Appendix L - Arnold Hall B5901 Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- FA890326R0069
About this file
This is a 100% Design Submittal document containing architectural, mechanical, electrical, plumbing, and fire protection design drawings for the renovation of Arnold Hall (Building B5901) at Keesler Air Force Base in Biloxi, Mississippi. The project number is MAHG241108 with an issue date of March 2026.
The renovation scope includes modifications to Areas A, B, C, and D within the building to convert the space into swing space for temporary occupancy. Key deliverables include demolition and new work floor plans, reflected ceiling plans, interior elevations and sections, room finish schedules, door and frame schedules, and mechanical, electrical, plumbing, and fire alarm system plans. The mechanical work involves HVAC modifications including VAV box installations, chilled water piping, and air distribution updates. Electrical work encompasses new panel installations, receptacle and data outlet placement, lighting fixture relocation, and antenna conduit routing. Plumbing includes water fountain relocation and drain line repair in the north restroom. Fire suppression and fire alarm systems require modifications to accommodate the new floor plan configuration. The design must comply with UFC 1-200-01:2022 C3, IBC, NFPA codes, NEC, and ABA accessibility standards. General contractor responsibilities include field verification of dimensions, protection of existing elements, daily cleaning, debris removal, and provision of a 5% stock of flooring and accessories for future maintenance.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SI
XT
H S
T
FI
FT
H S
T
5901 5904
57405735
INDEX OF DRAWINGS
SHEET NO. DESCRIPTION OF SHEET
COVER SHEETG-001
OVERALL DEMOLITION FLOOR PLANA-101
OVERALL NEW WORK FLOOR PLANA-102
G-002 ABBREVATIONS, SYMBOLS AND GENERAL NOTES
GENERAL SHEETS
ARCHITECTURAL
MECHANICAL
ELECTRICAL
A-301 INTERIOR SECTIONS
A-601 ROOM FINISH SCHEDULE DOOR AND FRAME SCHEDULE
A-401 LARGE SCALE DEMOLITION FLOOR PLANS
A-402 A-403
LARGE SCALE NEW WORK FLOOR PLANS
REFLECTED CEILING PLANS
G-004 LIFE SAFETY PLAN
MD-101 MECHANICAL DEMOLITION PLAN
FA-101 FLOOR PLAN- FIRE ALARM
MD-401
M-101 M-401 M-402 M-403 M-404
CHILLER DEMOLITION DETAIL
MECHANICAL INSTALLATION PLAN
MECHANICAL INSTALLATION AREA A
MECHANICAL INSTALLATION AREA B
MECHANICAL INSTALLATION AREA C AND D
M-501
CHILLER INSTALLATION
MECHANICAL DETAILS
M-701 MECHANICAL SCHEDULES
NORTH
FIRE ALARM
FIRE SUPPRESSION
FS-100 FIRE SUPPRESSION GENERAL SHEET
FS-101 EXISTING FIRE SUPPRESSION
FS-102 FIRE SUPPRESION PLAN
INTERIOR ELEVATIONA-201
PLUMBING
P-401 PLUMBING DEMOLITION PLAN
P-402 PLUMBING INSTALLATION PLANRENOVATE ARNOLD HALL FOR SWING SPACE, B5901
MAHG241108
MARCH, 2026
KEESLER AIR FORCE BASE BILOXI, MS
ISSUE DATE:
PROJECT NUMBER:
PROJECT
LOCATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
G-001
C O
VE
R
S H
EE
T
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
BLD.5901
P-403 NORTH RESTROOM DRAIN-LINE REPAIR
E-001 GENERAL ELECTRICAL NOTES
E-101 OVERALL DEMO PLAN-ELECTRICAL
E-201 ELEVATION DETAILS ANTENNA EXTERIOR POWER & ETHERNET
E-401 DEMOLITION PLAN-AREAS A,C,D
E-402 DEMOLITION PLAN-AREA B
E-403 DEMOLITION PLAN-AREAS A, C, D REFLECTED CEILING PLAN
E-404 DEMOLITION PLAN-AREA B REFLECTED CEILING PLAN
E-405 NEW WORK-AREAS A, C, D
E-406 NEW WORK-AREA B
E-407 NEW WORK-AREAS A, C, D REFLECTED CEILING PLAN
E-408 NEW WORK-AREA B REFLECTED CEILING PLAN
E-409 ANTENNA CONDUIT INSTALLATION DETAILS
E-410 GROUND BARS FOR CLASSROOMS
E-601 PANEL SCHEDULES
E-102 OVERALL NEW WORK PLAN-ELECTRICAL
G-003 ARCHITECTURAL BARRIERS ACT DETAILS
FA-101 FLOOR PLAN- FIRE ALARM
FA-102 NEW WORK-FIRE ALARM
FIRE ALARM
1. ALL WORK SHALL BE PERFORMED ACCORDING TO UFC 1_200_01_2022_C3, AND ALL LOCAL, STATE, AND FEDERAL
CODES (IBC, AFI, NAPA, NEC, AND ABA).
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BID AND START OF CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY CONDITIONS DETRIMENTAL TO THE COMPLETION OF THE
WORK AS DESIGNED.
3. CONTRACTOR SHALL PROTECT ALL ELEMENTS TO REMAIN SUCH AS FIRE ALARM COMPONENTS, FIRE EXTINGUISHER CABINETS, SPRINKLER HEADS, WINDOW SILLS, AND OTHER EQUIPMENT OR FINISHES PROTECT FROM DUST, PAINT, AND CONSTRUCTION DEBRIS DURING CONSTRUCTION. CONTRACTOR SHALL REPLACE OR
CLEAN IN PLACE ANY DAMAGED OR CONTAMINATED ITEMS.
4. CONTRACTOR SHALL CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE SCOPE OF WORK AND
SCHEDULE. MAINTAIN EGRESS PATH THROUGHOUT CONSTRUCTION.
5. ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THE SITE AND DISPOSED OF OFF-SITE IN A LEGAL LANDFILL. CONTRACTOR IS NOT ALLOWED TO STOCKPILE DEMOLITION MATERIALS ON SITE; ALL MATERIALS TO BE
REMOVED IN A TIMELY FASHION.
6. CONTRACTOR SHALL PROVIDE CONSTANT DAILY CLEANING OF THE WORK AREA.
7. CONTRACTOR TO PROVIDE 5% STOCK OF FLOORING AND ACCESSORIES TO CUSTOMER FOR REPAIR AND
MAINTENANCE USE.
8. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR/REPLACEMENT OF ITEMS DAMAGED DURING CONSTRUCTION AT
THEIR OWN COST.
9. ALL DIMENSIONS ARE FROM FACE OF WALL TO FACE OF WALL UNLESS OTHERWISE NOTED.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
G-002
AB
BR
EV
IA
TI
O
N S-
SY
M
BO
LS
AN
D G
EN
ER
AL
N
O
TE
S
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
GENERAL DEMOLITION NOTES
GENERAL NEW CONSTRUCTION NOTES
MIN
MLWK
PLUM
PLYWD
PT
VNYL
MOISTURE RESISTANT
MISCELLANEOUS
MOUNTED
MEMBRANE
MECHANICAL
MAXIMUM
CONCRETE MASONRY UNIT
CONCRETE
COLUMN
CENTERLINE
CEMENT
CERAMIC TILE
CHANNEL
CLEAN OUT
CEILING
CATCH BASIN
CARPET
CONTINUOUS
CONTROL JOINT
CONFERENCE
COLD ROLL CHANNEL
FIRE EXTINGUISHER CABINET
FURRING
FULL SIZE
FOOTING
FLOOR DRAIN
FLOOR
FIRE EXTINGUISHER
FIRE HYDRANT
FIRE HOSE CABINET
FINISH FLOOR
FINISH
PAPER TOWEL DISPENSER
PRECAST CONCRETE
PRE FABRICATED
POURED IN PLACE
PLASTIC LAMINATE
PROPERTY LINE
PLYWOOD
POUNDS
POLISHED
PLATE
PAVEMENT
PLASTER
PARTITION
PAIR
PAINTED
SANITARY NAPKIN DISPENSER
SECURITY
SEALANT
SECURITY GLASS
SECURITY HOLLOW METAL
SERVICE SINK
SCHEDULE
SOAP DISPENSER
SIMILAR
SHEET VINYL
SHEET
SOLID CORE
SPECIFICATION
SQUARE
SQUARE FEET
STANDARD
STAINLESS STEEL
STORM DRAIN
STORAGE
STEEL
STRUCTURAL
SYMMETRICAL
SUSPENDED
TOILET PAPER HOLDER
TOP OF STEEL
TOWEL BAR
TOP OF CURB
TREAD
TOP OF WALL
TYPICAL
TREATED
TOILET
THRESHOLD
TELEPHONE
BOTTOM OF CURB
BLOCKING
BITUMINOUS
BENCH MARK
BEAM
BOARD
BUILT UP
BUILDING
BOTTOM
REINFORCED CONCRETE PIPE
REFERENCE
REINFORCEMENT
RADIUS
REQUIRED
RESILIENT
ROOF DRAIN
RISER
ROOM
RUBBER BASE
ROUND
ABOVE FINISHED FLOOR
ACOUSTICAL CEILING TILE
AIR CONDITIONING
ACOUSTICAL
ADJUSTABLE
ALTERNATE
ARCHITECTURAL
APPROXIMATE
AND
AREA DRAIN
ASPHALT
AT
ANGLE
JOIST BEARING
JANITOR
JOINT
LAY IN ACOUSTICAL TILE
LIGHT WEIGHT
LAMINATE
MASONRY OPENING
MANHOLE
MOP HANGER
METAL
NOT IN CONTRACT
NOMINAL
NUMBER
NOT TO SCALE
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
VINYL BASE
VERTICAL
VENT THRU ROOF
VERIFY ON JOBSITE
VESTIBULE
WATER HEATER
WATER PROOF
WELDED WIRE MESH
WIRE GLASS
WATER CLOSET
WITH
WITHOUT
WEIGHT
WAINSCOT
WOOD
WORKING POINT
HOLLOW METAL
HOLLOW CORE
HEIGHT
HARDWARE
HOSE BIB
HORIZONTAL
HANDICAP
GALVANIZED
GAUGE
GLASS
GYPSUM
GRAB BAR
GYPSUM BOARD
GENERAL CONTRACTOR
OPPOSITE
OVERHEAD
OPENING
ON CENTER
OUTSIDE DIAMETER DIM
EXPANSION JOINT
ELEVATION
ELECTRICAL
EACH
EXTERIOR
EXISTING
EXPANSION
EQUIPMENT
EQUAL
EMERGENCY ROOF DRAIN
ELEVATOR
DRAWINGS
DOWNSPOUT
DIAMETER
DETAIL
DIMENSION
DAMPPROOFING
A.F.F.
