570-17-210.OPC.IFC.DWG.20210618Part-6of10.pdf

PDF 8 MB Posted

Attached to
Z2DA--REMODEL EMERGENCY DEPARTMENT FOR OBSERVATION BEDS | 570-17-210
Solicitation number
36C26121R0066
Issued by

View the file

Other files

File Type Posted
36C26121R0066 0005.docx DOCX document
36C26121R0066 0004.docx DOCX document
Site Visit Sign-in Sheet--12.1.2021.pdf PDF
Site Visit Sign-in Sheet--11.10.2021.pdf PDF
36C26121R0066--Responses to Pre-Proposal RFIs (1-17)--Complete--12.6.2021.pdf PDF
Specification 11 73 00-rev01-12.03.2021.pdf PDF
36C26121R0066 0003.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-17).pdf PDF
36C26121R0066 0002.docx DOCX document
36C26121R0066--Responses to Pre-Proposal RFIs (1-10).pdf PDF
ACM Report.pdf PDF
36C26121R0066 0001.docx DOCX document
570-17-210.OPC.IFC.DWG.20210618Part-7of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-1of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-8of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-10of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-3of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-2of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-5of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-4of10.pdf PDF
570-17-210.OPC.IFC.DWG.20210618Part-9of10.pdf PDF
Factor 6 - Divisional Construction Costs.pdf PDF
REQUEST FOR INFORMATION (RFI) FORM--36C26121R0066.docx DOCX document
Factor 4 - Past Performance (Questionnaire).docx DOCX document
570-17-210.OPC.IFC.Specification.R2.20210618Part-4.pdf PDF
570-17-210.OPC.IFC.Specification.R2.20210618Part-2.pdf PDF
Factor 2 - Key Personnel Qualifications Resumes.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-3.pdf PDF
VHA_DIRECTIVE_1193_D_2021_08_13--Vaccination_Program.pdf PDF
General Decision Number CA20210018 10.08.2021.pdf PDF
Responsibility - Contractor Certification Regarding Safety and Environmental.pdf PDF
Site_Visit_MAP.pdf PDF
Factor 1 - Prime Contractor Project Experience.xlsx XLSX spreadsheet
570-17-210.OPC.IFC.Specification.R2.20210618Part-1.pdf PDF
36C26121R0066_2.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

4 5 65.A

A.1

B

B.1

C

D

E

D4

A-901

B4

A-901

B7

A-901

D7

A-901

F4

A-901

F7

A-901

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:1

P

M

A-901

ARCHITECTURAL INTERIOR RENDERINGS -

DEDUCT ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS H.

GARDINER

ISSUED FOR

CONSTRUCTION

NTS

B7

VIEW B

NTS

D4

VIEW C

NTS

D7

VIEW D

NTS

B4

VIEW A

NTS

F4

VIEW E

NTS

F7

VIEW F

1/8" = 1'-0" F1

ARCHITECTURAL BASEMENT - PROPOSED PLAN AREA B - KEY PLAN

Revisions: Date:

RENDERINGS ARE PROVIDED TO

ILLUSTRATE DESIGN INTENT ONLY

AND SHALL BE CONSIDERED

REFERENCE MATERIAL.

DESIGN DRAWINGS AND

SPECIFICATIONS SHALL BE

FOLLOWED FOR ALL

CONSTRUCTION

RELATED ITEMS PERTAINING TO

THIS

SCOPE OF WORK.

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:1

P

M

A-902

ARCHITECTURAL CUTSHEETS - DEDUCT ALT

NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

Revisions: Date:

4 5 65.A

A.1

B

B.1

C

D

E

INTERVENTION

(SECLUSION)

ROOM

B1C28B1C28

NEW

OBSERVATION

ROOM

B1C23B1C23

CLEAN

UTILITY

B1C52B1C52

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR

NO.4

B1C43B1C43

ELEVATOR

EQUIP

RM

B1C40B1C40

LINEN

CLOSET

B1C39B1C39

CHIEF

OF ER

B1C35B1C35

HEAD

NURSE

B1C37B1C37

EMS

CLOSET

B1C36B1C36

CORRIDOR

B1C-1B1C-1

MALE

RR

B1C33B1C33

FEMALE

RR

B1C32B1C32

NEW

OBSERVATION

ROOM

B1C34KB1C34K

NEW

NURSES

STATION

B1C34FB1C34F

ELEVATOR

S-5S-5

ELEVATOR

S-6S-6

HALL

B1C-6AB1C-6A

NEW

OBSERVATION

ROOM

B1C21B1C21

PATIENT

COMFORT

ROOM

BC127BC127

NEW

OBSERVATION

ROOM

B1C34CB1C34C

OBSERVATION/

TREATMENT

RM

B1C14B1C14

SOILED

UTILITY

B1C53B1C53

CORRIDOR

B1C-2B1C-2

HAC

BC50BC50

CORRIDOR

B1C-9B1C-9

CRASH

CART

ALCOVE

PAT TLT

B1C34JB1C34J

NEW

OBSERVATION

ROOM

B1C34EB1C34E

NEW

OBSERVATION

ROOM

B1C34GB1C34G

CORRIDOR

B1C-6B1C-6

PAT TLT

B1C25AB1C25A

NEW

NURSES

STATION

B1C34BB1C34B

NEW

STORAGE

B1C34DB1C34D

NEW

STORAGE

B1C34HB1C34H

STF TLT

BC51BC51

NEW

OBSERVATION

ROOM

BC24BC24

PAT

SHWR

B1C25BB1C25B

CLEAN

UTILITY

BC26BC26

NEW

OBSERVATION

ROOM

B1C34AB1C34A

CORRIDOR

B1C-4

635 SF

IN-03.01

IN-09.03

IN-03.01 IN-03.01 IN-09.03

IN-03.01

IN-04.04B

IN-04.04B

IN-04.03D IN-04.03DIN-04.03D

IN-09.03

IN-04.03DB1C-6

B 1C

B 1C

B 1C

-4 A

B 1C

B 1C

B C

B1C-4

BC50

B1C25A

BC26

B1C34J

IN-01.07.01

IN-01.07.01

IN-01.07.01

IN-01.01

IN-18.04

IN-18.04

IN-18.04

IN-18.04

IN-18.04

IN-18.04 IN-18.04 IN-18.04

IN-01.02

ARCHITECTURAL SHEET NOTES

1. REFER TO PLAN SHEETS FOR SIGNAGE LOCATION

INFORMATION, REFER TO SPECIFICATIONS FOR

ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS

/ EQUIPMENT LABELING REQUIREMENTS.

