Appendix A - Air Force Facilities Sustainability Requirements Scoresheet.xlsx

XLSX spreadsheet 542 KB Posted

Attached to
RFQ for Title II for Repair Jones Hall at Keesler AFB
Solicitation number
FA890326R0069
Issued by

About this file

This is an Air Force Facilities Sustainability Requirements Scoresheet used to document compliance with High Performance and Sustainable Building (HPSB) standards for federal construction projects. The scoresheet tracks compliance across six major sustainability categories: Integrated Design Principles, Energy Performance, Water Conservation, Indoor Environmental Quality, Environmental Impact of Materials, and Climate Change Risk.

The specific project documented is Jones Hall (Building B6902) at Keesler Air Force Base in Biloxi, Mississippi, a 106,000 square foot facility with a project identification number MAHG 121033. The project, managed by AFCEC as the construction agent with Monica Escobar as the DM/CM, began design on November 7, 2022, with a Beneficial Occupancy Date of January 31, 2027, and an estimated cost of $18,850.00 PA. The project achieved 100% HPSB compliance using GBI Guiding Principles certification method and accomplished 9% energy efficiency improvement below ANSI/ASHRAE/IESNA Standard 90.1-2013. Key requirements met include integrated design and commissioning practices, energy-efficient products, indoor water conservation with metering systems, indoor environmental quality enhancements (thermal comfort, ventilation, daylighting, moisture control, low-emitting materials, air quality during construction, tobacco smoke control, and occupant wellness), recycled content materials, biologically-based products, ozone protection measures, construction waste recycling with 60% diversion from landfills, and climate change risk mitigation. Several requirements were marked not applicable based on life-cycle cost-effectiveness analysis (renewable energy, solar hot water systems) or site conditions (outdoor water use, stormwater management, steam metering).

View the file

Other files

File Type Posted
SOW_Title_II_09022026.pdf PDF
Appendix C - Keesler AFB Installation Facilities Standards (IFS).pdf PDF
Appendix D - Keesler AFB Premise Wiring Guidance.pdf PDF
Appendix E - SWPPP Guidance Manual.pdf PDF
Appendix H - Jones Hall SID Binder.pdf PDF
Appendix H - Jones Hall AFB Drawings Vole 2 of 2_optimized.pdf PDF
Appendix L - Arnold Hall B5901 Drawings.pdf PDF
Appendix N - Arnold Hall B5901 Specifications.pdf PDF
Appendix O - Arnold Hall B5901 Hazardous Material Survey.pdf PDF
RFQD-TII-Jones Hall - 17 Jun 2026.pdf PDF
Appendix B - Air Force Sustainable Design and Development (SDD) Implementing Guidance.pdf PDF
Appendix F - Keesler Architectural Compatibility Guide (ACG).pdf PDF
Appendix K - Jones Hall B6902 Hazardous Material Survey.pdf PDF
Appendix Q - Jones Hall B6902 Hazardous Materials Report.pdf PDF
Appendix R - Premise Wiring Guidance.pdf PDF
Appendix M - Arnold Hall B5901 Restroom As-Builts.pdf PDF
Appendix P - Arnold Hall B5901 Asbestos Inspection Report.pdf PDF
Appendix A - Air Force Facilities Sustainability Requirements Scoresheet.xlsx XLSX spreadsheet
Appendix G - Jones Hall B6902 DD Form 1391.pdf PDF
Appendix H - Jones Hall RLF Drawings Vol 1 of 2.pdf PDF
Appendix I - Jones Hall B6902 As-Built.pdf PDF
Appendix J - Jones Hall B6902 100 percent Specifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scoresheet

