SEI Industry QAs 17 mar09 actual.ppt

PPT presentation 258 KB Posted

Attached to
LRSW Systems Engineering & Integration
Solicitation number
FA8811-R-09-0002
Issued by

About this file

Industry Day questions and anwsers 17 Mar 09

View the file

Other files

File Type Posted
L-1 Instructions to offerors 2 Nov 09.pdf PDF
FA881109R0002AssembledWORDVersion.DOC DOC document
offeror comment request 2 nov 09.pdf PDF
L-1 Instructions to offerors 30 Oct 09.pdf PDF
30th SW base support plan.pdf PDF
19 oct SEI questions and responses.pdf PDF
SEI DD254_1oct09 with cont sheet.pdf PDF
Summary of Amendment 4 changes to SEI.pdf PDF
L-1 Instructions to offerors 15 Oct 09.pdf PDF
Summary of Amendment 3 changes to SEI.pdf PDF
sei 15 oct questions and responses.pdf PDF
SEI PWS 13 Oct 09.pdf PDF
questions and responses 9 Oct 09.pdf PDF
L-1 Instructions to offerors 13 Oct 09.pdf PDF
Sec L-1 Attach 5 PWS Potential OCI matrix 13 oct 09.xls XLS spreadsheet
SEI RFP 13 Oct 09.pdf PDF
Summary of Amendment 2 changes to SEI.pdf PDF
SEC M002 13 Oct 09 update.pdf PDF
SEI RFP 7 Oct 09 amend 1.pdf PDF
SEC M002 7 Oct 09 update.pdf PDF
Sec L-1 ATTACH 3 Past performance info 5 Oct 09.doc DOC document
Sec L-1 Attach 1 Pricing Format 5 oct 09.xls XLS spreadsheet
L-1 Instructions to offerors 7 Oct 09.pdf PDF
Summary of Amendment 1 changes to SEI.pdf PDF
Sec L-1 Attach 5 PWS Potential OCI matrix oct 09.xls XLS spreadsheet
SEI PWS 5 Oct 09.pdf PDF
SEC L-1 Attach 2 FTE tasks matrix 30 may 09.xls XLS spreadsheet
Award Term Plan 24 Aug 09 signed 14 sep 09.pdf PDF
SEC M002 28 Sep 09 update.pdf PDF
Sec L-1 Attach 4 OCI plan checklist.DOC DOC document
Sec L-1 ATTACH 3 Past performance info.doc DOC document
SEI RFP 25 Sep 09.pdf PDF
L-1 Instructions to offerors 28 Sep 09.pdf PDF
SEI PWS 22 Sep 09.doc DOC document
SEI DD254_1Jul09 full.pdf PDF
SEI DD254_1Jul09 full.pdf PDF
SEI PWS 6 Jul 09 update .doc DOC document
PWS DOCS - bidders library unclass.zip ZIP file
CDRLs 11 Jun.pdf PDF
Industry Day Draft RFP Questions20 apr.xls XLS spreadsheet
SEI Industry Briefing - Master 17 Mar 09 actual.ppt PPT presentation
draft RFP 10 Mar 09.pdf PDF
SE I Performance Plan.pdf PDF
draft rfp 5 mar 09.pdf PDF
draft DD254.pdf PDF
FT Mac maps.pdf PDF
contractor pricing spreadsheet - draft.xls XLS spreadsheet
PWS dated March 05 2009 - Master File .pdf PDF
SE I award term plan.pdf PDF
SMC_OCI_Plan_Checklist__May_2007_.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

Question 1:
Do you perceive an OCI issue between the LISC and the LRSW SE&I contracts? If a contractor were contemplating competing on both, are there known OCI issues?
Response:
The focus of this LRSW SE&I contract will be with LRSW launch systems. The Launch and Test Range System (LTRS) Integrated Support Contract (LISC) supports the Eastern and Western Ranges. A second LTRS SE&I RFP was formally released 10 Mar 09 (FA8811-09-R-0001) to support the Wing and its range requirements architecture development. At this time we see no OCI between the LRSW SE&I and LISC.
In all proposal submittals each offeror must address its own OCI situation relevant to each specific contract.
Question 2:
In the D-RFP, Section L, Para (b) page 6 of 16, the page limit for the Part II Technical Proposal is limited to 25 pages. In subfactor 1(b), mid-paragraph, it states, “…addresses all of the work scope in the eight PWS SE&I functional task areas”. Twenty-five pages may be too few to adequately respond to this requirement (the PWS is fifty pages). Please consider expanding the page limitation.
Answer:
The Technical Proposal page limit will be re-evaluated for the final RFP.
Question 3:
The PWS contains large sections that also appear to be covered in the 45 LCG, 30 LCG, and LRSW STS DOs. What is the transition or relationship between these separate contracting actions?
Answer:
The SE&I effort is a new requirement for LRSW.

The STS BPAs are for commercial services under GSA for Advisory and Assistance tasks. This instant acquisition is for SE&I not A&AS.

Question 4:
PWS 1.4.1.3 calls for a transition of VAFB Software Development work in Apr 2010. Can you clarify why this work does not begin until 2010 when the corresponding work at the Cape (PWS 1.3.1.3) begins immediately?
Answer:
PWS 1.4.1.3 will be updated to remove the delayed start of the work.
Question 5:
Will the Gov’t hold an Industry Day at the Launch sites?
Answer:
Since this effort is for systems engineering and integration oversight responsibilities, and the 30th and 45th Wings are briefing their requirements today, it was determined that Industry Days at the Launch sites would not be necessary.
Question 6:
Where should the OCI plan be included in the proposal? When should it be delivered? Confirm it is outside page count.

Submit as a separate document. In the Final RFP it may be requested early.

Not included in page count

Question 7
How will the 30th SE requirements interface with the LTRS SE&I modernization requirements?

These are two different efforts, however these contractors may have to interface with each other.

Question 8
Are the LRSW, CCAFS, and VAFB SE&I needs to be treated as three separate activities or is the intent to have common processes and teams across the enterprise?

There are common processes across the enterprise with separate taskings at each of the locations

Question 9
What are the current acquisition schedules for LTRS SE&I and LISC, and are they impacted by this acquisition?

Not impacted by this acquisition, please contact the appropriate PCOs for schedules

Question 10
How does the government intend to assess quality of technical performance under the evaluation of past contracts? The only criteria cited is “relevance” not quality of performance and the only POC requested is the CO, no technical people.
We will be requesting two POCs, the PM and CO
Survey questions will address quality and performance
Question 11
Please explain what the government expects related to associate contractor agreements in the proposals?

These would generally pertain to Non Disclosure Agreements

Question 12
Please provide a ROM estimate of the total FTE for planning purposes and anticipated value of the contract over 10 years.

To be addressed in the Final RFP

Question 13
Is the mission integration management focused on launch only or both launch and range? Same question for systems security and information assurance

This question will be answered in FedBizopps

Question 14
M002.G states an integrated best value award decision will be made of the lowest price offeror has a performance confidence assessment of “satisfactory confidence.” How will this be done if the only technical ratings are acceptable or not acceptable?

PPT allows for a trade-off between price and past performance. The contractors will first be evaluated for technical acceptability. Those contractors that are found technically acceptable move on in the competition. In general, the technically acceptable contractor with highest past performance rating and lowest price wins.