This presolicitation notice provides details for a future solicitation seeking environmental remediation services at 40 Base Realignment and Closure installations. The Air Force plans to award six indefinite delivery/indefinite quantity contracts on a full and open basis, with small business set asides, to support performance-based remediation efforts across five continental U.S. regions and Galena, Alaska. Services will include operation and maintenance of treatment systems, monitoring, land use control inspections, and advancing sites to completion. The contracts would have a 10-year period of performance from July 2020 to July 2030, with an initial ordering period from July 2020 to July 2025 and an option to extend ordering through July 2028.
NE IDIQ PWS 1
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northeast
| Region | Base | Site ID | Site Name | Site Alias | Operable Unit (OU) | Regulatory Program | Site Phase | Current Remedy | Notes | RC Date | SC Date |
| Northeast | Griffiss | CSS681 | Apron 1 Area LCP-E9 (NYSDEC Spill #1501553) | N/A | NYSDEC R6 Corrective Action (Spills) Program | RA-O | GW monitoring; non-CERCLA Five-Year Review (AF Policy Review) | Petroleum only site, injections conducted in 2017 and 2018. | FY21 | FY21 | |
| Northeast | Griffiss | SD052 | -01 | Apron 2 Chlorinated Plume | CERCLA | RA-O | GW monitoring (MNA), LUC/IC monitoring and Five-Year Review. | PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY40 | FY40 | |
| Northeast | Griffiss | SD052 | -02 | Bldg 775, Pumphouse 3 - chlorinated plume aka SS038 | CERCLA | RA-O | GW monitoring, maintain system on standby in operable condition & maintain permit, system decommissioning, LUC/IC monitoring and Five-Year Review | GW extraction/ discharge system on standby since 2016; injections completed in 2017 w/ injection pilot study in progress. Results anticipated xxx 2019. Continuing monitoring and evaluating effectiveness of pilot study is included in this PBR TO. Changes to the remedy based on pilot study are not included in this PBR TO. | FY26 | FY26 | |
| Northeast | Griffiss | SD052 | -04 | Landfill 6 Chlorinated Plume | CERCLA | RA-O | GW monitoring, LUC/IC monitoring and Five-Year Review | -Associated with LF009 -Injections completed in 2018. PFOS/PFOA detected within the site boundaries. -Investigation and remediation of PFAS is not included in this TO. | FY40 | Indefinite | |
| Northeast | Griffiss | SD052 | -05 | Bld 817 Chlorinated Plume | CERCLA | RA-O | GW monitoring, LUC/IC monitoring and Five-Year Review | Injections completed in 2017. | FY40 | FY40 | |
| Northeast | Griffiss | SD052 SVI | -02 | Bldg 775 Site (Bldg 774 & 776) sub-slab vapor mitigation | RA-O | O&M of passive sub-slab vapor mitigation system, reporting, LUC/IC monitoring and Five-Year Review | -Active mitigation system to be maintained in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective. | FY26 | FY26 | ||
| Northeast | Griffiss | ST006 | Bldg 101 | N/A | CERCLA | RA-O | Quarterly sub-slab SVE system O&M and monitoring; prepare Proposed Plan and ROD amendment for sub-slab SVE; LUC/IC monitoring and Five-Year Review | -2012 ROD specified LUC/ICs only, however a subslab SVE system was installed/ activated in 2013 to accelerate clean-up but has been inactive since Sept 2017 -Data gap analysis and optimization conducted by current PBR contractor. Results anticipated xxx 2019. | FY12 | FY26 | |
| Northeast | Griffiss | SS054 | Bldg 781, Pumphouse - Free Product on Groundwater (NYSDEC Spill #9202658) | N/A | NYSDEC R6 Corrective Action (Spills) Program | RA-O | O&M of biosparging system, quarterly GW monitoring, LUC/IC Monitoring, Non-CERCLA Five-Year Review (AF Policy Review) | Petroleum only site, injections completed in 2017. Preliminary observations from 2018 evaluation of existing biosparging system indicates that system modification or installation of new sparge wells may be required. | FY26 | FY26 | |