Air Force Sustainability Requirements Scoresheet
HPSB COMPLIANCE (Updated Jan 2017)* required entry
General Information
MAHG 121033Project ID (e.g. ABCD12345)SurveyData
000000000000456562Real Property Unique ID (RPUID)SurveyData
B6902Facility NumberSurveyData
Jones HallBuilding NameSurveyData
Keesler AFBInstallationSurveyData
BiloxiCitySurveyData
MSStateSurveyData
YesCONUSSurveyData
AETCMAJCOMSurveyData
AFCECConstruction AgentSurveyData
Federal Requirements CompleteEscobar, MonicaAFCEC DM/CM (Last Name, First Name)SurveyData
$18,850.00PASurveyData
106,000Building Size (SF)SurveyData
2025Program Year (FY####)SurveyData
RFP/35% DesignProject PhaseSurveyData
11/07/22Design Started (MM/DD/YY)SurveyData
01/31/27BOD (MM/DD/YY)SurveyData
GBI GPGuiding Principles Compliance Certification MethodSurveyData
Date Project Registered (MM/DD/YY)SurveyData
Date Project Certified (MM/DD/YY)SurveyData
100%HPSB CompliantSurveyData
9%Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA Standard 90.1-2013)SurveyData
12/21/22Date Scoresheet Completed or RevisedSurveyData
2017V1Scoresheet versionSurveyData
Color Coding: See Instructions Tab for more detail
Drop-Down BoxYes or N/A
No Entry RequiredNo
Custom EntryRecommended not Required
90.1-2013
HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2)
Total Points2Possible Points2
YesHPSB I.1Integrated Design1Federal RequirementsIntegrated DesignHPSB I.1
YesHPSB I.2Commissioning1Federal RequirementsCommissioningHPSB I.2
HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3)
Total Points5Possible Points5
N/AHPSB II.1Energy Efficiency1Federal RequirementsEnergy Efficiency
N/AReduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effectiveFederal RequirementsEnergy EfficiencyHPSB II.1
9.0%Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)Federal RequirementsEnergy EfficiencyHPSB II.1
2,370 kBTU/yr-sqftInsert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR 433Federal RequirementsEnergy EfficiencyHPSB II.1
YesRoof Attributes (Recommended)Federal RequirementsEnergy EfficiencyHPSB II.1
1Select roof types (Check below)1HPSB II.1
HPSB II.1
TRUECool roof (LEED SS cr 7.2 or Energy Star)Federal RequirementsEnergy EfficiencyHPSB II.1
FALSEGreen roofFederal RequirementsEnergy EfficiencyHPSB II.1
FALSESolar electricFederal RequirementsEnergy EfficiencyHPSB II.1
FALSESolar thermalFederal RequirementsEnergy EfficiencyHPSB II.1
FALSESolar passiveFederal RequirementsEnergy EfficiencyHPSB II.1
Energy Efficient Products1
YesFederal RequirementsEnergy Efficient ProductsHPSB II.1
N/AHPSB II.2On-site Renewable Energy1Federal RequirementsOn-site Renewable EnergyHPSB II.2
N/AInstalled renewable energy elements or projects were not lifecycle cost effectiveFederal RequirementsOn-site Renewable EnergyHPSB II.2
Renewable energy types (check below)
HPSB II.2
TRUENo RenewablesFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSESolar PVFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSESolar CPFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSESolar Thermal ElectricFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSEGeothermalFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSEGSHPFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSEWindFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSEHydroFederal RequirementsOn-site Renewable EnergyHPSB II.2
FALSEWTEFederal RequirementsOn-site Renewable EnergyHPSB II.2
0.0Insert generation capacity (kW)Federal RequirementsOn-site Renewable EnergyHPSB II.2
0.0%Insert percentage of total buildingFederal RequirementsOn-site Renewable Energy
N/AHPSB II.3On-site Renewable Energy - Solar Hot Water Heater System1Federal RequirementsOn-site Renewable Energy - Solar Hot Water Heater SystemHPSB II.3
N/AInstalled solar hot water heater system or found installation not lifecycle cost effectiveFederal RequirementsOn-site Renewable Energy - Solar Hot Water Heater SystemHPSB II.3
0.0Insert generation capacity (MMBtu/yr)Federal RequirementsOn-site Renewable Energy - Solar Hot Water Heater SystemHPSB II.3
0.0%Insert percentage of demandFederal RequirementsOn-site Renewable Energy - Solar Hot Water Heater SystemHPSB II.3
YesHPSB II.4Metering1HPSB II.4
YesElectric Metering: Select N/A if no serviceFederal RequirementsMeteringHPSB II.4
YesNatural Gas Metering: Select N/A if no serviceFederal RequirementsMeteringHPSB II.4
N/ASteam Metering: Select N/A if no serviceFederal RequirementsMeteringHPSB II.4
HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4)
Total Points6Possible Points6
YesHPSB III.1Indoor Water1Federal RequirementsIndoor WaterHPSB III.1
YesIndoor Water Metering1Federal RequirementsIndoor Water MeteringHPSB III.2
N/AHPSB III.2Outdoor Water1Federal RequirementsOutdoor WaterHPSB III.2
N/AOutdoor Water Metering1Federal RequirementsOutdoor Water MeteringHPSB III.3
N/AHPSB III.3Alternative Water1Federal RequirementsAlternative WaterHPSB III.4
N/AHPSB III.4Stormwater Management (LID Documentation per UFC 3-210-10)1
NoProject is in the United States, US Territory, or Possession of the USFederal RequirementsStorm Water ManagementHPSB III.3
Project includes construction or expansion of one or more buildingsFederal RequirementsStorm Water ManagementHPSB III.3*
Footprint is greater than 5,000 gross square feetFederal RequirementsStorm Water ManagementHPSB III.3*
0.0Change in Impervious Area (SF)Federal RequirementsStorm Water ManagementHPSB III.4
Pre-Award Cost Estimate ($)Federal RequirementsStorm Water ManagementHPSB III.4*
N/A

WINSLOW, JAMES A JR CTR USAF HAF AFCEC/CFTS: HPSB III.3 Stormwater Management is required if:

Project is in the United States, US Territory, or Possession of the US;

Project includes construction or expansion of one or more buildings;

AND Footprint (new impervious surfaces) is greater than 5,000 gross square feet.

