This presolicitation notice provides details for a future solicitation seeking environmental remediation services at 40 Base Realignment and Closure installations. The Air Force plans to award six indefinite delivery/indefinite quantity contracts on a full and open basis, with small business set asides, to support performance-based remediation efforts across five continental U.S. regions and Galena, Alaska. Services will include operation and maintenance of treatment systems, monitoring, land use control inspections, and advancing sites to completion. The contracts would have a 10-year period of performance from July 2020 to July 2030, with an initial ordering period from July 2020 to July 2025 and an option to extend ordering through July 2028.

NE IDIQ PWS 1

View the file

Other files

File Type Posted
RFI__5_BECOS.pdf PDF
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_4.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_2.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Myrtle Beach Dft 20 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
DRAFT_10242019_Central_South_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model_v2.xlsx XLSX spreadsheet
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Galena_Alaska_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Draft_18_SEP_Dft_19_v4.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req O'Hare Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
IDIQ_DD1423_CDRLS_Central_South_EXH_C002_(MGMT)_Dft_27_Sep_19.zip ZIP file
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
IDIQ_PWS__Attch_2__Central_South_-_Acronyms_and_Definitions_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Reese Dft 18 SEP 19 v2.0.docx DOCX document
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_A016_(DRPR)_27_Sep_19.zip ZIP file
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
TO1_PWS_Central_South_Dft_17_OCT_19_v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northeast