| Northeast | Griffiss | SS062 | AOC 9 Weapons Storage Area Landfill Chlorinated Plume | N/A | CERCLA | RA-O | GW monitoring, LUC/IC monitoring and Five-Year Review | -Injections completed in 2017 and 2018; SVI restriction remains on the site. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY26 | Indefinite | |
| Northeast | Griffiss | SS067 | Building 789 Type II Fuel System (NYSDEC Spill #9810713) | N/A | NYSDEC R6 Corrective Action (Spills) Program | RA-O | O&M of biosparge and free product recovery systems, GW monitoring, and LUC/IC monitoring, Non-CERCLA Five-Year Review (AF Policy Review) | Results of data gap analysis conducted in late 2018 and any achievable optimization data expected xxx 2019. Implementation of recommendations included in this PBR TO. | FY26 | FY26 | |
| Northeast | Griffiss | LF001 | Landfill 1 | N/A | CERCLA | LTM | Engineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and groundwater, surface water monitoring), LUC/IC monitoring, and Five-Year Review | PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY04 | Indefinite | |
| Northeast | Griffiss | LF002 | Landfill 2 & 3 | N/A | CERCLA | LTM | Engineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas and ground/surface water monitoring), LUC/IC monitoring, and Five-Year Review | FY03 | Indefinite | ||
| Northeast | Griffiss | LF003 | Landfill 7 | N/A | CERCLA | LTM | Soil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year Review | FY03 | Indefinite | ||
| Northeast | Griffiss | LF007 | Landfill 5 | N/A | CERCLA | LTM | Soil/Veg Cap. Landfill LTM (inspection, maintenance, and ground/surface water monitoring), LUC/IC monitoring, and Five-Year Review | FY05 | Indefinite | ||
| Northeast | Griffiss | LF009 | Landfill 6 | N/A | CERCLA | LTM | Engineered Cap. Landfill LTM (inspection, maintenance, LF gas and ground/surface water and leachate monitoring), LUC/IC monitoring, and Five-Year Review | PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY01 | Indefinite | |
| Northeast | Griffiss | SS008 | Bldg 112/PCB Dump Area | South Side-PCB Trans Leak, Roof (Former SS-19) | CERCLA | LTM | LUC/IC monitoring and Five-Year Review | FY05 | Indefinite | ||
| Northeast | Griffiss | SS017 | Lot 69 Former Hazardous Waste Storage Area | N/A | CERCLA | LTM | LUC/IC monitoring and Five-Year Review | Groundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending. | FY01 | Indefinite | |
| Northeast | Griffiss | SS025 | T-9 Storage Area - contaminated soil/groundwater | N/A | CERCLA | LTM | LUC/IC monitoring and Five-Year Review | Groundwater restriction deletion approved in 2013. Site closure (SC) under current PBR TO is pending. | FY05 | Indefinite | |
| Northeast | Griffiss | DP022 | Bldg 222 | N/A | CERCLA | LTM | Explanation of Significant Difference (ESD) to document change in site boundary; LUC/IC monitoring and Five-Year Review | -Groundwater restriction deletion approved in 2013. -Contamination discovered just outside the boundary of the site in 2017; current use will not accommodate removal; ESD will adjust site boundary to encompass footprint of the bldg. | FY01 | Indefinite | |
| Northeast | Griffiss | SS033 | Coal Storage Area - PCB Contamination | N/A | CERCLA | LTM | LUC/IC monitoring and Five-Year Review | Includes evaluation of AOI 66 in Five-Year Review with LUC/IC monitoring and FYR | FY01 | Indefinite | |
| Northeast | Griffiss | SS044 | Substation, Electrical Power - PCB Site | N/A | CERCLA | LTM | LUC/IC monitoring and Five-Year Review | FY12 | Indefinite | ||