Project addressed EISA 438Federal RequirementsStorm Water ManagementHPSB III.4
EISA Technical ConstraintsFederal RequirementsStorm Water ManagementHPSB III.4
Federal RequirementsStorm Water ManagementHPSB III.4
FALSERetaining stormwater on-site would adversely impact receiving water flowsFederal RequirementsStorm Water ManagementHPSB III.3
FALSESite has shallow bedrock, contaminated soils, high groundwater table, underground facilities or utilitiesFederal RequirementsStorm Water ManagementHPSB III.3
FALSESoil infiltration capacity is limitedFederal RequirementsStorm Water ManagementHPSB III.3
FALSESite is too small to infiltrate significant volumeFederal RequirementsStorm Water ManagementHPSB III.3
FALSENon-potable water demand (i.e. irrigation, toilets, & wash-water) is too small to warrant water harvesting and reuse systemFederal RequirementsStorm Water ManagementHPSB III.3
FALSEStructural, plumbing, and other modifications to existing building to manage stormwater are infeasibleFederal RequirementsStorm Water ManagementHPSB III.3
FALSEState or local regulations restrict water harvestingFederal RequirementsStorm Water ManagementHPSB III.3
FALSEState or local regulations restrict use of green infrastructure or LIDFederal RequirementsStorm Water ManagementHPSB III.3
TRUEOtherFederal RequirementsStorm Water ManagementHPSB III.3
0.0%Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)Federal RequirementsStorm Water ManagementHPSB III.4
On-SiteLID Features LocationsFederal RequirementsStorm Water ManagementHPSB III.4
0Integrated Management Practices EmployedFederal RequirementsStorm Water ManagementHPSB III.4
Federal RequirementsStorm Water ManagementHPSB III.4
FALSEBio-RetentionFederal RequirementsStorm Water ManagementHPSB III.3
FALSEDry WellsFederal RequirementsStorm Water ManagementHPSB III.3
FALSEFilter StripsFederal RequirementsStorm Water ManagementHPSB III.3
FALSEGrassed SwalesFederal RequirementsStorm Water ManagementHPSB III.3
FALSEInfiltration TrenchFederal RequirementsStorm Water ManagementHPSB III.3
FALSEInlet Pollution Removal DevicesFederal RequirementsStorm Water ManagementHPSB III.3
FALSEPermeable Pavement / PaversFederal RequirementsStorm Water ManagementHPSB III.3
FALSERain Barrels / CisternsFederal RequirementsStorm Water ManagementHPSB III.3
FALSESoil AmendmentsFederal RequirementsStorm Water ManagementHPSB III.3
FALSETree Box FiltersFederal RequirementsStorm Water ManagementHPSB III.3
FALSEVegetated BuffersFederal RequirementsStorm Water ManagementHPSB III.3
FALSEVegetated RoofFederal RequirementsStorm Water ManagementHPSB III.3
FALSEOtherFederal RequirementsStorm Water ManagementHPSB III.3
Final LID Construction Cost ($)Federal RequirementsStorm Water ManagementHPSB III.4
Post Construction Analysis (Name of DOR)Federal RequirementsStorm Water ManagementHPSB III.4
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5)
Total Points8Possible Points8
YesHPSB IV.1Thermal Comfort1Federal RequirementsThermal ComfortHPSB IV.1
YesHPSB IV.2Ventilation1Federal RequirementsVentilationHPSB IV.2
YesHPSB IV.3Daylighting1Federal RequirementsMoisture ControlHPSB IV.3
YesHPSB IV.4Moisture Control1Federal RequirementsLow Emitting MaterialsHPSB IV.4
YesHPSB IV.5Low Emitting Materials1Federal RequirementsLow Emitting MaterialsHPSB IV.5
YesHPSB IV.6Protect Indoor Air Quality during Construction1Federal RequirementsProtect Indoor Air Quality during ConstructionHPSB IV.6
YesHPSB IV.7Environmental Tobacco Smoke Control1Federal RequirementsEnvironmental Tobacco Smoke ControlHPSB IV.7
YesHPSB IV.8Occupant Health and Wellness1Federal RequirementsOccupant Health and WellnessHPSB IV.8
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6)
Total Points5Possible Points5
YesHPSB V.1Recycled Content1Federal RequirementsRecycled ContentHPSB V.1
YesHPSB V.2Biologically-based Products1Federal RequirementsBiologically-based ProductsHPSB V.2
YesHPSB V.3Ozone Depleting Substances1Federal RequirementsOzone Depleting SubstancesHPSB V.3
YesHPSB V.4Waste and Materials Management - Recycling1Federal RequirementsWaste and Materials Management - RecyclingHPSB V.4
YesHPSB V.5Waste and Materials Management - Divert 60% from Disposal1
Yes60% or greater divertedFederal RequirementsWaste and Materials Management - Divert 60% from DisposalHPSB V.5
60.0%Insert percentage diverted from landfillFederal RequirementsWaste and Materials Management - Divert 60% from DisposalHPSB V.5
HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7)
Total Points1Possible Points1
YesHPSB VI.1Address Climate Change Risk1Federal RequirementsAddress Climate Change RiskHPSB VI.1
Possible Points27
27Federal Requirements - Yes or N/ASurveyResult
0Federal Requirements - NoSurveyResult
100%Percentage of Federal Requirements MetSurveyResult
Justification for Non-Applicable Answers
FALSEHPSB I.1_NAIntegrated Design_NANA Justifications
FALSEHPSB I.2_NACommissioning_NANA Justifications
NA LCCEHPSB II.1_NAEnergy Efficiency_NANA Justifications
FALSEHPSB II.1_NAEnergy Efficient Products_NA
NA LCCEHPSB II.2_NAOn-site Renewable Energy_NA
NA LCCEHPSB II.3_NAOn-site Renewable Energy - Solar Hot Water Heater System_NA
HPSB II.4_NAMetering_NANA Justifications
FALSEHPSB II.4_NA_ElectricElectric Metering: Select N/A if no service_NANA Justifications
FALSEHPSB II.4_NA_NaturalGasNatural Gas Metering: Select N/A if no service_NANA Justifications
NA - No Steam; Bldg has its own boilerHPSB II.4_NA_SteamSteam Metering: Select N/A if no service_NANA Justifications
FALSEHPSB III.1_NAIndoor Water_NANA Justifications
FALSEHPSB III.1_NAIndoor Water Metering: Select N/A if no service_NANA Justifications
NA - No Outdoor water or irrigationHPSB III.2_NAOutdoor Water_NANA Justifications
NA - No Outdoor water or irrigationHPSB III.2_NAOutdoor Water Metering: Select N/A if no service_NANA Justifications
NA - No Outdoor water or irrigationHPSB III.3_NAAlternative Water_NA
HPSB III.4_NAStormwater Management_NA
NA - No change to impervious surfacesHPSB III.4_NAProject addressed EISA 438_NA
FALSEHPSB IV.1_NAThermal Comfort_NANA Justifications
FALSEHPSB IV.2_NAVentilation_NANA Justifications
FALSEHPSB IV.4_NAMoisture Control_NANA Justifications
FALSEHPSB IV.3_NADaylighting_NANA Justifications
FALSEHPSB IV.5_NALow Emitting Materials_NANA Justifications
FALSEHPSB IV.6_NAProtect Indoor Air Quality during Construction_NANA Justifications
FALSEHPSB V.1_NARecycled Content_NANA Justifications
FALSEHPSB V.2_NABiologically based products_NANA Justifications
FALSEHPSB V.3_NAOzone Depleting Substances_NANA Justifications
FALSEHPSB V.4_NAWaste and Materials Management - Recycling_NANA Justifications
FALSEHPSB V.5_NAWaste and Materials Management - Divert 60% from Disposal_NANA Justifications

