This presolicitation notice and draft request for proposal outline requirements for six regional indefinite delivery/indefinite quantity contracts to provide environmental remediation services at 40 closed military installations under the BRAC program. Services will include all activities necessary to meet performance objectives for site remediation, maintain regulatory remedies, implement optimization efforts, and advance sites to completion. The contracts will have a 10-year period of performance from July 2020 to July 2030 comprising an initial 5-year ordering period and optional 3-year extension. The solicitation will include full and open, 8(a), and total small business set-aside contracts awarded for each of five continental US regions plus Galena, Alaska. Questions on the draft RFP are due by November 4, 2019, with final solicitation expected in November 2019.
MW TO2 PWS 2
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
24 September 2019
1.1 Scope
The Rickenbacker ANGB is located in the City of Columbus, in Franklin County and Pickaway County, Ohio. Portions of Rickenbacker ANGB were closed on September 30, 1994, and other portions were realigned as part of the 1991 and 1993 round of BRAC closures. The BRAC mandated property transfer actions at Rickenbacker ANGB were completed on June 26, 2007.
The environmental restoration program at the BRAC portion of RANGB is currently managed under CERCLA, RCRA and Ohio’s Bureau of Underground Storage Tank Regulation (BUSTR) program. Regulatory oversight is provided primarily by Ohio EPA and BUSTR. The United States Environmental Protection Agency Region 5 (USEPA) is currently not involved in an oversight role. RANGB is not listed on the National Priorities List (NPL).
Remedial activities are being performed in accordance with the existing decision documents. The CERCLA sites include two Ditch Sites (SD025, SD027) which may close before the end of the current PBR and three groundwater sites (Sites SS021, SS041, SS042). One site is managed under RCRA - Site (SS001), and there is one BUSTR Site - SS046. Groundwater monitoring is required at sites SS001, SS021, SS041, and SS042. Five-Year Reviews are required for all of the CERCLA sites. Land use control (LUC) compliance monitoring is conducted at all sites.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional scope.
Contractors are not responsible for the following:
· No base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| IT. Final, Remedial Action Decision Document For IRP Sites 2, 21, 41, 42, and 43, Rickenbacker Air National Guard Base, Columbus, Ohio, October. |
| AR 964 |
| October 1999 |
| 2. |
| IT. Final Decision Document for IRP Sites 25/27 Drainage Ditches, Rickenbacker Air National Guard Base, Columbus, Ohio. |
| AR 887 |
| September 2001 |
| 3. |
| FPM/AFCEC, Amended Closure/Post Closure Plan (Revision 10), Site 1, November 2014 |
| AR 421854 |
| November 2014 |
| 4. |
| FPM/AFCEC. Annual Groundwater Report for January Through December 2017 (Includes the Corrective Action Effectiveness Report for 2017 [Update with 2018 when available] |
| AR 573012 |
| March 2018 |
| 5. |
| FPM/. Remedial Action-Operation (RAO) Report for Sites 21, 41, and 42, January through June 2016 [Update with latest report when available] |
| AR 541540 |
| 2017 |
| 6. |
| AFCEC, Second Five-Year Review Report, BRAC Portion of Rickenbacker ANG Base |
| AR 421616 |
| March 2014 |
| 7. |
| AFCEC, Land Use Control (LUC) Compliance Inspection Report - 2017 |
| AR 573011 |
| May 2018 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract Number: FA8903-09-D-8565 TO 0008 |
| Region 5 PBR |
| 06/30/2020 |
| 09/24/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· Onsite RANGB BCT meetings are held once per year and are typically scheduled to occur the same week as other Air Force BRAC meetings in Ohio (at nearby Gentile AFS and Newark AFB). Onsite meetings are typically held at Columbus Regional Airport Authority facilities at the Rickenbacker International Airport. These meetings are to be coordinated and facilitated by the PBR contractor. Post-meeting minutes (draft, draft final and final) are to be developed to document these meetings. Other as-needed BCT or other meetings are generally held via PBR contractor-hosted teleconference calls (typically two per year).
2.6.2 Public Meetings and Hearings
· Not applicable. The RANGB RAB exists but it is under the purview of the U.S. Army Corps of Engineers.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No additional base-specific requirements.
2.9 Contractor Documentation
· No additional base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No additional base-specific requirements.
6.14 Land Use Controls (LUC)
· LUC inspections are required every year as long as RA-O groundwater monitoring is performed. Thereafter, every five years, typically in the period immediately before a scheduled Five-Year Review.
6.15 Five-Year Reviews
· The third Five-Year Review will be completed under the current PBR and is due February 2019. The fourth Five-Year Review is due February 2023 and is included in this PBR.