2. REFER TO AW600 FOR SIGNAGE MESSAGE SCHEDULE.

3. REFER TO AW600 FOR SIGNAGE MOUNTING DETAILS.

4. REFER TO IN SERIES SHEETS FOR ARCHITECTURAL

INTERIOR FINISHES AND PAINTS.

SIGN TYPE, SEE SCHEDULEXXX

PRIMARY SIGN

SECONDARY SIGN

RESTROOM - ALL

EXIT

ARCHITECTURAL SIGNAGE LEGEND

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

AW100B

ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT

NO.3

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

1/4" = 1'-0" F4

ARCHITECTURAL SIGNAGE PLAN - DEDUCT ALT NO.3

Revisions: Date:

DEDUCTIVE ALTERNATE #3

REMOVE SIGNAGE FROM ED BED

OBSERVATION SCOPE AND TRAILER

COMPLETELY.

SIGNAGE GENERAL NOTES

1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION

STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL

DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED.

HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.

PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING

SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION,

DETAILING, MATERIALS AND COLORS.

2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO

INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING

SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.

3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.

4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L

DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.

5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE

STRUCTURE, UNLESS NOTED.

6. DO NOT SCALE DRAWINGS.

7. BACKS AND EDGES OF ALL ALUMINUM SIGNS MOUNTED DIRECTLY TO

STRUCTURE SHALL BE PAINTED WHITE TO PREVENT CATHODIC

REACTION.

8. ILLUMINATED SIGNS TO BE U.L. LISTED OR APPROVED EQUIVALENT.

9. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-

REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.

10. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE,

PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE,

COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.

11. HANG SIGN FROM OUTSIDE FACE OF BEAM.

12. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.

13. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND

TACTILE SURFACING REQUIREMENTS WITH CAMPUS STANDARDS AND

PG-18-12.

14. ALL SIGNS INDICATED TO BE RELOCATED SHALL BE REMOVED IN THEIR

ENTIRETY (INCLUDING CONCRETE FOUNDATIONS), REFURBISHED OFF

SITE TO LIKE NEW CONDITION, HAVE NEW MESSAGE INSTALLED AS

SCHEDULED, AND BE INSTALLED IN THEIR FINAL LOCATION BEFORE

COMPLETION OF THE PROJECT. INCLUDE NEW FOUNDATION (TO MATCH

EXISTING) IN BID PRICE FOR ALL RELOCATED SIGNS.

15. FOR ALL SIGNS IN THIS PROJECT, PROVIDE ENGINEERING FOR

FOUNDATIONS AND ATTACHMENT CONNECTIONS TO MEET LOCAL

CODES AND ORDINANCES FOR WIND LOADING AND OTHER APPLICABLE

SAFETY AND SOILS REQUIREMENTS.

16. ALL SITE SIGN LOCATIONS SHALL BE COORDINATED ON SITE WITH THE

ARCHITECT AND OWNER PRIOR TO FINAL INSTALLATION.

17. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS

DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW ORIENTATION

IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO

FABRICATION.

18. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA

LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS

INCORPORATING THE VA LOGO.

19. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN".

IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH FINAL

PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE

SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES

CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE

REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS

ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE

THIS SCOPE OF WORK WITHIN THE BID PRICE.

20. BID PRICE SHALL INCLUDE REFURBISHMENT TO LIKE NEW CONDITION,

REMESSAGING AND RELOCATION FOR (2) ADDITIONAL 5'x4' POST &

PANEL SITE SIGNS (2 SIDED), BEYOND WHAT IS INDICATED WITHIN

THESE DOCUMENTS, INCLUDING INSTALLATION AND FOUNDATIONS.

21. BID PRICE SHALL INCLUDE (1) ADDITIONAL SIGN #6 BEYOND WHAT IS

INDICATED WITHIN THESE DOCUMENTS, INCLUDING INSTALLATION AND

FOUNDATIONS.

22. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED

MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY

CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF

ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL MUST BE

REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.

23. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE

SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.

24. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT

REPRESENT LINES SEPARATING TEXT.

25. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED

MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF MESSAGE

SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT

COORDINATION TO BE PERFORMED WITH ARCHITECT DURING THE SHOP

DRAWING PROCESS.

26. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO

MATCH THAT OF THE MESSAGE BEING REPLACED.

27. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA"

LOGO REPLACED.

28. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS

PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT

TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND

SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.

29. PROVIDE 60 SF ROCK MULCH BED, INCLUDING CONTINUOUS PERIMETER

STEEL EDGING, AT ALL PROPOSED AND RELOCATED SITE SIGN

LOCATIONS. EXCEPTIONS ARE WHERE SIGNS ARE LOCATED ON

HARDSCAPE OR COMPLETELY WITHIN LANDSCAPE MULCH BEDS.

30. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE

FITTING WITHIN SIGN LIMITS.

31. PRIMARY DIRECTIONAL POST & PANEL AND PRIMARY BUILDING

IDENTIFICATION SIGNS LETTERING TO BE NO SMALLER THAN 3" IN

HEIGHT. SECONDARY POST & PANEL AND SECONDARY BUILDING

IDENTIFICATION & INFORMATIONAL SIGNS LETTERING TO BE NO

SMALLER THAN 2" IN HEIGHT.

32. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE

ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS AS

THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL

MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND

PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF

DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY

BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION

REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL

SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.

33. FOR ANY SIGN NOTED TO BE RETURNED TO OWNER, CONTRACTOR

SHALL COMPLETELY REMOVE CONCRETE FOUNDATION PRIOR TO

TURNING OVER.

INTERIOR SIGN PLAQUE COLOR

REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

PRIMARY SIGN

SECONDARY SIGN

CONFERENCE/TRAINING ROOM SIGN

RESTROOM - ALL

RESTROOM - MEN

RESTROOM - WOMEN

EXIT

EXTERIOR SIGNAGE

SIGN SHALL MATCH THE CAMPUS STANDARD IN PLACE, VENDOR TO

COORDINATE WITH VA FACILITIES TO OBTAIN COLOR AND FORMAT

https://www.cfm.va.gov/til/signs/SignageSumm.p df

1'-1"

FACE: CLEAR NON-GLARE

ACRYLIC WITH SUBSURFACE

BACKGROUND COLOR CREATING

CLEAR WINDOW

CLEAR INSERT

MOUNTED WITH DOUBLE SIDED

FOAM TAPE OR SILASTIC ADHESIVE

9"

ADA TACTILE NUMERALS AND

GRADE II BRAILLE

INSERT WITH CLEAR PROTECTOR

COVER WITH SURFACE APPLIED VINYL

ON SUBSTRATE

MOUNTED WITH DOUBLE SIDED FOAM

TAPE, SILASTIC ADHESIVE OR

SCREW

BACKGROUND COLOR: MATCH

EXISTING CAMPUS STANDARD

9"

ADA TACTILE NUMERALS AND

GRADE II BRAILLE

INSERT WITH CLEAR PROTECTOR

COVER WITH SURFACE APPLIED VINYL

ON SUBSTRATE

MOUNTED WITH DOUBLE SIDED FOAM

TAPE, SILASTIC ADHESIVE OR

SCREW

BACKGROUND COLOR: MATCH

EXISTING CAMPUS STANDARD

9"

/4

ADA TACTILE NUMERALS AND

GRADE II BRAILLE

TACTILE SYMBOL AND TEXT

MOUNTED WITH DOUBLE SIDED FOAM

TAPE OR SILASTIC ADHESIVE

BACKGROUND COLOR: MATCH

EXISTING CAMPUS STANDARD

EXIT

1'-10"

IN-01.07.01

5' -0

2'

-1 1"

VINYL ADHESIVE SIGN

FONT: FUTURA MD

COLOR: TO BE

DETERMINED BY VA

DESIGNER, TYP.

2" 8" 2" 1'-10" 2"

2' -6

5'

-5

2'-9"

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

9"

" ADA TACTILE NUMERALS AND

GRADE II BRAILLE

MOUNTED WITH DOUBLE SIDED FOAM

TAPE, SILASTIC ADHESIVE OR

SCREW

BACKGROUND COLOR: MATCH

EXISTING CAMPUS STANDARD

9"

HELVETICA BOLD WHITE COPY

RED BACKGROUND ACRYLIC PLAQUE

MOUNTED WITH DOUBLE SIDED

FOAM TAPE OR SILASTIC

ADHESIVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

AW601

ARCHITECTURAL SIGNAGE NOTES AND

SCHEDULE - DEDUCT ALT NO.3

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

BUILDING SIGNAGE SCHEDULE

TYPE VERSION TYPE COUNT DESCRIPTION INSTALLATION PROPOSED MESSAGE

BRAILLE OR RAISED

LETTERS REQUIRED TEXT COLOR BACKGROUND COLOR

DIMENSIONS

COMMENTSSIGN_HEIGHT SIGN_WIDTH

MOUNTING

HEIGHT

IN-01.01 IN-01.01 1 EMERGENCY EXIT PLAN, DETAIL E1 / AW601 PUBLIC SPACES REFER TO PAGE 8-5-3 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 NO REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 1' - 1" 1' - 1" 5' - 0"

IN-01.02 IN-01.02 1 FIRE EQUIPMENT IDENTIFICATION SIGN, DETAIL E3 / AW601 PUBLIC SPACES REFER TO PAGE 8-5-5 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"

IN-01.07.01 IN-01.07.01 3 EXIT SIGN, DETAIL E5 / AW601 VARIES REFER TO PAGE 8-5-15 OF CODE AND LIFE SAFETY SIGNS DESIGN GUIDE DATED 12/2012 NO WHITE RED (OSHA) 0' - 9" 1' - 10" 6' - 8"

IN-03.01 IN-03.01 4 ROOM NUMBER IDENTIFICATION, DETAIL E3 / AW601 UTILITY SPACES REFER TO PAGE 9-5-1 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 3" 0' - 9" 5' - 0"

IN-04.03 IN-04.03D 4 PRIMARY ROOM IDENTIFICATION WITH INSERT, DETAIL F1 / AW601 PUBLIC SPACES REFER TO PAGE 9-5-7 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"

IN-04.04 IN-04.04B 2 SECONDARY ROOM IDENTIFICATION WITH INSERT, DETAIL F3 / AW601 STAFF SPACES REFER TO PAGE 9-5-9 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 0' - 9" 0' - 9" 5' - 0"

IN-09.03 IN-09.03 3 RESTROOM IDENTIFICATION, DETAIL F5 / AW601 RESTROOM REFER TO PAGE 9-5-27 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 YES REFERENCE EXISTING CAMPUS STANDARDS REFERENCE EXISTING CAMPUS STANDARDS 1' - 0 1/4" 0' - 9" 5' - 0"

IN-18.04 IN-18.04 8 SURFACE APPLIED WHITE VINYL, DETAIL D5 / AW601 OBSERVATION BEDS REFER TO PAGE 9-5-101 OF INTERIOR SIGNS DESIGN GUIDE DATED 12/2012 NO REFERENCE EXISTING CAMPUS STANDARDS - 2' - 6" 2' - 9" 5' - 0"