A.C.T.
A/C
ACOUS
ADJ.
AL. or ALT.
ARCH.
APPROX.
A.D.
ASPH.
B.O.C.
BLK.
BIT.
B.M.
BM.
BD.
B.U. or B/U
BLDG.
BOT.
C.M.U.
CONC.
COL.
CEM.
or CH.
C.O.
CLG.
C.B.
CPT.
CONT.
C.J.
CONF.
C.R. CH.
CL or CL.
C.T.
E.I.F.S.
ELEC.
EA.
E.R.D.
E.
DWGS.
DS.
DIA.
DET.
DIM.
DP.
EXTERIOR INSULATION
AND FINISH SYSTEM
E.J. or EXP. JT.
ELEV. or EL.
EXT.
EXIST.
EXP.
EQUIP.
EQ.
F.E.C.
FURR
F.S.
FTG.
F.D.
FL.
F.E.
F.H.
F.H.C.
FIN. FL.
FIN.
GALV.
GA.
GL.
GYP.
G.B.
GYP.BD.
G.C.
PROJECT ABBREVIATIONS
THE FOLLOWING ABBREVIATIONS ON THIS SHEET APPLY TO ALL SHEETS IN THESE DOCUMENTS
J.B.
JAN.
JT.
L.A.T.
LT. OR WT.
LAM.
M.O.
MH.
M.H.
MTL.
H.M.
H.C.
HGT.OR HT.
HDW.
H.B.
HORIZ.
HCP OR H/C
INSULATION
INSIDE DIAMETER (DIM.)
INVERT
INTERIOR
INSUL.
I.D.
INV.
INT.
ACOUSTICAL TILEA.T.
HVAC. HEATING VENTING AIR CONDITIONING
MINIMUM
MILLWORK
M.R. GYP.BD.
MISC.
MTD.
MEMB.
MECH.
MAX.
P.T.D.
PC. CONC.
PRE-FAB.
P.I.P.
P.LAM
PWD.
LBS.
POL.
PL.
PVMT.
PLAS.
PTN. OR PNT
PR.
PTD.
S.N.D.
SEC.
SLT.
SEC. GL,
S.H.M.
SER. S.
SCHD.
S.D.
SIM.
S.V.
SHT.
S.C.
SPEC.
SQ/
SQ. FT.
STD.
S.ST.
ST. DR.
STOR.
STL.
STRUCT.
SYM.
SUSP.
T.P.H.
T.O.S.
T.B.
T.O.C.
T.
T.O.W.
TYP.
TRT'D
TLT.
T'HOLD
TELE.
R.C.P.
REF.
REINF.
RAD.
REQ.
RESIL.
R.D.
R.
RM.
R.B.
N.I.C.
NOM.
NO. OR #
N.T.S.
U.N.O.
V.C.T.
V.W.C.
V.B.
VERT.
V.T.R.
V.T.J.
VEST.
W.H.
W.P.
W.W.M.
W.GL
W.C.
W/ W/O
WT.
WSCT
WD
WK PT
OPP.
OH.
OPNG
O.C.
O.D.
OR P.L.PL
OR RD.O
PORCELAIN TILE
PLUMBING
PLYWOOD
VINYL
A
B
C
D
E
F
G
H
I
J
L
M
M
N
O
P
R
S
T
U
V
W
GENERAL NOTES
EXISTING SPRINKLER HEAD
ELEVATION
MARKER
SYMBOL DESCRIPTION
X
AX
ELEV. NO.
SHT. NO.
SCALE : SCALEX SHT DWG. DISCRIPTION
AX.X
X PLAN/ DETAIL/ SECTION
MARKER
DETAIL. NO.
SHT. NO.
GENERAL ARCHITECTURAL
LEGEND AND SYMBOLS
EQUIPMENT IDENTIFIER SYMBOL
B
A
DOOR IDENTIFIER SYMBOL 1
STO.
XXSF
100E
ROOM NAME
ROOM NUMBER
AREA OF SPACE
1 EXISTING & NEW WALL TYPE,
SEE SHT. WALL LEGEND FOR DETAILS
EXISTING DOOR TAG,
113A
ACCESSORY IDENTIFIER SYMBOL
DOOR LEAF IDENTIFIER SYMBOL
EQUIPMENT
B
A
WALL TYPE IDENTIFIER SYMBOL
STO.
XXSF
100E
ROOM NAME
ROOM NUMBER
AREA OF SPACE
WINDOW IDENTIFIER SYMBOL
NEW DOOR IDENTIFIER SYMBOL
EXISTING & NEW WALL TYPE,
SEE SHT. WALL LEGEND FOR DETAILS
EXISTING DOOR TAG,
113A
1 DEMOLITION NOTE
1 DEMOLITION NOTE
KEYED DEMOLITION AND NEW WORK NOTES1
1. GENERAL & SPECIFIC NOTE -
DEMO & NEW CONSTRUCTION
X
CALLOUT PLAN,
SECTION, OR DETAILX
AX
EX
COL. GRID LINESA
1. CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL ACTIONS AND CONDUCT OF THEIR EMPLOYEES, SUB
CONTRACTORS, VENDORS, AND SUPPLIERS WHILE ON BASE.
2. CONTRACTOR SHALL NOT USE ANY PLUMBING FIXTURE, FLOOR DRAIN, CATCH BASIN FOR DISPOSAL OF LIQUID WASTE OR SPENT LIQUIDS SUCH AS PAINT, SOLVENTS, ETC. THIS ACTION IS STRICTLY PROHIBITED.
3. CONTRACTOR AND SUB CONTRACTORS SHALL COORDINATE WITH THE CONTRACTING OFFICER, ANY
DEMOLITION OR NEW CONSTRUCTION WORK WHICH WILL PRODUCE ABNORMALLY LOUD NOISE OR
NOXIOUS FUMES AND ODORS.
4. THE CONTRACTING OFFICER. SHALL HAVE FIRST RIGHTS OF REFUSAL FOR ALL RECYCLABLE MATERIALS
SUCH AS SCRAP ALUMINUM, CEILING GRIDS, COPPER PIPING TUBING, ETC.
5. CONTRACTOR SHALL NOT LEAVE UNATTENDED ANY OPENINGS IN BUILDING ENVELOPE (NEW OR EXISTING) THAT IS NOT WEATHER-TIGHT. OPENINGS IN BUILDING ENVELOPE LEFT OPEN FOR ANY EXTENDED PERIOD, SHALL BE COMPLETELY COVERED/ SEALED AGAINST INFILTRATION OF OUTSIDE AIR, RAIN, WATER, WEATHER, DUST/ DIRT, INSECTS AND RODENTS.
1. THE CONSTRUCTION DOCUMENTS, WHICH INCLUDE ALL DRAWINGS, SOW & SPECIFICATIONS. DESCRIBE A COMPLETE PROJECT. THE GENERAL CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH A USABLE AND WORKING PRODUCT. IF THERE IS A CONFLICT BETWEEN THE DRAWINGS, SPECIFICATIONS AND/OR STATEMENT OF WORK WITH NO CLARIFICATION ISSUED, THE BIDDER SHALL BID THE MORE STRINGENT
PRODUCT OR APPLICATION.
2. CONTRACTOR SHALL FOLLOW ALL MANUFACTURER REQUIREMENTS, INSTRUCTIONS, AND
RECOMMENDATIONS FOR INSTALLATION AND WARRANTY OF ALL MATERIAL USED ON THIS PROJECT.
MANUFACTURER WARRANTIES SHALL BE ISSUED WHERE WARRANTIES ARE AVAILABLE. ALL PROJECT WORK SHALL USE MANUFACTURER APPROVED AND COMPATIBLE MATERIALS AND METHODS, INCLUDING
ADHESIVES, SEALANTS, SOLVENTS, ETC.
3. AT THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE ALL DEBRIS AND EXCESS MATERIAL FROM THE PROJECT BUILDINGS AND SITE. ADJACENT SPACES SHALL BE RETURNED TO THEIR ORIGINAL CONDITION AND FINISH. GLASS SHALL BE CLEANED. CONSTRUCTION DUST SHALL BE CLEANED AND
REMOVED FROM ALL SURFACES.
4. CONTRACTOR(S) SHALL COORDINATE WITH THE CONTRACTING OFFICER OF AN AREA TO BE USED FOR
CLEANING OF TOOLS AND EQUIPMENT LAYDOWN AREA, PORTABLE RESTROOMS AND CONTRACTOR
PARKING.