| Northeast | Griffiss | SD052 SVI | -1 | Apron 2 Chlorinated Plume Site (Bldg 785 & 786) sub-slab vapor mitigation | CERCLA | LTM | O&M of passive sub-slab vapor mitigation system, reporting, LUC/IC monitoring and Five-Year Review | -Active mitigation system (projected conversion to passive 2018-2019) to be kept in stand-by mode -SVI cannot reach SC prior to completion of GW cleanup objective. | FY05 | Indefinite | |
| Northeast | Griffiss | SS060 | STW-1300 Bldg 35/36 AOC | N/A | RCRA | LTM | LUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review) | FY00 | Indefinite | ||
| Northeast | Griffiss | CG412 | Flightline OU1 PFC Groundwater Plume | PFOS/PFOA Site | |||||||
| Northeast | Griffiss | FT030 | Fire Training Area (FPTA) | PFOS/PFOA Site | |||||||
| Northeast | Loring | SD010 | Flightline Drainage Ditch (FLDD) | CERCLA | LTM | OU13-Basewide surface water drainage, monitor concentrations of polychlorinated biphenyls (PCBs) and pesticides in fish tissue, stream sediment, and other biota every five years (2023, 2028). LUC inspections and Five-Year Reviews. | PCB impoundments were constructed along the East Branch of Greenlaw Brook. Inspection conducted in 2018 indicated erosion risk. Design and implementation of additional remedial action is not included in this TO. | FY40 | FY40 | ||
| Northeast | Loring | SS054 | Groundwater Monitoring Zone #1 (GMZ #1 Industrial) | CERCLA | LTM | Groundwater monitoring and biennial surface water monitoring, LUC inspections and Five-Year Reviews | ES/JEBS Plume has a TI waiver that requires a technology evaluation every five years in conjunction with the Five-Year Review | TBD | Indefinite | ||
| Northeast | Loring | SS056 | GMZ #3 BXSS | CERCLA | LTM | Groundwater and surface water monitoring, LUC inspections, and Five-Year Reviews. | Recently discovered soil contamination that may require delineation and other remedial actions like bioremediation and addn’l gw monitoring not included in this TO. | FY27 | FY27 | ||
| Northeast | Loring | SS057 | GMZ #4 Quarry | CERCLA | LTM | Groundwater and surface water monitoring, performance monitoring of in-situ enhanced bioremediation, LUC inspections and Five-Year Reviews. | Pilot study completed in November 2017 indicated potential for mass reduction via continued injections/ recirculation but the extent of the contamination is a factor. Modification of remedy based on pilot study is included in this TO. -TI waiver requires technology evaluation every five years in conjunction with the Five-Year Review. | TBD | Indefinite | ||
| Northeast | Loring | SS058 | GMZ #5 FJETC | CERCLA | RA-O | Groundwater monitoring, LUC inspections and Five-Year Reviews. | FY25 | FY25 | |||
| Northeast | Loring | SS059 | GMZ #6 East Base | CERCLA | LTM | Groundwater and surface water monitoring, LUC inspections and Five-Year Reviews. | Elevated manganese in the groundwater; site is located in remote part of base on U.S. Fish and Wildlife Service property. Development of recommendations to address manganese is included in this TO; however, implementation is not included. | TBD | Indefinite | ||
| Northeast | Loring | SS062 | Littleton Pump Station | POL | RA-O | Groundwater monitoring, LUC inspections and Five-Year Reviews | FY40 | FY40 | |||
| Northeast | Loring | SS063 | Mattawamkeag Pump Station | POL | RA-O | Semiannual (Spring and Fall) groundwater monitoring, LUC inspections and Five-Year Reviews | Investigation and remediation of LNAPL in the shallow bedrock is not included in this TO. | FY30 | FY30 | ||
| Northeast | Loring | Bldg 7330 | Vapor Intrusion, linked to OU12 GMZ 1 (SS054) | CERCLA | LTM | Operate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews. | TBD | TBD | |||