Grand total: 26

3" = 1'-0" E1

IN-01.01 SIGN DETAIL - EMERGENCY EXIT PLAN

3" = 1'-0" F1

IN-04.03 SIGN DETAIL - PRIMARY ROOM IDENTIFICATION

3" = 1'-0"

F3

IN-04.04 SIGN DETAIL - SECONDARY ROOM IDENTIFICATION

3" = 1'-0" F5

IN-09.03 SIGN DETAIL - RESTROOM IDENTIFICATION

1 1/2" = 1'-0" E5

IN-01.07 INTERIOR - EXIT SIGN

1/2" = 1'-0" D5

IN-18.04 SIGN DETAIL - VINYL GRAPHICS

Revisions: Date:

DEDUCTIVE ALTERNATE #3

REMOVE SIGNAGE FROM ED BED

OBSERVATION SCOPE AND TRAILER

COMPLETELY.

3" = 1'-0" E3

IN-03.01 SIGN DETAIL - ROOM NUMBER IDENTIFICATION

3" = 1'-0" D1

IN-01.02 SIGN DETAIL - FIRE EXTINGUISHER

UP

4 5 65.A

A.1

B

B.1

C

D

E

INTERVENTION

(SECLUSION)

ROOM

B1C28

119 SF

ELEVATOR

EQUIP RM

B1C40

113 SF

LINEN

CLOSET

B1C39

11 SF

CHIEF OF ER

B1C35

127 SF

HEAD NURSE

B1C37

97 SF

EMS CLOSET

B1C36

10 SF

MALE RR

B1C33

121 SF

FEMALE RR

B1C32

120 SF

ELEVATOR

S-5

82 SF

PATIENT

COMFORT

ROOM

BC127

42 SF

CORRIDOR

B1C-4B1C-4

INTERVENTION

(SECLUSION)

ROOM

B1C28B1C28

NEW

OBSERVATION

ROOM

B1C23

83 SF

CLEAN

UTILITY

B1C52

66 SF

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR

NO.4

B1C43B1C43

CORRIDOR

B1C-1B1C-1

WAITING

B1C-1B1C-1

NEW

OBSERVATION

ROOM

B1C34K

105 SF

NEW

OBSERVATION

ROOM

B1C34A

70 SF

ELEVATOR

S-5S-5

ELEVATOR

S-6S-6

HALL

B1C-6A

255 SF

NEW

OBSERVATION

ROOM

B1C21

84 SF

NEW

OBSERVATION

ROOM

B1C34C

78 SF

OBSERVATION/

TREATMENT

RM

B1C14B1C14

SOILED

UTILITY

B1C53

62 SF

CORRIDOR

B1C-2B1C-2

HAC

BC50

51 SF

CORRIDOR

B1C-7B1C-7

NURSE

STATION

B1C29AB1C29A

CRASH

CART

ALCOVE

A6

A6

A5 A6

A

B1C-4

B C

B 1C

B 1C

NEW

OBSERVATION

ROOM

B1C34G

93 SF

NEW

OBSERVATION

ROOM

B1C34E

78 SF

PAT TLT

B1C25A

67 SF

PAT SHWR

B1C25B

16 SF

CLEAN

UTILITY

BC26

70 SF

NEW

OBSERVATION

ROOM

BC24

93 SF

STF TLT

BC51

53 SF

CORRIDOR

B1C-6

246 SF

NEW NURSES

STATION

B1C34B

36 SF

NEW

STORAGE

B1C34D

14 SF

NEW NURSES

STATION

B1C34F

67 SF

NEW

STORAGE

B1C34H

13 SF

PAT TLT

B1C34J

54 SF

CORRIDOR

B1C-4

635 SF

B1C-6

A5WFT-1

WFT-3 ALL

WALLS WFT-4 ALL

WALLS

WFT-3 ALL

WALLS

WFT-4 ALL

WALLS

P-1

RB-1

LVT-1

WFT-4

PT-2

PT-1

3'-4"

1'-8"

1'-8"

A

8'-4"

8'-4"

1' -8

1'

-8

2'-0" 6'-4"

'-0

6'

-2

P-1

RB-1

LVT-1

WFT-1

RB-1

LVT-1

P-1,WFT-2

RB-1

LVT-1

WFT-5

S-1

PT-1

P-1,WFT-2

RB-1

LVT-1,2

WFT-4

PT-2

PT-1 P-1,3,/WFT-2,3,7

RB-1

LVT-1, 2

P-3/WFT-2,3,7

RB-1

LVT-1,2

WFT-3,7

RB-1

LVT-1,2

WFT-3,7

RB-1

LVT-1,2

WFT-3,7

RB-1

LVT-1,2

P-1

RB-1

LVT-1

P-1,3/ WFT-1,3,7

RB-1

LVT-1

P-1/WFT-1,3,7

RB-1

LVT-1

P-1,3/ WFT-1,3,7

RB-1

LVT-1

WFT-3

RB-1

PT-1

P-1/WFT-3

RB-1

LVT-1

P-1,2,3/WFT-1,3

RB-1

LVT-1,2

P-1,2,3/WFT-3

RB-1

LVT-1,2

P-1/WFT-3

RB-1

LVT-1

WFT-6

S-1

PT-1

W F

T -2

5' -0

WFT-2

9'-2"

W F

T -2

2' -8

W F

T -2

4' -6

W F

T -2

'-0

CG-1

CG-1

CG-1CG-1

W F

T -2

'-2

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1 CG-1

CG-1

CG-1CG-1CG-1

CG-1

CG-1

CG-1

CG-1CG-1

G R

A

IN

GRAIN

GRAIN

G R

A

IN

G R

A

IN G

R A

IN

GRAIN

GRAIN GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

G R

AIN

A-401

B7

A-401

C7

A-401

D7

A-401

F7

A-402

C7

A-402

E7

A-402

F7

P-3

P-3 P-3

REFER TO

C7/A-402 FOR

PAINT LOCATIONS

ON THIS WALL

WFT-2

9'-7"