5. ALL DEBRIS CREATED SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH
BASE STANDARDS AND REQUIREMENTS AS SPECIFIED.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
G-003
AR
C
H
IT
EC
TU
R
AL
B
AR
R
IE
R S
AC
T
D
ET
AI
LS
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
DOOR CLEARANCES
TYPICAL FIXTURE AND
DOOR CLEARANCES
TYPICAL FIXTURE AND
OVERLAPS AS PROVIDED IN ABA OVERLAPS AS PROVIDED IN ABA
FLOOR MOUNTED WATER CLOSET
WALL MOUNTED WATER CLOSET
AND GRAB BARS
WATER CLOSET
WATER CLOSET
WALL MOUNTED
WATER CLOSET
FLOOR MOUNTED
DISPENSER LOCATION
GRAB BARS AND
URINAL
OF ROUTE AT TURN
CLEAR WIDTH
ADULT
LAVATORY CLEARANCES
ACCESSIBLE ROUTE
CLEAR WIDTH OF AN
DOOR SIGN MOUNTING
ALCOVE CLEARANCE
UNOBSTRUCTED OBSTRUCTED
FORWARD REACH
DOOR SIGNSMANEUVERING CLEARANCES AT DOORSDOORS IN SERIES
PULL SIDE RECESSED
FRONT APPROACH
PUSH SIDE RECESSED
FRONT APPROACH
AND LATCH - RECESSED
PUSH SIDE W CLOSER
FRONT APPROACH
PUSH SIDE W CLOSER
FRONT APPROACH
AND LATCH
FRONT APPROACH
PUSH SIDE
FRONT APPROACH
PULL SIDE
HINGE APPROACH
PUSH SIDE
HINGE APPROACH
PUSH SIDE
LATCH APPROACH
PUSH SIDEPUSH SIDE
LATCH APPROACH
HINGE APPROACH
PULL SIDE
HINGE APPROACH
PULL SIDE
LATCH APPROACH
PULL SIDE
LATCH APPROACH
PULL SIDE
MOUNTING LOCATIONS, HEIGHTS, AND CLEARANCES FOR ACCESSIBILITY
ACCESSORIES
TOILET
LAVATORY SHOWER SEATBABY CHANGING STATIONSIDE APPROACH SINK
ADA - 604.5 - 604.7
W/ RECESSED LAV
W/C FRONT
E. D. F. WALL RECEIPTW/C FRONTW/C SIDE
SIDE REACH
UNOBSTRUCTED OBSTRUCTED
CHILD
(5 AND UNDER) FORWARD APPROACHPARALLEL APPROACH
BABY CHANGING
STATION WHERE
APPLICABLE
BABY CHANGING
STATION WHERE
APPLICABLE
WHEELCHAIR ACCESSIBLE TOILET
COMPARTMENT AND GRAB BARS
TURNING SPACE
CIRCULAR T-SHAPED
ABA TOILET & ROOM SIGNS
ABA SIGNAGE BY GENERAL CONTRACTOR PER ABA REQ.
NOTE: SIGNS WITH PICTOGRAPHS
APPROX. 6" X 8" (MIN.) PLASTIC SIGN W/ RAISED SYMBOL OF
ACCESSIBILITY W/ 1:1 WIDTH TO HEIGHT RATIO AND A
STROKE-WIDTH TO HEIGHT RATIO BETWEEN 1:5 AND 1:10 MOUNTED
ON WALL ADJACENT TO LATCH SIDE OF EACH TOILET ROOM DOOR
(AND OR ON DOOR) ACCOMPANIED WITH GRADE 2 BRAILLE.
NOTE: SIGNS WITH PICTOGRAPHS
APPROX. 2-1/2" HIGH MINIMUM PLASTIC SIGN WITH 1-1/2" HIGH
WHITE LETTERS RAISED 1/32" ON BACKGROUND. LETTERS MUST BE
UPPER CASE, SANS SERF TYPE & SHALL BE ACCOMPANIED WITH
GRADE 2 BRAILLE.
PLASTIC (FIELD) BACKGROUND WITH CONTRASTING
RAISED CHARACTERS AND/OR EMBLEMS. NOTE: EMBLEMS
AND LETTERS MUST BE RAISED A MINIMUM OF 1/32".
WOMEN'S ROOM
SIGN
MEN'S ROOM
SIGN
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
COMM
CORRIDOR
C O
R R
ID
O
R
VESTIBULE
CORRIDOR
MECHANICAL ROOM
CORRIDOR
MECHANICAL
SHOWER
STORAGE MECHANICAL
REST RM
F/SHWR
CONFERENCE
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
OPEN OFFICE
OFFICE
O
FF
IC
E
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
COPY
SUPPLY
STORAGE
OFFICE
HERITAGE
ROOM
OFFICE OFFICE
STORAGE
OFFICE
OFFICE
CORRIDORFE
C
FE
C
FEC
FE
C
FEC FEC
FEC
FE
C
FEC
FEC
AREA NOT IN THE
SCOPE OF WORK
F/TOILET
JAN
CORRIDOR
SHIPPING
BLOOD BANK
BLOOD DRAW
CORR
CLASSROOM
VESTIBULE
MECH
M/TLT
MECH
STORAGE
ST
O
R
AG
E
SCREEN
SCREEN
OFFICE
OFFICE
OFFICE
WORK AREA
KITCHEN
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
EXISTING EXIT WIDTHS
EXIT DOOR DOOR WIDTH
60" (5'-0")AA
C B
D E F G
60" (5'-0")
60" (5'-0")
60" (5'-0")
36" (3'-0")
36" (3'-0")
36" (3'-0")
FEC
PATH OF EXIT TRAVEL
LEGEND
FIRE EXTINGUISHER
CONTROLLING AUTHORITY:
OCCUPANCY CLASSIFICATION (IBC):
NEW CONSTRUCTION TYPE (IBC):
NUMBER OF FLOORS:
SPRINKLER SYSTEM:
ACTUAL TOTAL FLOOR AREA:
BASIC CRITERIA
CODE COMPLIANCE SUMMARY
CONTROLLING AUTHORITY:
AUTOMATIC SPRINKLER DESIGN:
OCCUPANT LOAD PER TABLE 7.3.1.2:
NOTE: LOAD CALCULATIONS ARE BASED
ON NET SQUARE FOOTAGE AREAS IAW
NFPA DESIGN CRITERIA.
EGRESS AND LIFE SAFETY REQUIREMENTS
UNIFIED FACILITIES CRITERIA (UFC
1-200-01, 3-600-01) 2021
GROUP A-3, ASSEMBLY GROUP B,
BUSINESS (IBC SECTION 304)
TYPE II - B (IBC)
YES
8,103 GROSS SQUARE FEET
UNIFIED FACILITIES CRITERIA (UFC
1-200-01 3-600-01) 2021
LIGHT HAZARD; ORDINARY HAZARD IN
STORAGE AND MECHANICAL ROOMS
(OFFICE ADMIN.): 8,103 SF / 150 SF PER
PERSON = 54 PERSONS
TOTAL 1ST FLOOR AREA 8,103 SF WITH
TOTAL OCCUPANT LOAD OF: 54 PERSONS
TOTAL
MEANS OF EGRESS:
NUMBER OF EXITS:
DEAD-END CORRIDOR LIMIT:
COMMON PATH OF TRAVEL:
TRAVEL DISTANCE TO EXITS:
EXIT ACCESS CORRIDORS:
EGRESS HARDWARE:
FOR NEW ASSEMBLY CORRIDORS - 44"
MINIMUM PER 12.2.3.8. DOORS - 32"
MINIMUM CLEAR WIDTH PER 7.2.1.2.4
REQUIRED
(6) SEPARATE EXITS DIRECTLY TO THE
EXTERIOR
50 FEET LIMIT PER 12.2.5.1.3
20 FEET LIMIT PER 12.2.5.1.2 EXCEPT 75
FEET IN SPACES WITH LESS THAN 50
OCCUPANTS (70 FEET MAX. COMMON
TRAVEL PATH IN SPACES WITH LESS THAN
50 OCCUPANTS.)
200 FEET LIMIT PER 12.2.5.1.6
CORRIDORS ARE NOT REQUIRED TO HAVE
A FIRE-RESISTANCE RATING IN
BUUILDINGS WITH A SPRINKLER SYSTEM
IAW SECTION 9.7 (12.3.6 - EXCEPTION 2)
DOOR HARDWARE SHALL BE PROVIDED
IN COMPLIANCE WITH THE PROVISIONS
OF 7.2.1 AND 7.2.1.8.2.
