BRAC Environmental Construction Optimization Services (BECOS)
Closed Pre-Solicitation Posted
A newer special notice was posted. See the latest special notice from .
- Solicitation number
- FA8903-20-R-0002
- Agency
- Air Force Installation and Mission Support Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562910 Remediation Services
- PSC
- Not on record
- Place of performance
- Conus and, Alaska, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Force Civil Engineer Center and 772nd Enterprise Sourcing Squadron seek to award six single-award Indefinite Delivery/Indefinite Quantity contracts to provide environmental remediation and construction services at 40 Base Realignment and Closure installations across five continental United States regions and Galena, Alaska. The services include maintaining remedies, implementing optimization efforts, and advancing sites to completion. Questions regarding the draft request for proposal are due by November 4, 2019. Evaluation criteria will include past performance, price, and small business participation for Galena.
The contracts include full and open competition, as well as reserves for 8(a) small businesses and 100% small businesses. NAICS codes include 541620, 541330, and 237990. Possible award values range from $500 million to $2 billion over ten years of performance from July 2020 through July 2030, including optional extensions. Incumbent contractors currently perform related work through task orders at multiple installations to be transitioned under the new regional contracts.
Notice text
6 versions
Update #6 · Latest ·
THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR VENDOR FEEDBACK TO A REQUEST FOR INFORMATION (RFI 5).
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) 2020
Please refer to the attachments RFI 5 BECOS and RFI 5 BECOS Response Matrix.
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
.
Update #5 ·
THIS IS A PRE‐SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY AND INCLUDES DRAFT REQUEST FOR PROPOSAL INFORMATION.
PRE‐SOLICITATION NOTICE:
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
This Pre‐Solicitation Notice is being issued for the purpose of advising potential Offerors of the Government's requirement for follow‐on contracts to current Base Realignment and Closure (BRAC) environmental remediation activities at BRAC installations.
INFORMATION PROVIDED IN THIS NOTICE DATED 23 OCT 2019 is no longer current and is hereby removed 31 OCT 2019. Further information will be provided, please continue to monitor FBO.
THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING A DRAFT RFP FOR PLANNING PURPOSES ONLY.
THIS REQUEST IS NOT A FINAL SOLICITATION.
****PLEASE DO NOT SUBMIT A PROPOSAL*****
Information regarding the Draft RFP is included in this pre‐solicitation notice for the purpose of obtaining industry feedback. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
1. Firms will not be reimbursed for proposal costs incurred.
2. Request for Questions: The Government anticipates a Final Solicitation to be released in November 2019. This notification is provided to allow early review of DRAFT RFP documentation for this requirement.
AMENDED 31 OCT 2019: The period for receipt of questions regarding this notice is hereby suspended. A revised deadline for submission of questions will be provided. Please continue to monitor FBO.
3. If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.
4. Contractor Registration and Representations and Certifications: Please be advised of online registration requirement in System for Award Management ‐ Central Contractor Registration (CCR) database http://federalcontractorregistry.com/sam‐ccr‐status‐check/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete.
5. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).
6. The Procuring Contracting Office is:
772 Enterprise Sourcing Squadron (ESS/PKS)
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236‐9853
Added: Oct 28, 2019 9:41 pm Modified: Oct 31, 2019 5:45 pmTrack Changes THIS IS A PRE‐SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY AND INCLUDES DRAFT REQUEST FOR PROPOSAL INFORMATION.
PRE‐SOLICITATION NOTICE:
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
Amended to add files "Northeast region IDIQ PWS and 4 attachments"
AMENDED 31 OCT 2019: The period for receipt of questions regarding this notice is hereby suspended. A revised deadline for submission of questions will be provided. Please continue to monitor FBO.
INFORMATION PROVIDED IN THIS NOTICE DATED 24 OCT 2019 is no longer current and is hereby removed 31 OCT 2019. Further information will be provided, please continue to monitor FBO.
The items removed are Draft RFP Section A, Section L, and Section M.
.
Update #4 ·
THIS IS A PRE‐SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY AND INCLUDES DRAFT REQUEST FOR PROPOSAL INFORMATION.