WFT-2

12'-9"

P-1

WFT-7

WFT-7

WFT-7

WFT-7

WFT-7

WFT-7

CORRIDOR

B1C-9B1C-9

5 5

CG-1

CG-1

CG-1

CG-1

WFT-2

3'-4"

GRAIN

G R

A

IN

GRAIN

W F

T -1

3' -4

W F

T -1

3' -4

WFT-2

3'-4"

WFT-7WFT-7

1'-6"

G R

A

IN

G R

A

IN

GRAIN

G R

A

IN

WFT-1

1'-8"

G R

A

IN

GRAIN

8"

W F

T -2

1' -3

W F

T -1

W F

T -1

3' -1

0"

5' -6

REFER TO

C7/A-402 FOR

PAINT LOCATIONS

ON THIS WALL

WFT-3 ALL

WALLS

WFT-3 ALL

WALLS

WFT-3 ALL

WALLS

WFT-2

13'-1"

W F

T -2

2' -2

CG-1

WFT-3

WFT-3

WFT-3

WFT-3

WFT-3

WFT-3

WFT-3

G R

AIN

G R

AIN

B1

IN601

A1

IN601

B1

IN601 FE

PATTERN CHANGE (REFER TO IF601 FOR

TRANSITION DETAILS)

MATERIAL FLOOR CHANGE (REFER TO IF601 FOR

TRANSITION DETAILS)

DIRECTION OF FINISH

INTERIOR FINISH SYMBOLS

P-_ PAINT COLOR / WALL FINISHES

EXTENT OF WALL FINISH TYPE

CORNER GUARD LOCATIONCG

GRAIN

HANDRAIL LOCATION

ROOM FINISH TAG

Wall Finish

Base Finish Floor Finish

WALL GUARD LOCATION

WG

LVT- 1 (FIELD COLOR)

LVT- 2 (ACCENT COLOR)

TILE (PT)

INTERIOR FLOOR FINISH LEGEND

LVT- 1 (FIELD COLOR) INSTALLED ON 45° ANGLE

NOT IN SCOPE

MATCH EXISTING (VCT - REFER TO IMAGE E2/IN100B FOR

COLOR REFERENCE, FINAL COLOR APPROVAL BY OWNER )

EQUIPMENT LEGEND

V V ITEM - VA SUPPLIED & INSTALLED

V C ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

C C ITEM - CONTRACTOR SUPPLIED &

INSTALLED

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

A1000

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

IN100B

INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA

B - DEDUCT ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

1/4" = 1'-0" F4

INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B

FINISH ABBREVIATIONS

REFER TO SHEET IN601 FOR FINISH LEGEND

ABBREVIATION FINISH TYPE

AT ACOUSTICAL CEILING TILE

CC CUBICLE CURTAIN TRACK

CG CORNER GUARD

HR HAND RAIL

LVT LUXURY VINYL TILE

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RWC RIGID WALL COVERING

S SOLID SURFACE

SS STAINLESS STEEL

TR TILE TRIM

WFT WALL FINISH TYPE

WG WALL GUARD

INTERIOR SHEET NOTES

A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

B. REFER TO SHEET IF601/IF602 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY, REFER

TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.

F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS

G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,

TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE

CLOSED POSITION.

H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

I. REFER TO AJ SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /

EQUIPMENT LABELING REQUIREMENTS.

J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE

SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO

NOT TRANSMIT TO ADJACENT SPACES.

K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION

AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE SHALL

BE REQUESTED FROM THE COR.

O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH IBC

2009 TABLE 803.9

Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR

INSTALLER FINISHED ITEMS.

S. PAINT ALL WALLS (P-1) UNO.

T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-1) UNO.

U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-2) UNO.

KEYNOTES

1 INSTALL NEW HANDRAIL TO MATCH EXISTING

2 MATCH EXISTING FLOORING INSTALLED AT CORRIDOR.

CONTRACTOR TO VERIFY TYPE AND MATERIAL WITH OWNER.

3 ALIGN FLOORING WITH WALL EDGE

4 PAINT TO MATCH EXISTING CORRIDOR COLOR, COORDINATE WITH

OWNER FOR PAINT STANDARD

5 DISPOSABLE CUBICLE CURTAINS WILL BE PURCHASED BY

OWNERS FACILITIES DEPARTMENT; CUBICLE CURTAIN TRACK

PROVIDED AND INSTALLED BY CC

6 RECESS SLAB FOR LEVEL FLOOR TRANSITION

7 TEMPORARY PARTITIONS

8 REFER TO ENLARGED PLANS ON A-401 FOR WALL FINISH TYPES

9 COVER ALL SIDES OF THIS WALL WITH WFT-3 WITH THE EXCEPTION

OF THE WET WALL FACE, THAT WALL WILL BE FINISHED IN WFT-1

FLOOR FINISH AREA

LVT-1 1480 SF

LVT-1 INSTALLED ON 45 239 SF

LVT-2 191 SF

MATCH EXISTING 82 SF

PORCELAIN TILE 245 SF12" = 1'-0"

E2

EXISTING FLOORING TO BE MATCHED

AT CORRIDOR B1C-2

PATTERN CHANGE (REFER TO IF601 FOR

TRANSITION DETAILS)

MATERIAL FLOOR CHANGE (REFER TO IF601 FOR

TRANSITION DETAILS)

DIRECTION OF FINISH

INTERIOR FINISH SYMBOLS

P-_ PAINT COLOR / WALL FINISHES

EXTENT OF WALL FINISH TYPE

CORNER GUARD LOCATIONCG

GRAIN

HANDRAIL LOCATION

ROOM FINISH TAG

Wall Finish

Base Finish Floor Finish

WALL GUARD LOCATION

WG

3' -0

4' -0

6"

HR-1

RB-1

RWC-1

RB-1

RWC-1

P-1

UNLESS NOTED

OTHERWISE ON

FINISH PLAN

WFT-2: HAND RAIL WFT-3: SHEET WALL PROTECTION

MANUFACTURER'