SYSTEMS FURNUTURE (SF)
SCHEMATIC LAYOUT FOR
REFERENCE ONLY
MEANS OF EGRESS REQUIREMENTS
NORTH
SCALE : 3/32" = 1'-0"1 LIFE SAFETY PLAN
0 10' 20'5'
AREA-C
AREA-D
AREA-A
AREA-B
AREA-C
AREA-D
AREA-G
AREA-A
AREA-B
CEILING MOUNTED EXIT SIGN
INDICATES DIRECTIONAL CHEVRON(S)
DENOTES LOCATION(S) OF ILLUMINATION EXIT FACE
WALL MOUNTED EXIT SIGN
INDICATES DIRECTIONAL CHEVRON(S)
DENOTES LOCATION(S) OF ILLUMINATION EXIT FACE
CLASSROOM/
ACE
CLASSROOM/
RF
CLASSROOM/
CI
CLASSROOM/
NCCD
CLASSROOM/
ACP
CLASSROOM/
FACT
CLASSROOM/
ACP
CLASSROOM/
FACT
CLASSROOM/
JOC
CLASSROOM/
SERVER
CLASSROOM/
MPC
COMMON PATH O
F
TRAVEL:
2 F
EET
EQUIPMENT
STORAGE
M/TLT
AREA IN THE SCOPE OF WORK (SOW
AA
B
C
DE
F G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
G-004
LI
FE
S
AF
ET
Y
PL
AN
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
COMM
CORRIDOR
C O
R R
ID
O
R
F/TOILET
VESTIBULE
JAN
CORRIDOR
M/TLT
MECHANICAL ROOM
CORRIDOR
CORRIDOR
SHIPPING
BLOOD BANK
BLOOD DRAW
CORR
CLASSROOM
VESTIBULE
MECH
M/TLT
MECH
MECHANICAL
SHOWER
STORAGE
STORAGE
MECHANICAL
ST
O
R
AG
E
SCREEN
SCREEN
SCREEN
OFFICE
OFFICE
OFFICE
WORK AREA
REST RM
F/SHWR
KITCHEN
CORRIDOR
TLT
CLASSROOMS
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
CORRIDOR
C O
R R
ID
O
R
OFFICE
OPEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TESTING STORAGE
OFFICE
OFFICE
PRINTER
NOOK
OFFICE
OFFICE
STOR.
COPY
SUPPLY
STORAGE
STOR.
MODELNUMBERTRADENAMEPRODUCTMATERIAL
HERITAGE
ROOM
R
EF
FR
Z
SO
D A
BR
EA
K R
O O
M
CORRIDOR
OFFICE
O
FF
IC
EOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
CORRIDOR
STORAGE
AREA NOT IN THE
SCOPE OF WORK
NORTH
SCALE : 3/32"=1'-0"1 OVERALL DEMOLITION FLOOR PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-101
O
VE
R
AL
L D
EM
O
LI
TI
O N
F
LO
O R
P
LA
N
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
AREA-B
AREA-C
AREA-D
AREA-G
AREA-A
0 10' 20'5'
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
F/TOILET
SCREEN
AREA NOT IN THE
SCOPE OF WORK
PROVIDE AND INSTALL TEMPORARY SIGNAGE BARRIER AT DOOR.
DEMOLITION KEYNOTES
CLASSROOM/MPC
F/TLT
M/TLT
F/SHWR
MECH
CLASSROOM/RF
CLASSROOM/ACE
OFFICE
OFFICE
CORRIDOR
CLASSROOM/
104 105
SERVER
CLASSROOM/
JOC
CLASSROOM/FACT
CLASSROOM/ACP
CLASSROOM/FACT
CLASSROOM/ACP
HERITAGE
ROOM
CLASSROOM/CI
CLASSROOM/NCCD
STORAGE
EQUIPMENT
STORAGE
COORIDOR-1
NORTH
SCALE : 3/32"=1'-0"1 OVERALL NEW WORK FLOOR PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-102
O
VE
R
AL
L N
EW
W
O R
K
FL
O O
R P
LA
N
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
A-402
A-402
A-402
A-402
A-402
0 10' 20'5'
CORRIDOR
AREA-C
AREA-G
AREA-A
AREA-D
AREA-B
8' -9
31'-4"
2' -0
6'-1" 6'-1"
EXISTING GYP. BD.
WALL INFILL
EXISTING H.M.
FRAME (TYP) NEW BLACKOUT
FILM (TYP.) 3'-0"-0"
EXISTING DOOR
3'-0"-0"
EXISTING DOOR
EQ
U
AL
S
PA
C
ES
SCALE :1/2" = 1'-0"1 INTERIOR ELEVATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-201
IN
TE
R
IO
R E
LE
VA
TI
O
N
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
0 2' 4'1'
P1
4'-0" 4'-0"
3 5/8" MTL STUDS @ 16" O.C. WITH 5/8"
GWB BOTH SIDES AND 3 1/2" SOUND
ATTENUATING BATTS. PARTITION TO
EXTEND TO THE UNDERSIDE OF THE
EXISTING CEILING.
VARIES AFF
(SEE ROOM
FINISH
SCHEDULE-
3/A-601)
EXTEND WALL
TO UNDERSIDE
OF CEILNG-
ATTACH TO
SUSPENSION
SYSTEM
EXIST. DECK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-301
IN
TE
R
IO
R S
EC
TI
O N
S
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
SCALE :1/2" = 1'-0"1 WALL TYPE P-1
0 2' 4'1'
SOUND BATT INSULATION
6" WALL BASE
3 5/8" STUDS
@ 16 O.C.
3 1/2" SOUND
ATTENUATING BATTS
5/8" GWB
31'-1"
'-2
10'-5"
'-0
'-5
39'-11"
'-7
" 24'-11"
3'- 4"
'-6
"14 '-2
11'-11"
22'-6"
18'-2"
'-2
'-1
9'-8"
16'-5" 9'-0"-0"
4'-0"-0"
'-5
4'- 9"
3'-11"
10'-0" 4'-5" 16'-0"
4' -4
4'
-5
9' -0
9'
-2
7' -9
9'
-7
4' -6
'-8
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
7'-0"
MODELNUMBERTRADENAMEPRODUCTMATERIAL
R
EF
FR
Z
SO
D A
23'-6"
'-1
1"
7'-2"
'-3
15'-2"
24'-2"
'-6
REMOVE EXISTING FLOORING AND WALL BASE. REMOVE REMAINING GLUE/DEBRIS
FROM FLOOR PRIOR TO INSTALLATION OF NEW FLOORING.
REMOVE EXISTING SINK, FIXTURES AND BASE AND WALL CABINETS. CAP OFF
DRAIN AT FLOOR. REMOVE SUPPLY BACK TO NEAREST CUTOFF.
NOT USED.
REMOVE GYPSUM BOARD AND METAL STUD INFILL TO EXPOSE EXISTING 5'-3" X
6'-10" OPENING IN MASONRY WALL AND PREP OPENING FOR NEW DOOR AND
HOLLOW METAL FRAME AS INDICATED ON DRAWINGS. SEE DRAWING 1&2/A-601.
REMOVE EXISTING DRINKING FOUNTAIN FROM THIS EXISTING LOCATION AS
SHOWN IN THIS DWG 4/A-401 AND PREPARE TO BE RELOCATED TO NEW
LOCATION. ( REF: P-401 FOR DEMO AND P-402 FOR NEW WORK)
EXISTING CARPET FLOORING WITHIN THIS AREA TO REMAIN IN PLACE. (GC, TO
ENSURE PROTECTION TO EXISTING)
EXIST DOOR AND FRAME TO REMAIN. (GC. TO ENSURE PROTECTION TO EXISTING)
REMOVE EXISTING WALLS AND PREPARE FOR NEW WORK
EXISTING LVT FLOORING TO REMAIN. (GC. TO ENSURE PROTECTION TO EXISTING)
REMOVE PORTION CEILING SYSTEM, TO TIE INTO EXISTING CEILING SYSTEM.
(GRID AND TILE)
REMOVE EXISTING DOOR AND FRAME AND PREPARE FOR NEW WORK
REMOVE EXISTING INTERIOR WINDOW AND PREPARE FOR NEW WORK
EXISTING CONSTRUCTION
LEGEND
DEMOLITION
DEMOLITION KEYNOTES
NORTH
SCALE :1/8" = 1'-0"5 DEMOLITION FLOOR PLAN - AREA G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-401
LA
R
G E
SC
AL
E D
EM
O
LI
TI
O N
F
LO
O R
P
LA
N S
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
OFFICE 2
OFFICE 3
OFFICE 4
PRINTER
NOOK
1 8
OFFICE 5
OFFICE 9
OFFICE 8
OFFICE 7
OFFICE
OFFICE
OFFICE 11
BREAK
ROOM OFFICE 12
OFFICE
OFFICE
STORAGE
1 7
CORRIDOR 1
STORAGE 2
1 8
1 8
TESTING
1 8 11
NORTH
SCALE :1/8" = 1'-0"4 DEMOLITION FLOOR PLAN - AREA B
STORAGE
F/TLT
M/TLT
F/SHWR
MECH
NORTH
SCALE :1/8" = 1'-0"3 DEMOLITION FLOOR PLAN - AREA A
9 17
CLASSROOM 1 HERITAGE
ROOM STORAGE
CORRIDOR
NORTH
SCALE :1/8" = 1'-0"1 DEMOLITION FLOOR PLAN - AREA C
1 17
OFFICE OFFICE
OFFICE 1
NORTH
SCALE :1/8" = 1'-0"2 DEMOLITION FLOOR PLAN - AREA D
0 8' 16'4' 0 8' 16'4'
0 8' 16'4'
0 8' 16'4'0 8' 16'4'
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
AREA-CAREA-A
AREA-B
AREA-D
AREA-G
EX
EX
EX EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX
SCOPE (CAMERA) EXISTING DRAIN-LINE TO LOCATE THE
OBSTRUCTION/BLOCKAGE IN THE LINE.
IF THERE IS AN OBSTRUCTION / BLOCKAGE LOCATED, CLEAR LINE.
IF UNABLE TO CLEAR THE LINE, REMOVE THE LINE AND PREPARE TO INSTALL NEW
LINE, MATCH EXISTING LINE SIZE.
IF LINE REQUIRES TO BE REMOVED AND REPLACED DETERMINE LOCATION OF
OBSTRUCTION / BLOCKAGE. REMOVE SLAB AND / OR WALL AS REQUIRED TO
ACCESS THE DRAIN PIPE.
CEILING SYSTEM TO REMAIN.
REMOVE HOLLOW METAL DOOR AND HARDWARE. FRAME TO REMAIN.
