Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx

DOCX document 54 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS)
Solicitation number
FA8903-20-R-0002
Issued by

About this file

This presolicitation notice provides information regarding a potential follow-on environmental remediation services contract for 40 closed military installations under the Base Realignment and Closure program. The effort, called BRAC Environmental Construction Optimization Services, would transition work currently performed under multiple performance-based remediation task orders at various installations.

The potential single-award indefinite delivery/indefinite quantity contracts would be awarded on a full and open basis, as well as under 8(a) small business and 100% small business set-aside considerations. Five continental U.S. regions and Galena, Alaska would be included. The period of performance is anticipated as 10 years from July 2020 through July 2030, with an initial ordering period of July 2020 through July 2025 and an option to extend the ordering period through July 2028. Questions regarding the draft request for proposal are due by November 4, 2019.

NE TO2 PWS

View the file

Other files

File Type Posted
RFI__5_BECOS.pdf PDF
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_4.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_2.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Myrtle Beach Dft 20 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
DRAFT_10242019_Central_South_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model_v2.xlsx XLSX spreadsheet
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Galena_Alaska_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Draft_18_SEP_Dft_19_v4.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req O'Hare Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
IDIQ_DD1423_CDRLS_Central_South_EXH_C002_(MGMT)_Dft_27_Sep_19.zip ZIP file
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
IDIQ_PWS__Attch_2__Central_South_-_Acronyms_and_Definitions_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Reese Dft 18 SEP 19 v2.0.docx DOCX document
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_A016_(DRPR)_27_Sep_19.zip ZIP file
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
TO1_PWS_Central_South_Dft_17_OCT_19_v3.0.docx DOCX document
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

22 September 2019

1.1 Scope

The former Loring AFB is located in Aroostook County in northern Maine, approximately 3 miles west of the Canadian (New Brunswick) border. The former Loring AFB occupies approximately 9,000 acres and is bordered on the south and east by the town of Limestone, on the north by the towns of Caswell and Connor, and on the west by the city of Caribou.

The former Loring AFB was placed on EPA’s National Priorities List of sites in 1990. Under CERCLA §120, a Federal Facility Agreement (FFA) between Environmental Protection Agency (EPA) Region 1, the Maine Department of Environmental Protection (MEDEP), and the U.S. Air Force was signed in January 1991 and amended in 1995 (FFA, 1995). The FFA governs the environmental activities being conducted at the former Loring AFB. Following the signing of the FFA, the former Loring AFB was placed on the U.S. Congress Base Closure List (1991) and was closed in September 1994. All property disposal actions are complete. Recipients include: U.S. Fish and Wildlife Service for a wildlife refuge; U.S. Department of Labor for a Job Corps Center; Loring Development Authority of Maine for economic development; Department of Interior holds some parcels for the Aroostook Band of MicMacs; and others.

In addition to the requirements presented in this PWS, this scope includes the following:

· No additional scope.

Contractors are not responsible for the following:

· No base-specific exclusions.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
AR Number
Date Issued
1.
Post Closure Monitoring and Maintenance Plan for Landfills, Rev. 4
562511
September 2017
2.
Fourth Five-Year Review Report for the Former Loring AFB
545762
September 2015
3.
OU 12 2017 Annual Report
pending
2019
4.
Biological Monitoring Quality Program Plan, 2018 Addendum, OU 13
575901
July 2018
5.
OU 13 Monitoring Report for 2018
Pending
2019
6.
2018 Corrective Action Report/ Corrective Action Work Plan Addendum No. 4, Mattawamkeag Pump Station (SS063), Searsport Pipeline
579949
November 2018
7.
Monitoring and Maintenance of Landfills 2017 Annual Report
577428
September 2018
8.
OU 12 LTMP, Rev. 6
576672
August 2018
9.
2012 Nonheating Season Sub-Slab Vapor and Indoor Air Sampling Report, Various Buildings within GMZ-1 (SS054) and GMZ-3 (SS056)
576342
February 2016
10.
OU 12 ROD Amendment for Vapor Intrusion
pending
December 2018
11.
Pilot Study Completion Report GMZ-4
585525
March 2019
12.
Fall 2017 Field Investigation Activities Report/Remedial Action Work Plan Addendum No. 3, Groundwater Management Zone 6 (SS059) Fire Training Area,
572081
April 2018
13.
Pilot Study Completion Report GMZ-1
577141
September 2018
14.
Corrective Action Plan Addendum for Groundwater
421660
June 2012

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-09-D-8580-0010
Performance Based Remediation at former Pease AFB and former Loring AFB
6/30/2020
9/30/2020

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· Typically conduct one in-person BCT meeting per year in the spring in Portland, Maine. Routine BCT teleconference calls are conducted every two weeks.

2.6.2 Public Meetings and Hearings

· The Loring RAB has been adjourned.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· All existing off-base easements extend beyond this PBR.

2.9 Contractor Documentation

· No additional base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No additional base-specific requirements.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct annual inspections and reviews to confirm compliance with all CERCLA and non-CERCLA environmental restrictions associated with the sites. Where possible, the Contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners. An annual inspection report shall be provided or otherwise included in site reports by the Contractor to confirm implementation of environmental restrictions.

· The Contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants.

6.15 Five-Year Reviews

· The next Five-Year Review is due September 2020 and every five years thereafter.

File details come from the government source that posted it. Updated .