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyNotesRC DateSC Date
NortheastGriffissCSS681Apron 1 Area LCP-E9 (NYSDEC Spill #1501553)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OGW monitoring; non-CERCLA Five-Year Review (AF Policy Review)Petroleum only site, injections conducted in 2017 and 2018.FY21FY21
NortheastGriffissSD052-01Apron 2 Chlorinated PlumeCERCLARA-OGW monitoring (MNA), LUC/IC monitoring and Five-Year Review.PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY40FY40
NortheastGriffissSD052-02Bldg 775, Pumphouse 3 - chlorinated plume aka SS038CERCLARA-OGW monitoring, maintain system on standby in operable condition & maintain permit, system decommissioning, LUC/IC monitoring and Five-Year ReviewGW extraction/ discharge system on standby since 2016; injections completed in 2017 w/ injection pilot study in progress. Results anticipated xxx 2019. Continuing monitoring and evaluating effectiveness of pilot study is included in this PBR TO. Changes to the remedy based on pilot study are not included in this PBR TO.FY26FY26
NortheastGriffissSD052-04Landfill 6 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year Review-Associated with LF009 -Injections completed in 2018. PFOS/PFOA detected within the site boundaries. -Investigation and remediation of PFAS is not included in this TO.FY40Indefinite
NortheastGriffissSD052-05Bld 817 Chlorinated PlumeCERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year ReviewInjections completed in 2017.FY40FY40
NortheastGriffissSD052 SVI-02Bldg 775 Site (Bldg 774 & 776) sub-slab vapor mitigationRA-OO&M of passive sub-slab vapor mitigation system, reporting, LUC/IC monitoring and Five-Year Review-Active mitigation system to be maintained in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.FY26FY26
NortheastGriffissST006Bldg 101N/ACERCLARA-OQuarterly sub-slab SVE system O&M and monitoring; prepare Proposed Plan and ROD amendment for sub-slab SVE; LUC/IC monitoring and Five-Year Review-2012 ROD specified LUC/ICs only, however a subslab SVE system was installed/ activated in 2013 to accelerate clean-up but has been inactive since Sept 2017 -Data gap analysis and optimization conducted by current PBR contractor. Results anticipated xxx 2019.FY12FY26
NortheastGriffissSS054Bldg 781, Pumphouse - Free Product on Groundwater (NYSDEC Spill #9202658)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparging system, quarterly GW monitoring, LUC/IC Monitoring, Non-CERCLA Five-Year Review (AF Policy Review)Petroleum only site, injections completed in 2017. Preliminary observations from 2018 evaluation of existing biosparging system indicates that system modification or installation of new sparge wells may be required.FY26FY26
NortheastGriffissSS062AOC 9 Weapons Storage Area Landfill Chlorinated PlumeN/ACERCLARA-OGW monitoring, LUC/IC monitoring and Five-Year Review-Injections completed in 2017 and 2018; SVI restriction remains on the site. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY26Indefinite
NortheastGriffissSS067Building 789 Type II Fuel System (NYSDEC Spill #9810713)N/ANYSDEC R6 Corrective Action (Spills) ProgramRA-OO&M of biosparge and free product recovery systems, GW monitoring, and LUC/IC monitoring, Non-CERCLA Five-Year Review (AF Policy Review)Results of data gap analysis conducted in late 2018 and any achievable optimization data expected xxx 2019. Implementation of recommendations included in this PBR TO.FY26FY26
NortheastGriffissLF001Landfill 1N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and groundwater, surface water monitoring), LUC/IC monitoring, and Five-Year ReviewPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY04Indefinite
NortheastGriffissLF002Landfill 2 & 3N/ACERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY03Indefinite
NortheastGriffissLF003Landfill 7N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY03Indefinite
NortheastGriffissLF007Landfill 5N/ACERCLALTMSoil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year ReviewFY05Indefinite
NortheastGriffissLF009Landfill 6N/ACERCLALTMEngineered Cap. Landfill LTM (inspection, maintenance, LF gas and ground/surface water and leachate monitoring), LUC/IC monitoring, and Five-Year ReviewPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY01Indefinite
NortheastGriffissSS008Bldg 112/PCB Dump AreaSouth Side-PCB Trans Leak, Roof (Former SS-19)CERCLALTMLUC/IC monitoring and Five-Year ReviewFY05Indefinite
NortheastGriffissSS017Lot 69 Former Hazardous Waste Storage AreaN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.FY01Indefinite
NortheastGriffissSS025T-9 Storage Area - contaminated soil/groundwaterN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewGroundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending.FY05Indefinite
NortheastGriffissDP022Bldg 222N/ACERCLALTMExplanation of Significant Difference (ESD) to document change in site boundary; LUC/IC monitoring and Five-Year Review-Groundwater restriction deletion approved in 2013. -Contamination discovered just outside the boundary of the site in 2017; current use will not accommodate removal; ESD will adjust site boundary to encompass footprint of the bldg.FY01Indefinite
