This is Appendix H containing Title II design drawings (Volume 1 of 2) for the Repair of Jones Hall (Building 6902) at Keesler AFB, Biloxi, Mississippi, under Contract FA8903-21-D-0004, Solicitation MAHG121033. The drawing set was issued for construction on April 14, 2026, and includes civil, architectural, plumbing, electrical, telecommunications, and security design plans.

The drawings document site demolition and restoration plans, grading and drainage designs, utility installations including 8-inch PVC sanitary sewer lines with lift station, storm sewer connections, water main extensions, and site restoration specifications. Key civil work includes removal of existing pavement and utilities, installation of bituminous paths and aggregate building pads, concrete curb and gutter, decorative concrete sidewalks, and site grading to elevation 24.00 for the Relocated Facilities (RLF) area and 25.25 for the Fabrication and Test (FAB-T) area. The specifications establish minimum 1.0 percent slope for paved drainage and 2.0 percent for vegetated areas, require contractor-performed compaction testing and dewatering, mandate erosion control measures per Mississippi Department of Environmental Quality requirements, and specify utility installation per local provider standards with minimum 30-inch cover. Construction sequencing includes topsoil stripping, temporary RLF pad grading with geotextile fabric over existing storm structures, fill placement, temporary Bermuda grass sodding, subsequent RLF removal, and final restoration to pre-construction elevations.

View the file

Other files

File Type Posted
SOW_Title_II_09022026.pdf PDF
Appendix A - Air Force Facilities Sustainability Requirements Scoresheet.xlsx XLSX spreadsheet
Appendix Q - Jones Hall B6902 Hazardous Materials Report.pdf PDF
Appendix L - Arnold Hall B5901 Drawings.pdf PDF
Appendix C - Keesler AFB Installation Facilities Standards (IFS).pdf PDF
Appendix A - Air Force Facilities Sustainability Requirements Scoresheet.xlsx XLSX spreadsheet
Appendix J - Jones Hall B6902 100 percent Specifications.pdf PDF
Appendix O - Arnold Hall B5901 Hazardous Material Survey.pdf PDF
Appendix H - Jones Hall AFB Drawings Vole 2 of 2_optimized.pdf PDF
Appendix H - Jones Hall SID Binder.pdf PDF
Appendix N - Arnold Hall B5901 Specifications.pdf PDF
Appendix G - Jones Hall B6902 DD Form 1391.pdf PDF
Appendix P - Arnold Hall B5901 Asbestos Inspection Report.pdf PDF
Appendix E - SWPPP Guidance Manual.pdf PDF
Appendix D - Keesler AFB Premise Wiring Guidance.pdf PDF
Appendix M - Arnold Hall B5901 Restroom As-Builts.pdf PDF
Appendix I - Jones Hall B6902 As-Built.pdf PDF
RFQD-TII-Jones Hall - 17 Jun 2026.pdf PDF
Appendix R - Premise Wiring Guidance.pdf PDF
Appendix F - Keesler Architectural Compatibility Guide (ACG).pdf PDF
Appendix B - Air Force Sustainable Design and Development (SDD) Implementing Guidance.pdf PDF
Appendix K - Jones Hall B6902 Hazardous Material Survey.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

U.S. AIR FORCE

U S

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R

IN

G C

E N

T E

R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

SHEET ID

K E

E S

L E

R A

F B

B

IL

O X

I, M

IS

S

IS

S

IP

P

I

VOLUME: 1

B

IM

/1

A F

C E

C J o n e s H a ll /P

N -K e e s le r- R

L F

-2 -G

.r v t

/1

/2

:2

:2

A

M

KEESLER AFB, MISSISSIPPI

REPAIR OF JONES HALL - BUILDING 6902

MAHG121033

RLF

KEESLER AFB

FA8903-21-D-0004

14 APRIL 2026

G-001

RLF

C O

V E

R S

H E

E T

K E

E S

L E

R A

F B

M

IS

S

IS

S

IP

P

I E

A

D A

M S

O N

E A

D A

M S

O N

B S

C -J

V

K L

IE

B M

A N

N

A

P R

IL

F A

-2

-D

-0

R E

P A

IR

O

F J

O N

E S

H A

L L

B U

IL

D

IN

G

M A

H G

ISSUED FOR CONSTRUCTION

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

VICINITY MAP

LOCATION MAP

PROJECT LOCATION

RELOCATED FACILITIES

04/14/26

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U S

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R

IN

G C

E N

T E

R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F il e P a th

P lo t D a te

SHEET ID

K E

E S

L E

R A

F B

B

IL

O X

I, M

IS

S

IS

S

IP

P

I

B

IM

/1

A F

C E

C J o n e s H a ll /P

N -K e e s le r- R

L F

-2 -G

.r v t

/1

/2

:2

:2

A

M

G-002

RLF

D R

A W

IN

G

I N

D E

X

K E

E S

L E

R A

F B

M

IS

S

IS

S

IP

P

I E

A

D A

M S

O N

E A

D A

M S

O N

B S

C -J

V

K L

IE

B M

A N

N

A

P R

IL

F A

-2

-D

-0

R E

P A

IR

O

F J

O N

E S

H A

L L

B U

IL

D

IN

G

M A

H G

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

SCHEDULE - SHEET INDEX

SHEET INFORMATION

NUMBER NAME

GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

CIVIL

C001 CIVIL ABBREVIATIONS AND LEGENDS

C002 CONSTRUCTION NOTES

V100 OVERALL EXISTING SITE PLAN

V101 RLF EXISTING SITE PLAN

V102 FABT EXISTING SITE PLAN

CD101 RLF DEMOLITION PLAN

CD102 FABT DEMOLITION PLAN

CS100 OVERALL SITE PLAN

CS101 RLF SITE PLAN

CS102 FABT SITE PLAN

CG100 OVERALL GRADING PLAN

CG101 RLF GRADING PLAN

CG102 FABT GRADING PLAN

CU101 RLF UTILITY PLAN

CU102 FABT UTILITY PLAN

CU103 SANITARY & STORM SEWER PROFILES

L101 RLF RESTORATION PLAN

L102 FABT RESTORATION PLAN

C501 RLF & FABT STANDARD DETAILS

C502 RLF & FABT STANDARD DETAILS

C503 RLF & FABT STANDARD DETAILS

C504 RLF LIFT STATION PLAN

C505 RLF LIFT STATION SECTION

ARCHITECTURE

A-001 ARCHITECTURAL GENERAL NOTES, MATERIAL AND ANNOTATION LEGEND

A-002 TYPICAL ABA DETAILS

AS101 ARCHITECTURAL - SITE PLAN

AS102 CLASSROOM RLF YARD - ARCHITECTURAL SITE PLAN

AS103 FAB-T YARD - ARCHITECTURAL SITE PLAN

A-110 COMPREHENSIVE RLF FLOOR PLAN

A-111 RLF FLOOR PLAN - AREA A

A-112 RLF FLOOR PLAN - AREA B

A-113 RLF FLOOR PLAN - AREA C

A-114 FAB-T RLF FLOOR PLAN

AR110 REFLECTED CEILING COMPREHENSIVE FIRST FLOOR PLAN

AR111 FAB-T REFLECTED CEILING PLAN

A-551 RAILING DETAILS

INTERIORS

IN100 INTERIOR FINISH PLAN - COMPREHENSIVE - RLF / FAB-T

IN601 INTERIOR FINISH - MATERIAL AND ROOM FINISH SCHEDULE - TRAILERS

IF111 INTERIOR FURNITURE - FLOOR PLAN - RLF - AREA A

IF112 INTERIOR FURNITURE FLOOR PLAN - RLF - AREA B

IF113 INTERIOR FURNITURE FLOOR PLAN - RLF -AREA C

IF114 INTERIOR FURNITURE FLOOR PLAN - RLF -FAB-T

PLUMBING

P-001 PLUMBING LEGEND

PP120 PLUMBING SITE PLAN

PP121 PLUMBING SITE PLAN RLF BUILDING

PP122 PLUMBING SITE PLAN FAB BUILDING

PP501 PLUMBING DETAILS

PP502 PLUMBING DETAILS

ELECTRICAL

E-120 ELECTRICAL SITE PLAN - RLF

E-121 ELECTRICAL DETAILS

E-122 ELECTRICAL DETAILS

TELECOMMUNICATIONS

T-120 TELECOMMUNICATION SITE PLAN

T-140 TELECOMMUNICATION TRAILER H - FAB-T PLAN

T-430 TELECOMMUNICATION ENLARGED PLANS

T-509 TELECOMMUNICATION CABINET ELEVATION

T-510 TELECOMMUNICATION OUTSIDE PLANT DETAILS

T-602 TELECOMMUNICATION RISER DIAGRAM

TY140 SECURITY TRAILER H - FAB-T PLAN

TY503 SECURITY DETIAILS

TY504 ACS-IDS EQUIPMENT DETAILS

TY602 SECURITY RISER DIAGRAM

04/14/26

F

WATER SURFACE ELEVATION

NORTH CAROLINA DEPARTMENT

OF ENVIRONMENTAL QUALITY

I

WATER METER

MANUAL ON UNIFORM

TRAFFIC CONTROL

DEVICES

NORTH CAROLINA DEPARTMENT

OF TRANSPORTATION

CIVIL ABBREVIATIONS

L

A

A.D.