FALSE HPSB VI.1_NA Address Climate Change Risk_NA

&"Aptos"&14&K000000 CUI&1#_x000D_

&D &P

&D &P_x000D_&1#&"Aptos"&14&K000000 CUI

Solar PV Solar CP Solar Thermal Electric Geothermal

GSHP

Wind Hydro Waste to Energy Renewables were not lifecycle cost effective Date Project Registered (MM/DD/YY) Date Project Certified (MM/DD/YY) Clear Cool roof Green roof Solar electric Solar thermal Solar Passive Retaining stormwater impact receving water flow Site too small to infiltrate significant volume State or local restrict water harvesting Shallow bedrock, contaminated soil, high ground water table, underground utilities Non-potable water demand to small Structural, plumbing, and other mods not feasible Soil infiltration capacity limited State or local restrict use of green infrastructure or LID Other Bio-Retention Infiltration Trench Soil Amendments Dry Wells Inlet Pollution Removal Device Permeable Pavement/Pavers Filter Strips Grassed Swells Rain Barrels/Cisterns Tree Box Filters Vegetated Buffers Vegetated Roof Other

NA_Justification

Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02
Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.
Justification for Non-Applicable AnswersCommon JustificationProject Specific JustificationComplete?
HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2)
HPSB I.1Integrated DesignApplicable
HPSB I.2CommissioningApplicable
HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-3)
HPSB II.1Energy EfficiencyNA LCCEYes
HPSB II.1Energy Efficient ProductsApplicable
HPSB II.2On-site Renewable EnergyNA LCCEYes
HPSB II.3On-site Renewable Energy - Solar Hot Water Heater SystemNA LCCEYes
HPSB II.4Metering
HPSB II.4Electric Metering: Select N/A if no serviceApplicable
HPSB II.4Natural Gas Metering: Select N/A if no serviceApplicable
HPSB II.4Steam Metering: Select N/A if no serviceNANo Steam; Bldg has its own boilerYes
HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-4)
HPSB III.1Indoor WaterApplicable
HPSB III.1Indoor Water Metering: Select N/A if no serviceApplicable
HPSB III.2Outdoor WaterNANo Outdoor water or irrigationYes
HPSB III.2Outdoor Water Metering: Select N/A if no serviceNANo Outdoor water or irrigationYes
HPSB III.3Alternative WaterNANo Outdoor water or irrigationYes
HPSB III.4Stormwater Management
HPSB III.4Project addressed EISA 438NANo change to impervious surfacesYes
HPSB III.4Applicable
HPSB III.4Applicable
HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-5)
HPSB IV.1Thermal ComfortApplicable
HPSB IV.2VentilationApplicable
HPSB IV.3DaylightingApplicable
HPSB IV.4Moisture ControlApplicable
HPSB IV.5Low Emitting MaterialsApplicable
HPSB IV.6Protect Indoor Air Quality during ConstructionApplicable
HPSB IV.8Occupant Health and WellnessApplicable
HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-6)
HPSB V.1Recycled ContentApplicable
HPSB V.2Biologically based productsApplicable
HPSB V.3Ozone Depleting SubstancesApplicable
HPSB V.4Waste and Materials Management - RecyclingApplicable
HPSB V.5Waste and Materials Management - Divert 60% from DisposalApplicable
HPSB VI: Adress Climate Change Riskd (UFC 1-200-02, 2-7)
HPSB VI.1Address Climate Change RiskApplicable

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

Guidance

High Performance Sustainable Building Requirements
References
Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade
HPSB I: Employ Integrated Design Principles
Integrated Design

HPSB I.1

UFC 1-200-02 para 2-2.1 Incorporate the following planning and evaluation into the integrated design, as described in ASHRAE 189.1 Informative Appendix F (Integrated Design). Follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section F1.1.1 (Charrette Process).

Use a collaborative, integrated planning and design team, composed of user, government support staff, and appropriate professionals, to identify requirements and to establish performance goals for siting, energy, water, materials, indoor environmental quality, and other comprehensive design goals. Ensure incorporation of these goals throughout the design and lifecycle of the building, including deconstruction.

Evaluate the site and building components to determine whether passive and natural design strategies and features are cost effectively incorporated before the active and mechanical systems are designed. Incorporate these features where applicable.

Take into account site attributes, including climate and local and regional context, which impact the design of the building.

During the site selection process, meet the requirements of UFC 2-100-01. See Appendix B “Best Practices” for desirable site characteristics.

During the planning and design process meet the requirements of applicable UFCs, and use the following site development considerations and passive strategies:

• Site design elements that ensure safe and convenient pedestrian access.

• Meet the requirements of UFC 3-201-02.

• Incorporate results of site analysis, in order to design the building, focusing on orientation, configuration and massing.

• Orient building to maximize energy efficiency, passive solar and daylighting potential.

• Select, design and integrate into the overall building, high performance and sustainable systems (e.g., HVAC, plumbing, water heating systems, lighting systems, control systems, elevators, building envelope and fire protection systems).

• Promote opportunities for occupants to voluntarily increase physical movement such as making stairwells a desirable option for circulation and active workstations.

Commissioning

HPSB I.2

UFC 1-200-02 para 2-2.2 In order to verify design and performance, and ensure that the Government requirements are met, employ commissioning practices appropriate to the size and complexity of the building and its system components. This must include an experienced commissioning provider, who should be independent of the project design and construction team, and the operations team. The choice of either contracted services or Government personnel to serve as the commissioning provider will be determined at project level.

Meet the requirements of ASHRAE 189.1 Section 10.3.1.2 (Building Project Commissioning), with the following modifications:

• For buildings and systems that are less complex6, commissioning may be tailored as determined by the DOD Component AHJ.

• “Schematic design” is the design charrette or similar conceptual design activity.

• Documentation as described in ASHRAE 55 Section 6.2 is not required.

For Air Force projects, the Project Delivery Team must determine the level of commissioning activities required.

Requirement Source Document(s)Executive Order 13693
UFGS 01 91 00.15, Total Building Commissioning
HPSB II: Optimize Energy Performance
Energy Efficiency

HPSB II.1

UFC 1-200-02 para 2-3.1 Energy Efficiency - Base energy efficiency design decisions on life-cycle cost as indicated in Chapter 1 of UFC 1-200-02.