NortheastGriffissSS033Coal Storage Area - PCB ContaminationN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewIncludes evaluation of AOI 66 in Five-Year Review with LUC/IC monitoring and FYRFY01Indefinite
NortheastGriffissSS044Substation, Electrical Power - PCB SiteN/ACERCLALTMLUC/IC monitoring and Five-Year ReviewFY12Indefinite
NortheastGriffissSD052 SVI-1Apron 2 Chlorinated Plume Site (Bldg 785 & 786) sub-slab vapor mitigationCERCLALTMO&M of passive sub-slab vapor mitigation system, reporting, LUC/IC monitoring and Five-Year Review-Active mitigation system (projected conversion to passive 2018-2019) to be kept in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective.FY05Indefinite
NortheastGriffissSS060STW-1300 Bldg 35/36 AOCN/ARCRALTMLUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review)FY00Indefinite
NortheastGriffissCG412Flightline OU1 PFC Groundwater PlumePFOS/PFOA Site
NortheastGriffissFT030Fire Training Area (FPTA)PFOS/PFOA Site
NortheastLoringSD010Flightline Drainage Ditch (FLDD)CERCLALTMOU13-Basewide surface water drainage, monitor concentrations of polychlorinated biphenyls (PCBs) and pesticides in fish tissue, stream sediment, and other biota every five years (2023, 2028). LUC inspections and Five-Year Reviews.PCB impoundments were constructed along the East Branch of Greenlaw Brook. Inspection conducted in 2018 indicated erosion risk. Design and implementation of additional remedial action is not included in this TO.FY40FY40
NortheastLoringSS054Groundwater Monitoring Zone #1 (GMZ #1 Industrial)CERCLALTMGroundwater monitoring and biennial surface water monitoring, LUC inspections and Five-Year ReviewsES/JEBS Plume has a TI waiver that requires a technology evaluation every five years in conjunction with the Five-Year ReviewTBDIndefinite
NortheastLoringSS056GMZ #3 BXSSCERCLALTMGroundwater and surface water monitoring, LUC inspections, and Five-Year Reviews.Recently discovered soil contamination that may require delineation and other remedial actions like bioremediation and addn’l gw monitoring not included in this TO.FY27FY27
NortheastLoringSS057GMZ #4 QuarryCERCLALTMGroundwater and surface water monitoring, performance monitoring of in-situ enhanced bioremediation, LUC inspections and Five-Year Reviews.Pilot study completed in November 2017 indicated potential for mass reduction via continued injections/ recirculation but the extent of the contamination is a factor. Modification of remedy based on pilot study is included in this TO. -TI waiver requires technology evaluation every five years in conjunction with the Five-Year Review.TBDIndefinite
NortheastLoringSS058GMZ #5 FJETCCERCLARA-OGroundwater monitoring, LUC inspections and Five-Year Reviews.FY25FY25
NortheastLoringSS059GMZ #6 East BaseCERCLALTMGroundwater and surface water monitoring, LUC inspections and Five-Year Reviews.Elevated manganese in the groundwater; site is located in remote part of base on U.S. Fish and Wildlife Service property. Development of recommendations to address manganese is included in this TO; however, implementation is not included.TBDIndefinite
NortheastLoringSS062Littleton Pump StationPOLRA-OGroundwater monitoring, LUC inspections and Five-Year ReviewsFY40FY40
NortheastLoringSS063Mattawamkeag Pump StationPOLRA-OSemiannual (Spring and Fall) groundwater monitoring, LUC inspections and Five-Year ReviewsInvestigation and remediation of LNAPL in the shallow bedrock is not included in this TO.FY30FY30
NortheastLoringBldg 7330Vapor Intrusion, linked to OU12 GMZ 1 (SS054)CERCLALTMOperate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews.TBDTBD
NortheastLoringBldg 7500Vapor Intrusion, linked to OU12 GMZ 1 (SS054)CERCLALTMOperate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews.TBDTBD
NortheastLoringBldg 8260Vapor Intrusion, linked to OU12 GMZ 1 (SS054)CERCLALTMOperate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews.TBDTBD
NortheastLoringCLF004Asbestos LandfillMEDEPLTMAnnual cap inspections, mowing, and erosion control as required. LUC inspections. No Five-Year Review required.FY99Indefinite
NortheastLoringLF001Landfill 1MEDEPLTMLUC inspections. No Five-Year Review required.FY12Indefinite
NortheastLoringLF002Landfill 2CERCLALTMUnlined RCRA cap with impermeable cover. Annual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.Monitoring period is 30 years, until 2026FY96Indefinite
NortheastLoringLF020Landfill 3CERCLALTMAnnual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews.Monitoring period is 30 years, until 2029FY99Indefinite
NortheastLoringOT018Fly Ash Disposal Site (FADS)MEDEPRA-OAnnual cap inspections, mowing, erosion control as required, LUC inspections. No Five-Year Review required.FY96Indefinite
NortheastLoringCCG006North Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG007South Wherry GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG008Nose Dock GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG009South Flightline GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG010Alert Area GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG011DRMO GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCG012East Base GURZPOLLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY00FY31
NortheastLoringCCF001Building 6100 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released.FY93Indefinite
NortheastLoringCCF002Building 6200 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.FY93Indefinite
NortheastLoringCCF003Building 6700 URZMEDEPLTMLUC Inspections, AF Policy five-year review required.FY90Indefinite
NortheastLoringSS054GMZ # 1Industrial AreaPFOS/PFOA Site
NortheastLoringSS059GMZ # 6 East BasePFOS/PFOA Site
NortheastLoringCG408B-52 Crash SitePFOS/PFOA Site
NortheastPeaseSS013Bulk Fuel Storage Area (BFSA)NHDESLTMGroundwater monitoringPFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TOFY30FY30
NortheastPeaseST081Self-Help ShopNHDESLTMGroundwater monitoring and rebound monitoringFY23FY23
NortheastPeaseSS082Plume 13/14NHDESLTMGroundwater monitoring-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TOFY25FY25
NortheastPeaseSS083Plume 41NHDESLTMGroundwater monitoringPotential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TOFY25FY25
NortheastPeaseSS084Pumphouse 2NHDESLTMGroundwater monitoring-Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TOFY27FY27
NortheastPeaseTU032Building 113CERCLALTMRA-O of isolation unit (sheet pile), performance monitoring, groundwater monitoringFY20Indefinite
NortheastPeaseID039Building 227CERCLARA-OSVE; performance monitoring of ISEB; and groundwater monitoringVapor intrusion pathway issue, PRAP/ROD amendment in progress to document SVE and will be completed by current contractor.FY23Indefinite
NortheastPeaseAB022Burn Area 1CERCLALTMGroundwater monitoring, decommissioning of AS/SVELNAPL discovered along with groundwater divide may drive alternate approach; metals issues. Evaluation of additional remedy not included in this TOFY27FY27
NortheastPeaseSS036Building 119CERCLALTMGroundwater monitoringPFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO.FY30FY30
NortheastPeaseSS049Building 22CERCLALTMMNA with PRB monitoring; performance monitoring of ISEB, groundwater monitoringPotential upgradient source (DNAPL in fractured bedrock), four new wells installed to delineate and possibly treat hot-spot in 2019. Evaluation of additional remedy for potential upgradient source not included in this TO.FY48FY48
NortheastPeaseID073Building 234CERCLALTMGroundwater monitoring-Established remedy creating reducing conditions that mobilize arsenic. Evaluation of additional remedy not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY23FY23
NortheastPeaseDP010Leaded Fuel Tank Sludge AreaCERCLALTMGroundwater monitoringBenzene rebound attributed to unknown source. Evaluation of additional remedy not included in this TO.FY27FY27
NortheastPeaseLF006Landfill 6CERCLALTMAnnual inspections, triennial groundwater monitoringIssues with arsenic due to reducing conditions post LF removal, potentially caused by wetland, geochemical analysis conducted in 2018 to determine if Arsenic issue is not naturally occurring. Evaluation of additional remedy not included in this TO.FY07FY28
NortheastPeaseSS045Old Engine Test Stands (OJETS)CERCLALTMGroundwater monitoringManganese remains elevated after completion of remedy and residual reducing conditions difficult to overcome. Evaluation of additional remediation not included in this TOFY27FY27
NortheastPeaseST072Motor PoolNHDESLTMTBDNew soil borings completed late 2018 by current contractor. Results available xxx 20xxFY30FY30
NortheastPeaseSS016Building 410CERCLALTMConfirmation sampling to validate contamination has been removed, , remove LUC/ICs if UU/UEFY95FY28
NortheastPeaseDP009Construction Rubble Dump 1 (CRD-1)NHDESLTMAnnual cap inspections, settlement monitoring every 5 yrs, mowing as needed, and erosion controlFY95Indefinite
NortheastPeaseDP017CRD-2NHDESLTMAnnual cap inspections, annual mowing, erosion control, and surface water and sediment samplingFY95Indefinite
NortheastPeaseST085Flightline Refueling System (FLRS)NHDESLTMGroundwater monitoringMNA not meeting goals. Evaluation of additional remedy not included in this TO.FY30Indefinite
NortheastPeaseLF005Landfill 5CERCLALTMAnnual cap inspections, settlement monitoring every 5-yrs, annual mowing, erosion control, triennially groundwater monitoring, surface water and sediment samplingFY08Indefinite
NortheastPeaseLF001Landfill 1NHDESLTMAnnual cap inspections, mowing as needed, erosion control, triennial groundwater monitoring, surface water and sediment samplingFY96Indefinite
NortheastPeaseNot ApplicableZone 2CERCLALTMGroundwater monitoringIncludes former AB037 monitoring requirements; closure of Zone 2 is dependent on closure of individual sites in Zone 2.TBDIndefinite
NortheastPeaseOU11Brooks and DitchesCERCLALTMSurface water and sediment monitoring
NortheastPeaseAT008FDTA - 2PFOS/PFOA Site
NortheastPeaseCG401Airfield PFC PlumePFOS/PFOA Site
NortheastPlattsburghFT002/Industrial Area Ground-water OUBasewide Groundwater (Includes Fire Training Area and Industrial Area GW)N/ACERCLARA-OGroundwater monitoring, discharge sampling (including sampling for PFAS), LUC/IC monitoring, and Five-Year Review