ALT.

ALUM.

AMP., A.

A.O.

APPROX.

ARCH.

A.T.F.P.

A.W.G.

A.W.W.A. AMERICAN WATER WORKS

ASSOCIATION

AMERICAN WIRE GAGE

ANTI-TERRORISM FORCE

PROTECTION

ARCHITECTURAL

APPROXIMATELY

ACCESS OPENING

AMPERES

ALUMINUM

ALTERNATE

AREA DRAIN

BLDG.

BM.

BOC

BOL

CAP.

C.B.

CEM.

CER.

C.F.M.

CIRC.

C.J.

CK'D

CKT.

C.M.U.

C.O.

COL.

CONC.

COND.

CONN.

CONST.

CONT.

C. TO C.

C.Y. CUBIC YARD

CENTER TO CENTER

CONTRACTING OFFICERS

REPRESENTATIVE

CONTINUOUS

CONSTRUCTION

CONNECTION

CONDENSATE

CONCRETE

COLUMN

CLEAN OUT

CONCRETE MASONRY UNIT

CENTER LINE

CIRCUIT

CHECKERED

CONSTRUCTION JOINT/

CONTRACTION JOINT

CIRCULATING

CUBIC FEET/MINUTE

CERAMIC

CEMENT

CATCH BASIN

CAPACITY

BOLLARD

BACK OF CURB

BENCH MARK

BUILDING

C

COR

D

DET.

DI

DIA.

DIFF.

DIM.

D.I.P.

DISC.

D.J.

DN.

DR.

D.S.

E

DETAIL

DROP INLET

DIAMETER

DIFFUSER

DIMENSION

DUCTILE IRON PIPE

DISCONNECT

DUMMY JOINT

DOWN

DRAIN

DOWN SPOUT

EA.

E.F.

EL.

ELEC.

EQUIP.

EXH.

EXP. JT.

EXT.

EX. / EXIST.

EACH

EXHAUST FAN

ELEVATION

ELECTRIC

EQUIPMENT

EXHAUST

EXPANSION JOINT

EXTERIOR

FC

F.D.

F.D.C.

F.E.S.

FIN.

FL.

FT.

FTG. FOOTING

FOOT, FEET

FLOOR

FINISH

FLARED END SECTION

FIRE DEPARTMENT CONNECTION

FLOOR DRAIN

FACE OF CURB

GA.

GAL.

GALV.

G.F.E.

GND.

GOV'T

G.P.H.

G.P.M.

GV GATE VALVE

GALLONS/MINUTE

GALLONS/HOUR

GOVERNMENT

GROUND

GALVANIZED

GALLON

GAGE

GOVERNMENT FURNISHED

EQUIPMENT

H

HC

HCP

HCR

HDW

HP

HSS

HT

HYD HYDRANT

HEIGHT

HIGH STRENGTH STEEL

HIGH POINT

HEADWALL

HANDICAP RAMP

HANDICAP PARKING

HANDICAP

ID.

INTX.

INV.

ISL

ITL. INDEPENDENT TESTING

LABORATORY

ISLAND

INVERT

INTERSECTION

INSIDE DIAMETER

J J.B.

JCT.

JT.

JUNCTION BOX

JUNCTION

JOINT

K

KVA

KW KILOWATT

KILOVOLT AMPERE

LGT

LP

LF LINEAR FEET

LIGHT POLE

LIGHT

L

M

MAX

MED

MH

MIN

MJ

MON

MTL

MW

M.U.T.C.D

N

NCDEQ

NC DOT

NIC

N/A

N.T.S.

O O.C.

O.D.

OH

OHE

OVH

MAXIMUM

MEDIAN

MANHOLE

MINIMUM

MECHANICAL JOINT

MONUMENT

METAL

MONITOR WELL

NOT IN CONTRACT

NOT APPLICABLE

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OVERHEAD

OVERHEAD ELECTRIC

OVERHANG

P P/A

PC

PER.

PI

PLT

PSF

PARKING AREA

POINT OF CURVATURE

PERIMETER

POINT OF INTERSECTION

PLATE

POUNDS PER SQUARE FOOT

POUNDS/SQUARE FOOT

POUNDS/SQUARE INCH

POINT

PAVEMENTPVMT

PT

PSI

PSF

R

R / RAD.

RCP

REINF.

REQ.

REV

RWM

RT

R.P.Z. REDUCED PRESSURE ZONE

RIGHT

RIGHT OF WAY MONUMENT

REVISED

REQUIRED

REINFORCING

REINFORCED CONCRETE PIPE

RADIUS

S

SAN

SCH

SET

SF

SHT

SIA

SP

SQ. FT.

SS

STA.

STD.

STM

STL

S/W

SWM. STORMWATER MANAGEMENT

SIDEWALK

STEEL

STORM

STANDARD

STATION

SANITARY SEWER

SQUARE FEET

SIGNAL POLE

SIAMESE CONNECTION

SHEET

SQUARE FEET

SETBACK

SCHEDULE

SANITARY SEWER

T T

TBM

TERR

TEL TELEPHONE

TERRA COTTA PIPE

TEMPORARY BENCHMARK

TANGENT

U U/C U/G

UNO UNLESS NOTED OTHERWISE

UNDERGROUND

UNDER CONSTRUCTION

WATER LINE

W

WL

WM

WSEL

WV

WTR

WWF WIRE WELD FABRIC

WATER

WATER VALVE

ABC AGGREGATE BASE COURSE

ABS AIR BREAK SWITCH

A.C. ASBESTOS CEMENT

ASPH. ASPHALT

A/C AIR CONDITIONING

A.F.F. ABOVE FINISHED FLOOR

B

BRG. BEARING

BVC BEGIN VERTICAL CURVE

BVCE BEGIN VERTICAL CURVE ELEVATION

BVCS BEGIN VERTICAL CURVE STATION

C

C&G CURB AND GUTTER

CATV CABLE TELEVISION

CBL CABLE

C.F.S. CUBIC FEET/SECOND

C.I. CURB INLET

C.I.P. CAST IRON PIPE

C.M. CONCRETE MONUMENT

C.M.P. CONCRETE METAL PIPE

DWG.(S) DRAWING(S)

DW DOMESTIC WATER

EXISTING

EG. EXISTING GRADE

E.I.P. EXISTING IRON PIPE

E.J. EXPANSION JOINT

E.M. ELECTRIC METER

EOP EDGE OF PAVEMENT

EVC END VERTICAL CURVE

EVCE

EVCS END VERTICAL CURVE STATION

F.F.E. FINISHED FLOOR ELEVATION

FG FINISHED GRADE

FH FIRE HYDRANT

FM FORCE MAIN

FOC FACE OF CURB

G

GC GENERAL CONTRACTOR

GL GAS LINE

GM GAS METER

GW GUY WIRE

K K VALVE

L LENGTH

LT LEFT

NAD 27 NORTH AMERICAN DATUM 1927

NAD 83 NORTH AMERICAN DATUM 1983

NORTH BOUND LINENBL

NORMAL CROWNNC

NEMA NATIONAL ELECTRICAL

MANUFACTURES ASSOCIATION

NIP NEW IRON PIPE

PCC POINT OF COMPOUND CURVATURE

PED PEDESTAL

PGL PROPOSED GRADE LINE

PINC POINT OF INTERSECTION ON CURVE

PIV POST INDICATOR VALVE

PIV ELEV POINT OF VERTICAL

INTERSECTION ELEVATION

PIV STA POINT OF VERTICAL

INTERSECTION STATION

R/W RIGHT OF WAY

SB SOIL BORING

SIG SIGNAL

SPECS SPECIFICATIONS

SR STATE ROAD

TOE

TOP

TOW TOP OF WALL

TOP OF SLOPE

TOE OF SLOPE

TOB TOP OF BANK

T/C TOP OF CURB

TYP. TYPICAL

TP TELEPHONE POLE

TRANS TRANSFORMER

V

VC

VCP VITRIFIED CLAY PIPE

VERTICAL CURVE

UP UTILITY POLE

ASUS AMERICAN STATES

UTILITY SERVICE

DB DESIGN BUILD TCN TOP OF CONCRETE

END VERTICAL CURVE ELEVATION

C001

C

IV

IL

A

BB

R

EV

IA

TI

O

N S

AN

D

L

EG

EN

D

S

CIVIL ABBREVIATIONS AND LEGENDS

LEGEND EXISTING:

SAN SANITARY SEWER LINE

STORM DRAIN/FOUNDATION DRAIN LINE

PROPOSED LEGEND:

CO SANITARY SEWER CLEAN OUT

W W DOMESTIC WATER LINE

SD SD

CONCRETE

PROPOSED BUILDING

SF SF SEDIMENT FENCE

UP UP UNDERGROUND POWER LINE

MINOR CONTOUR

MAJOR CONTOUR

CONCRETE

SANITARY SEWER LINESAN

UC UC

W W WATER LINE

TELECOMMUNICATION LINE

BUILDING

GAS UNDERGROUND GAS LINE

SEPTIC TANK

A/C HVAC SYSTEM

ELECTRICAL APPURTENANCE

BR BR BIOROLL/COMPOST SOCK

COMM TELECOMMUNICATION LINE

ST

E

ELECTRICAL POLE

XX OR DEMOLISH

SD SD STORM DRAIN LINE

CB CATCH BASIN - YARD INLET

WATER METER

TREE/HEDGE LINE

LOD LOD LIMITS OF DISTURBANCE

W

EXISTING GROUND ELEVATION

PROPOSED GROUND ELEVATION

CONTROL PANELCP

EXISTING BACKFLOW PREVENTERBFP

X X X X CHAIN LINK FENCE

STORM SEWER LINE

CHAIN LINK FENCE

AGGREGATE

STORM SEWER STRUCTURE

SANITARY SEWER STRUCTURE

ABA RAILING

BITUMINOUS PAVEMENT

SANITARY STRUCTURE

EXISTING BITUMINOUS PAVEMENT

TREE

LINETYPES FOR UTILITIES LOCATED BY GIS INFORMATION

UP-D UP-D UNDERGROUND POWER LINE

SANITARY SEWER LINESAN-D SAN-D

UC-D UC-D

W-D W-D WATER LINE

TELECOMMUNICATION LINE

GAS-D GAS-D UNDERGROUND GAS LINE

STORM SEWER LINESD-D SD-D

CHLR-D CHLR-D CHILLED WATER RETURN

CHLS-D CHLS-D CHLS-D CHILLED WATER SUPPLY

SCO SANITARY SEWER CLEANOUT

WV WATER VALVE

HYDRANT

F

E

FIBER APPURTENANCE

ELECTRICAL MANHOLE

LIGHT POLE

SIGN

TELEPHONE PEDESTALT

ELECTRICAL MANHOLE

NATURAL GAS VALVE

FIBER MARKER

IRRIGATION CONTROL VALVE

T/W 25.82

M/E 26.03

T/W 25.95

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C I0

.d w g

4/

/2

3:

:0

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J V

RLF

C002

C O

N

ST

R U

C

TI

O N

N O

TE

S

GENERAL NOTES:

1. DOR SHALL NOT HAVE AUTHORITY OVER THE SITE OR BUILDING CONTRACTOR'S WORK OR RESPONSIBILITIES. BSC JV IS

NOT RESPONSIBLE FOR SITE SAFETY PROCEDURES OR METHODS OF CONSTRUCTION.

2. ALL EXISTING UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND OTHER UTILITIES MAY EXIST.

CONTRACTOR MUST HAVE EXISTING UTILITIES LOCATED BY UNDERGROUND LINE LOCATORS AS WELL AS FIELD VERIFIED BY ONSITE PERSONNEL PRIOR TO ORDERING MATERIALS OR BEGINNING CONSTRUCTION. ANY DISCREPANCIES SHALL BE

REPORTED TO THE CONTRACTING OFFICER IMMEDIATELY.

3. EXISTING UTILITIES TO REMAIN MAY BE LOCATED WITHIN PROPOSED DEMOLITION AREAS. CONTRACTOR SHALL USE EXTREME CAUTION WHILE WORKING IN THESE AREAS TO ENSURE NO UTILITY SERVICE INTERRUPTIONS TO FACILITIES

THAT REMAIN OR TO ADJACENT PROPERTIES.

4. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT ADJACENT PROPERTIES AND IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING IMPROVEMENTS ON OR OFF SITE DUE TO THE CONSTRUCTION OF THIS PROJECT. ANY

DAMAGE WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

5. CONTRACTOR SHALL VERIFY SITE BOUNDARY AND EXISTING TOPOGRAPHY. NOTIFY THE CONTRACTING OFFICER OF ANY

DISCREPANCIES.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT ALL BENCHMARKS AND PROPERTY CORNERS. ANY

REPLACEMENT WILL BE AT THE CONTRACTOR'S EXPENSE.

7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS REQUIRED TO CONSTRUCT THIS PROJECT AND PAY ALL PERMIT FEES. ALL PERMITS MUST BE IN-HAND PRIOR TO CONSTRUCTION.

8. TOPOGRAPHIC INFORMATION PERFORMED BY BMA (BROWN, MITCHELL & ALEXANDER, INC.).

SITE DEMOLITION NOTES:

1. CONTRACTOR TO COORDINATE WITH OWNER PRIOR TO ANY DEMOLITION REGARDING ITEMS TO BE SALVAGED, RECYCLED, AND REUSED. CONTRACTOR SHALL REMOVE ITEMS TO BE SALVAGED WITH EXTREME CAUTION TO PREVENT

DAMAGE. CONTRACTOR SHALL TURN ALL SALVAGED ITEMS OVER TO OWNER.

2. CONTRACTOR SHALL COORDINATE WITH OWNER AND THE UTILITY PROVIDER PRIOR TO THE DISCONNECTING OR REMOVAL OF ANY UTILITY SERVICE TO THE EXISTING BUILDINGS. ALL UTILITIES TO BE REMOVED ARE TO BE CAPPED OR

PLUGGED OR TERMINATED ACCORDING TO THE UTILITY OWNERS REQUIREMENTS.

3. REFER TO SITE GRADING AND UTILITY PLANS FOR PROPOSED UTILITY AND DRAINAGE INSTALLATION AND REMOVAL.

4. REFER TO SITE PLAN FOR ADDITIONAL INFORMATION RELATING TO PAVING, CURB, SIDEWALKS, ETC. REMOVE EXISTING

CURBS AS NEEDED TO INSTALL PROPOSED IMPROVEMENTS.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL, RELOCATION OR PROTECTION OF ALL ABOVE AND BELOW

GROUND EXISTING IMPROVEMENTS THAT ARE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS UNLESS NOTED.

6. ALL DEMOLITION AND CONSTRUCTION DEBRIS SHALL BE TRANSPORTED AND DISPOSED OF AT IN A LEGAL AND APPROVED

MANNER.

7. ALL EXISTING PAVING, CURBS, HARDSCAPE, ETC. SHALL BE SAW CUT AT THE LIMITS OF REMOVAL IN ORDER TO PROVIDE A

CLEAN EDGE.

SITE LAYOUT NOTES:

1. ALL ABA ACCESSIBLE RAMPS, SIGNS, SYMBOLS, AND PAINTED ISLANDS AND ACCESS

ROUTES MUST CONFORM TO THE LATEST ABA REQUIREMENTS.

2. THE MAXIMUM SLOPE IN ABA ACCESSIBLE PARKING AREAS SHALL NOT EXCEED 1:48

SLOPE IN ANY DIRECTION. ALL ABA ACCESSIBLE ACCESS ROUTES SHALL NOT EXCEED 1:20

RUNNING SLOPE AND 1:48 CROSS SLOPE.

3. ALL DIMENSIONS AND COORDINATES SHOWN ARE TO THE OUTSIDE FACE OF BUILDING OR

TO THE EDGE OF SURFACING UNLESS OTHERWISE NOTED. REFER TO ARCHITECTURAL

PLANS FOR SPECIFIC BUILDING INFORMATION.