| Northeast | Loring | Bldg 7500 | Vapor Intrusion, linked to OU12 GMZ 1 (SS054) | CERCLA | LTM | Operate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews. | TBD | TBD | |||
| Northeast | Loring | Bldg 8260 | Vapor Intrusion, linked to OU12 GMZ 1 (SS054) | CERCLA | LTM | Operate 3 sub-slab depressurization mitigation systems, LUC inspections and Five-Year Reviews. | TBD | TBD | |||
| Northeast | Loring | CLF004 | Asbestos Landfill | MEDEP | LTM | Annual cap inspections, mowing, and erosion control as required. LUC inspections. No Five-Year Review required. | FY99 | Indefinite | |||
| Northeast | Loring | LF001 | Landfill 1 | MEDEP | LTM | LUC inspections. No Five-Year Review required. | FY12 | Indefinite | |||
| Northeast | Loring | LF002 | Landfill 2 | CERCLA | LTM | Unlined RCRA cap with impermeable cover. Annual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews. | Monitoring period is 30 years, until 2026 | FY96 | Indefinite | ||
| Northeast | Loring | LF020 | Landfill 3 | CERCLA | LTM | Annual cap inspections, mowing, erosion control as required; triennial landfill gas monitoring and groundwater elevation monitoring, and groundwater monitoring to support five-year reviews. LUC inspections and Five-Year Reviews. | Monitoring period is 30 years, until 2029 | FY99 | Indefinite | ||
| Northeast | Loring | OT018 | Fly Ash Disposal Site (FADS) | MEDEP | RA-O | Annual cap inspections, mowing, erosion control as required, LUC inspections. No Five-Year Review required. | FY96 | Indefinite | |||
| Northeast | Loring | CCG006 | North Wherry GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG007 | South Wherry GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG008 | Nose Dock GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG009 | South Flightline GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG010 | Alert Area GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG011 | DRMO GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCG012 | East Base GURZ | POL | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY00 | FY31 | ||
| Northeast | Loring | CCF001 | Building 6100 URZ | MEDEP | LTM | LUC Inspections, AF Policy five-year review required. | GW sampling every five years (2020, 2025) to determine if closure objectives have been achieved and LUCs can be released. | FY93 | Indefinite | ||
| Northeast | Loring | CCF002 | Building 6200 URZ | MEDEP | LTM | LUC Inspections, AF Policy five-year review required. | FY93 | Indefinite | |||
| Northeast | Loring | CCF003 | Building 6700 URZ | MEDEP | LTM | LUC Inspections, AF Policy five-year review required. | FY90 | Indefinite | |||
| Northeast | Loring | SS054 | GMZ # 1Industrial Area | PFOS/PFOA Site | |||||||
| Northeast | Loring | SS059 | GMZ # 6 East Base | PFOS/PFOA Site | |||||||
| Northeast | Loring | CG408 | B-52 Crash Site | PFOS/PFOA Site | |||||||
| Northeast | Pease | SS013 | Bulk Fuel Storage Area (BFSA) | NHDES | LTM | Groundwater monitoring | PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO | FY30 | FY30 | ||
| Northeast | Pease | ST081 | Self-Help Shop | NHDES | LTM | Groundwater monitoring and rebound monitoring | FY23 | FY23 | |||
| Northeast | Pease | SS082 | Plume 13/14 | NHDES | LTM | Groundwater monitoring | -Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO | FY25 | FY25 | ||
| Northeast | Pease | SS083 | Plume 41 | NHDES | LTM | Groundwater monitoring | Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO | FY25 | FY25 | ||
| Northeast | Pease | SS084 | Pumphouse 2 | NHDES | LTM | Groundwater monitoring | -Air sparge/soil vapor extraction system inactive due to assumed methane accumulation. Evaluation of methane not included in this TO. -Potential impacts associated with PFOS/PFOA P&T system (AIMS) exist. PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO | FY27 | FY27 | ||