Commercial and Multi-Family High-Rise Residential Buildings:

• Meet the requirements of ASHRAE 90.1. Use ASHRAE 90.1(2010) for all projects with design starts before November 6, 2016. Use ASHRAE 90.1(2013) thereafter.

• Design the building to achieve at least 30% energy consumption reduction from ASHRAE 90.1 baseline.

• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.

• Determine energy consumption levels for both the ASHRAE Baseline Building and proposed building by using the Performance Rating Method found in appendix G of ASHRAE 90.1, except the formula for calculating the Performance Rating.

Replace the formula in G1.2 with the following:

Percentage improvement = 100 × ((Baseline building consumption − Receptacle and process loads) − (Proposed building consumption − Receptacle and process loads)) / (Baseline building consumption − Receptacle and process loads)

Low-Rise Residential Buildings:

• Meet the requirements of International Energy Conservation Code (IECC).

• Design the building to achieve at least 30% energy consumption reduction from the IECC baseline using the Simulated Performance Alternative found in Section 405 of the IECC.

• If a 30% reduction is not LCCE, modify the design of the proposed building to achieve an energy consumption level at the highest level of energy efficiency that is LCCE.

Renovations:

• Renovation projects that replace everything above the foundation must either apply 2-3.1.1 or 2-3.1.2 as applicable.

• All other renovations choose one of the following options:

1. Reduce measured building energy use by at least 30%, below FY 2003 energy use baseline.

2. Reduce measured building energy use by at least 20% below FY 2015 energy use baseline.

3. Reduce modeled energy use (from all sources including renewable energy) by 20% compared to the ASRHAE 90.1 baseline building design.

• If none of the reduction choices is life-cycle cost-effective, modify the design of the proposed building system(s) to achieve an energy consumption level at the highest level of energy efficiency that is life-cycle cost-effective.

Energy Efficient Products

HPSB II.1

UFC 1-200-02 para 2-3.1.4 Energy Efficient Products – Per EISA 2007 Section 525, acquire products that are ENERGY STAR®-qualified or meet FEMP-designated efficiency requirements in all covered product categories. Select products based on life cycle cost, not initial cost. Link to EPA sites: http://www.energystar.gov/ or http://www1.eere.energy.gov/femp/

Per EISA 2007 Section 524, provide commercially available, off-the-shelf products that use no more than 1 watt in their standby mode.

Requirement Source Document(s)10 CFR 433, EPAct 05
LinksEnergy Star®
Federal Energy Management Program
On-site Renewable Energy

HPSB II.2

UFC 3-440-01 para 2-3.2 Provide on-site renewable energy systems in accordance with ASHRAE 189.1 Section 7.4.1.1 (On-Site Renewable Energy Systems) and UFC 3-440-01 where LCCE, considering climate, infrastructure condition, mission compatibility, and effects on base wide electrical system (grid) power quality. Exception: Do not use purchase of renewable energy certificates (RECs) as a substitute for the Section 7.4.1.1 new building requirement.

Air Force will utilize an installation-level solution to renewable energy systems and will not require ASHRAE 189.1 Section 7.3.2 if a building-level solution is not LCCE.

Requirement Source Document(s):Executive Order 13693
On-Site Renewable Energy – Solar Hot Water Heater System

HPSB II.3

UFC 1-200-02 para 2-3.2.1Per EISA 2007 Section 523, meet at least 30% of the annual domestic hot water requirement through the installation of solar water heating unless SDHW is not LCCE. If 30% is not LCCE, modify the design of the proposed system to achieve the highest level of solar water heating that is LCCE.
Requirement Source Document(s):
Measurement and Verification

HPSB II.4

UFC 1-200-02 para 2-3.4A utility meter must be installed at each building, for each utility serving the building (e.g., district steam, district hot and chilled water, electricity, natural gas, fuel oil, etc.) in the standard units of the measure. Meters must be connected to a base wide energy and utility monitoring and control system using the installation’s advanced metering protocols. The installation of meters is required per DODI 4170.11, and as amended by DOD Utilities Meter Policy, 16 April 2013.
Requirement Source Document(s):EPAct 2005 Section 103, EISA 2007 Section 434
LinksEnergy Policy Act of 2005
UFC 2-4.3: Provide an Energy Compliance Analysis (Recommended)Provide an Energy Compliance Analysis (ECA) which will demonstrate compliance with all energy related requirements in this UFC.
UFC ReferenceUFC 1-200-02, 2-4.3
LEED Credit(s) aligns closely with HPSB:None
LEED Credit(s) meet HPSB:None
Energy Efficiency

HPSB II.1

UFC 1-200-02 para 2-3.1For new Federal buildings and Federal buildings undergoing major renovations…(I) The buildings shall be designed so that the fossil fuel generated energy consumption of the buildings is reduced, as compared with such energy consumption by a similar building in fiscal year 2003 (CBECS or RECS data from EIA), by the percentage specified...FY2010 (55%), 2015 (65%), 2020 (80%), 2025 (90%), and 2030 (100%). The DOE Rulemaking is not yet complete
Requirement Source Document(s):EISA 2007, Sec. 433, (a)(D)(i)
LinksEnergy Independence and Security Act of 2007
LEED Credit(s) aligns closely with HPSB:None
LEED Credit(s) meet HPSB:None
HPSB 2.6: BenchmarkingCompare annual performance data with previous years’ performance data, by entering annual performance data in a measurement and tracking tool such as EPA’s ENERGY STAR®, Portfolio Manager. The Labs21® Energy Benchmarking Tool may be used to benchmark laboratory buildings. Results of benchmarking should be used to inform capital investment decisions for future projects.
UFC ReferenceUFC 1-200-02, 2-4.5
Requirement Source Document(s):Federal Leadership in High Performance and Sustainable Buildings MOU
HPSB III: Protect and Conserve Water
Indoor Water

HPSB III.1

UFC 1-200-02 para 2-4.1 Indoor Water – Base water efficiency design decisions on life-cycle cost as indicated in Chapter 1 of UFC 1-200-02.