4. ALL STRIPING TO BE PER THE LATEST EDITION OF THE MUTCD UNLESS NOTED

OTHERWISE.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING A SITE CONSTRUCTION

TRAFFIC CONTROL PLAN AND OBTAINING

ANY REQUIRED APPROVALS FROM THE LOCAL JURISDICTIONAL AUTHORITY. THE SITE

CONSTRUCTION TRAFFIC CONTROL PLAN SHALL TAKE INTO ACCOUNT THE ENTERING

AND EXITING OF CONSTRUCTION TRAFFIC ONTO THE ROADWAY AND THE IMPACT TO

THE FLOW OF TRAFFIC. THIS PLAN SHALL BE IN ACCORDANCE WITH THE LATEST

EDITION OF THE MUTCD. THIS SITE CONSTRUCTION TRAFFIC CONTROL PLAN SHALL BE

IN ADDITION TO ANY TRAFFIC CONTROL PLAN PROVIDED IN THE PLAN SET FOR

ROADWAY IMPROVEMENTS.

6. CONTRACTOR IS RESPONSIBLE FOR ADJUSTING ELEVATIONS OF ALL AT-GRADE

STRUCTURES AND UTILITIES TO REMAIN (VALVE BOXES, MANHOLES, INLETS, VAULTS, ETC)

TO MATCH PROPOSED FINISHED GRADES.

GRADING NOTES:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING COMPACTION TESTING.

2. ALL TOPSOIL SHALL BE STRIPPED WITHIN THE PROPOSED LIMITS OF GRADING AND SHALL BE STOCKPILED ON-SITE IN AN

APPROVED LOCATION FOR LATER USE WITH ANY EXCESS TO BE DISPOSED OF OFF-SITE ONCE ALL LANDSCAPED AREAS

HAVE BEEN BROUGHT TO FINISH GRADE UNLESS OTHERWISE NOTED ON THE PLANS.

3. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT PREPARED SUBGRADE AND RESTORE TO PROJECT SPECIFICATIONS

IF DAMAGED OR COMPROMISED DUE TO INCLEMENT WEATHER AND/OR CONSTRUCTION TRAFFIC.

4. COMPACTION WITHIN LIMITED SPACES (I.E. MANHOLES, INLETS, UTILITY TRENCHES) SHOULD BE BACKFILLED AND COMPACTED SYSTEMATICALLY, AT THE DIRECTION OF THE ON-SITE GEOTECHNICAL ENGINEER. STONE BACKFILL SHALL BE INSTALLED IN 12" MAXIMUM LOOSE LIFTS AND COMPACTED WITH 6-8 PASSES OF A VIBRATORY COMPACTOR.

5. NO GRADING OFF-SITE OR IN ANY ROAD RIGHT-OF-WAY WITHOUT PROPER APPROVALS AND PRIOR NOTIFICATION.

6. COORDINATE THE SEQUENCING OF ALL GRADING OPERATIONS WITH THE EROSION CONTROL PLAN.

7. ALL GRADING ADJACENT TO EXISTING OR PROPOSED BUILDINGS SHALL BE SLOPED AWAY FROM THE STRUCTURES AT A

MINIMUM OF 1.0% GRADE FOR PAVED AREAS, AND 2.0% FOR VEGETATED AREAS. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM THE STRUCTURES. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES.

8. PROPOSED GRADES INDICATED ON THIS PLAN ARE TO FINISH GRADE. THE CONTRACTOR SHALL MAKE SUBGRADE

ADJUSTMENTS FOR TOPSOIL, PAVING, BUILDING PAD, ETC.

9. ALL PROPOSED STORM INLETS (GRATES, CURB, YARD, AREA DRAINS) SHALL BE LOCATED AT THE LOWPOINTS. GRADING SHALL BE TO DIRECT RUNOFF TO THESE INLETS. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES.

10. STORM DRAINAGE SYSTEMS SHALL BE CONSTRUCTED FROM DOWNSTREAM TO UPSTREAM. VERIFY ALL PIPE SLOPES, INVERTS, AND POINTS OF CONNECTION PRIOR TO CONSTRUCTION. NOTIFY THE CONTRACTING OFFICER OF ANY

DISCREPANCIES.

11. A GEOTECHNICAL REPORT HAS BEEN PREPARED BY TERRACON (PROJECT NO. EB225044) AND IS AVAILABLE FOR INFORMATIONAL PURPOSES. THE CONTRACTOR SHALL REVIEW THIS REPORT, VISIT THE SITE AND COMPLETE ANY ADDITIONAL EXPLORATIONS THAT IT FEELS NECESSARY IN ORDER TO PROVIDE SATISFACTORY CONSTRUCTION.

12. DEWATERING SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING PROJECT SITE AND SURROUNDING AREA. PROTECT SUBGRADES FROM SOFTENING, UNDERMINING, WASHOUT, AND DAMAGE BY RAIN OR WATER ACCUMULATION. REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. DO NOT USE EXCAVATED TRENCHES AS TEMPORARY DRAINAGE DITCHES. INSTALL A DEWATERING SYSTEM TO KEEP SUBGRADES DRY AND CONVEY GROUND WATER AWAY FROM EXCAVATIONS. MAINTAIN UNTIL DEWATERING IS NO LONGER REQUIRED. IF GROUNDWATER DEWATERING IS REQUIRED, CONTRACTOR IS TO OBTAIN

ANY PERMITS AS MAY BE REQUIRED PRIOR TO DISCHARGE OF EFFLUENT FROM DEWATERING.

13. GRADING ADJACENT TO THE BUILDING SHALL BE COORDINATED WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FOUNDATION WALLS, STEM WALLS, DRAINS, AND OTHER CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER OF ANY DISCREPANCIES.

STORM DRAINAGE NOTES:

1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL STORM PIPE MATERIALS TO

THE CONTRACTING OFFICER PRIOR TO INSTALLATION AND/OR FABRICATION.

2. STORM DRAINAGE SYSTEMS SHALL BE CONSTRUCTED FROM DOWNSTREAM TO

UPSTREAM. VERIFY ALL PIPE SLOPES, INVERTS, AND POINTS OF CONNECTION PRIOR TO

CONSTRUCTION. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES.

3. THE CONTRACTOR SHALL VERIFY ALL EXISTING AND PROPOSED STORM PIPE GRADES

AND POINTS OF CONNECTION PRIOR TO INSTALLATION. THE CONTRACTING OFFICER

SHALL BE NOTIFIED OF ANY DEVIATIONS PRIOR TO CONSTRUCTION.

EROSION CONTROL NOTES:

1. SITE EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS, CODES, AND REGULATIONS.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A "NOTICE OF INTENT" (NOI) FROM MISSISSIPPI DEPARTMENT

OF ENVIRONMENTAL QUALITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MONITORING, INSPECTIONS, ETC. TO ENSURE THE OWNER THAT THE SITE IS AT ALL TIMES IN ACCORDANCE WITH MDEQ RULES & REGULATIONS.

DOCUMENTATION OF INSPECTIONS BY A Q.C.I. OR Q.C.P. SHALL BE MAINTAINED BY THE CONTRACTOR AND PROVIDED TO THE OWNER AT HIS/HER REQUEST. ANY AND ALL FEES, FINES, ETC., SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

3. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING THE CONSTRUCTION PROCESS AND UNTIL ALL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. ALL EROSION CONTROL INSTALLATION AND MAINTENANCE SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE AT NO ADDITIONAL COST TO

THE OWNER.

4. EROSION CONTROL DEVICES SHOWN ON THESE PLANS ARE A MINIMUM AND ARE DEPENDENT ON THE CONTRACTOR'S CONSTRUCTION PHASING OF THE PROJECT. ADDITIONAL DEVICES SHALL BE INSTALLED AS REQUIRED TO PREVENT SILTATION, EROSION AND OTHER DEGRADATION OR POLLUTION TO THE SITE OR ADJACENT PROPERTIES, STREAMS, DITCHES, AND PUBLIC ROADWAYS. ADDITIONAL MEASURES MAY INCLUDE, AS MINIMUM, TEMPORARY SEDIMENT BASINS, CONSTRUCTION EXITS PAD, VEHICLE WASH RACKS, SILT FENCING, STRAW AND RIP RAP CHECK DAMS, DIVERSION DITCHES, ETC. THESE ADDITIONAL MEASURES SHALL BE AT NO ADDITIONAL COST TO THE OWNER.