COORDINATE CEILING REMOVAL. INTENT IS TO KEEP EXISTING 7'-11" AND 8'-8"
CEILINGS, AND EXISTING 'TRANSITION RISE' BETWEEN THE TWO HEIGHTS.
WHERE CEILINGS REMOVED IN OFFICES 6 AND 12, TIE 7'-11" CEILING BETWEEN
THOSE AREAS TO NEW CEILING OVER WHERE OFFICES WERE AND TIE CURRENTLY
BETWEEN THE OFFICES INSTALL NEW 7'-11" CEILING AND THE EXISTING 8'-8"
CEILING.
14 15 16
13 14 15 16
WOOD STUD WALL
CMU WALL
WOOD STUD WALL
CMU WALL
7 7
7 7
CEILING SUPPORTED BY
WALL BETWEEN COLUMNS
APPROX. LINE OF CEILING HEIGHT
CHANGE ABOVE (7'-11/8'-8")
EXISTING CEILING HEIGHTS
OFFICE 1 7'-11"
OFFICE 2.3,&4 7'-11"
OFFICE 5,7,8,9,&10 8'-8"
OFFICE 6 8'-6"
OFFICE 13 7'--11"
OFFICE 14, STORAGE 2, & TESTING
8'-5"
CLASSROOM 1 7-11"
STORAGE 1 9'-5"
OFFICE
6 6
EX
R
EF
FR
Z
SO
D A
P1
P1
P1
P1
P1
P1
P1
P1
P1
FEC
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MODELNUMBERTRADENAMEPRODUCTMATERIAL
PROVIDE NEW TRANSITION STRIP.
NOT USED.
PROVIDE NEW VCT FLOORING AND WALL BASE.
PROVIDE NEW DOOR AND FRAME TO INCLUDE ALL HARDWARE. SEE DOOR
SCHEDULE ON SHEET A-601.
PATCH EXISTING WALLS AS REQUIRED TO LEVEL 4 FINISH PRIME AND PAINT.
PROVIDE AND INSTALL NEW SUPPORT FOR TV. MOUNTING HEIGHT 5'-7" CENTER
OF TV TO FINISH FLOOR.
PROVIDE AND INSTALL FILM TO EXISTING WINDOW GLAZING.
INSTALL RELOCATED DRINKING FOUNTAIN.
IF BLOCKAGE LOCATED REMOVE PORTION OF FLOOR OR WALL AS REQUIRED TO
ACCESS THE BLOCKED DRAIN LINE. MATCH EXISTING AND REPLACE BLOCKED
DRAIN LINE AND RETURN TO POSITIVE FLOW. PATCH FLOOR (ADD COMPACTED
FILL, VAPOR BARRIER, REINF. STEEL AND CONCRETE, AND FLOAT), AND INSTALL
TILE FLOOR, AND/OR PATCH WALL (REPLACE PORTION OF STUD WALL AND SILL
PLATE WITH TREATED MATERIAL, TILE BACKER BOARD), AND INSTALL COVE
BASE AND WALL TILE. SHOULD 3'X3' FIBERGLAS SHOWER STALL REQUIRE
REMOVAL REPLACE IN KIND AND WRAP IN TREATED WOOD FRAMING, INSTALL
TILE BACKER BOARD, COVE BASE AND WALL TILE.
PROVIDE NEW WALL BASE ON EACH SIDE OF NEW WALL.
NEW WORK KEYNOTES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-402
LA
R
G E
SC
AL
E N
EW
W
O R
K
FL
O O
R P
LA
N
S
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
23'-6"
4"
'-6 " 23'-6" 7'-2"
'-3
HERITAGE
ROOM
15'-0"
CLASSROOM/CI
CLASSROOM/NCCD
STORAGE
EQUIPMENT
STORAGE
'-0
0"
NORTH
SCALE :1/8" = 1'-0"1 FLOOR PLAN-NEW WORK -AREA C
24'-2"
11 6
CLASSROOM/MPC
NORTH
SCALE :1/8" = 1'-0"2 FLOOR PLAN-NEW WORK - AREA D
15'-4"
'-2
CLASSROOM/SERVER
CLASSROOM/JOC
2"
NORTH
SCALE :1/8" = 1'-0"3 FLOOR PLAN-NEW WORK - AREA A
19'-8" 19'-8"
'-6
24'-11"
'-3
'-2
'-2
5' -4
6 6
6 6
6 6
A-201
CLASSROOM/FACT
CLASSROOM/ACP
CLASSROOM/FACT
CLASSROOM/ACP
CLASSROOM/RF
CLASSROOM/ACE
OFFICE
OFFICE
CORRIDOR
22'-6"
6 6
NORTH
SCALE :1/8" = 1'-0"4 FLOOR PLAN-NEW WORK - AREA B
STORAGE
F/TLT
M/TLT
F/SHWR
MECH
NORTH
SCALE :1/8" = 1'-0"5 FLOOR PLAN-NEW WORK - AREA G
'-3
39'-10"
'-9
23'-11"
'-4
14'-5" 8'-11" 4'-10"
'-3
'-1
0"
'-1
0"
'-3
11'-10"
31'-1"
'-1
0"
9' -3
7' -1
52'-7"
'-6
39'-10"
19'-9" 19'-9"
5' -1
0"
4'-4" 3'-11" 26'-5" 8'-5"
34'-9"
'-6
24'-1"30'-7" 20'-7"
0 8' 16'4' 0 8' 16'4' 0 8' 16'4'
0 8' 16'4' 0 8' 16'4'
CORRIDOR
'-6
15'-9"
8' -6
7'-8"
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN
NORTH
AREA-CAREA-A
AREA-B
AREA-D
AREA-G
EX
EX
EX
EX
EX
EX
EX EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXISTING CONSTRUCTION
LEGEND
NEW CONSTRUCTION
PARTITION TYPE#X#.#
WOOD STUD WALL
CMU WALL
WOOD STUD WALL
CMU WALL
1EX
5 5
TRAINING
OFFICE
OFFICE
BREAK
ROOM
OFFICE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-403
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
S
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
CORRIDOR
HERITAGE
ROOM STORAGE
23'-6"
'-0
'-6
23'-6"
CLASSROOM
CLASSROOM
15'-0"
'-0
"STORAGE
EQUIPMENT
NORTH
SCALE :1/8" = 1'-0"1 REFLECTED CEILING PLAN - AREA C
24'-2"
'-6
OFFICE OFFICE
CLASSROOM
NORTH
SCALE :1/8" = 1'-0"2 REFLECTED CEILING PLAN - AREA D
15'-4" 15'-4"
'-2
CLASSROOM
CLASSROOM
1 2
1 2
NORTH
SCALE :1/8" = 1'-0"3 REFLECTED CEILING PLAN - AREA A
8'-8" A.F.F.8'-8" A.F.F.
19'-8" 19'-8"
24'-11"
'-6
'-3
22'-6"
'-2
'-2
5'
- 4
1 2 3
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
1 2 3
CLASSROOM
CLASSROOM
1 2
OFFICE
OFFICE
1 2
NORTH
SCALE :1/8" = 1'-0"4 REFLECTED CEILING PLAN - AREA B
31'-1"
30'-6"
39'-10"
4' -1
1"
'-1 0"
34'-9"
M
AT
C H
E
XI
ST
A.
F.
F. 8'-6" A.F.F.
ONLY REMOVE AND REPLACE PORTION OF THE CEILING AS REQUIRED TO
ALTER THE DUCT WORK AND SUPPLY/RETURN GRILLES AND FIRE SPRINKLER
SYSTEM.
ADJUST LOCATION OF LIGHT FIXTURES AND HVAC SEE MECHANICAL AND
ELECTRICAL.
NEW CEILING GRID AND TILE AS REQUIRED FOR ABOVE CEILING WORK.
NEW PENETRATION ABOVE CEILING FOR CONDUITS. SEE ELECTRICAL
DRAWING E-410.
TIE INTO EXISTING CEILING.
REMOVE PORTION OF CEILING TO TIE BACK INTO EXISTING CEILING
EXISTING CONSTRUCTION
LEGEND
NEW CONSTRUCTION
NEW ACOUSTICAL CEILING GRID
ARCHITECTURAL KEYNOTES
SUPPLY AIR
RETURN AIR
CEILING HEIGHT ABOVE
FINISH FLOOR
AND CEILING TILES @ 7'-11" AFF/8'-6" AFF
0 8' 16'4' 0 8' 16'4' 0 8' 16'4'
0 8' 16'4'
CORRIDOR
11'-9"
7' -2
'-1 0"
7'-2"
'-3
52'-5"
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
AREA-CAREA-A
AREA-B
AREA-D
AREA-G
SOUND BATT INSULATION ABOVE CEILING
VERTICAL RISE FROM 7'-11" TO 8'-8" IN
CEILING GRID. FRAME WITH GRID AND TILE.
CORRIDOR
SCALE :1/8" = 1'-0"5 DEMOLITION CEILING PLAN - AREA B
0 8' 16'4'
`REMOVE EXISTING CEILING TILE
AND GRID THIS AREA
7'-11" A.F.F.
7'-11" A.F.F.
TIE NEW 7'-11" CEILING TO
EXISTING 7'-11" CEILING
SHEET NOTES
ALL NEW WALLS ARE TO THE UNDERSIDE OF THE EXISTING CEILING.
WHERE NEW CEILING IS CONSTRUCTED, SECURE CEILING GRID TO EXISTING
WALLS AND TO EXISTING CEILING TILE GRID.
1.
2.
