(ATCH 1 to Industry Day Question Responses) EXAMPLE Task Order for CIMTIC III.pdf

PDF 86 KB Posted

Attached to
Command, Control, Communications, Intelligence (C4I) and Munitions Test Improvement Contract (CIMTIC III) Federal contract opportunity
Solicitation number
FA9201-10-R-0001-CIMTICIII
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Eglin Air Force Base

About this file

ATTACHMENT 1 to Government response to Industry Day Questions from potential Offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Command, Control, Communications, Intelligence (C4I) and Munitions Test Improvement Contract (CIMTIC III), newest first.
File Type Posted
Q A 10 Sep 10.doc DOC document
Q A 09 Sep 10.doc DOC document
Q A 07 Sep 10.doc DOC document
RFP Amendment 0005.pdf PDF
Atch 6 - Sample Delivery Order.pdf PDF
Q A 31Aug 10.doc DOC document
RFP Amend 4.pdf PDF
REVISED L-5 Past Performance Questionnare.pdf PDF
RFP Amendment P0002.pdf PDF
Q A 5 Aug 10.doc DOC document
P0001.pdf PDF
REVISED A CDRLS 29 Jul 10.pdf PDF
Section L - REVISED ATTACHMENTS L-2 L-3 L-8.pdf PDF
REVISED B CDRLS 29 Jul 10.pdf PDF
Q A 4 Aug 10.doc DOC document
Atch 5 - DD254.pdf PDF
Section A-K.pdf PDF
Executive Summary Letter.pdf PDF
Atch 3 - Delivery Order Proposal Procedures Atch 3.pdf PDF
Atch 4 - GFE PLACEHOLDER.pdf PDF
Exh A CDRLs.pdf PDF
Atch 2 - SOW_11 May 10.pdf PDF
Atch 6 - Sample Del Order Placeholder.pdf PDF
Section M - Attachment 22 July 10.pdf PDF
Presolicitation Notice.doc DOC document
Final CIMTIC III Industry Day slides 21 Apr 10.pdf PDF
Industry Day Roster One On One Requests.pdf PDF
Atch 8 DD254 CIMTIC III.pdf PDF
Exhibit A CDRLs ALL IN ONE PACKAGE.pdf PDF
Draft RFP.pdf PDF
Atch 7 -Draft Atch JEAN COST FORMAT A.pdf PDF
Atch 1 CONTRACT DATA REQUIREMENTS LIST.pdf PDF
Atch 2 DRAFT SOW.pdf PDF
Final Section L Draft 15 Apr 10.pdf PDF
Final Section M DRAFT 15 Apr 10.pdf PDF
Atch 9 Cover Letter-Past Performance.pdf PDF
Exhibit B CDRLs ALL IN ONE PACKAGE.pdf PDF
Atch 11 Key Personnel Qualifications Summary.pdf PDF
Atch 10 Past Performance Questionnare.pdf PDF
Exec Summary Ltr Prospective offerors.pdf PDF
CIMTIC III - Industry Day Invite_12 Apr 10.pdf PDF
CIMTIC III RFI - III 10 Feb 10.doc DOC document
Atch 2 DRAFT SOW.doc DOC document
CIMTIC III RFI - III 10 Feb 10.doc DOC document
CIMTIC III RFI.doc DOC document
Memo for Potential Offerors.pdf PDF
Industry Day Revision.pdf PDF
MEMO FOR POTENTIAL OFFERORS.pdf PDF
INDUSTRY DAY Registration.doc DOC document
Atch 2 CIMTIC III FINAL DRAFT SOW.doc DOC document
Show all 50

Command, Control, Communications, Intelligence (C4I) and Munitions Test Improvement Contract (CIMTIC III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Industry Day Question Responses

Statement of Work for

Joint Advanced Missile Instrumentation (JAMI) Software Development

1.0 INTRODUCTION.

1.1 Purpose. The purpose of this delivery order is to provide software development support to the JAMI Project.

1.2 Background. The JAMI Project has developed a new type of global positioning system

(GPS) Sensor Unit (GSU) that will be used to track and provide scoring for Department of

Defense weapon systems. The GSU is unique, since it is a hybrid and has some characteristics of a Global Positioning System (GPS) translator and some of a GPS receiver and is a one-of-a-kind system. To meet DoD objectives, the JAMI Project requires software development support to test the Advanced Medium Range Air-to-Air Missile (AMRAAM) at Tyndall AFB, FL. This support is very specialized due to the uniqueness of the hybrid system.