5. EROSION CONTROL DEVICES SHALL INCLUDE, BUT NOT LIMITED, TO THE FOLLOWING DEVICES: SILT FENCING, SEDIMENT BASINS, DETENTION PONDS, STRAW WATTLES , CHECK DAMS, JUTE MATTING, DIVERSION BERMS, ETC.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL DEVICES IN GOOD OPERATING CONDITION DURING ALL LAND DISTURBING ACTIVITIES. THIS RESPONSIBILITY SHALL INCLUDE THE CLEANUP AND/OR

REPAIRS TO THE DEVICES AT NO ADDITIONAL COST TO THE OWNER.

7. EROSION CONTROL DEVICES SHALL BE MONITORED AND MAINTAINED UNTIL THE SITE HAS BEEN PERMANENTLY

STABILIZED AND AFTER EACH RAINFALL 0.50 INCHES OR GREATER.

8. AFTER ALL LAND DISTURBANCE ACTIVITIES HAVE CEASED AND AFTER ALL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED, THE EROSION CONTROL DEVICES SHALL BE REMOVED BY THE CONTRACTOR AND THE AREA CLEANED AND

DRESSED.

9. DEWATERING OPERATIONS MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION OF THE SITE OR POLLUTION

TO ADJACENT PROPERTIES, STREAMS, DITCHES, OR PUBLIC ROADWAYS.

10. A GRAVELED ACCESS DRIVE OF SUFFICIENT SIZE SHALL BE AT EACH SITE ENTRANCE/EXIT TO PREVENT TRACKING OF DIRT AND SEDIMENT ONTO PUBLIC OR PRIVATE ROADWAYS. IF SEDIMENT REACHES THE ROADWAY, THEN IT MUST BE

CLEANED AT THE END OF EACH WORKDAY.

11. ALL LAND DISTURBANCE ACTIVITIES SHALL BE CONDUCTED IN A LOGICAL SEQUENCE TO MINIMIZE THE EXPOSURE OF

BARE AREAS AT ANY ONE TIME.

12. ALL PREVIOUSLY GRADED AREAS SHALL RECEIVE 4 INCHES OF TOPSOIL AND PERMANENT GRASSING UNLESS

OTHERWISE INDICATED ON THE LANDSCAPE PLAN.

13. PRIOR TO SITE CLEARING, ALL PERIMETER SILT FENCING, ETC. AND GRAVELED ACCESS DRIVES SHALL BE INSTALLED.

14. ALL EXISTING STREAMS, DITCHES, ETC. SHALL BE PROTECTED FROM SEDIMENTS AND SILTS BY SILT FENCING, WATTLES, BRUSH BERMS, ETC.

15. WATTLES OR SILT FENCING SHALL BE INSTALLED AT ALL INLETS UPON THE COMPLETION OF EACH INLET AS INSTALLED.

UTILITY NOTES:

1. THE SITE CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL UTILITY SERVICES (WATER, SEWER, GAS, ELECTRICAL)

FROM THE POINT THE RESPECTIVE UTILITY COMPANY COMPLETES THEIR WORK TO THE POINT OF CONNECTION NOTED

ON THE DRAWING.

2. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL, ETC. PLANS FOR ALL PROPOSED UTILITY POINTS OF

CONNECTION AT THE BUILDING. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES.

3. GRAVITY SEWER SYSTEMS SHALL BE CONSTRUCTED FROM DOWNSTREAM TO UPSTREAM. VERIFY ALL PIPE SLOPES, INVERTS, AND POINTS OF CONNECTION PRIOR TO CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY

DISCREPANCIES.

4. THE CONTRACTOR SHALL VERIFY ALL EXISTING AND PROPOSED GRAVITY SEWER PIPE GRADES AND POINTS OF CONNECTION PRIOR TO INSTALLATION. CONTRACTING OFFICER SHALL BE NOTIFIED OF ANY DEVIATIONS PRIOR TO

CONSTRUCTION.

5. WATER MAINS AND SERVICES SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL UTILITY COMPANY'S REQUIREMENTS. ALL MAINS AND SERVICES SHALL BE INSTALLED WITH A MINIMUM OF 30" COVER UNLESS OTHERWISE

INDICATED ON PLANS.

6. ELECTRICAL INFORMATION SHOWN ON CIVIL DRAWINGS FOR REFERENCE ONLY. REFER TO ELECTRICAL PLANS FOR

SPECIFIC INFORMATION.

7. GAS SERVICE SHALL BE PER THE LOCAL UTILITY COMPANY'S REQUIREMENTS. INFORMATION SHOWN ON CIVIL DRAWINGS

FOR REFERENCE ONLY. COORDINATE WITH MECHANICAL ENGINEER AND UTILITY COMPANY.

8. WHEN INSTALLING UTILITIES IN EXISTING PAVED AREAS OR IN AREAS WHERE SOILS ARE CONSIDERED UNSUITABLE FOR BEDDING OR BACKFILLING, UTILITY TRENCHES SHALL BE BACKFILLED FULL DEPTH WITH CRUSHED AGGREGATE.

9. WHERE UTILITIES ARE TO BE INSTALLED IN AREAS OF EXISTING PAVING, HARDSCAPE, SIDEWALKS, ETC. CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING PAVING, HARDSCAPE, SIDEWALK ETC. AND REPLACE IN LIKE KIND AND RESTRIPE

AS NECESSARY. BACKFILL TRENCH FULL DEPTH WITH STONE.

SAFETY NOTES:

1. ALL WORK SHALL BE PERFORMED IN A SAFE MANNER. ALL SAFETY RULES AND

GUIDELINES OF O.S.H.A. AND EM385 SHALL BE FOLLOWED. THE CONTRACTOR SHALL BE

WHOLLY RESPONSIBLE FOR ANY INJURIES OF HIS EMPLOYEES AND ANY DAMAGE TO

PRIVATE PROPERTY OR PERSONS DURING THE COURSE OF THIS PROJECT.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PROJECT SAFETY PRECAUTIONS AS

PER THE CONTRACT REQUIREMENTS.

3. THE CONTRACTOR SHALL INSPECT WORK AREAS AT THE END OF EACH DAY AND ASSURE

THAT THEY ARE CLEANED TO THE SATISFACTION OF THE CONTRACTING OFFICER.

4. THE CONTRACTOR IS RESPONSIBLE FOR CLEARLY IDENTIFYING THE AREA OF

CONSTRUCTION AND SAFELY ROUTING ALL VEHICULAR AND PEDESTRIAN TRAFFIC

AROUND THE CONSTRUCTION AREA.

5. WHERE TRENCH EXCAVATION EXCEEDS FIVE (5) FEET IN DEPTH, THE CONTRACTOR

SHALL SUBMIT A TRENCH SAFETY SYSTEM FOR APPROVAL. THE TRENCH SAFETY SYSTEM

SHALL BE COMPLIANT WITH O.S.H.A. STANDARD 29 CFR, 1926 SUBPART P - EXCAVATION,

SECTION 1926.650.

6. THERE SHALL BE NO UNPROTECTED OPEN TRENCHES AT THE DAY'S END.

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C I0

.d w g

4/

/2

3:

:0

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J

W

E

M T

GV

T

T

W V

ICV

ICV

F E SCO

SCO

E

MM

SCO

SCO

MWV

SCO

W V

T

M M

WV

WVWV

M

GV

ICV

M M

T

ICV

WV

SAN SAN

X

X

X

W

U C

W W

W

U P

GAS

UPUP

JONES HALL

FFE = 26.65

8" 8" 6"

