This performance work statement outlines environmental remediation services required at the former Grissom Air Force Base in Indiana. The scope of work includes long-term monitoring and closure activities at multiple sites involving landfills, heating plants, and fire training areas contaminated with chlorinated solvents and PFAS. Specific tasks involve groundwater and soil sampling, five-year reviews, and inspections of land-use controls through September 2020. The contractor must also support meetings with regulatory agencies, public stakeholders, and the base cleanup team on an as-needed basis. Applicable documents provide details on previous investigations, decisions, and monitoring reports for the nine sites addressed. No additional or excluded scope items are specified.

MW TO2 PWS 2

View the file

Other files

File Type Posted
RFI__5_BECOS.pdf PDF
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_4.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS.docx DOCX document
Northeast_Region_BECOS_IDIQ_PWS_Attachment_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_2.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Myrtle Beach Dft 20 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
DRAFT_10242019_Central_South_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model_v2.xlsx XLSX spreadsheet
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Galena_Alaska_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_PWS_Attachment_1_-_Base_Site_List_Draft_18_Sept_2019_v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Draft_18_SEP_Dft_19_v4.0.docx DOCX document
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req O'Hare Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
IDIQ_DD1423_CDRLS_Central_South_EXH_C002_(MGMT)_Dft_27_Sep_19.zip ZIP file
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
IDIQ_PWS__Attch_2__Central_South_-_Acronyms_and_Definitions_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Richards Gebaur Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Reese Dft 18 SEP 19 v2.0.docx DOCX document
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_A016_(DRPR)_27_Sep_19.zip ZIP file
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
TO1_PWS_Central_South_Dft_17_OCT_19_v3.0.docx DOCX document
Show 40 more

Latest 50 of 120 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

24 September 2019

1.1 Scope

Former Grissom AFB is located approximately 15 miles north of Kokomo in Cass County, Indiana and was established in July 1942 by the United States Navy as Naval Air Station (NAS) Bunker Hill. NAS Bunker Hill was closed at the end of World War II and the U.S. Air Force (USAF) obtained right of entry to 25 buildings in November 1951, reactivating Bunker Hill as an Air Force Base in 1954. The installation was renamed in 1968 to Grissom AFB and the Air Force Reserve began using the base in the early 1970s.

In 1984, the USAF initiated the Installation Restoration Program (IRP) to identify and evaluate environmental issues associated with past waste, disposal practices and spills. The former Grissom AFB is a non-National Priorities List installation and IRP activities are not currently under a Federal Facility Agreement or Interagency Agreement with the lead regulatory agency, the Indiana Department of Environmental Management (IDEM), or United States Environmental Protection Agency (USEPA).

In 1993, the BRAC Commission directed realignment of Grissom AFB to the Air Force Reserve (ARB) and on 1 October 1994 Grissom AFB ceased all active-duty operations. In 2008, Grissom ARB entered into a joint-use agreement with Miami County Economic Development Authority to have Montgomery Aviation managing day-to day civil operations. The Air Reserve Base occupies 1,233 acres of the former installation with the remaining 1,489 acres being maintained by private entities, the State of Indiana, or by the Miami County Economic Development Authority.

In response to USAF’s enterprise-wide response to possible releases of PFAS containing AFFF, a preliminary assessment was completed in 2015. The site investigation conducted by Amec Foster Wheeler in 2016 documented the presence of PFAS in soil, groundwater, surface water, and sediment near Fire Training Areas FT001 and FT002.

Currently, IDEM is the regulatory authority, and USEPA is not involved in the environmental program.

There are nine sites included in this PBR TO that are being addressed following the CERCLA progress. Two sites are landfills (LF003 and LF005) with ongoing routine post-closure activities. One site is the Central Heat Plant (CHP049) which is also in Long-term Management (LTM). Sites SS190, FT001, and FR002 will have very specific requirements for verification monitoring and closure activities and reporting only. Sites SS035, SS053, and SS058 have chlorinated solvents in soil and groundwater and require further action. Land use control (LUC) inspections and five-year reviews are required for all sites.

In addition to the requirements presented in this PWS, this scope includes the following:

· No additional scope.

Contractors are not responsible for the following:

· No base-specific exclusions.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Final Annual 2017 Groundwater Monitoring Report for Installation Restoration Program Site SS190
AR # TBD
September 2018
2.
Draft Final Third Five-Year Review Report
AR # TBD
July 2018
3.
Final Land Use Controls Inspection Report
AR # TBD
April 2018
4.
Draft Groundwater Investigation and Work Plan Memorandum for Installation of Additional Groundwater Monitoring Wells at Installation Restoration Program Site SS053
AR # TBD
August 2017
5.
Final Addendum to the Groundwater and Vadose Zone Soil Remediation Work Plan for Installation Restoration Program Site SS190
AR # 573440 & 557114
April 2017
6.
Final Groundwater Monitoring Report for Installation Restoration Program Sites SS035, SS053, and SS058
AR # 557415
February 2017
7.
Final Annual 2016 Groundwater Monitoring Report for Installation Restoration Program Sites FT001 and FT002
AR # 557104
September 2016
8.
Memorandum for Changes to the November 2001 Decision Document for the Fire Protection Training Areas 1 and 2
AR # 381
July 2005
9.
Final Record of Decision for Area of Concern 53 at Hangar 200
AR # 367
October 2003
10.
Final Decision Document Fire Protection Training Areas 1 and 2
AR # 382
November 2001
11.
Final Decision Document for Landfill 2 (LF004)
AR # 359
May 2001
12.
Final Decision Document for Landfill 1 (LF003)
AR # 329
September 2000

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Region 5 Bases PBR
FA8903-09-D-8565
24 September 2020
24 September 2020

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· Grissom BCT meetings are generally held monthly via PBR contractor-hosted teleconference calls. In addition, onsite BCT meetings are held on an as-needed basis approximately 2 times per year and are typically scheduled to occur the same week as other Air Force meetings (e.g., RAB meetings, public meetings, stakeholder meetings). Onsite meetings are typically held at the former base in the Grissom Reserves offices.

2.6.2 Public Meetings and Hearings

· Grissom RAB meetings are held on annually; typically, in August and is held along with the Grissom Reserves RAB. Grissom Reserves host the RAB in their offices and conduct public notices and logistics. The PBR contractor is responsible for preparing and presenting the Air Force BRAC portion of the RAB.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No additional base-specific requirements.

2.9 Contractor Documentation

· No additional base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No additional base-specific requirements.

6.14 Land Use Controls (LUC)

· Annual LUC inspections are required.

6.15 Five-Year Reviews

· The third Five-Year Review has been completed under the current PBR and was due September 2015. The fourth Five-Year Review due September 2020 will be delayed and is included in this PBR. The fifth five-year review, falling within the PoP of this contract, is also included in this PBR.