TO2 PWS Attch 2 Central South - Base Specific Req Reese Dft 18 SEP 19 v2.0.docx

DOCX document 52 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS)
Solicitation number
FA8903-20-R-0002
Issued by

About this file

This document contains a pre-solicitation notice and draft request for proposal for the BRAC Environmental Construction Optimization Services (BECOS) contract. The Air Force Civil Engineer Center and 772nd Enterprise Sourcing Squadron are seeking proposals for six single-award IDIQ contracts to provide environmental remediation services at 40 former military installations under the Base Realignment and Closure program. Services will include construction, operations and maintenance, monitoring, reporting, and closeout activities to maintain remedies and advance sites to completion. The contracts will have a 10-year period of performance from July 2020 to July 2030. Awards will be made on a full and open basis, with small business set-asides. The pre-solicitation notice provides background and requests industry questions on the draft RFP by November 4th, 2019. A final RFP is expected to be released in November 2019.

CS TO2 PWS 3

View the file

Other files

File Type Posted
RFI__5_BECOS.pdf PDF
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_4.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_2.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Myrtle Beach Dft 20 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
DRAFT_10242019_Central_South_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model_v2.xlsx XLSX spreadsheet
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Galena_Alaska_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Draft_18_SEP_Dft_19_v4.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req O'Hare Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
IDIQ_DD1423_CDRLS_Central_South_EXH_C002_(MGMT)_Dft_27_Sep_19.zip ZIP file
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
IDIQ_PWS__Attch_2__Central_South_-_Acronyms_and_Definitions_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_A016_(DRPR)_27_Sep_19.zip ZIP file
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
TO1_PWS_Central_South_Dft_17_OCT_19_v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

18 September 2019

1.1 Scope

The former Reese AFB is not listed on the National Priorities List (NPL). Environmental restoration is executed through the Texas Commission on Environmental Quality (TCEQ) issued Resource Conservation and Recovery Act (RCRA) corrective action permit and compliance plan, consequently there is no Federal Facility Agreement or Records of Decision. All groundwater remediation has been complete for chemicals of concern with the only remaining actions being landfill long-term cap maintenance and annual land use control (LUC) monitoring. Eight (8) sites included in this contract are being addressed following the RCRA corrective action process. There is one primary site requiring long-term inspection and maintenance, LUC inspection and annual reporting. Seven (7) additional closed sites with LUCs require annual inspection and reporting.

In addition to the requirements presented in this PWS, this scope includes the following:

· US EPA 7003(a) Order Compliance: The Contractor shall perform semi-annual groundwater sampling of up to six (6) domestic wells under the USEPA 7003 Order which are still being monitored as a result of groundwater contamination from the Tower Area plume. This sampling will continue for the duration of the project unless results of a particular sampling event confirm requirements for closeout of the 7003 Order have been met. In addition, the contractor shall conduct remediation to achieve the restoration goal of less than 5 ug/L TCE in Well No. JS17-DW014 within the PoP. At the completion of required 4 sampling events, the Contractor shall request closure of the EPA 7003 Order in accordance with the Order requirements. The contractor shall pay any fees and/or costs associated with the necessary rights of access or easements required to complete the work described in this section.

Contractors are not responsible for the following:

· PFAS monitoring or mitigation.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Hazardous Waste Permit and Compliance Plan No. 50302, Industrial Solid Waste Registration No. 62005, Former Reese Air Force Base, Lubbock County, Texas
Not currently on the AR
March 13, 2019

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract GS10F0280V, Order Number FA8903-16-F-0014
PBR, Central Region BRAC Installations
4/27/2021
6/27/2021

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· Former Reese BCT meetings are held on an as-needed basis approximately 2 times per year, and are typically scheduled to occur the same week as other Air Force meetings (e.g., public meetings, stakeholder meetings). Onsite meetings are typically held at the former base in the main conference room of the Lubbock-Reese Redevelopment Authority. Offsite meetings are held at the TCEQ’s offices in Austin, Texas.

2.6.2 Public Meetings and Hearings

· The Restoration Advisory Board (RAB) at the former Reese AFB was adjourned and there are currently no plans to reform the RAB, however, the Air Force may elect to conduct Ad-Hoc meetings to inform the Lubbock community of the environmental cleanup progress.

· Newspaper notices and facts sheets/written meeting materials shall be prepared in both English and Spanish.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No additional base-specific requirements.

2.9 Contractor Documentation

· No additional base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No additional base-specific requirements.

6.14 Land Use Controls (LUC)

· LUC inspections are required annually.

6.15 Five-Year Reviews

· The fourth Five-Year Review will be completed under the current PBR and is due September 2021. The fifth Five-Year Review due September 2026 is included in this PBR.