PRE‐SOLICITATION NOTICE:
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
Amended to add files "Northeast region IDIQ PWS and 4 attachments"
Response deadline for questions: 04 November 2019 at 10:00AM CT
.
Update #3 ·
THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS A REQUEST FOR VENDOR FEEDBACK TO A DRAFT REQUEST FOR PROPOSALS (RFP).
Base Realignment and Closure (BRAC) Environmental Construction Optimization Services (BECOS) 2020
Please refer to the Draft RFP Sections (attachments)
.
Update #2 ·
THIS IS A PRE‐SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY AND INCLUDES DRAFT REQUEST FOR PROPOSAL INFORMATION.
PRE‐SOLICITATION NOTICE:
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
This Pre‐Solicitation Notice is being issued for the purpose of advising potential Offerors of the Government's requirement for follow‐on contracts to current Base Realignment and Closure (BRAC) environmental remediation activities at 40 BRAC installations. This new effort will effectively be called the BRAC Environmental Construction Optimization Services (BECOS). The subject pre‐solicitation notice is to provide information for early planning and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the provision
of this information. Note that official information concerning this pre‐solicitation will be provided by the Contracting Officer only.
GENERAL INFORMATION: The 772d Enterprise Sourcing Squadron/Environmental Services (772 ESS/PKS) in conjunction with the Air Force Civil Engineer Center (AFCEC), at Joint Base San Antonio‐Lackland, TX, is contemplating a performance‐based approach for follow‐on contracts to current Base Realignment and Closure (BRAC) environmental remediation activities at 40 BRAC installations. These performance based remediation (PBR) efforts support the AFCEC BRAC mission and enhance BRAC program capabilities within AFCEC Program Execution Branch
(AFCEC/CIB). The requirements support a variety of environmental restoration services and construction necessary to maintain regulatory selected remedies, implement optimization to enhance remedial progress, and advance sites to completion in a cost effective manner. The efforts will be executed in accordance with technical and regulatory requirements to ensure protection of human health and the environment. At present this work is accomplished through multiple PBR task orders (TO's) at multiple installations managed by the BRAC/CIB, Joint Base San Antonio - Lackland and the BECOS efforts will transition from the existing PBR contracts/task orders.
This effort is a validated FY20 requirement; however, funds are not currently available. The Government reserves the right to cancel this requirement at any time. Should the Air Force determine to proceed with this requirement, it will be processed using FAR Part 15 procedures and will result in a Firm Fixed Price (FFP) with Cost Reimbursable
(CR) CLINs, "D" type contract. The requirement will be issued as a single RFP with intention to award six (6) individual single‐award Indefinite Delivery/Indefinite Quantity contracts, one (1) per annotated region that will include: Full/Open, 8(a) Small Business set‐aside, and 100% Small Business set‐aside. Offerors may be selected for award of one (1), or maximum of two (2) for which they propose. A formal solicitation will be finalized and posted to FedBizOpps at a later date. No formal Request for Proposal has been issued to‐date.
PROJECT NARRATIVE: The 772 ESS/PKS in conjunction with AFCEC is considering a performance based remediation (PBR) effort as a natural follow to the current multiple PBR task orders (TOs) at multiple Air Force installations managed under the BRAC Program Execution Branch. This new effort will combine the current TO efforts at multiple BRAC installations into regional groupings. The focus of this contractual design is to promote implementation of cost effective solutions and sustainable life cycle cost reductions. The BECOS effort will permit implementation of realistic, relevant, and technically sound remediation approaches focused on advancing sites to completion through the achievement of a range of AF established site‐specific objectives. The BECOS requirement includes five Continental United States (CONUS) regions and Galena, AK. The focus of this acquisition will be the combined solicitation of the five CONUS regions and the OCONUS Galena, AK region. The awarded contractors shall perform all necessary activities as required to meet the performance objectives of the Final Performance Work Statement(s) (PWS). All documents related to this effort can be located on FBO. The ID/IQ will include a 10‐year Period of Performance (PoP) anticipated to run from 31 July 2020 through 30 July 2030. The anticipated initial ordering period ranges from 31 July 2020 to 30 July 2025. The ID/IQ will include the option to extend the ordering period an additional three (3) years, through 30 July 2028. The contract will permit performance up to 2‐years after the end of the ordering period to complete existing task orders by 30 July 2030.
ORGANIZATIONAL CONFLICT OF INTEREST (OCI): An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to
your firm under the proposed future action. In accordance with the parameters set forth in FAR Subpart 9.5, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor's judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. OCIs may exist in the following three ways.
a. Unequal access to information ‐ access to non‐public information that gives a contractor an unfair competitive advantage.
b. Biased ground rules ‐ when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).
c. Impaired objectivity ‐ when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests). Please keep in mind OCI or potential OCI issues your firm (including all subsidiaries, legacy companies, teaming partners, and subcontractors) may have with respect to the scope of effort at these sites.
THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING A DRAFT RFP FOR PLANNING PURPOSES ONLY.
THIS REQUEST IS NOT A FINAL SOLICITATION.
****PLEASE DO NOT SUBMIT A PROPOSAL*****
Information regarding the Draft RFP is included in this pre‐solicitation notice for the purpose of obtaining industry feedback. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
1. Firms will not be reimbursed for proposal costs incurred.
2. Request for Questions: The Government anticipates a Final Solicitation to be released in November 2019. This notification is provided to allow early review of DRAFT RFP documentation for this requirement. Questions concerning the DRAFT RFP are due by 10:00 AM CT on 04 November 2019. Questions/Comments regarding the DRAFT RFP MUST be submitted on the Questions and Answers Spreadsheet provided and sent to: alicia.kooda@us.af.mil, and robert.neeb.2@us.af.mil. The government will collect all submitted questions/comments, and provide them with the government's response.
3. If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.
4. Contractor Registration and Representations and Certifications: Please be advised of online registration requirement in System for Award Management ‐ Central Contractor Registration (CCR) database http://federalcontractorregistry.com/sam‐ccr‐status‐check/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete.
5. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).
6. The Procuring Contracting Office is:
772 Enterprise Sourcing Squadron (ESS/PKS)
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236‐9853
.
Update #1 ·
THIS IS A PRE‐SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY AND INCLUDES DRAFT REQUEST FOR PROPOSAL INFORMATION.
PRE‐SOLICITATION NOTICE:
THIS IS NOT A FORMAL SOLICITATION FOR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.
This Pre‐Solicitation Notice is being issued for the purpose of advising potential Offerors of the Government's requirement for follow‐on contracts to current Base Realignment and Closure (BRAC) environmental remediation activities at 40 BRAC installations. This new effort will effectively be called the BRAC Environmental Construction Optimization Services (BECOS). The subject pre‐solicitation notice is to provide information for early planning and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the provision
of this information. Note that official information concerning this pre‐solicitation will be provided by the Contracting Officer only.
GENERAL INFORMATION: The 772d Enterprise Sourcing Squadron/Environmental Services (772 ESS/PKS) in conjunction with the Air Force Civil Engineer Center (AFCEC), at Joint Base San Antonio‐Lackland, TX, is contemplating a performance‐based approach for follow‐on contracts to current Base Realignment and Closure (BRAC) environmental remediation activities at 40 BRAC installations. These performance based remediation (PBR) efforts support the AFCEC BRAC mission and enhance BRAC program capabilities within AFCEC Program Execution Branch
(AFCEC/CIB). The requirements support a variety of environmental restoration services and construction necessary to maintain regulatory selected remedies, implement optimization to enhance remedial progress, and advance sites to completion in a cost effective manner. The efforts will be executed in accordance with technical and regulatory requirements to ensure protection of human health and the environment. At present this work is accomplished through multiple PBR task orders (TO's) at multiple installations managed by the BRAC/CIB, Joint Base San Antonio - Lackland and the BECOS efforts will transition from the existing PBR contracts/task orders.