| Northeast | Pease | TU032 | Building 113 | CERCLA | LTM | RA-O of isolation unit (sheet pile), performance monitoring, groundwater monitoring | FY20 | Indefinite | |||
| Northeast | Pease | ID039 | Building 227 | CERCLA | RA-O | SVE; performance monitoring of ISEB; and groundwater monitoring | Vapor intrusion pathway issue, PRAP/ROD amendment in progress to document SVE and will be completed by current contractor. | FY23 | Indefinite | ||
| Northeast | Pease | AB022 | Burn Area 1 | CERCLA | LTM | Groundwater monitoring, decommissioning of AS/SVE | LNAPL discovered along with groundwater divide may drive alternate approach; metals issues. Evaluation of additional remedy not included in this TO | FY27 | FY27 | ||
| Northeast | Pease | SS036 | Building 119 | CERCLA | LTM | Groundwater monitoring | PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO. | FY30 | FY30 | ||
| Northeast | Pease | SS049 | Building 22 | CERCLA | LTM | MNA with PRB monitoring; performance monitoring of ISEB, groundwater monitoring | Potential upgradient source (DNAPL in fractured bedrock), four new wells installed to delineate and possibly treat hot-spot in 2019. Evaluation of additional remedy for potential upgradient source not included in this TO. | FY48 | FY48 | ||
| Northeast | Pease | ID073 | Building 234 | CERCLA | LTM | Groundwater monitoring | -Established remedy creating reducing conditions that mobilize arsenic. Evaluation of additional remedy not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY23 | FY23 | ||
| Northeast | Pease | DP010 | Leaded Fuel Tank Sludge Area | CERCLA | LTM | Groundwater monitoring | Benzene rebound attributed to unknown source. Evaluation of additional remedy not included in this TO. | FY27 | FY27 | ||
| Northeast | Pease | LF006 | Landfill 6 | CERCLA | LTM | Annual inspections, triennial groundwater monitoring | Issues with arsenic due to reducing conditions post LF removal, potentially caused by wetland, geochemical analysis conducted in 2018 to determine if Arsenic issue is not naturally occurring. Evaluation of additional remedy not included in this TO. | FY07 | FY28 | ||
| Northeast | Pease | SS045 | Old Engine Test Stands (OJETS) | CERCLA | LTM | Groundwater monitoring | Manganese remains elevated after completion of remedy and residual reducing conditions difficult to overcome. Evaluation of additional remediation not included in this TO | FY27 | FY27 | ||
| Northeast | Pease | ST072 | Motor Pool | NHDES | LTM | TBD | New soil borings completed late 2018 by current contractor. Results available xxx 20xx | FY30 | FY30 | ||
| Northeast | Pease | SS016 | Building 410 | CERCLA | LTM | Confirmation sampling to validate contamination has been removed, , remove LUC/ICs if UU/UE | FY95 | FY28 | |||
| Northeast | Pease | DP009 | Construction Rubble Dump 1 (CRD-1) | NHDES | LTM | Annual cap inspections, settlement monitoring every 5 yrs, mowing as needed, and erosion control | FY95 | Indefinite | |||
| Northeast | Pease | DP017 | CRD-2 | NHDES | LTM | Annual cap inspections, annual mowing, erosion control, and surface water and sediment sampling | FY95 | Indefinite | |||
| Northeast | Pease | ST085 | Flightline Refueling System (FLRS) | NHDES | LTM | Groundwater monitoring | MNA not meeting goals. Evaluation of additional remedy not included in this TO. | FY30 | Indefinite | ||
| Northeast | Pease | LF005 | Landfill 5 | CERCLA | LTM | Annual cap inspections, settlement monitoring every 5-yrs, annual mowing, erosion control, triennially groundwater monitoring, surface water and sediment sampling | FY08 | Indefinite | |||
| Northeast | Pease | LF001 | Landfill 1 | NHDES | LTM | Annual cap inspections, mowing as needed, erosion control, triennial groundwater monitoring, surface water and sediment sampling | FY96 | Indefinite | |||
| Northeast | Pease | Not Applicable | Zone 2 | CERCLA | LTM | Groundwater monitoring | Includes former AB037 monitoring requirements; closure of Zone 2 is dependent on closure of individual sites in Zone 2. | TBD | Indefinite | ||
| Northeast | Pease | OU11 | Brooks and Ditches | CERCLA | LTM | Surface water and sediment monitoring | |||||
| Northeast | Pease | AT008 | FDTA - 2 | PFOS/PFOA Site | |||||||
| Northeast | Pease | CG401 | Airfield PFC Plume | PFOS/PFOA Site | |||||||
| Northeast | Plattsburgh | FT002/Industrial Area Ground-water OU | Basewide Groundwater (Includes Fire Training Area and Industrial Area GW) | N/A | CERCLA | RA-O | Groundwater monitoring, discharge sampling (including sampling for PFAS), LUC/IC monitoring, and Five-Year Review |
a) Operation of SVE system (VGAC) at Bldg. 2753 (installed late FY09, deactivated in Feb 2014 and reactivated in Feb 2018), and annual sub-slab and indoor air sampling.
b) Annual sub-slab and indoor air sampling at New Building C and Bldg. 2766, SVE systems at these two locations have been deactivated and confirmation sampling is in progress ( may require reactivation if rebound occurs). d) Quarterly monitoring and inspections and maintenance including whole house filter changeout, carbon recycling and replacement/changeout on whole home PFAS mitigation systems at one location
| c) Ongoing operation and maintenance (O&M), and discharge monitoring and reporting of three passive groundwater collection trenches | -Runway/Flightline Collection Trench (RFCT) GW Treatment Plant has been deactivated and approved for decommissioning/demolition which is included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | FY84 | FY84 | ||||||||
| Northeast | Plattsburgh | SS013 | Munitions Maintenance Squadron | N/A | CERCLA | RA-O | Ozone sparging system operated intermittently through 2014; Soil excavation to remove residual contamination planned in 2018 followed by possible restart of ozone sparge system; groundwater/surface water monitoring, LUC/IC monitoring including general SVI restriction and occupancy restriction for Bldg. 3578, and Five-Year Review. | -The SVI restriction is based on calculations and not an actual study. Site closure (SC) under current PBR TO is pending. -PFOS/PFOA detected within the site boundaries Investigation and remediation of PFAS is not included in this TO. | for GW FY26 | ||
| Northeast | Plattsburgh | RW042 | Wash Rack AOC | N/A | non-CERCLA managed as petroleum site | RA-O | Semiannual groundwater monitoring, LUC/IC monitoring and Non-CERCLA Five-Year Review (AF Policy Review). | -LNAPL discovered at site in 2017; results of investigation under current PBR are expected xxx 2019. Modification to the remedy based on the investigation is not included in this TO. -PFOS/PFOA detected within the site boundaries. Investigation and remediation of PFAS is not included in this TO. | TBD | ||
| Northeast | Plattsburgh | CTU234 | UST-3580 | Former heating fuel UST | NYSDEC Corrective Action (Spills) Program | RA-O | MNA, Groundwater monitoring, LUC/IC inspections and Non-CERCLA Five-Year Review (AF Policy Review) | Site closure (SC) is pending on the current PBR TO. | FY12 | FY25 | |
| Northeast | Plattsburgh | CTU281 | UST-2704 | Former diesel fuel UST | NYSDEC Corrective Action (Spills) Program | RA-O | Groundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review) | Injection completed in 2018. Site closure (SC) is pending on the current PBR TO | FY25 | FY25 | |