APPROXIMATE LOCATION OF
'TRANSITION RISE' FROM 7'-11" TO 8'-8"
SEE DETAIL 6/A-403 ON THIS SHEET
EXISTING CEILING
TO REMAIN
TIE NEW CEILING
INTO 8'-8" CEILING
SCALE :1/8" = 1'-0"6 TRANSITION RISE
7'-11"
CEILING GRID
CEILING TILE
GRID HANGER
CEILING GRID
CEILING TILE
8'-8"
RM# ROOM NAME FLOOR CLG.HTBASE WALLS CEILING NOTES
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
8'-8"
112 EQUIPMENT STORAGE - - - -
STORAGE113 - - - -
M/TLT114 - - - -
- - - -F/TLT115
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
-CORRIDOR116
-CORRIDOR117
8'-8" 7'-11" 7'-11" 7'-11" 8'-8" 8'-8"
7'-11"/8'-8" 7'-11"/8'-8"
8'-5" 8'-8" 9'-5" 9'-5" 8'-8" 8'-8" 8'-8" 8'-5"
3'-0"
3'-0"
3'-0"
3'-0"
WD7'-0"
WD7'-0"
WD D16-8"
WD D11 3/4"7'-0"
WD7'-0" 3'-0"
D1
D1
D1
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 / A-601 2 / A-601
HM7'-0" 3'-0" D21 3/4"112
3 / A-601 4 / A-601
3 / A-601 4 / A-601
3 / A-601 4 / A-601
3 / A-601 4 / A-601
MAT'L DESIGNATION ( WALL LOCATION )
FINISH LEGEND
MATERIAL DESIGNATION
N
SW E WALL LOCATION (PLAN NORTH)
EXISTING MASONRY
WALL
SEALANT ALL AROUND
EXISTING PLASTER
ON CMU
WOOD DOOR
EXISTING MASONRY
WALL
SEALANT EA.
SIDE ALL AROUND
EXISTING PLASTER
ON CMU
8" GYPSUM BD WALL
ON METAL STUDS
METAL STUDS
SEALANT ALL AROUND
EXISTING MASONRY
WALL
EXISTING PLASTER
ON CMU
NON-SHRINK GROUT
FLOATED SMOOTH TO MATCH
EXISTING FINISH. PRIME AND
PAINT.
CLASSROOM
SIDE
CLASSROOM
SIDEWOOD DOOR
HOLLOW METAL FRAME
8" GYPSUM BD
RETURN ON METAL
STUDS
CORRIDOR SIDE
EXISTING GYP. BD.
ON METAL STUDS
8" GYPSUM BD
RETURN ON METAL
STUDS
5'-3"
10" 11"3'-5"
1' -6
8" GYPSUM BD
RETURN ON METAL
STUDS
SEALANT EA.
SIDE ALL AROUND
EXISTING GYP. BD.
ON METAL STUDS
8" GYPSUM BD
RETURN ON METAL
STUDS
8" GYPSUM BD
RETURN ON METAL
STUDS
WOOD DOOR
HOLLOW METAL FRAME
PROVIDE AND INSTALL 58" GYPSUM
BD WALL ON METAL STUD WALL
INFILL
PROVIDE AND INSTALL 58" GYPSUM
BD WALL ON METAL STUD WALL
INFILL
PROVIDE AND INSTALL 58" GYPSUM
BD WALL ON METAL STUD WALL
INFILL
PROVIDE AND INSTALL 58" GYPSUM
BD WALL ON METAL STUD WALL
INFILL
SHIM/BLOCKING
DBL STUD AT DOOR
JAMBS
PROVIDE/INSTALL TRANSITION
STRIP BETWEEN FLOOR
MATERIALS.
P
AS
S
C H
ED
SCHED
AS2"
2"
2"
SCHED
D-1 F-1
AS
S
C H
ED
AS
H THKW
NO.
MTL. TYPE
DOOR AND FRAME SCHEDULE
DOOR
SIZE
FRAME NOTES:
1. ALL HOLLOW METAL FRAME MEMBERS 2" WIDE UNLESS
NOTED OTHERWISE.
2. ALL EXISTING HOLLOW METAL
FRAMES TO BE PAINTED TO MATCH EXISTING.
DOOR:
SOLID CORE SWINGING WOOD DOOR
DOOR FINISH:STAIN
FRAME: HOLLOW METAL
FRAME FINISH:PAINTED
RATED: NON-RATED
HARDWARE:
· ABA COMPLIANT LEVER
· BUTT HINGES
· CYLINDRICAL LOCKSET
· DOOR STOP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
AN
SI
-D
A-601
R O
O M
F
IN
IS
H
S C
H
ED
U
LE
D O
O R
A N
D F
R
AM
E
SC
H
ED
U
LE
G . R
EE
D
SM
A
G .R
EE
D
S
M A
M
AR
C H
, 2
SCALE : N.T.S.5 DOOR ELEVATIONS
NEW TILE IN TOILET ROOMS ONLY IF BID OPTION 3 ADD ALTERNATE IS SELECTED.
FINISH SCHEDULE NOTES
1.
ROOM FINISH SCHEDULE
PT
D
. G
YP
. B D
VC
T
R U
BB
ER
EXIST. FLOOR TO REMAIN
EXIST. FLOOR TO REMAIN
EXIST. FLOOR TO REMAIN
EXIST. FLOOR TO REMAIN
C
ER
AM
IC
T
IL
E
PO
R
C
EL
AI
N
T
IL
E
C
ER
AM
IC
T
IL
E
LA
Y-
IN
C
EI
LI
N G
TI
LE
SEE GEN. NOTE -1
SEE GEN. NOTE -1
HEAD JAMB
SCALE :1/2" = 1'-0"2 JAMB DETAIL
SCALE :1/2" = 1'-0"1 HEAD DETAIL
D-2
DOOR:
HOLLOW METAL DOOR
FRAME: EXISTING
FRAME FINISH:PAINTED
RATED: NON-RATED
HARDWARE:
· ABA COMPLIANT LEVER
· BUTT HINGES
· CYLINDRICAL LOCKSET
· DOOR STOP
SCHED
AS
S
C H
ED
AS
SCALE :1 1/2" = 1'-0"4 JAMB DETAIL
SCALE :1 1/2" = 1'-0"3 HEAD DETAIL
AutoCAD SHX Text
EXISTING WALL FRAMING
AutoCAD SHX Text
SEALANT ALL AROUND
AutoCAD SHX Text
DOOR AS SCHED
AutoCAD SHX Text
FRAME AS SCHED SECURE INTO EXIST WALL
AutoCAD SHX Text
SEALANT ALL AROUND
AutoCAD SHX Text
DOOR AS SCHED
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
HEAD DETAIL
AutoCAD SHX Text
JAMB DETAIL
AutoCAD SHX Text
EXISTING WALL FRAMING
AutoCAD SHX Text
FRAME AS SCHED SECURE INTO EXIST WALL
AutoCAD SHX Text
EXISTING WALL
OFFICE 2 OFFICE 5
OFFICE 12
OFFICE 3
OFFICE 9
OFFICE 8
OFFICE 7
TESTING STORAGE 2
OFFICE
OFFICE 4
OFFICE 11
OFFICE 13
HERITAGE
ROOM
BREAK
ROOM
OFFICE OFFICE
OFFICE
STORAGE
OFFICE 1
OFFICE
CORRIDOR 1
CLASSROOM 1
CORRIDOR
STORAGE
OFFICE 10
x1 x1 x2 x2
15x11 x1
10x8
24x17
10x7
10x7
10x7 x7
12x10
10"Ø x1 x1
8x
10x7 8"Ø x1 x1
12x7 x1
11x810x7
8x7 x1
10x7
10x1210x17 x1 x1 x1
24x22
10x7 10x6 5x3
8x
6x
10x8 x1 x1 x1 x8
10x8 8"Ø
10x8
15x11
10x8
12x10 9x6
10x1210x9
FLEXIBLE DUCT TO REMAIN
LINEAR SLOT DIFFUSER TO REMAIN
MECHANICAL LEGEND
VAV BOX TO REMAIN
RETURN AIR GRILLE TO REMAIN
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. REMOVE ALL LINEAR SLOT DIFFUSERS AND ATTACHED FLEX DUCT BACK TO MAIN
IN AREA OF WORK UNLESS SPECIFICALLY REFERENCED.
3. REMOVE AND RETAIN EXISTING THERMOSTATS IN AREA OF WORK.
GENERAL MECHANICAL NOTES
FLEXIBLE DUCT TO BE DEMOLISHED
LINEAR SLOT DIFFUSER TO BE DEMOLISHED
HARD DUCT TO BE DEMOLISHED
NO WORK THIS AREA
HARD DUCT TO REMAIN
VAV BOX TO BE DEMOLISHED
MD-401
REMOVE EXISTING VAV 1-2
REMOVE EXISTING VAV 4-2
MECHANICAL KEY NOTES
AN
SI
-D
MD-101
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE : 3/32"=1'-0"1 MECHANICAL DEMOLITION PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E x2
EXISTING
23.5KV/208V
TRANSFORMER
EXISTING DOMESTIC WATER
EXISTING 115 V
EXISTING 208 V
EXISTING CWR
EXISTING CWS
W
W W W WW
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
GENERAL MECHANICAL NOTES
KEY PLAN
FIRST FLOOR
REMOVE INSULATION FROM CHILLED WATER SUPPLY AND RETURN LINES FROM
EXISTING BUTTERFLY VALVES TO THE CHILLER.
DISCONNECT PIPE AT EXISTING VALVES. REMOVE EXISTING CHILLED WATER
SUPPLY AND RETURN PIPE.
DISCONNECT ELECTRIC SERVICE TO EXISTING CHILLER. REMOVE CONDUCTORS
FROM CHILLER CONTROL PANEL.