S

STANDARD

TRIM PIECES AT

ALL SEAMS AND

EDGES

P-1 , UNLESS

NOTED

OTHERWISE ON

FINISH PLAN

TR-1

PT-2

WFT-4: WAINSCOT TILE

P-1

UNLESS NOTED

OTHERWISE ON

FINISH PLAN

TR-2

PT-3

3' -0

6"

1' -0

4' -6

6"

RB-1

S-1

WFT-1: SOLID SURFACE WALL PANEL

AT WALL MOUNTED LAVATORIES

P-1 , UNLESS NOTED

OTHERWISE ON

FINISH PLAN

EQ EQ

UNO ON FINISH PLAN

2'-6"

4' -6

"4' -0

WFT-5: PATIENT TOILET

4' -6

3'

-6

8' -0

8' -0

S-1

WFT-6: PATIENT SHOWER

8' -0

TR-2

S-1

P-1

UNLESS NOTED

OTHERWISE ON

FINISH PLAN

EASED EDGE

SCRIBE TO

CEILING

TR-2

WFT-7: WALL GUARDS AT

HEAD WALL

WG-1

RB-1

4' -6

2'-0"

SCRIBE

AND SEAL

INSIDE

SHOWER

CORNERS

WG-2

1' -0

D3

IN601

D5

IN601

6"

1' -6

P-1

UNLESS NOTED

OTHERWISE ON

FINISH PLAN

CENTER WALL

GUARDS IN

OBSERVATION BAY

SPACE.

COORDINATE WITH

HEADWALL

CONTROLS IN

FIELD.

RESILIENT BASE AS SCHEDULED

RESILIENT FLOOR AS SCHEDULED

WATER VAPOR CONTROL SYSTEM

PARTITION AS SCHEDULED

TOP OF SLAB

PORCELAIN TILE LUXURY VINYL TILE

ALIGN

CEMENTITIOUS SETTING BED

LVT TO PT-1

STAINLESS STEEL TRANSITION STRIP

(TR-3)

RECESSED SLAB

PORCELAIN TILE

CEMENTITIOUS SETTING BED

SHOWER TO PT-1

HIGH POINT

RECESSED SLABSLOPED CEMENTITIOUS

SETTING BED

SLOPE DIRECTLY TO DRAIN

GROUT

1 7/8" [48MM]

1 /

[1 0 3

M M

VINYL COVER

CONTINUOUS

ALUMINUM RETAINER

#10X 1 3/4" SHEET

METAL SCREW WITH

ALLIGATOR ANCHOR

WALL AS

SCHEDULED

SEE F1 ON THIS

SHEET FOR

MOUNTING HEIGHTS

CONTINUOUS IMPACT BUMPER

CONTINUOUS

ALUMINUM RETAINER

#10X 1 3/4" SHEET

METAL SCREW WITH

ALLIGATOR ANCHOR

WALL AS

SCHEDULED

VINYL COVER

1" [25MM]

1'-0" AFF

4" [1

M

M

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

IN601

INTERIOR FINISH LEGEND & ROOM FINISH

SCHEDULE - DEDUCT ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

FINISH LEGEND

SYMBOL FINISH TYPE

SPEC

SECTION MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE NOTES

AT-1 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * ULTIMA HEALTH ZONE TEGULAR 1937 FLAT WHITE 24"X24" 15/16" CEILING GRID SYSTEM

AT-2 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG * ULTIMA HIGH NRC 1943 FLAT WHITE 24"X48" 15/16" CEILING GRID SYSTEM

AT-3 ACOUSTICAL CEILING TILE 09 51 00 SKYFACTORY * CLASSIC ECOSLIM LED ES22-CLA SKY IMAGE

CC-1 CUBICLE CURTAIN TRACK 10 21 23 IN PRO * FORMATRAC BENDABLE TRACK WHITE CURTAIN TO BE PROVIDED AND INSTALLED BY THE VA (VV); TRACK PROVIDED AND

INSTALLED BY GC (CC)

CG-1 CORNER GUARD 10 26 00 IN PRO * 150 BN SURFACE MOUNT SHARKSKIN 0350 3" LEGS, 4'H

HR-1 HAND RAIL 10 26 00 IN PRO * 1000 SHARKSKIN 0350

LVT-1 LUXURY VINYL TILE 09 65 19 INTERFACE * NATIVE FABRIC SEAGRASS A00802 50"CMX50CM" FIELD

LVT-2 LUXURY VINYL TILE 09 65 19 INTERFACE * NATIVE FABRIC FLAX A00801 50"CMX50CM" ACCENT

P-1 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DE6254- SATIN FINISH COLOR MATCH: LIGHT SPRINKLE LRV 71 MAIN FIELD

P-2 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DE6242- SATIN FINISH COLOR MATCH: WELLS GRAY LRV 43 TRIM

P-3 PAINT 09 91 00 PPG * COLOR MATCH: DUNN EDWARDS -DET604- SATIN FINISH COLOR MATCH: BROODING STORM LRV 15 ACCENT

PL-1 PLASTIC LAMINATE 06 20 00 WILSONART * Y0598 FAWN WALNUT CROSSGRAIN

PT-1 PORCELAIN TILE 09 30 13 DALTILE * FABRIC ART MOSAIC MODERN TEXTILE TAUPE MT52 1"x3" MOSAIC FLOOR TILE, GROUT COLOR: MAPEI 105 DRIFTWOOD

PT-2 PORCELAIN TILE 09 30 13 DALTILE * FABRIC ART MODERN TEXTILE TAUPE MT52 12"X24" WALL TILE, GROUT COLOR: MAPEI 15 BONE

PT-3 PORCELAIN TILE 09 30 13 DALTILE * COLOR WAVE COLOR WAVE SMOKED PEARL CW17 1"X6" WALL TILE ACCENT BAR STACKED, GROUT COLOR: MAPEI 15 BONE

RB-1 RESILIENT BASE 09 65 13 TARKETT * TRADITIONAL VINYL 1/8" TYPE TV TA3 CASTAWAY 6"

RWC-1 RIGID WALL COVERING 10 26 00 IN PRO * PALLADIUM G2 SHARKSKIN 0350

S-1 SOLID SURFACE 12 36 00 AVONITE * WET WALL 0936 SANDSTORM 1/4" THICK

SS-1 STAINLESS STEEL 06 20 00 - - - - COUNTERTOP AT SOILED UTILITY B1C53

TR-1 TILE TRIM 09 30 13 SCHLUTER * JOLLY SATIN NICKEL ANODIZED ALUMINUM TOP FINISH PIECE AT WALL TILE

TR-2 TILE TRIM 09 30 13 SCHLUTER * DILEX-AHK SATIN NICKEL ANODIZED ALUMINUM COVE FINISH PIECE AT RESTROOM/SHOWER; SIZE PER WALL MATERIAL

TR-3 TILE TRIM 09 30 13 SCHLUTER * DECO STAINLESS STEEL TRANSITION AT TILE

WFT-1 WALL FINISH TYPE - - - - - - SEE F1 THIS SHEET

WG-1 WALL GUARD 10 26 00 IN PRO * 1300 SHARKSKIN 0350 4-1/16" HEADWALL WALL PROTECTION; REFER TO F1 THIS SHEET FOR DETAILS

WG-2 WALL GUARD 10 26 00 IN PRO * 1400 SHARKSKIN 0350 4"H

ROOM FINISH SCHEDULE

NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

B1C21 NEW OBSERVATION ROOM LVT-1 RB-1 GWB P-1 GWB WFT-3 GWB P-3, WFT-3,7 GWB WFT-1,3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C23 NEW OBSERVATION ROOM LVT-1 RB-1 GWB P-1 GWB WFT-1,3 GWB WFT-7,3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C25A PAT TLT PT-1 S-1 GWB WFT-5 GWB WFT-5 GWB WFT-5 GWB WFT-5 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C25B PAT SHWR PT-1 S-1 GWB WFT-6 GWB WFT-6 - - GWB WFT-6 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34A NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34B NEW NURSES STATION LVT-1,2 RB-1 GWB P-1 GWB P-1,2,3/WFT-3 GWB P-1 - - GYB,AT-3, P-3

B1C34C NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34D NEW STORAGE LVT-1 RB-1 - - GWB P-1/WFT-3 - - GWB P-1 AT-1

B1C34E NEW OBSERVATION ROOM LVT-1,2 RB-1 - - - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34F NEW NURSES STATION LVT-1,2 RB-1 GWB P-1 GWB P-1,2,3/WFT-1,3 GWB P-1 - - GWB, AT-1,3, P-3 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34G NEW OBSERVATION ROOM LVT-1,2 RB-1 GWB P3, WFT-2,3 - - - - GWB WFT-3,7 AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34H NEW STORAGE LVT-1 RB-1 - - GWB WFT-3 - - GWB P-1 AT-1

B1C34J PAT TLT PT-1 PT-2 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C34K NEW OBSERVATION ROOM LVT-1, 2 RB-1 GWB P-1, WFT-2 GWB P-3, WFT-3,7 GWB P-1 - - AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C52 CLEAN UTILITY LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1

B1C53 SOILED UTILITY LVT-1 RB-1 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C-2 CORRIDOR EXISTING MATCH EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING GWB MATCH EXISTING GWB, EXISTING P-1, MATCH EXISTING REFER TO SHEET IN101 FOR PAINT BOUNDARY

B1C-4 CORRIDOR LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-2

B1C-6 CORRIDOR LVT-1 RB-1 GWB P-1, WFT-2 GWB P-1 GWB P-1, WFT-2 - - AT-1, GWB, P-3 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C-6A HALL LVT-1,2 RB-1 GWB P-1, WFT-2 - - - - - - AT-1 SEE F1 THIS SHEET FOR WFT INFORMATION

B1C-9 CORRIDOR LVT-1 RB-1 EXISTING P-1 GWB P-1 GWB P-1 - -

BC24 NEW OBSERVATION ROOM LVT-1 RB-1 - - GWB WFT-3 GWB P-3, WFT-3,7 GWB P-1,WFT-1,3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

BC26 CLEAN UTILITY LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 AT-1

BC50 HAC PT-1 RB-1 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB WFT-3 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

BC51 STF TLT PT-1 PT-2 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB WFT-4 GWB P-1 SEE F1 THIS SHEET FOR WFT INFORMATION

INTERIOR SHEET NOTES

A. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

B. REFER TO SHEET IF601/IF602 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

C. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

D. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

E. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY, REFER

TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND PHASING.

F. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS

G. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT DOORWAYS,

TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN DOOR PANEL IS IN THE

CLOSED POSITION.

H. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

I. REFER TO AJ SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND SYSTEMS /

EQUIPMENT LABELING REQUIREMENTS.

J. COORDINATE APPLICATION OF PAINTS AND ADHESIVES WITH COR. PROVIDE

SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO ENSURE ODORS DO

NOT TRANSMIT TO ADJACENT SPACES.

K. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

L. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

M. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD VERIFICATION

AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

N. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR SUBSTITUTE SHALL

BE REQUESTED FROM THE COR.

O. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

P. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH IBC

2009 TABLE 803.9

Q. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

R. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS OR

INSTALLER FINISHED ITEMS.

S. PAINT ALL WALLS (P-1) UNO.

T. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-1) UNO.

U. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-2) UNO.