COOLING

TOWER

W W

W W

UC

U C

U C

U C

U C

UCUC

U C

U C

UC

UC

U C

UC

U C

U P-D

X

X

X

X

U P-D

U P-D

UP-D

UP-D

UP-D UP-D UP-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-D

UP-D UP-D UP-D

U P-D

U P-D

U

P-D UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U

P-DUP-DUP-D

UP-D

UP-D

UP-D

U P-D

UP-D

UP-D

UP-D UP-D

U P-D

U P-D

UP-D

UP-D

U P-D

U P-D

UP-D

C -D

C-DC-DC-DC-D C-D C-D C-D C-D C-D C-D

C -D

C-DC-DC-DC-D

C -D

C-D C-D

C-D C-D C-D

C-D

C-D C-D C-D

C -D

C-D

C-D

C-D

C -D

C -D

C -D

C-D

C -D

C -D

C -D

C-D C-D C-DC-D C-D C-D

C-D C-D C-D

C-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D

C -D

C -D

C -D

C-D

C-D C-D

C-D C-D C-D

C -D

C -D

C -D

C-D

C-D

C-D

C-D

C-D

C-D

C-D

GAS-D GAS-D GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

G

AS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SAN-D

SAN-D

SAN-D

SAN-D SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN-D

SAN-D

SAN-D

SAN

-D SAN-D

SAN-D SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D SAN-D

SAN-D

SAN-D

SAN

-D

SAN-D

SAN-D

SD-D

SD-D SD-D SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD

-D

SD

-D

SD

-D

SD-D

SD

-D

SD

-D

CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

CHLS-D

CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS-D

CHLS-D

CHLS

-D

CHLS-D

CHLS-D

CHLS

-D

CHLS-D

CHLS-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS

-D

CHLS

-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D

CHLR

-D

CHLR

-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-DCHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

CHLR-D

C

H

LR

-D C

H

LR

-D

CHLR

-D

CHLR

-D

CHLR

-D

CHLR

-D

W-D W-D

W-D W-D

W-D W-D W-D

W-D

W-D

W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D W-D W-D W-D W-D W-D

W -D

W-D W-D

W-D W

-D W-D

W -D

W -D

W -D

W-D W-D

W -D

W -D

W -D

W -D

W -D

W -D W

-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D W-D W-D W-D W-D

W -D

W -D

SAN

-D

SAN

-D

18" PVC

12" PVC

12" PVC

12" RCP

12" PVC

18" RCP 18" RCP

42" R C

P 42" R

C P

42" R C

P

42" R C

P

42" R C

P

24" RCP

24" RCP

24" R C

P

24" RCP

18" PVC

Pipe

4" PVC Pipe

4" PVC Pipe

12" PVC Pipe

12" PVC Pipe

12" PVC Pipe

12" PVC Pipe 12" PVC Pipe

12" PVC Pipe

6" CLAY

6" PVC

Pipe

4" PVC Pipe

6" CLAY

18" RCP

4" PVC

Pipe

15" RCP 15" RCP

12" PVC

18" RCP

18" PVC 6"6"

4" PVC

4" PVC

6" PVC

UP-D

UP-D

UP-D UP-D UP-D

UP-D

UP-D

U P-D

6" WM

6" W M

8" W M

6" WM

6" WM

6" WM

6" WM

2" W M

6" WM

6" WM

6" W M

6" W M

6" W M

6" W M

6" W M

6" W M

6" WM

6" WM

8" W M

8" W M

8" W M

6" WM

ABAN

D

O N

ED

W

M

8" WM 8" WM

6" W M

6" W M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABANDONED SSWR

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABANDONED SSWR

SSWR

AB

AN

D O

N

ED

6"

6" CLAY

6" F

M

6" F

M

8" SSWR

4" SSWR

4" SSWR

8" SSWR

12" R C

P

12" RCP 6" PVC Pipe

6" PVC Pipe

12" PVC Pipe

30" PIPE

30" PIPE

30" PIPE

42" R C

P

12" RCP10" RCP

" R

C P

" R

C P

SD

-D

SD

-D

8" PVC

6" PVC

6" PVC

4" PLASTIC 4" PLASTIC

4" PLASTIC

4" PLASTIC

6" PLASTIC

6" PLASTIC

6" PLASTIC

U N

K.

PLASTIC

U N

K.

PLASTIC

GAS-D

GAS-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

G

AS-D

G

AS-D

GAS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D

GAS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

GAS-DGAS-DGAS-DGAS-DGAS-DGAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D

ABANDONED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABANDONEDABANDONEDABANDONED

ABANDONED

ABANDONED

ABANDONED

ABANDONED

ABANDONED ABANDONED

ABANDONEDABANDONEDABANDONED

ABANDONED ABANDONED

ABAN

D

O N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABANDONED

ABAN

D

O N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

ABANDONED

ABANDONED X

X

X

XXXXXXXX

X X

X X

X X

X X X X X X X X X

X X

X X

S16°21'17"W 3 42.16'

TO BM1

S3 1°

'3

3" E

.3

9'

TO

B M

BM3

27 28

24252627

282828

22232425

V100

O

VE

R

AL

L

EX

IS

TI

N G

S

IT

E

PL

AN

OVERALL EXISTING SITE PLAN

SCALE: 1" = 60'

PLAN

NORTH

0 120' 180'60'10'

BM1

BM2

BM3

BM4

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C E1

.d w g

4/

/2

3:

:4

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J

NOTES:

1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL UTILITY

LOCATIONS PRIOR TO THE START OF CONSTRUCTION.

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-D

U P-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D U

P-D

U P-D

U P-D

U P-D

U P-D

UP-D UP-D UP-D UP-D UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

C -D

C -D

C -D

C -D

C-D C-D C-D C-D C-D C-D C-D C-D C-D

C-D

C-D

C-D

C -D

C -D

C -D

C -D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SD-D

SD-D

SD-D

SD-D

SD-D SD-D SD-D SD-D SD-D SD-D SD-D SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD-D

SD-D

SD-D

SD-D

SD

-D

SD

-D

SD

-D

C H

LS-D

C

H

LS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

UP-D

UP-D

8" W M

6" WM

6" WM

6" W M

6" W M

6" W M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABAN

D

O N

ED

SSW

R

30" PIPE

12" RCP10" RCP

" R

C P

" R

C P

SD

-D

SD

-D

SD

-D

8" PVC

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

ABANDONED

ABANDONED

ABANDONED ABANDONED

ABANDONEDABANDONEDABANDONED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D

O N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

ABANDONED

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

KEYPLAN

B

C

FAB-T

A

V101

R

LF

E

XI

ST

IN

G S

IT

E

PL

AN

RLF EXISTING SITE PLAN

SCALE: 1" = 20'

0 40' 60'20'10'

PLAN

NORTH

CE102SEE SHEET V102SEE SHEET

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C E1

.d w g

4/

/2

3:

:5

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J

NOTES:

1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL UTILITY

LOCATIONS PRIOR TO THE START OF CONSTRUCTION.

F E SCO

SCO

E

MM

SCO

SCO

MW

V

SCO

WV

T

M M

WV

W

VWV

M

SAN

SAN

U P

W W

W

UP

U P

U P

U P

U P

U P

U P

W W

W

W

U P

U P

U P

UP

UP

6"

COOLING

TOWER

W W W W W W W W

UC

UC

U C

U C

U C

U C

U C

U C

UCUCUCUCUCUCUC

U C

U C

U C

UC UC UC

UC

UC UC

U C

UC

UC

U C

U C

U C

UC

UC

U P-D

U P-D

U P-D

U P-D

X X

X X

X X X X

X X

X X

XXXX

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D U

P-D U

P-D U

P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D C-D C-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D C-D C-D C-D C-D C-D C-D

C-D C-D C-D C-D C-D C-D C-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD-D

SD-D

CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D

CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-DCHLR-DCHLR-D

CHLR-DCHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D

W-D

SAN

-DSAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

12" PVC

18" RCP 18" RCP

42" R C

P 42" R

C P

12" PVC Pipe 12" PVC Pipe

12" PVC Pipe

6" CLAY

18" RCP

18" RCP

18" PVC 6"6"

6" PVC

6" WM

6" WM

2" W M

6" W M

8" W M

8" W M

8" WM

ABANDONED SSWR

ABANDONED SSWR

SSWR

AB

AN

D O

N

ED

6"

6" CLAY

6" F

M

6" F

M

SD

-D

SD

-D

SD

-D

8" PVC

6" PVC

6" PVC

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

G

AS-D

ABAN

D

O N

ED

ABANDONEDABANDONEDABANDONED

ABAN

D

O N

ED

ABAN

D O

N

ED

X X

X X

X X

X X

X

XXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X

S3 1°

'3

3"

.3

9'

TO

B M

KEYPLAN

B

C

FAB-T

A

V102

FA

BT

E

XI

ST

IN

G S

IT

E

PL

AN

FABT EXISTING SITE PLAN

SCALE: 1" = 20'

1 0 40' 60'20'10'

PLAN

NORTH

V101SEE SHEET

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C E1

.d w g

4/

/2

3:

:0

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D U

P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-D

U P-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D U

P-D

U P-D U

P-D U

P-D

UP-D UP-D UP-D UP-D UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

C -D

C -D

C-D C-D C-D C-D C-D C-D C-D C-D C-D

C-D

C-D

C-D

C-D C-D

C -D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SD-D

SD-D

SD-D

SD-D

SD-D SD-D SD-D SD-D SD-D SD-D SD-D SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD-D

SD-D

SD-D

SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

C H

LS-D

C

H

LS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

C H

LR

-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

UP-D

UP-D

8" W M

6" WM

6" WM

6" W M

6" W M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABAN

D

O N

ED

SSW

R

30" PIPE

12" RCP10" RCP

" R

C P

" R

C P

SD

-D

SD

-D

SD

-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

ABANDONED

ABANDONED

ABANDONED ABANDONED

ABANDONEDABANDONEDABANDONED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D

O N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

ABANDONED

SF

SF

SF

SF

SF

SF

SF

SF

SF SF

SF

SF SF SF SF SF SF SF

SF

SF

SF

SF

SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSF

SF

SF

SFSFSF

SFSFSFSF

SF

SF

SF

SF

SF

SF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

NOTES:

1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL UTILITY

LOCATIONS PRIOR TO THE START OF CONSTRUCTION.

