2)
PAINT
FIELD
PPG*
COLOR MATCH
DUNN EDWARDS
DE6254 LIGHT SPRINKLE
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP
Project Number
Board Number
# of #
Office of Construction and Facilities Management
ACCENT
PPG*
COLOR MATCH
DUNN EDWARDS
DET604 BROODING STORM
DOOR FRAME/ TRIM/ ACCENT
PPG*
COLOR MATCH
DUNN EDWARDS
DE6242 WELLS GRAY
WALL PROTECTION
IN PRO*
SHARKSKIN 0350
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
DATE MRP
Project Number
Board Number
# of #
Office of Construction and Facilities Management
*OR EQUAL *OR EQUAL
RUBBER WALL BASE
TARKETT*
TA3 CASTAWAY
RESTROOMS
DALTILE (or equal)
FABRIC ART
COLOR: MODERN TEXTILE TAUPE MT52
GROUT:
MAPEI 105 DRIFTWOOD AT FLOOR TILE
MAPEI 15 BONE AT WALL TILE
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
DATE MRP
Project Number
Board Number
# of #
Office of Construction and Facilities Management
P-1
P-3
CG-1
RWC-1
RB-1
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PT-1
PT-2
LUXURY VINYL TILE
INTERFACE (or equal)
NATICE FABRIC
COLOR: SEAGRASS A00802
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP NB
Project Number
Board Number
# of #
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
LVT-1 LVT-2
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
INTERFACE (or equal)
NATIVE FABRIC
COLOR: FLAX A00801
PT-3
DALTILE (or equal)
COLOR WAVE
COLOR: SMOKED PEARL CW17
SIZE: 1"X6"
GROUT: MAPEI 15 BONE
P-2
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
CEILING FINISH
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
DATE MRP
Project Number
Board Number
# of #
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
ACOUSTICAL CEILING TILE
ARMSTRONG (or equal)
STYLE: ULTIMA SQUARE LAY-IN
SIZE: 24"X48"
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
Project Title
Location
Date Checked Drawn
DATE
Project Number
Board Number
# of #
Office of Construction and Facilities Management
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
AT-2
ARMSTRONG (or equal)
STYLE: OPTIMA HEALTH ZONE
SIZE: 24"X24"
AT-1
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
SKY FACTORY (or equal)
STYLE: CLASSIC ECOSLIM LED
ES22-CLA
AT-3
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
WALL GUARD
IN PRO*
WG-1
WALL GUARD
IN PRO*
HR-1
WALL GUARD
IN PRO*
WG-2
S-1 AVONITE (or equal)
WET WALL
COLOR: SANDSTORM
HEAD WALL / MILLWORK
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checke d
Drawn
MRP
Project Number
Board Number
# of #
Office of Construction and Facilities Management
*OR EQUAL
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO
ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com
NB
570-17-210
2615 E. CLINTON AVENUE,
FRESNO, CA 93703
REMODEL ED BEDS FOR
OBSERVATION BEDS
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
WILSONART (or equal)
COLOR: FAWN WALNUT
CROSSGRAIN Y0598
PL-1
1. REMOVE ALL ARCHITECTURAL RENOVATION WORK
ASSOCIATED WITH THE INTERIOR EMERGENCY
DEPARTMENT BED OBSERVATION AREA, THIS
INCLUDES DEMOLITION WORK AND ALL
CONSTRUCTION WORK OUTLINED WITHIN THE "AREA
OF WORK". WORK SHOWN ON A-200, A-350, & A-351
REMAIN.
2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)
FROM AHU (AIR HANDLER UNIT) SELECTION.
3. REMOVE SIGNAGE FROM ED BED OBSERVATION
SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1
IS EXERCISED DEDUCT ALT#3 WOULD COVER THE
REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.
DEDUCTIVE ALTERNATES
NOTE: DEDUCTIVE ALTERNATES ARE NOT
CASCADING. THE OWNER WILL EXERCISE DEDUCTS
AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER
SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO
DETERMINATIONS CAN BE MADE AND PRIORITIES
ESTABLISHED BASED ON BIDS RECEIVED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
B
IM
/5
-1 -2
E x p a n d E
D B e d s
/5
-1
-2
.O
P C
.A R
C H
.r v t
/1
/2
:3
:2
P
M
IN701
INTERIOR FINISH COLOR BOARDS - DEDUCT
ALT NO.1
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
6/18/2021 M. PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
| 570-17-210.OPC.IFC.DWG.20210618Part-12 |
| 570-17-210.OPC.IFC.DWG.20210618Part-13 |
| 570-17-210.OPC.IFC.DWG.20210618Part-14 |
| 570-17-210.OPC.IFC.DWG.20210618Part-15 |
File details come from the government source that posted it. Updated .