• Meet the requirements of ASHRAE 189.1 Section 6.3.2 (Building Water Use Reduction), which incorporates USEPA WaterSense-labeled products. Water closet replacements in renovations may have a flush value of up to 1.6 GPF (6.1 LPF) to accommodate existing plumbing capacity.

• Meet the requirements of ASHRAE 189.1 Section 6.4.2 (Building Water Use Reduction).

• Meet the requirements of ASHRAE 189.1 Section 6.4.3 (Special Water Features).

Indoor Water Metering

HPSB III.1

UFC 1-200-02 para 2-4.1.1 Indoor Water Metering -- Install advanced water meters to monitor building indoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.

Requirement Source Document(s):EPAct 1992
Outdoor Water

HPSB III.2

UFC 1-200-02 para 2-4.2 Outdoor Water --

• Limit potable irrigation water use by 50% compared to the conventional methods, and when LCCE, by using the methodologies in ASHRAE 189.1: Section 6.3.1 (Mandatory Provisions: Site Water Use Reduction) and either Section 6.4.1 (Prescriptive Option: Site Water Use Reduction) or Section 6.5.1 (Performance Option: Site Water Use Reduction).

• For existing systems, if a building has a single water meter, reduce indoor and outdoor potable water use combined by at least 20% compared to building water use in 2007. Compare results to a baseline building, using the EPA WaterSense landscape water budget tool version 1.01 or later, or a Component approved tool.

• Show preference for irrigation contractors who are certified through a WaterSense labeled program, or other industry-recognized credentialing programs.

• Refer to UFC 3-201-02 for additional requirements.

Outdoor Water MeteringWater

HPSB III.2

UFC 1-200-02 para 2-4.2.1 Water metering for landscaping – When potable water is used, provide water meters for irrigation systems serving more than 25,000 square feet of landscape, when life-cycle cost-effective. Install advanced water meters to monitor outdoor potable water consumption, as required by DOD Utilities Meter Policy, 16 April 2013.

For all other irrigation systems, separate water meters for locations with outdoor water use are encouraged.

Requirement Source Document(s):Executive Order 13693
Alternative Water

HPSB III.3

UFC 1-200-02 para 2-4.3Where life-cycle cost-effective and permitted by local laws and regulations, use alternative water sources, such as harvested rainwater, treated wastewater, air handler condensate capture, grey water, and reclaimed water.
Requirement Source Document(s):
Stormwater Management

HPSB III.4

UFC 3-210-10 para 2-4.3.1 The criteria and design standards in UFC 3-210-10 are required for the planning, design and construction of all Department of Defense (DoD) projects in the United States, United States Territories and Possessions of the United States that meet both of the following conditions:

1) The project includes construction or expansion of one or more buildings as part of its primary scope (i.e., primary facilities vice supporting facilities).

2) The “footprint” is greater than 5,000 gross square feet (464.5 square meters). “Footprint” consists of all new impervious surfaces associated with the building(s), including both building area and pavement area of associated supporting facilities (such as parking and sidewalks). “Footprint” does not include existing building area to be renovated, existing pavement area to be resurfaced, or new pavement area other than supporting facilities associated with the building(s).

For projects in the United States, United States Territories, and Possessions of the United States that do not meet the applicability requirements above, LID techniques apply to the extent practical.

Requirement Source Document(s):EISA 2007 Sec 438
HPSB IV: Enhance Indoor Environmental Quality
Thermal Comfort

HPSB IV.1

UFC 1-200-02 para 2-5.1 Meet the requirements of ASHRAE 55. Compliance with standards by providing passive (non-mechanical) thermal comfort methods are allowed and encouraged as described in paragraph entitled, “Integrated Design” in UFC 1-200-02.

Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for thermal comfort criteria.

Requirement Source Document(s):Executive Order 13693
Ventilation

HPSB IV.2

UFC 1-200-02 para 2-5.1 Meet the requirements of ASHRAE 62.1 (62.2 for low-rise residential).

Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for ventilation criteria.

Requirement Source Document(s):Executive Order 13693
Daylighting

HPSB IV.3

UFC 1-200-02 para 2-5.2 All regularly occupied spaces located on the exterior wall must have vision fenestration. Where mission precludes vision fenestration for regularly occupied spaces located on the exterior wall, daylighting is still required. All classrooms and offices must have daylighting. Meet the requirements of ASHRAE 189.1 Section 8.4.1.2 (Minimum Sidelighting effective Aperture for Office Spaces and Classrooms) or Section 8.5.1.2 (Usable Daylight Illuminance in Office Spaces and Classrooms). Provide automated lighting controls in accordance with UFC 3-530-01.

Exception: For Medical Treatment Facilities, refer to UFC 4-510-01 Medical Military Facilities for additional daylighting criteria.

Requirement Source Document(s):Executive Order 13693
Moisture Control

HPSB IV.4

UFC 1-200-02 para 2-5.3.1Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contamination, and reduce health risks related to moisture. Meet the requirements of ASHRAE 189.1 Section 10.3.1.5 (Moisture Control), UFC 3-410-01, Chapter 3, Sections 3-2 and 3-3 (Ventilation Air), and UFC 3-101-01 Chapter 3 (Building Envelope Requirements). Refer to Appendix B “Protect Indoor Air Quality” for best practices.
Requirement Source Document(s):Executive Order 13693
Low Emitting Materials

HPSB IV.5

UFC 1-200-02 para 2-5.3.2 Specify materials and products with low or no pollutant emissions, including composite wood products, adhesives, sealants, interior paints and finishes, carpet systems, and furnishings. Meet the requirements of ASHRAE 189.1 Section 8.4.2 (Prescriptive Option: Materials).

Exception: Exclude compliance with 8.4.2, first sentence.

Requirement Source Document(s):Executive Order 13693
Protect Indoor Air Quality during Construction

HPSB IV.6

UFC 1-200-02 para 2-5.3.3 For new construction and for renovation of unoccupied existing buildings, comply with ASHRAE 189.1 Section 10.3.1.4 (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60%.

For renovation of occupied existing buildings, comply with ANSI/SMACNA 008-2008, 2nd Edition, SMACNA IAQ Guidelines for Occupied Buildings Under Construction.

Requirement Source Document(s):Executive Order 13693
Environmental Tobacco Smoke Control

HPSB IV.7

UFC 1-200-02 para 2-5.3.4Prohibit smoking within the building and within a minimum of 50 feet (15.24 meters) of all building entrances, operable windows, and building ventilation intakes. Verify if more stringent facility criteria or Installation policy applies.
Requirement Source Document(s):Federal Register: December 22, 2008 (Volume 73, Number 246) - EO 13058
Occupant Health and Wellness

HPSB IV.8

UFC 1-200-02 para 2-5.4Promote opportunities for occupants to voluntarily increase physical movement such as making stairwells a desirable option for circulation, active workstations, fitness centers, and bicycle commuter facilities. Support occupant health by considering options such as providing convenient access to healthy dining options, potable water, daylight, plants, and exterior views. Indicate in the Integrated Design Process how these efforts were evaluated.
Requirement Source Document(s):
HPSB V: Reduce Environmental Impact of Materials
Recycled Content

HPSB V.1

UFC 1-200-02 para 2-6.1.1Use RCRA Section 6002 compliant products that meet or exceed EPA's recycled content recommendations, available on EPA’s Comprehensive Procurement Guideline web site at http://www.epa.gov/
Requirement Source Document(s):RCRA 2002, Sec 6002
Biologically-based Products

HPSB V.2

UFC 1-200-02 para 2-6.1.2Per Section 9002 of the Farm Security and Rural Investment Act, specify products composed of the highest percentage of biobased content consistent with the USDA BioPreferred Program, if products meet performance requirements and are available at a reasonable cost. Exceptions taken to biobased product procurement must be documented. A preference for purchasing products with the highest biobased content per USDA recommendations for designated product categories must be included in all applicable solicitations. USDA’s biobased product designations and biobased content (which includes certified sustainably-harvested and rapidly renewable resources) recommendations are available on USDA’s BioPreferred web site at http://www.biopreferred.gov/
Requirement Source Document(s):FSRIA 2002 Section 9002
Environmentally Preferable Products

HPSB V.3

UFC 1-200-02 para 2-6.1.4 Meet the requirements of ASHRAE 189.1 Section 9.3.3 (Refrigerants), if equipment or systems using ozone depleting substances are included in the project. Do not use ozone depleting substances (ODS) or high Global Warming Potential (GWP) chemicals where EPAs Significant New Alternative Policy (SNAP) has identified acceptable substitutes or where other environmentally preferable products are available for use in construction, repair or end-of-life replacements: www.epa.gov/snap

Exceptions: Refer to UFC 3-600-01 for fire protection system requirements.

Requirement Source Document(s):Executive Order 13693
Waste and Materials Management - Recycling

HPSB V.4

UFC 1-200-02 para 2-6.2.1Meet the requirements of ASHRAE 189.1 Section 9.3.4.1 (Storage and Collection of Recyclables – Recyclables), where markets or onsite recycling exist.
Requirement Source Document(s):Executive Order 13693
Waste and Materials Management, Divert 60% from Disposal

HPSB V.5

UFC 1-200-02 para 2-6.2.2Divert minimum 60% of nonhazardous construction and demolition waste material from landfills.
Requirement Source Document(s):Executive Order 13693
UFGS 01 74 19, Construction and Demolition Waste Management
HPSB VI: Adress Climate Change Risk
Address Climate Change Risk

HPSB VI.1

UFC 1-200-02 para 2-7 Provide building design solutions responsive to any Government-provided projections of climate change projection and determination of acceptable risk.

For a building located in a floodplain of concern, provide design solutions which mitigate both impact on the floodplain, and impact of the design flood event on building function and occupants, consistent with mission criticality.

&"Aptos"&14&K000000 CUI&1#_x000D_

&P

&P_x000D_&1#&"Aptos"&14&K000000 CUI https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h6enr.txt.pdfhttp://www.wbdg.org/ccb/browse_cat.php?c=3https://www.fedcenter.gov/programs/eo13693/http://www.wbdg.org/ccb/browse_cat.php?c=3http://www.gpo.gov/fdsys/granule/CFR-2011-title10-vol3/CFR-2011-title10-vol3-sec433-5/content-detail.htmlhttps://www.fedcenter.gov/programs/eo13693/http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h6enr.txt.pdfhttps://www.fedcenter.gov/programs/eo13693/http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=109_cong_bills&docid=f:h6enr.txt.pdfhttps://www.fedcenter.gov/programs/eo13693/https://www1.eere.energy.gov/femphttps://www.energystar.gov/http://thomas.loc.gov/cgi-bin/query/z?c102:H.R.776.ENR:https://www.federalregister.gov/articles/2008/12/22/E8-30377/protecting-federal-employees-and-the-public-from-exposure-to-tobacco-smoke-in-the-federal-workplacehttps://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/https://www.fedcenter.gov/programs/eo13693/ EISA Section 438

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

Color Legend

AF Sustainable Building Requirements Legend
Gray TextRecommended (Federal Requirement not fully defined at this time)
Light Gray CellCell is populated by other cells. User is not required to enter values.
Light Green Cell (When used, conditional formatting changes cell to Green or Red depending on entry)Cell provides a drop-down box for the user to select which LEED Credits and HPSB Requirements that the project is attempting. When a "Yes" or "No" is selected the cell follows the stoplight convention to visually represent progress. The stoplight convention is also used for "Yes" or "No" totals. Some light green boxes also have an option for "N/A" when used for subquestions
Cell uses a drop down box and user is designating "Yes" or "N/A" when applicable
Cell uses a drop down box and user is designating "No"
Light Yellow CellCell is for custom entry on how the project is pursuing HPSB requirements. These are subquestions and also general information questions. Boxes that appear when cell is selected give further instruction on entering data. Some cells restrict values that can be entered - which is explained if incorrectly entered