2.0 SCOPE. The contractor shall develop software to track the GPS sensor installed in the

AMRAAM.

3.0 TECHNICAL REQUIREMENTS.

3.1 Evaluate and modify existing software to allow JAMI technical personnel to track a specially modified AIM-9M missile. This missile launch is in preparation for the AMRAAM launches scheduled in FY06. (CDRL A010)

3.1.1 Support Tyndall AFB personnel in decommutating telemetry data received from the

AMRAAM and AIM-9 and provide updated software to the Government. (CDRL A010)

3.2 Develop software and provide support on the hardware to meet the JAMI Data Processor

(JDP) requirements. This shall require taking state-of-the-art software and modifying it to meet specific JAMI requirements at Tyndall AFB. (CDRL A010)

3.3 Support the development of inertial measurement unit (IMU) sensor software and hardware that shall be used to track AMRAAM immediately after launch from the aircraft. (CDRL A010)

3.4 Support the development of IMU sensors that shall be installed in pods to track the shooter and target aircraft at Tyndall AFB. This shall also require JDP software development to allow the tracking of the airborne vehicles. (CDRL A010)

3.5 Develop software to integrate JAMI components into the Range infrastructure at Tyndall

AFB. (CDRL A010)

3.6 Technical Reviews. The contractor shall be required to attend and support three technical reviews at Tyndall.

4.0 DATA DELIVERABLES:

The following data shall be delivered in accordance with the basic CIMTIC III SOW, Exhibit A, DD Form 1423, CDRL. Distribution requirements for this delivery order are supplements, not deletions unless specified by a modification to the basic contract.

4.1 CDRL A004: DI-MGMT-80368

TITLE: Status Report

SCHEDULE: Deliver in accordance with Block 16, DD Form 1423. Contractor format is acceptable.

DISTRIBUTION: One copy each to 46 TSSQ, 46 TSSQ/TSRM, AAC/PKES, and ACO.

REMARKS: Electronic delivery is acceptable.

DELIVERY ORDER PARA: 5.2

4.2 CDRL A010: DI-MCCR-80700

TITLE: Computer Software Product

SUBTITLE: Tyndall Range Integration Support Software

SCHEDULE: At the completion of each task a copy of the software shall be delivered on CD

ROM.

DISTRIBUTION: One copy to 46 TSSQ and letter of transmittal to 46 TSSQ/TSRM, AAC/PKES.

DELIVERY ORDER PARA: 3.1, 3.1.1, 3.2, 3.3, 3.4, 3.5

4.3 CDRL A012: DI-FNCL-80912

TITLE: Performance and Cost Report

SCHEDULE: Deliver in accordance with Block 16, DD Form 1423.

DISTRIBUTION: Deliver one copy each to 46 TSSQ, 46 TSSQ/TSRM, AAC/PKES, and ACO.

REMARKS: Electronic delivery is acceptable.

DELIVERY ORDER PARA: 5.2

ADDRESSES FOR DATA:

46 TSSQ 46 TSSQ/TSRM

Attn: Attn:

308 W. “D” Ave., Ste 217 308 W. “D” Ave., Ste 217

Eglin AFB, FL 32542 Eglin AFB, FL 32542 email: email:

AAC/PKES ACO: TBD

Attn:

205 W. D Avenue, Ste 428

Eglin AFB, FL 32542-6862

5.0 SPECIAL CONSIDERATIONS.

5.1 Program Management.

5.1.1 Project Management. The contractor shall designate a project director who shall be responsible for the control and coordination of all work performed on this delivery order. The contractor shall provide the project manager’s name in writing to the PCO within 7 days after issuance of delivery order.

5.1.2 Government Project Manager. The Government Project Manager for this delivery order is

NAME, OFFICE SYMBOL, PHONE NUMBER WITH AREA CODE, E-MAIL.

5.2 Program Status. The contractor shall monitor performance and cost of this delivery order in accordance with the applicable clauses of the CIMTIC III contract. (CDRLs A004, A012)

5.3 Release of Information. The contractor shall not release any information to any person, Government agency, or contractor concerning the programs under this delivery order without the approval of the Government CIMTIC III Program Manager.

5.4 Security Clearances. Work on this project is classified up to Secret.

6.0 LABOR REQUIREMENTS. The period of performance for this delivery order shall not exceed 12 months after contract award.

File details come from the government source that posted it. Updated .