DISCONNECT CONTROL WIRES FROM THE CHILLER CONTROL PANEL. REMOVE
WIRES FROM CONTROL PANEL TO PANEL IN MECHANICAL EQUIPMENT ROOM.
REMOVE EXISTING CHILLER
MECHANICAL KEY NOTES
1 2
AN
SI
-D
MD-401
C H
IL
LE
R D
EM
O
LI
TI
O N
D
ET
AI
L
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
E
NORTH
SCALE : 1/4" = 1'-0"1 CHILLER DEMOLITION DETAIL
0 4' 8'2'
HERITAGE
ROOM
OFFICE
STORAGE
OFFICE
CLASSROOM/
SERVER
CLASSROOM/
JOC
CLASSROOM/FACT
CLASSROOM/ACP
CLASSROOM/ACP
CLASSROOM/FACT
CLASSROOM/
RF
CLASSROOM/
ACE
CLASSROOM/NCCD
CLASSROOM/Cl
CLASSROOM/MPC
EQUIPMENT
STORAGE
STORAGE
CORRIDOR
CORRIDOR
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL,
ARCHITECTURAL, FIRE SPRINKLER CONTRACTORS.
3. FIRE SPRINKLER LOCATIONS SHOWN ARE DIAGRAMMATIC. SEE FS-100 - FS-102.
4. CONSTRUCTION MUST BE COMPLETED PER SMACNA STANDARDS, NFPA CODES
AND STANDARDS, AND UFC.
GENERAL MECHANICAL NOTES
M-401
M-404
M-403
M-402
M-403
MECHANICAL LEGEND
LINEAR SLOT DIFFUSER TO REMAIN
24"X24" SQUARE SUPPLY AIR DIFFUSER TO
INSTALL
24"X24" SQUARE RETURN AIR GRILLE TO
INSTALL
FLEXIBLE DUCT TO REMAIN
FLEXIBLE DUCT TO INSTALL
HARD DUCT TO REMAIN
HARD DUCT TO INSTALL
VAV BOX TO REMAIN
VAV BOX TO INSTALL
NO WORK THIS AREA
RETURN AIR GRILLE TO REMAIN
APPROXIMATE FIRE SPRINKLER HEAD
LOCATION
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
GENERAL MECHANICAL NOTES
AN
SI
-D
M-101
M
EC
H
AN
IC
AL
IN
ST
AL
LA
TI
O
N P
LA
N
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE : 3/32"=1'-0"1 MECHANICAL NEW WORK PLAN
0 10' 20'5'
AREA-D
AREA-B
AREA-C
AREA-A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
AT
CLASSROOM/
SERVER
CLASSROOM/
JOC
COPY SUPPLY STORAGE OFFICE
OFFICE
x1
10x910x5 10x12 14x12 x1
12"Ø
16x12 16"Ø
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL,
ARCHITECTURAL, AND FIRE SUPPRESSION CONTRACTORS.
3. PROVIDE AND INSTALL NEW DIFFUSERS PER DIFFUSER SCHEDULE AND DRAWN
CFM. SEE M-701 FOR DIFFUSER AND GRILLE SCHEDULE. PROVIDE AND INSTALL
NEW 8" FLEX DUCT, 45 DEGREE BOOT TAPS, AND MANUAL VOLUME DAMPERS.
4. REINSTALL THERMOSTAT RETAINED IN DEMOLITION.
5. CONSTRUCTION MUST BE COMPLETED PER SMACNA STANDARDS, NFPA CODES
AND STANDARDS, AND UFC.
GENERAL MECHANICAL NOTES
MECHANICAL LEGEND
DUCT TAKEOFF WITH MANUAL VOLUME
DAMPER
24"X24" SQUARE RETURN AIR GRILLE TO
INSTALL
24"X24" SQUARE SUPPLY AIR DIFFUSER TO
INSTALL
HARD DUCT TO INSTALL
HARD DUCT TO REMAIN
FLEXIBLE DUCT TO INSTALL
FLEXIBLE DUCT TO REMAIN
VAV BOX TO REMAIN
THERMOSTAT
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
VAV BOX TO INSTALL
A
400 CFM
A
400 CFM
A
400 CFM
A
400 CFM
A
400 CFM
B
B
VAV:1-2
VAV:1-3
A
200 CFM
100 CFM 100 CFM 100 CFM 100 CFM
100 CFM
AN
SI
-D
M-401
M
EC
H
AN
IC
AL
IN
ST
AL
LA
TI
O
N A
R
EA
A
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE :1/2"=1'-0"1 MECHANICAL NEW WORK AREA A
0 2' 4'1'
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
AREA-A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
STORAGE
CLASSROOM/FACT
CLASSROOM/ACP
CLASSROOM/ACP
CLASSROOM/FACT
CLASSROOM/
RF
CLASSROOM/
ACE
CORRIDOR
CORRIDOR
F/SHWR
OFFICE OFFICE
10x8
10x8
24x22 x1
10x7 11x8 x1
10x17 10x12
24x17
10x7
10x7
15x11
"Ø
32x16 x1 x2 x1 x1 x1 x1 x1 x1
24x19
12x10
10"Ø x1
8x8 8x8
8x8
10x8 x1
10x8
10x7 x7
10x10
10x7
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
GENERAL MECHANICAL NOTES
A
275 CFM
A
275 CFM
A
250 CFM A
300 CFM
A
180 CFM
A
180 CFM
A
300 CFM
A
110 CFM
A
360 CFM
A
250 CFM
A
250 CFM
A
230 CFM
A
320 CFM
A
200 CFM
A
100 CFM
A
100 CFM
A
200 CFM
A
250 CFM
A
250 CFM
A
250 CFM
B
B
BB
B
B
MECHANICAL LEGEND
DUCT TAKEOFF WITH MANUAL VOLUME
DAMPER
24"X24" SQUARE RETURN AIR GRILLE TO
INSTALL
24"X24" SQUARE SUPPLY AIR DIFFUSER TO
INSTALL
HARD DUCT TO INSTALL
HARD DUCT TO REMAIN
FLEXIBLE DUCT TO INSTALL
FLEXIBLE DUCT TO REMAIN
VAV BOX TO REMAIN
THERMOSTAT
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL,
ARCHITECTURAL, AND FIRE SUPPRESSION CONTRACTORS.
3. PROVIDE AND INSTALL NEW DIFFUSERS PER DIFFUSER SCHEDULE AND DRAWN
CFM. SEE M-701 FOR DIFFUSER AND GRILLE SCHEDULE. PROVIDE AND INSTALL
NEW 8" FLEX DUCT, 45 DEGREE BOOT TAPS, AND MANUAL VOLUME DAMPERS.
4. REINSTALL THERMOSTAT RETAINED IN DEMOLITION.
5. CONSTRUCTION MUST BE COMPLETED PER SMACNA STANDARDS, NFPA CODES
AND STANDARDS, AND UFC.
50 CFM
AN
SI
-D
M-402
M
EC
H
AN
IC
AL
IN
ST
AL
LA
TI
O
N A
R
EA
B
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE : 3/32"=1'-0"1 MECHANICAL NEW WORK AREA B
0 10' 20'5'
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
AREA-B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
HERITAGE
ROOM
CLASSROOM/NCCD
CLASSROOM/CI
CORRIDOR
10x8 x1
15x1112"Ø
12"Ø 15x11
10x8
7x8
8"Ø x8
12x10 12x6
12x6 x1
12x10
OFFICE OFFICE
CLASSROOM/MPC
CORRIDOR
12x7 x1
"Ø x1 x1
7x1010x7 8"Ø
8x x1 x1
GENERAL MECHANICAL NOTES
A
350 CFM
A
350 CFM
A
350 CFM
A
350 CFM
A
350 CFM
A
100 CFM
A
100 CFM
B
B
B
B
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL,
ARCHITECTURAL, AND FIRE SUPPRESSION CONTRACTORS.
3. PROVIDE AND INSTALL NEW DIFFUSERS PER DIFFUSER SCHEDULE AND DRAWN
CFM. SEE M-701 FOR DIFFUSER AND GRILLE SCHEDULE. PROVIDE AND INSTALL
NEW 8" FLEX DUCT, 45 DEGREE BOOT TAPS, AND MANUAL VOLUME DAMPERS.
4. REINSTALL THERMOSTAT RETAINED IN DEMOLITION.
5. CONSTRUCTION MUST BE COMPLETED PER SMACNA STANDARDS, NFPA CODES
AND STANDARDS, AND UFC.
A
350 CFM
A
350 CFM
VAV 4-2
VAV 4-1
VAV 4-3
VAV 4-4
VAV 2-7
VAV 2-8
100 CFM 100 CFM
100 CFM
100 CFM
75 CFM
A
350 CFM
MECHANICAL LEGEND
DUCT TAKEOFF WITH MANUAL VOLUME
DAMPER
24"X24" SQUARE RETURN AIR GRILLE TO
INSTALL
24"X24" SQUARE SUPPLY AIR DIFFUSER TO
INSTALL
HARD DUCT TO INSTALL
HARD DUCT TO REMAIN
FLEXIBLE DUCT TO INSTALL
FLEXIBLE DUCT TO REMAIN
VAV BOX TO REMAIN
THERMOSTAT
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
24"X24" SQUARE RETURN AIR GRILLE TO
REMAIN
VAV BOX TO INSTALL
AN
SI
-D
M-403
M
EC
H
AN
IC
AL
IN
ST
AL
LA
TI
O
N A
R
EA
C A
N D
D
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE :1/4" = 1'-0"1 MECHANICAL NEW WORK AREA C
NORTH
SCALE : 1/4" = 1'-0"2 MECHANICAL NEW WORK AREA D
0 4' 8'2' 0 4' 8'2'
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
AREA-C
AREA-D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
TLT
SHOWER
EXISTING
23.5KV/208V
TRANSFORMER
EXISTING DOMESTIC WATER
NEW 4" CWR
NEW 4" CWS
NEW COMPRESSOR
W
W W W WW
EXISTING 115 V
EXISTING 208 V
EXISTING CWR
EXISTING CWS
PROVIDE NEW WATERCOOLED CHILLER PER CHILLER SCHEDULE. SEE SHEET
M-701.