2. ALL WASTE MATERIAL GENERATED FROM DEMOLITION

ACTIVITIES SHALL BE DISPOSED OF OFF GOVERNMENT

PROPERTY AND IN ACCORDANCE WITH ALL

APPLICABLE RULES AND REGULATIONS.

3. PROTECT ALL EXISTING UTILITIES THAT ARE NOT

DELINEATED FOR DEMOLITION.

4. PROTECT ALL TREES NOT MARKED FOR DEMOLITION

KEY NOTES :

1. SAWCUT BITUMINOUS PAVEMENT - FULL DEPTH

2. DEMOLISH BITUMINOUS PAVEMENT

3. CATCH BASIN PROTECTION - SEE 1/C501

4. INSTALL SILT FENCE

5. TOPSOIL STRIPPING WITHIN GRADING LIMITS

(APPROXIMATELY 2.5").

6. INSTALL BIOROLL

7. DEMOLISH CONCRETE CURB AND GUTTER

1 KEYPLAN

B

C

FAB-T

A

RLF WORK SEQUENCING:

1. STRIP TOPSOIL (APPROX. 2.5")

2. PRIOR TO PROPOSED GRADING, INSTALL

GEOTEXTILE FABIRC AND METAL PLATE

OVER EXISTING STORM SEWER

STRUCTURE (EX SD-8).

3. ADD FILL AND GRADE TO RLF PAD

ELEVATION. (SEE SHEETS CG101-CG102)

4. TEMPORARY RESTORATION: SOD

DISTURBED AREAS WITH BERMUDA

GRASS.

5. AFTER PERMANENT CONSTRUCTION IS

COMPLETED, REMOVE RLFS.

6. REMOVE PAD FILL AND REGRADE TO PRE

CONSTRUCTION ELEVATIONS. (SEE

SHEETS CS201-CS202)

7. FINAL RESTORATION: SOD DISTURBED

AREAS WITH BERMUDA GRASS. (SEE

SHEETS CS201-CS202)

CD101

R

LF

D

EM

O

LI

TI

O

N P

LA

N

RLF DEMOLITION PLAN

SCALE: 1" = 20'

0 40' 60'20'10'

PLAN

NORTH

3 3

CD102SEE SHEET CD102SEE SHEET

5 5

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C D

1.

dw g

4/

/2

3:

:5

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J V

RLF

6 5

MM

SCO

MWV

SCO

WV

T

M M

WV

WVWV

M

SAN

SAN

W

U P

U P

U P

U P

W W

W

W

U P

U P

U P

UP

UP

W W W W W W W W

UC

UC

U C

U C

U C

U C

UCUCUCUCUCUCUC

U C

U C

U C

U C

UC

UC

U C

U C

U C

U P-D

U P-D

U P-D

X X

X X

X X X X

X X

X X

XXXX

U P-D

U P-D

U P-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D U

P-D U

P-D U

P-D U

P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D C-D C-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D C-D C-D C-D C-D C-D C-D

C-D C-D C-D C-D C-D C-D C-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SD-D

SD-D

SD-D

CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D

W-D

SAN

-DSAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D18" RCP 18" RCP

42" R C

P

12" PVC Pipe 12" PVC Pipe

12" PVC Pipe

6" CLAY

18" RCP

18" RCP

6" WM

6" WM

2" W M

6" W M

8" W M

8" WM

ABANDONED SSWR

ABANDONED SSWR

SSWR

AB

AN

D O

N

ED

6" F

M

6" F

M

SD

-D

SD

-D

SD

-D

SD

-D

8" PVC

6" PVC

6" PVC

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

SF

SF

SF

SF

SF

SF

SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSFSFSFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

NOTES:

1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL UTILITY

LOCATIONS PRIOR TO THE START OF CONSTRUCTION.

2. ALL WASTE MATERIAL GENERATED FROM DEMOLITION

ACTIVITIES SHALL BE DISPOSED OF OFF GOVERNMENT

PROPERTY AND IN ACCORDANCE WITH ALL

APPLICABLE RULES AND REGULATIONS.

3. PROTECT ALL EXISTING UTILITIES THAT ARE NOT

DELINEATED FOR DEMOLITION.

4. PROTECT ALL TREES NOT MARKED FOR DEMOLITION

KEYPLAN

B

C

FAB-T

A

RLF WORK SEQUENCING:

1. STRIP TOPSOIL (APPROX. 2.5")

2. PRIOR TO PROPOSED GRADING, INSTALL GEOTEXTILE FABIRC AND METAL

PLATE OVER EXISTING STORM SEWER STRUCTURE (EX SD-8).

3. ADD FILL AND GRADE TO RLF PAD ELEVATION. (SEE SHEETS CG101-CG102)

4. TEMPORARY RESTORATION: SOD DISTURBED AREAS WITH BERMUDA GRASS.

5. AFTER PERMANENT CONSTRUCTION IS COMPLETED, REMOVE RLFS.

6. REMOVE PAD FILL AND REGRADE TO PRE CONSTRUCTION ELEVATIONS. (SEE

SHEETS CS201-CS202)

7. FINAL RESTORATION: SOD DISTURBED AREAS WITH BERMUDA GRASS. (SEE

SHEETS CS201-CS202)

KEY NOTES :

1. INSTALL SILT FENCE

2. TOPSOIL STRIPPING WITHIN GRADING LIMITS

(APPROXIMATELY 2.5").

3. DEMOLISH CONCRETE SIDEWALK

4. INSTALL BIOROLL

CD102

FA

BT

D

EM

O

LI

TI

O

N

PL

AN

FABT DEMOLITION PLAN

SCALE: 1" = 20'

0 40' 60'20'10'

PLAN

NORTH

CD101SEE SHEET

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C D

1.

dw g

4/

/2

3:

:0

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J V

RLF

WV

M

T

GV

T

T

W V

ICV

ICV

F E

E

MM

SCO

SCO

MWV

SCO

W V

T

M M

WV

W

VW

V

M

GV

ICV

M M

T

ICV

W V

SAN SAN

W

U C

W W

W

U P

GAS

UPUP

JONES HALL

FFE = 26.65

W W

W W

UC

U C

U C

U C

U C

UCUC

U C

U C

UC

UC

U C

UC

U C

U P-D

X

X

X

X

U P-D

U P-D

UP-D

UP-D

UP-D UP-D UP-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-D

UP-D UP-D UP-D

U P-D

U P-D

U

P-D UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U

P-DUP-DUP-D

UP-D

UP-D

UP-D

U P-D

UP-D

UP-D

UP-D UP-D

U P-D

U P-D

UP-D

UP-D

U P-D

U P-D

UP-D

C -D

C-DC-DC-DC-D C-D C-D C-D C-D C-D C-D

C -D

C-DC-DC-DC-D

C -D

C-D C-D

C-D C-D C-D

C-D

C-D C-D C-D

C -D

C-D

C-D

C-D

C -D

C -D

C -D

C-D

C -D

C -D

C -D

C-D C-D C-DC-D C-D C-D

C-D C-D C-D

C-D

C -D

C -D

C -D

C -D

C -D

C -D

C -D

C-D

C -D

C -D

C -D

C-D C-D

C-D

C-D C-D C-D

C -D

C -D

C -D

C-D

C-D

C-D

C-D

C-D

C-D

C-D

GAS-D GAS-D GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

G

AS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

SAN-D SAN-D SAN-D SAN-D SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN-D

