questions and responses 9 Oct 09.pdf
PDF 56 KB Posted
- Attached to
- LRSW Systems Engineering & Integration
- Solicitation number
- FA8811-R-09-0002
About this file
offeror questions and responses to LRSW SE I RFP Amendment 1
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LRSW SE&I Amendment 1 Questions:
This amendment includes a change to the PWS where the paragraph corresponding to REMOTE LAUNCH CONTROL CENTER (RLCC) ENGINEERING MANAGEMENT has been deleted (paragraph 1.4.2.1.2).
a. In the RFP version released on Sept 28, both Section L, para III(c) Subfactor 3, and Section M, para 2.A.iii refer to subparagraphs 1.4.2.1.2.2 and
1.4.2.1.2.4 in the context of workload fluctuation for the RLCC. The amended versions of both Sections L and M still refer to these paragraphs; however the context is now for Launch site application software sustainment. Is it the Government’s intention to have deleted these references to 1.4.2.1.2.2 and
1.4.2.1.2.4 in sections L and M in the amended RFP?
Sec L‐1 and Sec M002 have been corrected to remove references to the deleted PWS paragraphs 1.4.2.1.2.2 and 1.4.2.1.2.4.
b. Also, Para. 1.4.2.1.3 was made reserved in the Oct 6 version and there are references in Sections L and M to 1.4.2.1.3.5 which is now 1.4.2.1.2.5. Please clarify.
1.4.2.1.3.5 now reads 1.4.2.1.2.5 in Sections L‐1 and M002
c. In similar manner, paragraph L‐III(b)9 of both the Sept 28 and Oct 6 versions of the RFP indicate 12 FTE for the 30th LCG at VABF. In response to the elimination of the RLCC in the Oct 6 PWS version, is it the Government’s intention to reduce the 12FTE to 11FTE for the 30th LCG at VAFB?
No, the 30th VAFB FTE count remains at 12.