Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req General Mitchell Dft 24 SEP 19 v3.0.docx
DOCX document 52 KB Posted
- Solicitation number
- FA8903-20-R-0002
About this file
This document provides information regarding a forthcoming solicitation for Base Realignment and Closure (BRAC) environmental remediation services. The services include maintaining regulatory remedies, optimizing remediation, and advancing sites to completion at 40 BRAC installations across five continental U.S. regions and Galena, Alaska. The Air Force Civil Engineer Center plans to award six single-award indefinite delivery/indefinite quantity contracts, one per region, through a competitive process. The contracts will have a 10-year period of performance from July 2020 through July 2030 and include optional extensions. The solicitation is expected to be released in November 2019 for full and open competition as well as set-asides for small businesses. Questions regarding the draft solicitation are due by November 4, 2019.
MW TO2 PWS 2
View the file
Other files
Show 40 more
Latest 50 of 120 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
24 September 2019
1.1 Scope
Former General Mitchell ARS is situated in the southwest portion of the General Mitchell International Airport (GMIA) property and has a footprint of approximately 101 acres in Milwaukee County, Wisconsin. GMIA is located approximately 7 miles south of downtown Milwaukee and is surrounded by urban development on approximately 1,900 acres of land. Operations at GMIA include airfield operations facilities, the Wisconsin Air National Guard (WIANG), and the former General Mitchell ARS. GMIA is owned and operated by Milwaukee County.
General Mitchell ARS formally opened in 1941 as Hamilton Field, later renamed General Billy Mitchell Field. Prior to the USAF constructing the installation, the field may have been developed for agriculture. The 924th Reserve Training Wing was activated in February 1952, later re-designated as the 538th Fighter Bomber Wing on 1 July 1952, 274th Air Force Reserve Training Center (AFRTC) in 1953, and 2473rd AFRTC later that same year. The aircraft maintenance hangar with the heating plant, along with base supply and petroleum oils and lubricants (POL) areas were completed in 1956. The installation was renamed General Mitchell ARS in 1986 and officially closed on 2 February 2008 as part of the 2005 BRAC Commission.
Wisconsin Department of Natural Resources (WDNR) is the regulatory authority. USEPA is not involved.
There is one IRP site included in this PBR TO. Site ST010 is in Response Complete (RC) and only requires annual land use control (LUC) inspections and reporting, and abbreviated Five-Year Reviews.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional base-specific requirements.
Contractors are not responsible for the following:
· No additional base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Final First Five-year Review Report for Former General Mitchell Air Reserve Station ERP Site ST-10 |
| Not yet in AR (cannot find signed copy) |
| May 2015 |
| 2. |
| Closure Report for Oil/Water Separator 104A |
| AR # 421917 |
| February 2010 |
| 3. |
| Closure Report for Oil/Water Separator 104B |
| AR # 421918 |
| February 2010 |
| 4. |
| Closure Report for Oil/Water Separator 104C |
| AR # 421919 |
| February 2010 |
| 5. |
| Closure Report for Oil/Water Separator 308 |
| AR # 421926 |
| February 2010 |
| 6. |
| Final Phase II Investigation Report |
| AR # 421914 |
| February 2010 |
| 7. |
| Aboveground Storage Tank and Oil/Water Separator Clean-out Summary |
| AR # 421915 |
| October 2008 |
| 8. |
| Case Closure Request Package Installation Restoration Program Site ST-10 |
| AR # 421963 |
| October 2003 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Not applicable. |
| - |
| - |
| - |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· No public meeting or BCT meeting are currently held for General Mitchell.
2.6.2 Public Meetings and Hearings
· Not applicable.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· None.
2.9 Contractor Documentation
· None.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· None.
6.14 Land Use Controls (LUC)
· Annual LUC inspections are required.
6.15 Five-Year Reviews
· Abbreviated Five-Year Review for Site ST010 included in this PBR.