Final CIMTIC III Industry Day slides 21 Apr 10.pdf
PDF 2 MB Posted
- Attached to
- Command, Control, Communications, Intelligence (C4I) and Munitions Test Improvement Contract (CIMTIC III) Federal contract opportunity
- Solicitation number
- FA9201-10-R-0001-CIMTICIII
About this file
Industry Day (4-21-10) slide presentation.
View the file
Other files for this federal contract opportunity
Show all 50
Command, Control, Communications, Intelligence (C4I) and Munitions Test Improvement Contract (CIMTIC III) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contracting Officer: Lorna J. Hendrix
Program Manager: Mr. David Budenstein 21 April 2010
For Official Use Only
Industry Day
C4I and Munitions Test
Improvement Contract III
(CIMTIC III)
https://www.afmc-mil.wpafb.af.mil/
2For Official Use Only
CIMTIC III SCOPE
– Intended to meet urgent needs which cannot be accomplished through the normal 6-18 month acquisition cycle
– Provides
• Design, development, and fabrication of hardware and software to improve T&E resources in the area of C4I and munitions testing or training
• Prototype hardware and software to meet urgent requirements in testing capability
• Installation, acceptance testing, and O&M training for developed hardware/software
– Does Not Provide A&AS Type Support
• No Services / No Manpower Support
3For Official Use Only
CIMTIC III
• Contract Type
– Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) Contract
– Firm Fixed Price (FFP) with a Cost Reimbursable (CR) CLIN
– Period of Performance: Five (5) Year Ordering Period
– Delivery Orders will be competed among Prime Contractors
• Contract Line Items (CLINs)
– Hardware (FFP)
– Software (FFP)
– Design (FFP)
– Travel (CR)
– Data (NSP)
4For Official Use Only
CIMTIC III (Con’t)
• How it works
– The Task Initiator will prepare a Delivery Order package – including:
• Description of technical requirements (SOW)
• Funding documents and cost estimates
• Administrative instructions and contractual requirements
• 46 TSSQ/TSRM (AMO) can assist as needed
• 4% Admin Fee for non-46 Range Group work (OG, MN, Other
Svcs)
– Each contractor submits a proposal that includes technical approach and cost.
– Simple 2-page evaluation form for the User
– Proposals evaluated and contractor selected – within 45 days from task initiation.
5For Official Use Only
CIMTIC III (Con’t)
• How it works (cont’d)
– Task initiator (PM/Engr) provides technical oversight and guidance
– The 46 TSSQ/TSRM (AMO) provides contract administration and monitoring
6For Official Use Only
Business Strategy
Ms. Lorna Hendrix
Contracting Officer
850-882-0171
7For Official Use Only
Notice
• All dates, technical information and other aspects of the program may change without further notice
• Be sure to read the final RFP in total, as the information and/or requirements will change from what was published in the draft documents
8For Official Use Only
Exchanges with Industry
Before RFP issue
• Exchanging information before receipt of proposals is encouraged
– Improves understanding of Government requirements and industry capabilities
– Ensure exchanges are IAW procurement integrity rules (FAR 3.104)
• Industry Day Q&As to be published on FedBizOpps
• Before RFP release is the best time to comment on the Draft RFP; tell your contracting personnel and proposal preparation experts
9For Official Use Only
Exchanges with Industry after
RFP issue
• After RFP release, ALL communications with industry shall be through the Procuring Contracting Officer, Lorna Hendrix, with a copy to
Contract Specialist, Robin Gibson.
– Q&As and RFP Amendments, if necessary, on FedBizOpps
– Information protection still applies
10For Official Use Only
Federal Business
Opportunities
• Information released to industry as it becomes available
• Posted
– Sources Sought Synopsis
– Draft Request for Proposal (DRFP)
– Draft Statement of Work (SOW)
• Upcoming Postings
– Industry Day Slides and Attendance list
– Questions and responses (non-sensitive only)
Federal Business
Opportunities (Con’t)
– Upcoming Postings (con’t)
– Notice of Contract Action (NOCA)
– RFP
Interested parties should register through interested vendor’s List (IVL) feature of FedBizOpps
• We will continue to seek industry’s input for the
RFP
12For Official Use Only
RFP/Proposal
Procedures
Section L – “Instructions, Conditions, and Notices to Offerors”
• Correlates to Section M “Evaluation Criteria”
• Contains information to guide offeror’s in proposal preparation
• Preparation of Proposals
– Develop technical proposal
– Prepare each volume simply and economically
– Government will not assume an offeror possesses any capability not specifically stated in proposal
– Cross reference between volumes of the proposal in lieu of repeating lengthy descriptions or data
• Specifically identify all proprietary information in the proposal
• Follow specific page count and format outline in Section L
• Cross Reference Matrix
• Emphasize any important ideas/features/aspects of your proposal wherever you want them considered in the evaluation
13For Official Use Only
RFP/Proposal
Procedures (Con’t)
Section M – Basis for Evaluating Offerors’ Proposals
• Describes Government evaluation
• Addresses ratings using the Mandatory Procedures (MP5315.3) and
Performance Price Tradeoff (PPT) Informational Guidance
(IG5315.101-1)
• Relative order of importance of factors and sub-factors (Technical
Acceptability, Past Performance, Cost/Price)
• Evaluation methodology of cost/price area
• Evaluate Technical, Rank by Price, Assess Performance
14For Official Use Only
What Does It Take?
