This document outlines requirements for performance-based remediation services at 40 Base Realignment and Closure installations. The Air Force is planning to solicit six indefinite delivery/indefinite quantity contracts for environmental remediation and construction services at the installations. The contracts will be awarded on a single-award basis for each of five continental U.S. regions and Galena, Alaska. Services will include maintaining remedies, implementing optimization efforts, and advancing sites to completion. The period of performance for task orders issued against the contracts will be from July 2020 to July 2028 with an optional three-year extension. Questions regarding the draft solicitation are due by November 4, 2019.
CS TO2 PWS 5
View the file
Other files for this federal contract opportunity
Show all 50
BRAC Environmental Construction Optimization Services (BECOS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
20 September 2019
1.1 Scope
The former Eaker Air Force Base (AFB) is located in Blytheville, Arkansas. Eaker AFB was closed on 15 December 1992. Whole-base transfer completed in September 2002. The Gosnell Regional Airport Authority now operates the airfield as the Arkansas International Airport.
At the former Eaker AFB, the 17 sites are being addressed following the RCRA process or Military Munitions Response Program (MMRP). Eaker AFB and the United States Environmental Protection Agency (USEPA) signed an administrative consent order indicating sites were subject to RCRA corrective action and would be addressed under a RCRA facility investigation. DDs have been completed for all RCRA sites and remedies are in place. At the former Eaker AFB, one RCRA site requires groundwater monitoring (Site SS003). Three other RCRA sites are anticipated to achieve closure in FY19 (Sites FT001, ST012, and ST005). If closure is not achieved, these sites will be included in this PBR contract. All 17 Sites require Visual Site Inspections (VSIs) and Five-Year Reviews.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional requirements.
Contractors are not responsible for the following:
· No additional base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Final Remedial Action Decision Document (RADD) for Corrective Action |
| AR#331 |
| October 1999 |
| 2. |
| Consent Administrative Order and Agreement, Eaker AFB, Blytheville, Arkansas |
| AR#Pending |
| August 1993 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565-0007 |
| Performance-Based Remediation at Former Bergstrom AFB, TX, Former Carswell AFB, TX, Former Eaker AFB, AR, Former Homestead AFB, FL, Former Richards-Gebaur AFB, MO |
| 9/24/2020 |
| 9/24/2020 |
| W9128F-14-D-0036 |
| Air Force Military Munitions Response Program Site Inspections, Former Bergstrom AFB, TX, and Former Eaker AFB, AR |
| 9/30/2020 |
| 9/30/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· The Contractor participate in Quarterly Teleconferences with the United States Air Force (USAF) representatives to discuss the progress toward accomplishing project objectives.
2.6.2 Public Meetings and Hearings
· There are no base-specific meetings or hearing requirements.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· There are no base-specific permit/easement requirements.
2.9 Contractor Documentation
· No base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct annual Visual Site Inspections at all sites and prepare a report. The next VSI event is due in 2020.
6.15 Five-Year Reviews
· The Contractor shall prepare a Five-Year Review Report for sites managed under the RCRA/MMRP MMRP as a policy review. The signature date for the Fourth Five-Year Review Report is due March 2021.