SAN-D

SAN-D

SAN

-D SAN-D

SAN-D SAN-D

SAN-D

SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D SAN-D

SAN-D

SAN-D

SAN

-D

SAN-D

SAN-D

SD-D

SD-D SD-D SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD

-D

SD

-D

SD

-D

SD-D

SD

-D

SD

-D

CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

CHLS-D CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

CHLS-D

CHLS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS-D

CHLS-D

CHLS

-D

CHLS-D

CHLS-D

CHLS

-D

CHLS-D

CHLS-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS-D

CHLS

-D

CHLS

-D

CHLS

-D

CHLS

-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

C H

LS-D

C

H

LS-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D

CHLR

-D

CHLR

-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D

CHLR-D

CHLR

-D

CHLR-D

CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

C H

LR

-D

CHLR-D

CHLR-D

CHLR-D

C

H

LR

-D C

H

LR

-D

CHLR

-D

CHLR

-D

CHLR

-D

CHLR

-D

W-D W-D

W-D W-D

W-D W-D W-D

W-D

W-D

W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D W-D W-D W-D W-D W-D

W -D

W-D W-D

W-D W

-D W-D

W -D

W -D

W -D

W-D W-D

W -D

W -D

W -D

W -D

W -D

W -D W

-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D

W-D W-D W-D W-D W-D

W -D

W -D

SAN

-D

SAN

-D

18" PVC

12" PVC

12" PVC

12" RCP

12" PVC

18" RCP 18" RCP

42" R C

P 42" R

C P

42" R C

P

42" R C

P

42" R C

P

24" RCP

24" RCP

24" R C

P

24" RCP

18" PVC

Pipe

4" PVC Pipe

4" PVC Pipe

12" PVC Pipe

12" PVC Pipe

12" PVC Pipe

12" PVC Pipe 12" PVC Pipe

12" PVC Pipe

6" CLAY

6" PVC

Pipe

4" PVC Pipe

6" CLAY

18" RCP

4" PVC

Pipe

15" RCP 15" RCP

12" PVC

18" RCP

18" PVC 6"6"

4" PVC

4" PVC

6" PVC

UP-D

UP-D

UP-D UP-D UP-D

UP-D

UP-D

U P-D

6" WM

6" W M

8" W M

6" WM

6" WM

6" WM

6" WM

2" W M

6" WM

6" WM

6" W M

6" W M

6" W M

6" W M

6" W M

6" W M

6" WM

6" WM

8" W M

8" W M

8" W M

6" WM

ABAN

D

O N

ED

W

M

8" WM 8" WM

6" WM

6" W M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABANDONED SSWR

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABANDONED SSWR

SSWR

AB

AN

D O

N

ED

6"

6" CLAY

6" F

M

6" F

M

8" SSWR

4" SSWR

4" SSWR

8" SSWR

12" R C

P

12" RCP 6" PVC Pipe

6" PVC Pipe

12" PVC Pipe

30" PIPE

30" PIPE

30" PIPE

42" R C

P

12" RCP10" RCP

" R

C P

" R

C P

SD

-D

SD

-D

8" PVC

6" PVC

6" PVC

4" PLASTIC 4" PLASTIC

4" PLASTIC

4" PLASTIC

6" PLASTIC

6" PLASTIC

6" PLASTIC

U N

K.

PLASTIC

U N

K.

PLASTIC

GAS-D

GAS-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

G

AS-D

G

AS-D

GAS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D

GAS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D GAS-D

G

AS-D

GAS-DGAS-DGAS-DGAS-DGAS-DGAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D GAS-D GAS-D GAS-D

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABANDONEDABANDONEDABANDONED

ABANDONED

ABANDONED

ABANDONED

ABANDONED

ABANDONED ABANDONED

ABANDONEDABANDONEDABANDONED

ABANDONED ABANDONED

ABAN

D

O N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABANDONED

ABAN

D

O N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

ABANDONED

ABANDONED

CS100

O

VE

R

AL

L

SI

TE

P

LA

N

OVERALL SITE PLAN

SCALE: 1" = 60'

PLAN

NORTH

0 120' 180'60'10'

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C S1

.d w g

4/

/2

3:

:0

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

, M

IS

SI

SS

IP

PI

J.

P

O N

D

J.

PO

N D

K.

SC

H

LE

G

EL

A

PR

IL

FA

-2

1- D

-0

IS

SU

ED

F

O R

C O

N

ST

R U

C

TI

O N

R

EP

AI

R

O F

JO

N

ES

H

AL

L

- B U

IL

D

IN

G

M

AH

G

BS

C

-J V

RLF

CONSTRUCTION PLANS FOR THIS REGION OF

THE SITE ARE FOUND IN VOLUME 1 - AFB.

U P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D U

P-D

U P-D

U P-D

U P-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-DUP-D

U P-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D U

P-D

U P-D U

P-D U

P-D

UP-D UP-D UP-D UP-D UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

UP-DUP-DUP-DUP-DUP-DUP-DUP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

U P-D

U P-D

U P-D

U P-D

C -D

C -D

C-D C-D C-D C-D C-D C-D C-D C-D C-D

C-D C-D

C-D

C -D

C -D

C -D

C -D

SAN-D SAN-D SAN-D SAN-D SAN-D SAN-D

SAN-D

SAN-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SAN

-D

SD-D

SD-D

SD-D

SD-D

SD-D SD-D SD-D SD-D SD-D SD-D SD-D SD-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD

-D

SD-D

SD-D

SD-D

SD-D

SD-D

SD

-D

SD

-D

SD

-D

C H

LS-D

C

H

LS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

CHLS-D

C H

LR

-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

CHLR-D

W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D W-D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

W -D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D UP-D

UP-D

UP-D

UP-D

UP-D

UP-D

U P-D

U P-D

UP-D

UP-D

8" W M

6" WM

6" WM

6" W M

6" W M

6" W M

ABAN

D

O N

ED

W

M

ABAN

D

O N

ED

SSW

R

ABANDONED SSWR

ABAN

D

O N

ED

SSW

R

30" PIPE

12" RCP10" RCP

" R

C P

" R

C P

SD

-D

SD

-D

SD

-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D

GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D GAS-D

GAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

GAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-DGAS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

G

AS-D

ABANDONED

ABANDONED

ABANDONED ABANDONED

ABANDONEDABANDONEDABANDONED

ABAN

D

O N

ED

ABAN

D O

N

ED

ABAN

D

O N

ED

ABAN

D

O N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

AB

AN

D O

N

ED

ABANDONED

61.8'

.7'

.4

.4

.0

R5.0'

R10.0'

R10.0'

.5

34.8'

.6

186.4'

.9

46.0'

.3

180.2'

56.9'

.1

.1

28.3'

8.

5'

5.7'

.2

19.9'

0.

6'

.5

11.1'

R5.0'

R15.0'

R5.0'

R15.0'

R15.0'

R20.0'

R20.0'

23.9'

R12.0'

.0

' R

0.

0'

48.1'

28.0'

.0

2.0'

24.2'

R40 .0'

90.0'

.2

20.0'

.7

37.7'

.0

52.5'

R12.0'

NOTES:

1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH

SPECIFICATIONS.

2. ALL UNPAVED DISTURBED AREAS SHALL BE

TEMPORARILY RESTORED WITH BERMUDA GRASS SOD.

KEY NOTES :

1. BITUMINOUS PATH

2. 6" AGGREGATE BUILDING PAD - SEE 1/C503

3. 10" AGGREGATE FIRE APPARATUS ACCESS ROAD

4. CONCRETE CURB AND GUTTER

KEYPLAN

B

C

FAB-T

A

CS101

R

LF

S

IT

E

PL

AN

RLF SITE PLAN

SCALE: 1" = 20'

0 40' 60'20'10'

PLAN

NORTH

CS102SEE SHEET CS102SEE SHEET

6.0'

6.0'

.0

.6

SHEET ID

U S

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

IN

G

C

EN

TE

R

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C :\U se rs

\jo po nd \O ne D riv e

- S ta nt ec

O ffi ce

M yP ro je ct s\

Ke es le r A

FB

\C

AD

\D w g\

Pl an sh ee ts \P

N

_C S1

.d w g

4/

/2

3:

:1

PM

KE

ES

LE

R

A

FB

, M

IS

SI

SS

IP

PI

KE

ES

LE

R

A

FB

BI

LO

XI

,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .