Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx
DOCX document 54 KB Posted
- Solicitation number
- FA8903-20-R-0002
About this file
This document provides information regarding a presolicitation notice for follow-on BRAC environmental remediation contracts at 40 installations. The Air Force is considering consolidating current performance-based remediation task orders into six regionally-focused indefinite delivery/indefinite quantity contracts to be awarded in July 2020. The contracts would have a 10-year period of performance through July 2030 and cover environmental restoration services and construction at sites in the continental US and Galena, Alaska. Awards are intended for one full and open contract, one 8(a) small business set-aside contract, and one small business set-aside contract per region. The solicitation response date was November 4, 2019 for planning questions regarding the draft RFP, with the final solicitation anticipated to be released in November 2019 and awards in July 2020.
MW TO2 PWS 2
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
24 September 2019
1.1 Scope
The former Richards-Gebaur AFB is located in Kansas City, Cass County, Missouri and originally occupied approximately 2,400 acres. Built as an auxiliary airport in 1942, Richards-Gebaur has served a variety of functions since that time. The installation operated from 1941 until 1994 when the military flying mission ended. In 1980, approximately 80 percent of the installation property was deemed excess to the current needs of the USAF and transferred to the General Services Administration. The majority of this area was then transferred to the cities of Kansas City and Belton, Missouri by public benefit conveyance in August 1985. At base closure, Richards-Gebaur AFB was comprised of 429 acres of land that included 244 acres in the main cantonment area and 185 acres approximately four miles south of the cantonment area at the Belton Training Complex (BTC).
The majority of the base was transferred to Kansas City and is managed through the Port Authority of Kansas City (PortTKC) for private and industrial sector use. The former runway has been converted to rail and truck intermodal facilities for use by the Kansas City Southern Railroad.
Missouri Department of Natural Resources (MDNR) provides regulatory oversight of the environmental program at Richards-Gebaur. USEPA is no longer participating in the oversight role.
Only one site SS012 is expected to be included in this PBR with very specific requirements to bring it to Site Closeout (SC). Of the three open sites at Richards-Gebaur, two sites may close (ST005 and SS006) prior to this contract, but if not will be included as specified in the site list. None of the three sites have met Response Complete (RC).
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional scope.
Contractors are not responsible for the following:
· No base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Final – 2017 Basewide Groundwater and Land Use Controls/Institutional Controls Monitoring Report |
| AR # TBD |
| July 2018 |
| 2. |
| Final Treatability Study Performance Monitoring Report for Groundwater (Operable Unit 2): Sites ST005, SS006, SS012 |
| AR # TBD |
| June 2018 |
| 3. |
| Final Treatability Study Performance Monitoring Report for Groundwater (Operable Unit 2): Sites ST005, SS006, SS012 |
| AR # 574270 & 556985 |
| March 2017 |
| 4. |
| Final Treatability Study Implementation Report Sites SS006 and SS012 |
| AR # 557314 |
| September 2015 |
| 5. |
| Final Construction Completion Report Site SS012 Groundwater Treatability Study |
| AR # 300103 |
| November 2013 |
| 6. |
| Final Record of Decision (Operable Units 1 and 2) |
| AR # 395 |
| July 2004 |
| 7. |
| Final Feasibility Study for Groundwater (Operable Unit 2) |
| AR # 396 |
| November 2002 |
| 8. |
| Final Evaluation and Consolidation Study |
| AR # 181 |
| March 1999 |
| 9. |
| Preliminary Groundwater Assessment, Oil Saturated Area (SS003), Hazardous Waste Storage Area (SS004), Hazardous Material Storage (SS006), and Fire Valve Area (SS009) |
| AR # 140 |
| November 1996 |
| 10. |
| Final Feasibility Study Site ST005 (POL Storage Yard) |
| AR # 50 |
| November 1992 |
| 11. |
| Final Remedial Investigation Report, Site ST005 (POL Storage Yard) |
| AR # 386 |
| November 1992 |
| 12. |
| Preliminary Assessment of the Hazardous Material Storage Area (Site SS006) |
| AR # 40 |
| October 1991 |
| 13. |
| Remedial Investigation Report for Sites FT002, SS003, SS005 and ST005 |
| AR # 37 |
| October 1991 |
| 14. |
| Preliminary Assessment Site 13 (Site SS006) Hazardous Material Storage Area |
| AR # 27 |
| July 1990 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565 |
| South-Central PBR |
| 24 September 2020. |
| 24 September 2020. |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· Richards-Gebaur BCT meetings are generally held monthly via PBR contractor-hosted teleconference calls. In addition, onsite BCT meetings are held on an as-needed basis approximately two times per year and are typically scheduled to occur the same week as other Air Force meetings (e.g., RAB meetings, public meetings, stakeholder meetings).
2.6.2 Public Meetings and Hearings
· The RAB at Richards-Gebaur has been long adjourned. However, Air Force conducts an annual stakeholders coordination meeting attended by Port KC (the reuse authority), US Navy, Marines, and others involved in the current use and redevelopment at the former base. This meeting has been held at the Calvary University located at the former base in recent years. The PBR contractor is required to facilitate the meeting location and logistics, and prepare briefing material.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No additional base-specific requirements.
2.9 Contractor Documentation
· No additional base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No additional base-specific requirements.
6.14 Land Use Controls (LUC)
· Annual LUC inspections required.
6.15 Five-Year Reviews
· The second five-year review for Richards-Gebaur was signed in August 2012. The third five-year review is under preparation as of September 2018. It is a policy review. The fourth five-year review is included in this contract. The successive five-year reviews falling within the PoP of this contract are included in this PBR.
File details come from the government source that posted it. Updated .