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

LocationList

****FOUO******
BASE Selections:
BASE NAMECITYSTATECONUSMAJCOM
Altus AFBAltusOKYesAETC
Arnold AFBManchesterTNYesAFMCAndersen AFBAganaGuamNoPACAF
Aviano ABPordenoneItalyNoUSAFEJoint Region Marianas-Guam-Andersen
Barksdale AFBBossier CityLAYesAFGSC
Beale AFBYuba CityCAYesACC
Bellows AFBHonoluluHIYesPACAF
Buckley AFBDenverCOYesAFSPC
Cannon AFBClovisNMYesAFSOC
Cape Canaveral AFSCape CanaveralFLYesAFSPC
Cheyenne Mountain AFSColorado SpringsCOYesAFSPC
Columbus AFBColumbusMSYesAETC
Creech AFBIndian SpringsNVYesACC
Davis-Monthan AFBTucsonAZYesACC
Dover AFBDoverDEYesAMC
Dyess AFBAbileneTXYesACC
Edwards AFBEdwards AFBCAYesAFMC
Eglin AFBValparisoFLYesAFMC
Eielson AFBFairbanksAKYesPACAF
Ellsworth AFBRapid CitySDYesACC
F. E. Warren AFBCheyenneWYYesAFGSC
Fairchild AFBSpokaneWAYesAMC
Goodfellow AFBSan AngeloTXYesAETC
Grand Forks AFBGrand ForksNDYesAMC
Hanscom AFBBedfordMAYesAFMC
Hill AFBOgdenUTYesAFMC
Holloman AFBAlamogordoNMYesACC
Hurlburt FieldFt Walton BeachFLYesAFSOC
Incirlik ABIncirlikTurkeyNoUSAFE
IzmirIzmirTurkeyNoUSAFE
Joint Base Anacostia-BollingWashington DCDCYesAFDW
Joint Base AndrewsCamp SpringsMDYesAFDW
Joint Base Cape CodBourneMAYesAFSPC
Joint Base CharlestonCharlestonSCYesAMC
Joint Base Elmendorf-RichardsonAnchorageAKYesPACAF
Joint Base Langley-EustisHamptonVAYesACC
Joint Base Lewis-McChord AFBTacomaWAYesAMC
Joint Base McGuire-Dix-LakehurstTrentonNJYesAMC
Joint Base Myer-Henderson HallVAYes
Joint Base Pearl Harbor-HickamHonoluluHIYesPACAF
Joint Base San Antonio - Fort Sam HoustonSan AntonioTXYesAETC
Joint Base San Antonio - LacklandSan AntonioTXYesAETC
Joint Base San Antonio - RandolphSan AntonioTXYesAETC
Joint Expeditionary Base Little Creek-Fort StoryVAYes
Joint Region Marianas-Guam-AndersenGuamGuamNo
Kadena ABOkinawaJapanNoPACAF
Keesler AFBBiloxiMSYesAETC
Kirtland AFBAlbuquerqueNMYesAFMC
Kunsan ABKunsan CityS. KoreaNoPACAF
Lajes FieldTerceira IslandPuerto RicoNoUSAFE
Laughlin AFBDel RioTXYesAETC
Little Rock AFBLittle RockARYesAMC
Los Angeles AFBEl SegundoCAYesAFSPC
Luke AFBPhoenixAZYesAETC
MacDill AFBTampaFLYesAMC
Malmstrom AFBGreat FallsMTYesAFGSC
Maxwell-Gunter AFBMontgomeryALYesAETC
McConnell AFBWichitaKSYesAMC
Minot AFBMinotNDYesAFGSC
Misawa ABMisawaJapanNoPACAF
Moody AFBValdostaGAYesACC
Mountain Home AFBMountain HomeIDYesACC
Nellis AFBLas VegasNVYesACC
Offutt AFBBellevueNEYesACC
Osan ABOsanS. KoreaNoPACAF
OtherOtherOtherOther
Patrick AFBCocoa BeachFLYesAFSPC
Peterson AFBColorado SpringsCOYesAFSPC
Pope AFBFayettevilleNCYes
RAF AlconburyAlconburyUnited KingdomNoUSAFE
RAF CroughtonCroughtonUnited KingdomNoUSAFE
RAF FairfordFairfordUnited KingdomNoUSAFE
RAF LakenheathLakenheathUnited KingdomNoUSAFE
RAF MildenhallMildenhallUnited KingdomNoUSAFE
Ramstein ABKaiserslauternGermanyNoUSAFE
Robins AFBWarner RobinsGAYesAFMC
Rome LaboratoryRomeNYYesAFMC
Schriever AFBColorado SpringsCOYesAFSPC
Scott AFBBellvilleILYesAMC
Seymour Johnson AFBGoldsboroNCYesACC
Shaw AFBSumterSCYesACC
Sheppard AFBWitchita FallsTXYesAETC
Spangdahlem ABTrierGermanyNoUSAFE
Thule ABThuleGreenlandNoAFSPC
Tinker AFBOklahoma CityOKYesAFMC
Travis AFBFairfieldCAYesAMC
Tyndall AFBPanama CityFLYesACC
USAF AcademyColorado SpringsCOYesUSAFA
Vance AFBEnidOKYesAETC
Vandenberg AFBLompocCAYesAFSPC
Whiteman AFBKnob NosterMOYesAFGSC
Wright-Patterson AFBDaytonOHYesAFMC
Yokota ABTokyoJapanNoPACAF

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

Dropdowns

Date TestGreater Than FYDsg Start
90.1-201320156-Nov-16
Key for Saving VBA codeIncomplete
Completeness CheckTRUE
General Information
HPSB 1 - Integrated Design
HPSB 2 - Energy
HPSB 3 - Water
HPSB 4 - IAQ
HPSB 5 - Materials
HPSB 6 - Climate
NA Check0
Incomplete
NA Defaults
NA LCCEYes
NA Mission RestrictionYes
NA Location/Regional RestrictionYes
NA Locale RestrictionYes

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI image1.emf image2.png image3.png

File details come from the government source that posted it. Updated .