This effort is a validated FY20 requirement; however, funds are not currently available. The Government reserves the right to cancel this requirement at any time. Should the Air Force determine to proceed with this requirement, it will be processed using FAR Part 15 procedures and will result in a Firm Fixed Price (FFP) with Cost Reimbursable
(CR) CLINs, "D" type contract. The requirement will be issued as a single RFP with intention to award six (6) individual single‐award Indefinite Delivery/Indefinite Quantity contracts, one (1) per annotated region that will include: Full/Open, 8(a) Small Business set‐aside, and 100% Small Business set‐aside. Offerors may be selected for award of one (1), or maximum of two (2) for which they propose. A formal solicitation will be finalized and posted to FedBizOpps at a later date. No formal Request for Proposal has been issued to‐date.
PROJECT NARRATIVE: The 772 ESS/PKS in conjunction with AFCEC is considering a performance based remediation (PBR) effort as a natural follow to the current multiple PBR task orders (TOs) at multiple Air Force installations managed under the BRAC Program Execution Branch. This new effort will combine the current TO efforts at multiple BRAC installations into regional groupings. The focus of this contractual design is to promote implementation of cost effective solutions and sustainable life cycle cost reductions. The BECOS effort will permit implementation of realistic, relevant, and technically sound remediation approaches focused on advancing sites to completion through the achievement of a range of AF established site‐specific objectives. The BECOS requirement includes five Continental United States (CONUS) regions and Galena, AK. The focus of this acquisition will be the combined solicitation of the five CONUS regions and the OCONUS Galena, AK region. The awarded contractors shall perform all necessary activities as required to meet the performance objectives of the Final Performance Work Statement(s) (PWS). All documents related to this effort can be located on FBO. The ID/IQ will include a 10‐year Period of Performance (PoP) anticipated to run from 31 July 2020 through 30 July 2030. The anticipated initial ordering period ranges from 31 July 2020 to 30 July 2025. The ID/IQ will include the option to extend the ordering period an additional three (3) years, through 30 July 2028. The contract will permit performance up to 2‐years after the end of the ordering period to complete existing task orders by 30 July 2030.
ORGANIZATIONAL CONFLICT OF INTEREST (OCI): An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to
your firm under the proposed future action. In accordance with the parameters set forth in FAR Subpart 9.5, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor's judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. OCIs may exist in the following three ways.
a. Unequal access to information ‐ access to non‐public information that gives a contractor an unfair competitive advantage.
b. Biased ground rules ‐ when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).
c. Impaired objectivity ‐ when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests). Please keep in mind OCI or potential OCI issues your firm (including all subsidiaries, legacy companies, teaming partners, and subcontractors) may have with respect to the scope of effort at these sites.
THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING A DRAFT RFP FOR PLANNING PURPOSES ONLY.
THIS REQUEST IS NOT A FINAL SOLICITATION.
****PLEASE DO NOT SUBMIT A PROPOSAL*****
Information regarding the Draft RFP is included in this pre‐solicitation notice for the purpose of obtaining industry feedback. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
1. Firms will not be reimbursed for proposal costs incurred.
2. Request for Questions: The Government anticipates a Final Solicitation to be released in November 2019. This notification is provided to allow early review of DRAFT RFP documentation for this requirement. Questions concerning the DRAFT RFP are due by 10:00 AM CT on 04 November 2019. Questions/Comments regarding the DRAFT RFP MUST be submitted on the Questions and Answers Spreadsheet provided and sent to: alicia.kooda@us.af.mil, and robert.neeb.2@us.af.mil. The government will collect all submitted questions/comments, and provide them with the government's response as an attachment to the final solicitation.
3. If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.
4. Contractor Registration and Representations and Certifications: Please be advised of online registration requirement in System for Award Management ‐ Central Contractor Registration (CCR) database http://federalcontractorregistry.com/sam‐ccr‐status‐check/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete.
5. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).
6. The Procuring Contracting Office is:
772 Enterprise Sourcing Squadron (ESS/PKS)
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236‐9853
.
Attachments
Show all 50
This notice has more attachments on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Base Realignment and Closure (BRAC) Environmental Construction Optimization Services (BECOS) | Special Notice | |
| BRAC Environmental Construction Optimization Services (BECOS) | Pre-Solicitation |