a) Operation of SVE system (VGAC) at Bldg. 2753 (installed late FY09, deactivated in Feb 2014 and reactivated in Feb 2018), and annual sub-slab and indoor air sampling.

b) Annual sub-slab and indoor air sampling at New Building C and Bldg. 2766, SVE systems at these two locations have been deactivated and confirmation sampling is in progress ( may require reactivation if rebound occurs). d) Quarterly monitoring and inspections and maintenance including whole house filter changeout, carbon recycling and replacement/changeout on whole home PFAS mitigation systems at one location

c) Ongoing operation and maintenance (O&M), and discharge monitoring and reporting of three passive groundwater collection trenches-Runway/Flightline Collection Trench (RFCT) GW Treatment Plant has been deactivated and approved for decommissioning/demolition which is included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.FY84FY84
NortheastPlattsburghSS013Munitions Maintenance SquadronN/ACERCLARA-OOzone sparging system operated intermittently through 2014; Soil excavation to remove residual contamination planned in 2018 followed by possible restart of ozone sparge system; groundwater/surface water monitoring, LUC/IC monitoring including general SVI restriction and occupancy restriction for Bldg. 3578, and Five-Year Review.-The SVI restriction is based on calculations and not an actual study. Site closure (SC) under current PBR TO is pending. -PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO.for GW FY26
NortheastPlattsburghRW042Wash Rack AOCN/Anon-CERCLA managed as petroleum siteRA-OSemiannual groundwater monitoring, LUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review).-LNAPL discovered at site in 2017; results of investigation under current PBR are expected xxx 2019. Modification to the remedy based on the investigation is not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO.TBD
NortheastPlattsburghCTU234UST-3580Former heating fuel USTNYSDEC Corrective Action (Spills) ProgramRA-OMNA, Groundwater monitoring, LUC/IC inspections and Non-CERCLA Five-Year Review (AF Policy Review)Site closure (SC) is pending on the current PBR TO.FY12FY25
NortheastPlattsburghCTU281UST-2704Former diesel fuel USTNYSDEC Corrective Action (Spills) ProgramRA-OGroundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review)Injection completed in 2018. Site closure (SC) is pending on the current PBR TOFY25FY25
NortheastPlattsburghCTU-294UST-2009Former fuel oil USTNYSDEC Corrective Action (Spills) ProgramRA-OGroundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review)Soil excavation and mixing completed in 2017. Site closure (SC) is pending on the current PBR TO.FY28FY28
NortheastPlattsburghSS005No-Destructive Inspection (NDI) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewFY98Indefinite
NortheastPlattsburghSS006Aerospace Ground Equipment (AGE) FacilityN/ACERCLALTMLUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year ReviewFY98Indefinite
NortheastPlattsburghSS018Auto Hobby ShopN/ACERCLALTMLUC/IC monitoring (non-residential use), and Five-Year ReviewFY13Indefinite
NortheastPlattsburghLF021Former Landfill (56-59)N/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY97Indefinite
NortheastPlattsburghLF022Former Landfill (59-66)(D-3, D-7)CERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY95Indefinite
NortheastPlattsburghLF023Former Landfill (66-81)(D-4)CERCLALTMEngineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas monitoring, and groundwater monitoring including baseline and routine events LUC/IC monitoring, and Five-Year Review.Site is governed by a Source Control Record of Decision and a Groundwater Operable Unit Record of DecisionFY95Indefinite
NortheastPlattsburghLF024Former C & D LandfillN/ACERCLALTMSoil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year ReviewFY97Indefinite
NortheastPlattsburghSS028Building 508 Open Storage AreaN/ACERCLALTMLUC/IC (non-residential use) monitoring and Five-Year ReviewSoil vapor extraction system pilot study planned for 2018 to assess residual soil gas contamination; SVI issues may require additional LUC/ICs at the site. Site closure (SC) under current PBR is pending.FY21Indefinite
NortheastPlattsburghSS031Central Heat PlantN/ANYSDEC R5 Corrective Action (Spills) ProgramLTMRemediation of heavier residual soil contamination planned for 2018 via excavation was completed xxx 201x; Non-CERCLA Five-Year Review (AF Policy Review)Petroleum only site; Site closure (SC) under current PBR TO is pending but under question given contamination discovered at site boundary near rails; if SC is not achieved, LUC/ICs including SVI restriction may be required.Indefinite
NortheastPlattsburghCWM127OTH-3505-1Construction Debris AreaRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghCSA283OTH-3210-2D&H NurseryRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghCDA286OTH-1700Area R Trash DumpRCRALTMLUC/IC Inspections and Five-Year ReviewDecision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICsFY21Indefinite
NortheastPlattsburghFT002Fire Training AreaPFOS/PFOA Site
NortheastPlattsburghCG406North Flightline PFC Groundwater PlumePFOS/PFOA Site
NortheastPlattsburghCG407Southern AirfieldPFOS/PFOA Site

FA8903-20-R-0002

Northeast Region Attachment 1 17 October 2019