NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx

DOCX document 55 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS)
Solicitation number
FA8903-20-R-0002
Issued by

About this file

This pre-solicitation notice and draft request for proposal provide details regarding a potential indefinite delivery/indefinite quantity contract for Base Realignment and Closure environmental remediation services at 40 closed military installations across five regions of the continental United States and Galena, Alaska. The Air Force Civil Engineer Center and 772nd Enterprise Sourcing Squadron seek to award six single-award contracts on a full and open basis, with two set-asides for small businesses and one set-aside for 8(a) small businesses. The anticipated period of performance is ten years from July 2020 through July 2030, with an initial ordering period of five years and an option to extend the ordering period an additional three years. The scope of work will encompass all activities required to meet performance objectives for environmental restoration, maintain remedies, implement optimization efforts, and advance sites to completion in a cost-effective manner according to technical and regulatory standards. Questions regarding the draft request for proposal are due by November 4, 2019.

NC TO2 PWS 2

View the file

Other files

File Type Posted
RFI__5_BECOS.pdf PDF
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_4.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_2.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Myrtle Beach Dft 20 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
DRAFT_10242019_Central_South_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model_v2.xlsx XLSX spreadsheet
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Galena_Alaska_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Draft_18_SEP_Dft_19_v4.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req O'Hare Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
IDIQ_DD1423_CDRLS_Central_South_EXH_C002_(MGMT)_Dft_27_Sep_19.zip ZIP file
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
IDIQ_PWS__Attch_2__Central_South_-_Acronyms_and_Definitions_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Reese Dft 18 SEP 19 v2.0.docx DOCX document
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_A016_(DRPR)_27_Sep_19.zip ZIP file
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
TO1_PWS_Central_South_Dft_17_OCT_19_v3.0.docx DOCX document
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

19 September 2019

1.1 Scope

The former Mather Air Force Base (AFB) is listed on the National Priorities List (NPL) and has a Federal Facility Agreement (FFA) in place. Records of Decision (RODs) have been signed for all but one Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites included in this task order, and Remedy in Place (RIP) has been achieved for those sites. Property transfer from the Air Force has been completed for all of the sites included in this PBR.

In 2017 a new soil vapor source area was discovered near Building 4260 within the Main Base/SAC Area (MBSA) groundwater plume. A soil vapor extraction (SVE) removal action was initiated in August 2018. The Building 4260 soil vapor source area was added to Site SD057 because of its potential to impact groundwater in the MBSA groundwater plume. Note that discontinuing SVE is a rigorous process and regulators have been hesitant to approve in the past.

The 23 sites (or portions of sites) included in this task order are being addressed following the CERCLA process or state corrective action program (non-CERCLA). Regulatory oversight is provided by the U.S. Environmental Protection Agency (EPA), California Department of Toxic Substances Control (DTSC) and Central Valley Regional Water Quality Control Board (Water Board). Remedies include landfill caps, groundwater pump and treat, and soil vapor extraction (SVE). Groundwater contamination has migrated off-site and the Air Force conducts sampling of off-base wells under various easements, licenses, and letters of permission. In addition, the Air Force samples off-base water supply wells (county and private water company wells) as well as operates wellhead treatment systems on these wells as required. All of the sites included in this task order must be included in the Five-Year Review. Annual reporting of compliance with institutional controls (ICs) is also required.

In addition to the requirements presented in this PWS, this scope includes the following:

· Contractor is responsible for maintaining GAC systems to treat PFAS at SD057 and WP007, monitoring system influent and effluent in accordance with the GAC system O&M Plans, and conducting quarterly/annual monitoring of guard wells and off-base drinking water wells for PFAS.

Contractors are not responsible for the following:

· Preparation of easements or letters of permission required for off-base extraction and monitoring activities.

· Payment of fees associated with off-base easements.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
FFA
AR 1830
July 21, 1989
2.
ROD, Aircraft Control and Warning (AC&W) SiteWP012
AR 602
December 1993
3.
AC&W ESD (WP012) for Surface Water Discharge
AR 1319
June 12, 1997
4.
Final ESD, Institutional Controls for Groundwater Remedy, Site WP-12 (Aircraft Control and Warning Site)
AR 2728
November 13, 2008
5.
ROD, Landfill OU
AR 844
July 1995
6.
ESD, Consolidation of Additional Refuse & Debris into Landfill Site 4
AR 1186
October 29, 1996
7.
Final Memorandum of Post-ROD Changes Clarification of Institutional Controls for the Landfill Operable Unit Remedies
AR 2738
August 6, 2009
8.
ROD, Soil OU Sites and Groundwater OU Plumes
AR 799
April 29, 1996
9.
ESD, Disposal of Contaminated Soil, Soil OU, WP-07, FT-11
AR 1746
September 18, 1998
10.
Final ESD, Soil OU and Groundwater OU Plumes ROD for Sites 56, 59, and 60
AR 2636
December 1998
11.
Revised Final ESD from the ROD for Soil Operable Unit Sites and Groundwater Operable Unit Plumes, Soil Sites WP-07/FT-11, ST-37/ST-39/SS-54, SD-57, SD-59, Main Base/SAC Area Plume, Site 7 Plume, Northeast Plume, February 2010
AR 2971
August 31, 2010
12.
ROD, Basewide OU
AR 1135
August 24, 1998
13.
Final ESD from the ROD, Excavation of Shallow Soil Contaminated with Lead at Site 10C/68
AR 2709
August 15, 2008
14.
Final ESD from the ROD for Basewide Operable Unit Sites, Sites FT-10C/ST-68, LF-18, OT-23C, and OT-87
AR 2972
August 31, 2010
15.
ROD, Supplemental Basewide OU
AR 2646
September 30, 2006
16.
Final Action Memorandum for Soil Vapor Extraction (SVE) at Building 4260, former Mather AFB
AR 576035
August 7, 2018

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-16-F-0018
PBR for Western Region Bases: Caste, Norton, and Mather
07/22/21
09/22/2021

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· BCT meetings are currently held on a semi-annual basis. Meetings are typically one full day and are held at the former McClellan Air Force Base.

· Technical Working Group (TWG) meetings are held on an as needed basis to discuss issues with regulatory technical experts. Meetings are generally 2-4 hours and are held at the former McClellan Air Force Base.

2.6.2 Public Meetings and Hearings

· The Mather RAB has been adjourned and no RAB meetings are held.

· Stakeholder meetings or other publicly attended meetings are held on an as needed basis. Meetings are generally 2-4 hours and are held at the former McClellan Air Force Base or other Sacramento area venue.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· Easements and/or letters of permission are required for extraction and monitoring activities on the off-base properties. The Air Force will prepare the easements and letters of permission, track receipt of signed permission letters, and pay all required easement fees.

· The Contractor is responsible for renewing the sewer discharge permit every three years and for preparing monthly sewer discharge reports.

2.9 Contractor Documentation

· No base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct annual inspections and reviews to confirm compliance with all CERCLA and non-CERCLA environmental restrictions associated with the sites. Where possible, the Contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners. Although there are State Land Use Covenants on some properties, the Air Force is continuing to do annual inspections and reporting to ensure environmental restrictive covenants are being enforced.

6.15 Five-Year Reviews

· The current PBR contractor will complete the fifth Mather 5-year review, due by 30 September 2020. The next five-year review will be due by 30 September 2025.