Successful proposal is responsive to RFP when ALL requirements of the RFP are met
• Administrative Volume: Complete ALL required forms/formats using instructions in Sec L
– Signed SF 33
– Section K, Representations and Certifications, provisions completed (electronic & DoD specific)
– Subcontracting Plan
– Management Plan
– Organizational Conflict of Interest Plan
– Sections A-K as applicable
• Contains all volumes with content and format IAW Sec L
15For Official Use Only
Source Selection
Procedures
• Evaluation Factors
– Technical Acceptability
– Past Performance
– Cost/Price
• The Government will select the best overall offer, based upon an integrated assessment of Technical Acceptability, Past Performance and Price/Cost
• The Government will use tradeoffs to ensure the Best Value to the
Government
16For Official Use Only
Procedures
• Technical Acceptability Sub-Factors
(1) Staffing/Qualifications/Experience
(2) SOW Capabilities
(3) Delivery Order Process
(4) Sample Delivery Order
(5) Organizational Conflict of Interest Plan
17For Official Use Only
Procedures
• Technical Acceptability Factor
• The Government technical evaluation team will evaluate the technical proposals on a pass/fail basis assigning ratings of Acceptable, Reasonably
Susceptible of Being Made Acceptable, or Unacceptable.
18For Official Use Only
Procedures
• Past Performance Evaluation
• Recent (current or past contracts within 3 years)
• Substantial Confidence – Based on the offeror’s performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
• Satisfactory Confidence – Based on the offeror’s performance record, the Government has an expectation that the offeror will successfully perform the required effort.
• Limited Confidence – Based on the offeror’s performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
19For Official Use Only
Procedures
• Past Performance Evaluation (con’t)
• No Confidence – Based on the offeror’s performance record the
Government has no expectation that the offeror will be able to successfully perform the required effort.
• Unknown Confidence – No performance record is identifiable or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
• Questionnaire Tied to Technical Acceptability Sub-factors and Cost
Factor
20For Official Use Only
Procedures
• Cost/Price reasonableness will be determined by the results of price analysis as defined by FAR 15.404 Proposal Analysis.
• Reliance on DCAA/DCMA Information
21For Official Use Only
Business Considerations
– Small Business
• NAICS Code - 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
• Size Standard of 750 Employees
• Small Business Subcontracting Requirements:
– One reason we are here today
– Market research – Hope to get more insight from this Industry Day to support realistic milestone dates.
• Subcontracting plan evaluation
– Use of Small Business Subcontracting
22For Official Use Only
Security
Considerations
• The contractor shall possess or complete the DD Form 254 to obtain a facility security clearance at the classification level of Top Secret prior to commencing work
• The contractor shall comply with DODM 5220-22, National Industrial
Security Program, to prevent loss or compromise of all classified material
• The contractor shall institute, and establish procedures to comply with, AFI 31-209, The Air Force Resources Protection Program, as supplemented and/or amended
23For Official Use Only
Tentative Dates of
Interest
• Issue NOCA - 17 May 10
• Issue RFP - 1 Jun 10
• Issue Sample Delivery Order -18 Jun 10
• Proposals Due - 1 Jul 10
• Award Contract - 1Oct 10
• ALL DATES ARE SUBJECT TO CHANGE
24For Official Use Only
• Ask for clarification
– Question request forms available
• All questions must be submitted in writing to:
• Ms. Robin Gibson, robin.gibson@eglin.af.mil, or
• Ms. Lorna Hendrix, lorna.hendrix@eglin.af.mil
• Answers to questions will be posted on FedBizOpps
• Proprietary and Sensitive information will be protected
Questions
25For Official Use Only
Summary
• We need industry input on:
– Acquisition Strategy
– SOW
– RFP
– Cost Control initiatives
– Small Business Subcontracting Plan