TIE NEW CHILLER INTO EXISTING CHILLED WATER SUPPLY AND RETURN PIPING.
MECHANICAL KEYNOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
2. CONSTRUCTION MUST BE COMPLETED PER SMACNA STANDARDS, NFPA CODES
AND STANDARDS, AND UFC.
3. SEE SHEET M-501 FOR CHILLER INSTALLATION DETAILS
4. SEE SHEET M-701 FOR CHILLER SCHEDULE
5. PIPING SHOWN IS FOR GENERAL POINT-OF-CONNECTION ONLY AND IS NOT
INTENDED TO SHOW SPECIFIC DETAILS.
6. VERIFY ALL DIMENSIONS.
7. PROVIDE TEMPERATURE AND PRESSURE GAUGES AS INDICATED.
8. PIPE MUST BE SCHEDULE 40 STEEL PIPE.
9. PROVIDE ALL PIPING, INCLUDING BUT NOT LIMITED TO VALVES, FITTINGS,
INSULATION, ETC.
10. PROVIDE ALL PIPING SUPPORTS AND HANGERS.
11. ALL CHILLED WATER PIPING MUST BE INSULATED WITH 2” THICK PRE-FORMED
CELLULAR GLASS (FOAMGLASS) INSULATION.
12. DEMOLITION WORK MUST BE SCHEDULED WITH THE NEW INSTALLATION WORK.
13. DISPOSE OF ANY MATERIALS REMOVED FROM THE WORK AREA IN ACCORDANCE
WITH ALL FEDERAL STATE AND LOCAL LAWS, CODES AND REGULATIONS.
14. REMOVE DEMOLISHED MATERIALS ON A DAILY BASIS AND DO NOT ALLOW
DEBRIS OR TRASH TO ACCUMULATE IN THE BUILDING.
15. INFORMATION ON DRAWINGS IS SCHEMATIC ITS REPRESENTATION.
16. ALL SERVICES ARE TO BE KEPT IN OPERATION AT ALL TIMES, EXCEPT WHEN
SPECIFIC PERMISSION IS GIVEN TO DO OTHERWISE. BEFORE ANY SERVICES ARE
INTERRUPTED, COORDINATE WITH CONTRACTING OFFICER TO DO WORK AT A
TIME MOST CONVENIENT TO THE OCCUPANTS. THIS PROCEDURE MUST REQUIRE
THE LENGTH OF THE INTERRUPTION AGREED BY CONTRACTING OFFICER IN
ADVANCE.
GENERAL MECHANICAL NOTES
AN
SI
-D
M-404
C H
IL
LE
R
IN
ST
AL
LA
TI
O N
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
NORTH
SCALE : 1/4" = 1'-0"1 CHILLER NEW WORK DETAIL
0 4' 8'2'
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
VITREOUS CHINALAVATORYGREENWICHK-2031
KEYPLAN - FIRST FLOOR
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
3/4" SHUT-OFF VALVE (BALL VALVE TYPE)
TYPICAL HIGH POINT IN PIPING SYSTEMMINIMUM 3/4" BRASS NIPPLE
PROVIDE TYPICALLY AT ALL SYSTEM HIGH POINTS.
THERMOMETER
THERMOMETER
PRESSURE GAUGE
PRESSURE GAUGE
FLOW SWITCH
EXISTING CHILLED
WATER SUPPLY AND
RETURN PIPE
EXISTING BUTTERFLY
VALVES - TYPICAL OF 4
TO REMAIN
NEW CHILLED 4"
WATER SUPPLY - TIE
NEW PIPE INTO
EXISTING BF1
NEW CHILLED 4"
WATER RETURN - TIE
NEW PIPE INTO
EXISTING BF3
BF2
BF1
BF3
BF4
LENGTH TO SUIT
PIPES TO BE
SUPPORTED
4"° STEEL PIPE
3"X3"X1/4" ANGLE
MIN. 2 INCH
OVERLAP
BASE PLATE
ALUMINUM JACKET
PITTWRAPPIPE INSULATION
PIPE
GALVANIZED STEEL DUCTWORK
HEATING COIL W/ GALVANIZED CASING,
COPPER TUBES & ALUMINUM FINS.
PRESSURE INDEPENDENT VAV BOX W/
ELECTROSTATIC GALVANIZED STEEL CASING
ALL THREAD RODS UP TO ROOF
STRUCTURE. (TYP. OF 4 PER
UNIT INSTALL SPRING
VIBRATION ISOLATORS WITH
FPVAV UNITS.
INLET (ROUND, OVAL OR
RECTANGULAR). TRANSITION AS
NECESSARY.
AIRFLOW
GALVANIZED UNISTRUT
SUPPORT WITH NEOPRENE
GASKET. (TYP. OF 2 PER UNIT)
DRAIN
VALVE
MANUAL AIR
VENT
PRESSURE/TEMPERATURE
PLUG
STRAINER
SUPPLY
RETURN CIRCUIT SETTER
FLOW CONTROL
VALVE
GATE VALVE (TYP.)
3-WAY CONTROL
VALVE
BALANCE
COCK
ALUMINUM JACKET
PITTWRAPPIPE INSULATION
PIPE
SADDLE
AN
SI
-D
M-501
M
EC
H
AN
IC
AL
D
ET
AI
LS
A.
T
O W
E
L.
F
IE
LD
IN
G
M
AR
C H
, 2
SCALE : N.T.S.1 AIR COOLED CHILLER PIPING
SCALE : N.T.S.2 MANUAL AIR VENT
SCALE : N.T.S.3 WEATHERPROOFING OF PIPE
SCALE : N.T.S.4 PIPE SUPPORT DETAIL
SCALE : N.T.S.5 PIPE SADDLE DETAIL
SCALE : N.T.S.6 VAV DETAIL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SO
LI
C
IT
AT
IO
N N
O
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
IS
SU
E
D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
ST
C
IV
IL
E
N G
IN
EE
R S
Q U
AD
R
O N
L
ST
R
EE
T, B
LD
G
BI
LO
XI
, M S
KE
ES
LE
R
A
IR
F O
R C
E
BA
SE
B
IL
O
XI
, M
IS
SI
SS
IP
PI
R
EN
O
VA
TE
A R
N O
LD
H
AL
L
FO
R
S W
IN
G
S
PA
C E, B5
PR
O
JE
C T
N O
. M
AH
G
0%
D
ES
IG
N
S U
BM
IT
TA
L
D
ES
C R
IP
TI
O N
M
AR
K D
DIFFUSER, REGISTER & GRILLE SCHEDULE
TAG DESCRIPTION FACE NECK DIRECTION NOTES
A DIFFUSER 24"x24" 8" DIA. SUPPLY 1,2,3, & 5
B REGISTER 24"x24" 22"x22" RETURN/EXHAUST 1,2,3,4,5 & 7
1. COORDINATE MOUNTING FRAME WITH CEILING/WALL TYPE.
2. COORDINATE COLOR & FINISH WITH CONTRACTING OFFICER.
3. NC (NOISE CRITERIA) LEVEL MAY BE NO GREATER THAN 25.
4. PROVIDE GRILLE WITH BORDER FLANGE FOR LAY-IN TYPE CEILINGS. SEE PLAN FOR LOCATIONS.
5. PROVIDE WITH ALUMINUM OPPOSED BLADE DAMPER.
6. PROVIDE WITH REAR OPERATED OPPOSED BLADE DAMPER.
7. PROVIDE DUCT FITTING TO MATCH NECK SIZE.
CHILLER SCHEDULE
UNIT EVAPORATOR DATA COMPRESSOR CONDENSER
MARK LOCATION MIN. CAP.
TONS
AMBIENT
TEMP F
MIN. EFF.
GPM
WATER TEMP F
FOULING
FACTOR MAX PD FT.
NUMBER RLA
(EA) VOLT/PH
NUMBER RLA
(EA) VOLT/PH REMARKS
KW KW/TON ENT LVG
CH-1 BLDG 5901 80 105 88.4 1.105 192 54 44 0.0001 18 1/110 460/3 6/5.2 460/3
1 - LOW AMBIENT TO 0°F
2 - TWO INDEPENDENCE REF. CIRCUITS
3 - FLOW SWITCH
4 - CONTROL POWER TRANSFORMER
5 - VARIABLE SPEED DRIVE WITH SOFT START
6 - MICRO PROCESSOR CONTROLLED MAGNETIC BEARING SYSTEM
7 - REFRIGERANT 134A
CHILLER AND CONDENSER POINTS LIST
OUTPUT INPUT VIRTUAL LOCAL CONTROLLER BMS FULL BMS
INTEGRATION
DIGITAL ANALOG DIGITAL ANALOG DIGITAL ANALOG VISIBLE ADJUSTABLE OVERRIDABLE VISIBLE ADJUSTABLE OVERRIDABLE
CONDENSER CD STATUS/ALARM X X X
CONDENSER CD START/STOP X X X
CHILLED WATER SUPPLY FLOW X X X
CHILLED WATER SUPPLY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .