Attachment_4_BECOS_Relevancy_Matrix_Draft_RFP.pdf

PDF 111 KB Posted

Attached to
BRAC Environmental Construction Optimization Services (BECOS) Federal contract opportunity
Solicitation number
FA8903-20-R-0002
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center

About this file

This document provides details regarding a pre-solicitation notice for follow-on environmental remediation contracts at 40 Base Realignment and Closure installations. The Air Force Civil Engineer Center and 772nd Enterprise Sourcing Squadron plan to award six indefinite delivery/indefinite quantity contracts on a full and open basis, with small business set asides, to perform regulatory compliance, remediation, and construction services across five continental U.S. regions and Galena, Alaska. The contracts would have a 10-year period of performance from July 2020 to July 2030 and include optional extensions. Services will support achieving site closure objectives at multiple installations in accordance with technical and regulatory requirements to ensure protection of human health and the environment. Questions regarding the draft request for proposal are due by November 4, 2019 to be addressed in the final solicitation.

PP Matrix

View the file

Other files for this federal contract opportunity

Other files attached to BRAC Environmental Construction Optimization Services (BECOS), newest first.
File Type Posted
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_A010_(QCIC)_03_Oct_19.zip ZIP file
TO2 PWS Central South Dft 25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Galena_AK_Region_BECOS_TO_2_PWS_Draft_25_SEP_19_v3.0.zip ZIP file
DRAFT_10242019_NorCal_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
Section_I_Draft_RFP_FA890320R0002.pdf PDF
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
Northeast_Region_BECOS_TO_2_PWS_Attachment_1_-_Site_List_Dft_25_SEP_19_v2.0.zip ZIP file
Midwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Carswell Dft 20 SEP 19 v3.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Grissom Dft 24 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal_Region_BECOS_TO_2_PWS_Draft_25_SEP_19_v3.0.zip ZIP file
DRAFT_10242019_Midwest_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_L_Draft_RFP.pdf PDF
TO1_DD1423_CDRLS_Central_South_EXH_B006-B007-B008_(ADMN)_Dft_17_Oct_19.zip ZIP file
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
NorCal_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
Draft_RFP_FA890320R0002_Standard_Form_33_-_Solicitation,_Offer_and_Award.pdf PDF
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
DRAFT_10242019_Southwest_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_2_-_Acronyms_and_Definitions_Draft_18_Sept_19_v1.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Newark Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req General Mitchell Dft 24 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_TO_2_PWS_Attachment_1_-_Site_List_Dft_25_SEP_19_v1.0.zip ZIP file
Show all 50

BRAC Environmental Construction Optimization Services (BECOS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Program Management and Quality Assurance

Very Relevant To be considered very relevant, Past Performance (PP) experience demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience demonstrated in any of the 5 criteria below.

A. Experience providing documents, technical plans, and reports accurate, timely and complete and with demonstrated quality. (did not require excessive revision)

B. Experience performing site work in compliance with required and applicable regulations. (such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations)

C. Experience performing record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Experience implementing RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Experience working with state regulatory processes IAW regulation and protective of Human Health and the Environment.

2. Regulatory Interaction and Stakeholder Coordination

To be considered very relevant, Past Performance (PP) experience demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience demonstrated in any of the 5 criteria below.

A. Experience working proactively and collaboratively with the Government and engaging regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Experience implementing and / or facilitating Community Involvement, addressing challenging stakeholders and / or collaborating with community stakeholders in such instances as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Experience transitioning work well, providing all the required documents (such as GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Experience performing an effort that required work on multiple areas with more than (5) five contract designated sites such as installations or former installations. (able to coordinate work on multiple sites and areas well)

E. Experience managing environmental restoration activities on property with multiple owners / stakeholders. (such as local redevelopment authorities, private entities, federal agencies and municipalities)

3. Analysis and Data Management

To be considered very relevant, Past Performance (PP) experience demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience demonstrated in any of the 5 criteria below.

A. Experience providing reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Experience applying an innovative approach in order to accelerate site closeout at a site.

C. Experience exhibiting technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data) D. Experience designing, installing, operating, maintaining, and / or optimizing remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Experience consistently monitoring the current remedy progress and / or tracking site progress issues, communicating progress / metrics, and reporting on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)

File details come from the government source that posted it. Updated .