FINISH ABBREVIATIONS

REFER TO SHEET IN601 FOR FINISH LEGEND

ABBREVIATION FINISH TYPE

AT ACOUSTICAL CEILING TILE

CC CUBICLE CURTAIN TRACK

CG CORNER GUARD

HR HAND RAIL

LVT LUXURY VINYL TILE

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RWC RIGID WALL COVERING

S SOLID SURFACE

SS STAINLESS STEEL

TR TILE TRIM

WFT WALL FINISH TYPE

WG WALL GUARD

1/2" = 1'-0" F1

WALL FINISH TYPES

6" = 1'-0" D1

RESILIENT TO RESILIENT BASE (TOE BASE)

12" = 1'-0" B1

LUXURY VINYL TILE TO RECESSED PORCELAIN TILE

NOTE:

MATERIALS ARE PROVIDED AS THE BASIS OF DESIGN, ALL MATERIAL SUBSTITUTIONS ARE SUBJECT TO OWNERS APPROVAL.

12" = 1'-0" A1

RECESSED PORCELAIN TILE TO SHOWER TILE

Revisions: Date:

1/2" = 1'-0" D3

WALL GUARD (WG-1)

1/2" = 1'-0"

D5

WALL GUARD (WG-2)

PAINT

FIELD

PPG*

COLOR MATCH

DUNN EDWARDS

DE6254 LIGHT SPRINKLE

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP

Project Number

Board Number

# of #

Office of Construction and Facilities Management

ACCENT

PPG*

COLOR MATCH

DUNN EDWARDS

DET604 BROODING STORM

DOOR FRAME/ TRIM/ ACCENT

PPG*

COLOR MATCH

DUNN EDWARDS

DE6242 WELLS GRAY

WALL PROTECTION

IN PRO*

SHARKSKIN 0350

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

DATE MRP

Project Number

Board Number

# of #

Office of Construction and Facilities Management

*OR EQUAL *OR EQUAL

RUBBER WALL BASE

TARKETT*

TA3 CASTAWAY

RESTROOMS

DALTILE (or equal)

FABRIC ART

COLOR: MODERN TEXTILE TAUPE MT52

GROUT:

MAPEI 105 DRIFTWOOD AT FLOOR TILE

MAPEI 15 BONE AT WALL TILE

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

DATE MRP

Project Number

Board Number

# of #

Office of Construction and Facilities Management

P-1

P-3

CG-1

RWC-1

RB-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PT-1

PT-2

LUXURY VINYL TILE

INTERFACE (or equal)

NATICE FABRIC

COLOR: SEAGRASS A00802

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP NB

Project Number

Board Number

# of #

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

LVT-1 LVT-2

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

INTERFACE (or equal)

NATIVE FABRIC

COLOR: FLAX A00801

PT-3

DALTILE (or equal)

COLOR WAVE

COLOR: SMOKED PEARL CW17

SIZE: 1"X6"

GROUT: MAPEI 15 BONE

P-2

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

CEILING FINISH

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

DATE MRP

Project Number

Board Number

# of #

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

ACOUSTICAL CEILING TILE

ARMSTRONG (or equal)

STYLE: ULTIMA SQUARE LAY-IN

SIZE: 24"X48"

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

Project Title

Location

Date Checked Drawn

DATE

Project Number

Board Number

# of #

Office of Construction and Facilities Management

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

AT-2

ARMSTRONG (or equal)

STYLE: OPTIMA HEALTH ZONE

SIZE: 24"X24"

AT-1

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

SKY FACTORY (or equal)

STYLE: CLASSIC ECOSLIM LED

ES22-CLA

AT-3

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

WALL GUARD

IN PRO*

WG-1

WALL GUARD

IN PRO*

HR-1

WALL GUARD

IN PRO*

WG-2

S-1 AVONITE (or equal)

WET WALL

COLOR: SANDSTORM

HEAD WALL / MILLWORK

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checke d

Drawn

MRP

Project Number

Board Number

# of #

Office of Construction and Facilities Management

*OR EQUAL

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO

ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

Triple C A& E Group 4401 Atlantic Avenue, Suite 200 Long Beach, CA 90807 www.triplecaeg.com

NB

570-17-210

2615 E. CLINTON AVENUE,

FRESNO, CA 93703

REMODEL ED BEDS FOR

OBSERVATION BEDS

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

(VACCHCS)

WILSONART (or equal)

COLOR: FAWN WALNUT

CROSSGRAIN Y0598

PL-1

1. REMOVE ALL ARCHITECTURAL RENOVATION WORK

ASSOCIATED WITH THE INTERIOR EMERGENCY

DEPARTMENT BED OBSERVATION AREA, THIS

INCLUDES DEMOLITION WORK AND ALL

CONSTRUCTION WORK OUTLINED WITHIN THE "AREA

OF WORK". WORK SHOWN ON A-200, A-350, & A-351

REMAIN.

2. REMOVE ERV (ENERGY RECOVERY VENTILATOR)

FROM AHU (AIR HANDLER UNIT) SELECTION.

3. REMOVE SIGNAGE FROM ED BED OBSERVATION

SCOPE AND TRAILER COMPLETELY. IF DEDUCT ALT.1

IS EXERCISED DEDUCT ALT#3 WOULD COVER THE

REMOVAL OF SIGNAGE FROM THE TRAILER ONLY.

DEDUCTIVE ALTERNATES

NOTE: DEDUCTIVE ALTERNATES ARE NOT

CASCADING. THE OWNER WILL EXERCISE DEDUCTS

AS NEEDED. EACH DEDUCT SHALL BE PRICED UNDER

SEPARATE CLINs (CONTRACT LINE ITEM NUMBER) SO

DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

B

IM

/5

-1 -2

E x p a n d E

D B e d s

/5

-1

-2

.O

P C

.A R

C H

.r v t

/1

/2

:3

:2

P

M

IN701

INTERIOR FINISH COLOR BOARDS - DEDUCT

ALT NO.1

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

6/18/2021 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

570-17-210.OPC.IFC.DWG.20210618Part-12
570-17-210.OPC.IFC.DWG.20210618Part-13
570-17-210.OPC.IFC.DWG.20210618Part-14
570-17-210.OPC.IFC.DWG.20210618Part-15

File details come from the government source that posted it. Updated .