| Northeast | Plattsburgh | CTU-294 | UST-2009 | Former fuel oil UST | NYSDEC Corrective Action (Spills) Program | RA-O | Groundwater monitoring, LUC/IC inspections, and Non-CERCLA Five-Year Review (AF Policy Review) | Soil excavation and mixing completed in 2017. Site closure (SC) is pending on the current PBR TO. | FY28 | FY28 | |
| Northeast | Plattsburgh | SS005 | No-Destructive Inspection (NDI) Facility | N/A | CERCLA | LTM | LUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year Review | FY98 | Indefinite | ||
| Northeast | Plattsburgh | SS006 | Aerospace Ground Equipment (AGE) Facility | N/A | CERCLA | LTM | LUC/IC monitoring (Groundwater, Non Residential Use) and Five-Year Review | FY98 | Indefinite | ||
| Northeast | Plattsburgh | SS018 | Auto Hobby Shop | N/A | CERCLA | LTM | LUC/IC monitoring (non-residential use), and Five-Year Review | FY13 | Indefinite | ||
| Northeast | Plattsburgh | LF021 | Former Landfill (56-59) | N/A | CERCLA | LTM | Soil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year Review | FY97 | Indefinite | ||
| Northeast | Plattsburgh | LF022 | Former Landfill (59-66) | (D-3, D-7) | CERCLA | LTM | Soil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year Review | FY95 | Indefinite | ||
| Northeast | Plattsburgh | LF023 | Former Landfill (66-81) | (D-4) | CERCLA | LTM | Engineered RCRA Cap. Landfill LTM (inspection, maintenance, landfill gas monitoring, and groundwater monitoring including baseline and routine events LUC/IC monitoring, and Five-Year Review. | Site is governed by a Source Control Record of Decision and a Groundwater Operable Unit Record of Decision | FY95 | Indefinite | |
| Northeast | Plattsburgh | LF024 | Former C & D Landfill | N/A | CERCLA | LTM | Soil/vegetative cover. Landfill LTM (inspection, maintenance, and groundwater monitoring), LUC/IC monitoring, and Five-Year Review | FY97 | Indefinite | ||
| Northeast | Plattsburgh | SS028 | Building 508 Open Storage Area | N/A | CERCLA | LTM | LUC/IC (non-residential use) monitoring and Five-Year Review | Soil vapor extraction system pilot study planned for 2018 to assess residual soil gas contamination; SVI issues may require additional LUC/ICs at the site. Site closure (SC) under current PBR is pending. | FY21 | Indefinite | |
| Northeast | Plattsburgh | SS031 | Central Heat Plant | N/A | NYSDEC R5 Corrective Action (Spills) Program | LTM | Remediation of heavier residual soil contamination planned for 2018 via excavation was completed xxx 201x; Non-CERCLA Five-Year Review (AF Policy Review) | Petroleum only site; Site closure (SC) under current PBR TO is pending but under question given contamination discovered at site boundary near rails; if SC is not achieved, LUC/ICs including SVI restriction may be required. | Indefinite | ||
| Northeast | Plattsburgh | CWM127 | OTH-3505-1 | Construction Debris Area | RCRA | LTM | LUC/IC Inspections and Five-Year Review | Decision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICs | FY21 | Indefinite | |
| Northeast | Plattsburgh | CSA283 | OTH-3210-2 | D&H Nursery | RCRA | LTM | LUC/IC Inspections and Five-Year Review | Decision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICs | FY21 | Indefinite | |
| Northeast | Plattsburgh | CDA286 | OTH-1700 | Area R Trash Dump | RCRA | LTM | LUC/IC Inspections and Five-Year Review | Decision document being prepared under current PBR TO projected for completion by 2021 to memorialize establishment of LUC/ICs | FY21 | Indefinite | |
| Northeast | Plattsburgh | FT002 | Fire Training Area | PFOS/PFOA Site | |||||||
| Northeast | Plattsburgh | CG406 | North Flightline PFC Groundwater Plume | PFOS/PFOA Site | |||||||
| Northeast | Plattsburgh | CG407 | Southern Airfield | PFOS/PFOA Site |
FA8903-20-R-0002
Northeast Region Attachment 1 17 October 2019
&P of &N